Method for treating crack water seepage of concrete floor and wall body Download PDF

Info

Publication number
CN104234090A
CN104234090A CN201410447712.8A CN201410447712A CN104234090A CN 104234090 A CN104234090 A CN 104234090A CN 201410447712 A CN201410447712 A CN 201410447712A CN 104234090 A CN104234090 A CN 104234090A
Authority
CN
China
Prior art keywords
grouting
hole
red
wall body
crack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410447712.8A
Other languages
Chinese (zh)
Other versions
CN104234090B (en
Inventor
姜雪岐
梁晓荣
张朝伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Nantong Sanjian Construction Group Co ltd
Original Assignee
Jiangsu Nantong No3 Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Nantong No3 Construction Group Co Ltd filed Critical Jiangsu Nantong No3 Construction Group Co Ltd
Priority to CN201410447712.8A priority Critical patent/CN104234090B/en
Priority claimed from CN201410447712.8A external-priority patent/CN104234090B/en
Publication of CN104234090A publication Critical patent/CN104234090A/en
Application granted granted Critical
Publication of CN104234090B publication Critical patent/CN104234090B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The invention discloses a method for treating the crack water seepage of a concrete floor and a wall body. Leakage points are successively searched for from one side of the concrete floor or a wall body structural surface and are marked by red spray type paint; after holes are arranged, an electric drill is held with a hand to drill by keeping an angle of 45 degrees with a base plane on a position which is far away from each leakage point for 3-4cm according to red mark, the drilling depth is one second of structure thickness or less than or equal to two thirds of the structure thickness, and grouting nozzles are arranged at drilled positions; an electric grouting machine is adopted for grouting, grouting is finished if the water absorbing capacity of each hole is detected to be less than 1.0L/min when the slurry feeding amount of each grouting hole section is less than 5L/min, and construction is carried out on a next position; the holes are seal: after the grouting is finished, the grouting nozzles are removed, and the holes are sealed tightly by Duloubao type materials; during grouting, since one end of the grouting hole is sealed, grouting pressure is increased to quickly fill the crack and seepage holes so as to improve an anti-leakage effect; the use amount of grouting liquid and cement is greatly reduced. The method is practical and economical, days for construction are shortened, and no big cracks and damage appear.

Description

A kind of method of administering concrete floor, wall body slit infiltration
Technical field
The present invention relates to a kind of method of administering concrete floor, wall body slit infiltration.
Background technology
General employing is along water seepage hole or infiltration crack and at this position vertical perforating, penetrate sole plate or wallboard, then by upper slurry injection nozzle, slurry Main Ingredients and Appearance is that the slurries of cement are noted in the upstream face of sole plate or metope and water seepage hole and crack, carrys out leakage blocking and seepage-proofing water according to this.But the method has two wretched insufficiency points: one, through hole is due to its penetrability, and cannot make water seepage hole, crack entoplasm fills, impervious effect is undesirable; They are two years old, through hole grouting pressure is little, only control grouting amount from control grouting pressure, often cause slip casting not to be too much (slip casting is not enough), and easily cause because slip casting is too much, be deposited in upstream face, the waterproofing course bursting of upstream face, or slurry sole plate is lifted (deformation of wall), and cause it to ftracture, occur larger crack and destruction.Therefore, need to provide a kind of new technical scheme to solve the problems referred to above.
Summary of the invention
For solving the problem, the invention provides a kind of method of administering concrete floor, wall body slit infiltration.
The technical solution used in the present invention:
Administer a method for concrete floor, wall body slit infiltration, comprise the following steps:
A, cloth hole: from the side in wall body structure face, search leak source everywhere, and indicate with red atomizing paint, the method indicated is determined according to the difference of seepage place, large-area seepage adopts intensive red sign, crack-leakage adopts red × sign, along the trend in crack every 10-12cm both sides alternating sign, single seepage point adopts zero red sign;
B, drilling construction: after cloth hole, electric hand drill keeps 45° angle to hole according to be marked at 3 ~ 4cm place and the basal plane by leak source of redness, and drilling depth is Yi Ban Huo≤2/3 structural thickness of structural thickness, then installs grouting nozzle in the place of boring hole;
C, mortar depositing construction: slip casting adopts electronic slurry filling machine to carry out, and at one end setting pressure table of Grouting Pipe, when the grout absorption of slip casting each hole section is less than 5L/min, and stablize 10-15min after reaching design pressure, when the water absorption every meter of inspection eye is less than 1.0L/min, slip casting terminates, and then carries out the mortar depositing construction at next place;
D, sealing of hole be out: after slip casting terminates, pick and chisel out grouting nozzle, then uses leak stopping precious class material packing closely knit.
Described injecting paste material adopts elastic polyurethane foaming water-stop.
In step b drilling construction, the drilling depth marking red point is shallow, red × the some drilling depth that indicates want darker and tilt to crack place, the red zero point drilling depth indicated wants dark, until there is open fire to flow out.
The invention has the beneficial effects as follows: because injected hole one end is obstructed during slip casting, grouting pressure is increased, and fills up rapidly crack and seepage hole, thus improve impervious effect; A large amount of minimizing injection slurry and cement consumption, economical and practical, the reduction of erection time; Stop, because slip casting is too much, is deposited in upstream face, the waterproofing course bursting of upstream face, or sole plate is lifted (deformation of wall), and cause it to ftracture, occur larger crack and destruction.
Accompanying drawing explanation
Fig. 1 is the slip casting schematic diagram of concrete floor of the present invention, wall body slit.
1, crack, 2, grouting nozzle, 3, injected hole, 4, concrete floor.
Detailed description of the invention
Following embodiment only for illustration of the present invention, but can not limit protection scope of the present invention.
A kind of method of administering concrete floor, wall body slit infiltration of the present invention, comprises the following steps:
A, cloth hole: from the side in wall body structure face, search leak source everywhere, and indicate with red atomizing paint, the method indicated is determined according to the difference of seepage place, large-area seepage adopts intensive red sign, crack-leakage adopts red × sign, along the trend in crack 1 every 10-12cm both sides alternating sign, single seepage point adopts zero red sign;
B, drilling construction: after cloth hole, electric hand drill keeps α angular bit hole (injected hole 3) according to be marked at 3-4cm place and the basal plane by leak source of redness, α is 45 °, aperture is 10mm, for the diameter of grouting nozzle, drilling depth is generally Yi Ban Huo≤2/3 structural thickness of structural thickness, the drilling hole degree of depth marking red point is shallow, red × some drilling depth of indicating want darker and tilt slightly to crack place, the red zero point drilling depth indicated wants dark, until there is open fire to flow out, then in the place of having bored hole, grouting nozzle 2 is installed, to try one's best during installation and deeply establish, only expose 1-1.5cm outer and tighten at plate,
C, mortar depositing construction: slip casting adopts electronic slurry filling machine to carry out, and at one end setting pressure table of Grouting Pipe, when the grout absorption of slip casting each hole section is less than 5L/min, and stablize 10-15min after reaching design pressure, when the water absorption every meter of inspection eye is less than 1.0L/min, slip casting terminates, and then carries out the mortar depositing construction at next place;
D, sealing of hole be out: after slip casting terminates, pick and chisel out grouting nozzle, then uses leak stopping precious class material packing closely knit.
Adopt electrodynamic type slurry filling machine, use voltage to be 220 volts, grouting pressure can reach 50Mpa, and machinery weight is 5 kilograms, easy to carry, can operate in narrow space.
Injecting paste material adopts elastic polyurethane foaming water-stop, and this material has extremely strong concrete castability and meets Water blown performance.Spread rapidly along concrete micro-cracks (more than 0.02 millimeter), hole under pressure, meet Water blown blocking hole, thus reach the object of sealing.This material has the performance of continuous quadratic foaming after meeting water, have the unrivaled feature of other leak stopping expanded materials.
The method of improvement concrete floor of the present invention, wall body slit infiltration is compared with conventional method, and process aspect is given prominence to: beat inclined hole, and hole deviation through crack or water seepage hole, but does not penetrate mine dam or sole plate (concrete floor 4).The object of such operation is: pressure increase during slip casting, injection slurry is penetrated in crack and seepage hole in a large number and goes, impel in crack and seepage hole and fill injection slurry, improve impervious effect; Can not owing to being difficult to control grouting pressure to control grouting amount during slip casting, cause slip casting not enough or excessive, particularly prevent because slip casting is too much, be deposited in upstream face, the waterproofing course bursting of upstream face, or sole plate is lifted (deformation of wall), and cause it to ftracture, there is larger crack and destruction.
The method of improvement concrete floor of the present invention, wall body slit infiltration, because injected hole one end is obstructed during slip casting, makes grouting pressure increase, and fills up rapidly crack and seepage hole, thus improve impervious effect; A large amount of minimizing injection slurry and cement consumption, economical and practical, the reduction of erection time; Stop, because slip casting is too much, is deposited in upstream face, the waterproofing course bursting of upstream face, or sole plate is lifted (deformation of wall), and cause it to ftracture, occur larger crack and destruction.

Claims (3)

1. administer a method for concrete floor, wall body slit infiltration, it is characterized in that, comprise the following steps:
A, cloth hole: from the side in wall body structure face, search leak source everywhere, and indicate with red atomizing paint, the method indicated is determined according to the difference of seepage place, large-area seepage adopts intensive red sign, crack-leakage adopts red × sign, along the trend in crack every 10-12cm both sides alternating sign, single seepage point adopts zero red sign;
B, drilling construction: after cloth hole, electric hand drill keeps 45° angle to hole according to be marked at 3 ~ 4cm place and the basal plane by leak source of redness, and drilling depth is Yi Ban Huo≤2/3 structural thickness of structural thickness, then installs grouting nozzle in the place of boring hole;
C, mortar depositing construction: slip casting adopts electronic slurry filling machine to carry out, and at one end setting pressure table of Grouting Pipe, when the grout absorption of slip casting each hole section is less than 5L/min, and stablize 10-15min after reaching design pressure, when the water absorption every meter of inspection eye is less than 1.0L/min, slip casting terminates, and then carries out the mortar depositing construction at next place;
D, sealing of hole be out: after slip casting terminates, pick and chisel out grouting nozzle, then uses leak stopping precious class material packing closely knit.
2. a kind of method of administering concrete floor, wall body slit infiltration according to claim 1, is characterized in that: described injecting paste material adopts elastic polyurethane foaming water-stop.
3. a kind of method of administering concrete floor, wall body slit infiltration according to claim 2, it is characterized in that: in step b drilling construction, the drilling depth marking red point is shallow, red × some drilling depth of indicating want darker and tilt to crack place, the red zero point drilling depth indicated wants dark, until there is open fire to flow out.
CN201410447712.8A 2014-09-04 A kind of administer concrete floor, wall body slit infiltration method Active CN104234090B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410447712.8A CN104234090B (en) 2014-09-04 A kind of administer concrete floor, wall body slit infiltration method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410447712.8A CN104234090B (en) 2014-09-04 A kind of administer concrete floor, wall body slit infiltration method

Publications (2)

Publication Number Publication Date
CN104234090A true CN104234090A (en) 2014-12-24
CN104234090B CN104234090B (en) 2017-01-04

Family

ID=

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105350556A (en) * 2015-11-10 2016-02-24 中交一航局第四工程有限公司 New material underground structure leakage stoppage construction technology
CN105369833A (en) * 2015-10-15 2016-03-02 昆明风行防水材料有限公司 Grouting maintenance construction method for basement roof leakage
CN105421803A (en) * 2015-11-02 2016-03-23 中国三冶集团有限公司 Maintenance method for building interior wall surface mildewing
CN105442862A (en) * 2015-11-19 2016-03-30 江苏鼎达建筑新技术有限公司 Method for leakage water plugging, strengthening and repairing against concrete crack
CN105507606A (en) * 2015-12-02 2016-04-20 江苏南通三建集团有限公司 Method for reinforcing columns of underground garages
CN105625447A (en) * 2014-12-26 2016-06-01 中国铁建大桥工程局集团有限公司 Plugging construction method for underground structure in soft soil area
CN105937308A (en) * 2016-06-24 2016-09-14 武大巨成结构股份有限公司 Basement bottom plate seepage crack grouting structure and grouting method thereof
CN106049868A (en) * 2016-07-01 2016-10-26 重庆市铜梁区长进防水材料厂 Indoor leakage-prevention construction method
CN107201753A (en) * 2017-06-16 2017-09-26 潍坊学院 It is a kind of to be used for the high-pressure slip-casting blocking method of basement or top plate of underground parking garage
CN108952206A (en) * 2018-09-07 2018-12-07 中铁十四局集团第四工程有限公司 A kind of restorative procedure in the discontinuous crack of concrete construction body
CN109457735A (en) * 2018-11-16 2019-03-12 中铁二十三局集团第四工程有限公司 A kind of concrete wall and the restorative procedure in bottom plate infiltration crack
CN110144896A (en) * 2019-05-21 2019-08-20 湖南宏禹工程集团有限公司 Concrete defect leak quick blocking restorative procedure in a kind of underground space engineering
CN110241837A (en) * 2019-07-08 2019-09-17 中国建筑第四工程局有限公司 A kind of construction method for preventing basement bottom board from cracking under high artesian geological conditions
CN110952644A (en) * 2019-12-31 2020-04-03 黑龙江科顺防水堵漏技术有限公司 Leakage detection and leakage stoppