CN104794870A - Electric power optical cable maintenance pre-warning system and method - Google Patents

Electric power optical cable maintenance pre-warning system and method Download PDF

Info

Publication number
CN104794870A
CN104794870A CN201510194390.5A CN201510194390A CN104794870A CN 104794870 A CN104794870 A CN 104794870A CN 201510194390 A CN201510194390 A CN 201510194390A CN 104794870 A CN104794870 A CN 104794870A
Authority
CN
China
Prior art keywords
module
early warning
optical cable
information
electric power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510194390.5A
Other languages
Chinese (zh)
Other versions
CN104794870B (en
Inventor
马超
周洁
孙勇健
刘方舟
曹立斌
田保鹏
杨璐
刘晓晨
张志明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Information and Telecommunication Branch of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Information and Telecommunication Branch of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Information and Telecommunication Branch of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201510194390.5A priority Critical patent/CN104794870B/en
Publication of CN104794870A publication Critical patent/CN104794870A/en
Application granted granted Critical
Publication of CN104794870B publication Critical patent/CN104794870B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B31/00Predictive alarm systems characterised by extrapolation or other computation using updated historic data

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Computing Systems (AREA)
  • Emergency Management (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Data Exchanges In Wide-Area Networks (AREA)
  • Optical Communication System (AREA)

Abstract

The invention discloses an electric power optical cable maintenance pre-warning system and method. The system comprises a collecting unit, a data processing unit, a data storage unit, a data storage unit, a service resource module, a controller and a display unit, wherein the collecting unit collects the network configuration resources and performance data in an electric power optical cable transmission network; the data processing unit comprises an optical path information module and a service routing graph module, the optical path information module converts the network configuration resources and performance data transmitted by the collecting unit into optical path information graphs, and the service routing graph module converts the received warning data transmitted by the collecting unit into service routing graphs; the data storage unit comprises an optical cable resource module used for storing electric power communication network optical path information; the service resource module is used for storing service routing information; the controller is used for acquiring and analyzing data in the data storage unit; the display unit is used for displaying pre-warning information and maintenance word order information.

Description

A kind of electric power optical cable maintenance early warning system and method thereof
Technical field
The present invention relates to a kind of electric power optical cable maintenance early warning system and method thereof.
Background technology
Along with the development of power industry, the relation of communication speciality and electrical production is also more and more closer, and the whether normal safe and stable operation to electrical network of communication service plays vital effect.Because electrical network scale is increasing, energy communication service is towards the develop rapidly of optical communication, and the service work of optical cable more and more affects the operation of electrical network.
Active and standby two communication ports that general important production business all can have route different, two passes is all carried on different optical cables.Current Shandong Electric Power Group communication network also exists the phenomenon that many optical cables overhaul simultaneously, if the optical cable carrying the active and standby passage of same business interrupts maintenance simultaneously, will cause service disconnection, and bring immeasurable loss to electrical network.The active and standby multichannel analysis of business before current maintenance is all manually carry out, and there will be the phenomenon of omission unavoidably, easily causes the primary channel of important service to interrupt simultaneously.
Summary of the invention
For solving the problem, the invention provides a kind of electric power optical cable maintenance early warning system and method thereof.
The present invention takes following concrete scheme:
A kind of electric power optical cable maintenance early warning system, comprising: collecting unit, the net resource allocation in its collection electric power optical cable transmission network and performance data; And
Data processing unit, it comprises optical path information module and business routing diagram module; The net resource allocation of the collecting unit transmission received and performance data are generated optical path information figure by described optical path information module; The alarm data of the collecting unit transmission received is generated business routing diagram by described business routing diagram module; And
Data storage cell, comprises cable resource module, and it is for store power communication network optical path information; And
Service resources module, it is for storage service routing iinformation; And
Controller, it, for obtaining power telecom network optical path information in data storage cell and business routing iinformation, compares with the power telecom network light path preset under normal circumstances and business routing iinformation; If when the information that controller obtains all is not mated with arbitrary information of power telecom network light path and business routing iinformation under normal circumstances, controller produces early warning signal, and is formed and overhaul work order information and be stored to check man's single module; And
Display unit, for showing early warning signal and maintenance work order information.
Described power telecom network optical path information, comprises the length of power telecom network optical cable, type, the operation time limit and core number.
Described business routing iinformation be the main road of business by the operating path with standby route, comprise the information of node on operating path.
Described cable resource module and optical path information module to be associated relation by manual interrelational form.
Described service resources module and business routing diagram module to be associated relation by manual interrelational form.
Described maintenance work order packets of information is drawn together repair time, maintenance content, affects optical cable, is affected business and arrangement and method for construction.
Based on a method for early warning for electric power optical cable maintenance early warning system, comprise the following steps:
Step (1): the net resource allocation in collecting unit acquisition electric power optical cable transmission network and performance data;
Step (2): the data of acquisition are transferred to data processing unit by collecting unit, the net resource allocation of the collecting unit transmission received and performance data are generated optical path information figure by the optical path information module in data processing unit;
The alarm data of the collecting unit transmission received is generated business routing diagram by the business routing diagram module in data processing unit;
Step (3): step (2) processes the optical path information figure that obtains and the transmission of business routing diagram and is stored to the unit optical cable resource module and service resources module that data store respectively;
Step (4): controller obtains and analyzes the data in data storage cell, produces early warning signal, and formation maintenance work order information is stored to check man's single module;
Step (5): the early warning signal that step (4) obtains and maintenance work order information are at display unit.
The detailed process of described step (4) is:
Power telecom network optical path information in controller acquisition data storage cell and business routing iinformation, compare with the power telecom network light path preset under normal circumstances and business routing iinformation; If when the information that controller obtains all is not mated with arbitrary information of power telecom network light path and business routing iinformation under normal circumstances, controller produces early warning signal, and is formed and overhaul work order information and be stored in check man's single module.
Beneficial effect of the present invention:
(1) by analyzing service operation state and route, effectively can stop unplanned property service disconnection, the safety operation level of electrical network is carried to the highest;
(2) danger by overhauling optical cable carries out system automatic decision, decreases handling time and the erroneous judgement that manually may cause and careless omission, has both liberated manual labor, and improved again system early warning level;
(3) by the unplanned interruption of minimizing business, greatly improve operation of power networks level, reduce the grid power blackout time, for the fast development of the whole province's economy provides guarantee.
Accompanying drawing explanation
Fig. 1 is electric power optical cable of the present invention maintenance early warning system structural representation.
Wherein, 1, electric power optical cable transmission network; 2, collecting unit; 3, business routing diagram module; 4, optical path information module; 5, service resources module; 6, cable resource module; 7, controller; 8, display unit; 9, check man's single module.
Embodiment
Below in conjunction with the drawings and specific embodiments, the present invention is further detailed explanation.
As shown in Figure 1, a kind of electric power optical cable maintenance early warning system, comprising:
Collecting unit 2, the net resource allocation in its collection electric power optical cable transmission network 1 and performance data; And data processing unit, it comprises optical path information module 3 and business routing diagram module 4; The net resource allocation of the collecting unit transmission received and performance data are generated optical path information figure by described optical path information module 3; The alarm data of the collecting unit transmission received is generated business routing diagram by described business routing diagram module 4; And data storage cell, comprise cable resource module 6, it is for store power communication network optical path information; And service resources module 5, it is for storage service routing iinformation; And controller 7, it, for obtaining power telecom network optical path information in data storage cell and business routing iinformation, compares with the power telecom network light path preset under normal circumstances and business routing iinformation; If when the information that controller 7 obtains is not mated with arbitrary information of power telecom network light path and business routing iinformation under normal circumstances, controller 7 produces early warning signal, and formed and overhaul work order information and be stored to check man's single module 9;
Wherein, described power telecom network optical path information, comprises the length of power telecom network optical cable, type, the operation time limit and core number; Described business routing iinformation be the main road of business by the operating path with standby route, comprise the information of node on operating path, wherein, the information of each node is corresponding with optical cable core; And
Display unit 8, for showing early warning signal and maintenance work order information.
Described cable resource module 6 and optical path information module 4 to be associated relation by manual interrelational form.
Described service resources module 5 and business routing diagram module 3 to be associated relation by manual interrelational form.
Described maintenance work order packets of information is drawn together repair time, maintenance content, affects optical cable, is affected business and arrangement and method for construction.
Based on a method for early warning for electric power optical cable maintenance early warning system, comprise the following steps:
Step (1): collecting unit 2 obtains net resource allocation in electric power optical cable transmission network 1 and performance data;
Step (2): the data of acquisition are transferred to data processing unit by collecting unit 2, the net resource allocation that the collecting unit 2 received transmits by the optical path information module 3 in data processing unit and performance data generate optical path information figure;
The alarm data that the collecting unit 2 received transmits by the business routing diagram module 4 in data processing unit generates business routing diagram;
Step (3): step (2) processes the optical path information figure that obtains and the transmission of business routing diagram and is stored to the unit optical cable resource module 6 and service resources module 5 that data store respectively;
Step (4): controller 7 obtains and analyze the data in data storage cell, produces early warning signal, and formation maintenance work order information is stored to check man's single module 9, and its detailed process is:
Controller 7 obtains power telecom network optical path information in data storage cell and business routing iinformation, compares with the power telecom network light path preset under normal circumstances and business routing iinformation; If when the information that controller obtains all is not mated with arbitrary information of power telecom network light path and business routing iinformation under normal circumstances, controller 7 produces early warning signal, and formed and overhaul work order information and be stored in check man's single module 9;
Step (5): the early warning signal that step (4) obtains and maintenance work order information are at display unit 8.
Although foregoing is described the specific embodiment of the present invention process by reference to the accompanying drawings; but be not limiting the scope of the invention; one of ordinary skill in the art understand; on technical solution of the present invention basis, those skilled in the art can not pay various amendment or distortion that creative work just can make still within protection scope of the present invention.

Claims (10)

1. an electric power optical cable maintenance early warning system, is characterized in that, collecting unit, the net resource allocation in its collection electric power optical cable transmission network and performance data; And
Data processing unit, it comprises optical path information module and business routing diagram module; The net resource allocation of the collecting unit transmission received and performance data are generated optical path information figure by described optical path information module; The alarm data of the collecting unit transmission received is generated business routing diagram by described business routing diagram module; And
Data storage cell, comprises cable resource module, and it is for store power communication network optical path information; And
Service resources module, it is for storage service routing iinformation; And
Controller, it, for obtaining power telecom network optical path information in data storage cell and business routing iinformation, compares with the power telecom network light path preset under normal circumstances and business routing iinformation; If when the information that controller obtains all is not mated with arbitrary information of power telecom network light path and business routing iinformation under normal circumstances, controller produces early warning signal, and is formed and overhaul work order information and be stored to check man's single module; And
Display unit, for showing early warning signal and maintenance work order information.
2. a kind of electric power optical cable maintenance early warning system as claimed in claim 1, is characterized in that described power telecom network optical path information comprises the length of power telecom network optical cable, type, the operation time limit and core number.
3. a kind of electric power optical cable maintenance early warning system as claimed in claim 1, is characterized in that, described business routing iinformation be the main road of business by the operating path with standby route, comprise the information of node on operating path.
4. a kind of electric power optical cable maintenance early warning system as claimed in claim 1, is characterized in that, described cable resource module and optical path information module to be associated relation by manual interrelational form.
5. a kind of electric power optical cable maintenance early warning system as claimed in claim 1, is characterized in that, described service resources module and business routing diagram module to be associated relation by manual interrelational form.
6. a kind of electric power optical cable maintenance early warning system as claimed in claim 1, it is characterized in that, described maintenance work order packets of information is drawn together repair time, maintenance content, affects optical cable, is affected business and arrangement and method for construction.
7., based on a method for early warning for the electric power optical cable maintenance early warning system as described in claim as arbitrary in claim 1-6, it is characterized in that, comprise the following steps:
Step (1): the net resource allocation in collecting unit acquisition electric power optical cable transmission network and performance data;
Step (2): the data of acquisition are transferred to data processing unit by collecting unit, the net resource allocation of the collecting unit transmission received and performance data are generated optical path information figure by the optical path information module in data processing unit;
The alarm data of the collecting unit transmission received is generated business routing diagram by the business routing diagram module in data processing unit;
Step (3): step (2) processes the optical path information figure that obtains and the transmission of business routing diagram and is stored to the unit optical cable resource module and service resources module that data store respectively;
Step (4): controller obtains and analyzes the data in data storage cell, produces early warning signal, and formation maintenance work order information is stored to check man's single module;
Step (5): the early warning signal that step (4) obtains and maintenance work order information are at display unit.
8. the method for early warning of a kind of electric power optical cable maintenance early warning system as claimed in claim 7, it is characterized in that, the detailed process of described step (4) is:
Power telecom network optical path information in controller acquisition data storage cell and business routing iinformation, compare with the power telecom network light path preset under normal circumstances and business routing iinformation; If when the information that controller obtains all is not mated with arbitrary information of power telecom network light path and business routing iinformation under normal circumstances, controller produces early warning signal, and is formed and overhaul work order information and be stored in check man's single module.
9. the method for early warning of a kind of electric power optical cable maintenance early warning system as claimed in claim 7, is characterized in that, described cable resource module and optical path information module to be associated relation by manual interrelational form.
10. the method for early warning of a kind of electric power optical cable maintenance early warning system as claimed in claim 7, is characterized in that, described service resources module and business routing diagram module to be associated relation by manual interrelational form.
CN201510194390.5A 2015-04-22 2015-04-22 Electric power optical cable maintenance pre-warning system and method Active CN104794870B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510194390.5A CN104794870B (en) 2015-04-22 2015-04-22 Electric power optical cable maintenance pre-warning system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510194390.5A CN104794870B (en) 2015-04-22 2015-04-22 Electric power optical cable maintenance pre-warning system and method

Publications (2)

Publication Number Publication Date
CN104794870A true CN104794870A (en) 2015-07-22
CN104794870B CN104794870B (en) 2017-05-03

Family

ID=53559641

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510194390.5A Active CN104794870B (en) 2015-04-22 2015-04-22 Electric power optical cable maintenance pre-warning system and method

Country Status (1)

Country Link
CN (1) CN104794870B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106357531A (en) * 2016-10-12 2017-01-25 广西电网有限责任公司 Method and device for detecting route under N-X overhauling mode
CN106357530A (en) * 2016-10-12 2017-01-25 广西电网有限责任公司 Method and device for detecting route under N-1 overhauling mode
CN108988938A (en) * 2018-07-22 2018-12-11 国网山东省电力公司信息通信公司 A kind of power telecom network optical cable Risk-warning and method of disposal
CN109187670A (en) * 2018-10-16 2019-01-11 国网山东省电力公司信息通信公司 A kind of communications optical cable splice tray intelligent checking system
CN110705232A (en) * 2019-08-27 2020-01-17 国网山东省电力公司信息通信公司 Method and system for generating service state analysis report of power communication network maintenance influence
CN112614314A (en) * 2020-12-03 2021-04-06 广东电力通信科技有限公司 Power transmission network service configuration method and system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102064883A (en) * 2010-08-27 2011-05-18 天津大学 Operational decision making system of lumped control multi-type heterogeneous electricity communication network
CN102437922A (en) * 2011-09-24 2012-05-02 国网电力科学研究院 N-1 principle-based electric power communication network service influence analysis method
CN103310387A (en) * 2013-05-20 2013-09-18 国家电网公司 Security check method for running way of power communication network
US20130327943A1 (en) * 2012-06-08 2013-12-12 Ut-Battelle Llc Egr distribution and fluctuation probe based on co2 measurements
CN104038371A (en) * 2014-05-22 2014-09-10 国家电网公司 Self-adaptive performance collecting method of power communication transmission network

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102064883A (en) * 2010-08-27 2011-05-18 天津大学 Operational decision making system of lumped control multi-type heterogeneous electricity communication network
CN102437922A (en) * 2011-09-24 2012-05-02 国网电力科学研究院 N-1 principle-based electric power communication network service influence analysis method
US20130327943A1 (en) * 2012-06-08 2013-12-12 Ut-Battelle Llc Egr distribution and fluctuation probe based on co2 measurements
CN103310387A (en) * 2013-05-20 2013-09-18 国家电网公司 Security check method for running way of power communication network
CN104038371A (en) * 2014-05-22 2014-09-10 国家电网公司 Self-adaptive performance collecting method of power communication transmission network

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106357531A (en) * 2016-10-12 2017-01-25 广西电网有限责任公司 Method and device for detecting route under N-X overhauling mode
CN106357530A (en) * 2016-10-12 2017-01-25 广西电网有限责任公司 Method and device for detecting route under N-1 overhauling mode
CN106357530B (en) * 2016-10-12 2019-08-16 广西电网有限责任公司 Route detecting method and device under a kind of N-1 maintenance model
CN106357531B (en) * 2016-10-12 2019-08-16 广西电网有限责任公司 Route detecting method and device under a kind of N-X maintenance model
CN108988938A (en) * 2018-07-22 2018-12-11 国网山东省电力公司信息通信公司 A kind of power telecom network optical cable Risk-warning and method of disposal
CN109187670A (en) * 2018-10-16 2019-01-11 国网山东省电力公司信息通信公司 A kind of communications optical cable splice tray intelligent checking system
CN110705232A (en) * 2019-08-27 2020-01-17 国网山东省电力公司信息通信公司 Method and system for generating service state analysis report of power communication network maintenance influence
CN110705232B (en) * 2019-08-27 2023-04-07 国网山东省电力公司信息通信公司 Method and system for generating service state analysis report of power communication network maintenance influence
CN112614314A (en) * 2020-12-03 2021-04-06 广东电力通信科技有限公司 Power transmission network service configuration method and system

Also Published As

Publication number Publication date
CN104794870B (en) 2017-05-03

Similar Documents

Publication Publication Date Title
CN104794870A (en) Electric power optical cable maintenance pre-warning system and method
CN102074956B (en) Power grid risk management method and system
CN102710443B (en) A kind of power communication relaying protection business impact analysis method and system thereof
CN102437922B (en) A kind of power telecom network business impact analysis method based on N-1 principle
US20170030736A1 (en) Photovoltaic power station remote monitoring system
CN106452571B (en) Electric power terminal communication access net topological relation faulty section determines and analysis method
CN103227662B (en) A kind of electric power communication device safety detection method based on mode control and system
CN110493670B (en) Optical cable interruption judgment method and device
CN113691406B (en) Network quality optimization method and device, storage medium and electronic equipment
CN202004534U (en) Power grid risk monitoring system
CN106329501A (en) Selection method of two cascaded voltage for single-set configuration interval merging unit
CN103558819A (en) Slicing machine fault diagnosis system
CN104300674A (en) Distribution automation system
CN103607239B (en) Simple optical fiber tester
CN106788701B (en) A kind of method and system positioning the segment fault of ODN network
CN102122842A (en) Abnormal operation remote alarm device for distribution transformer distribution room equipment
CN209088970U (en) A kind of novel Optical Channel Protection system based on OASS
CN104319887A (en) Optical fiber chain scission anomaly judgment method for intelligent transformer substation
CN103248519A (en) Fault auxiliary analysis and short message warning system for communication station
CN103916182B (en) Submarine communication optical fiber monitoring method
CN204408345U (en) Optical cable on-line monitoring system
CN103543730A (en) Fault diagnosis system for chip mounters
CN203574654U (en) Simple optical fiber tester
CN104333413A (en) Optical cable online monitoring system
CN204231381U (en) The checkout gear of cable and detection system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant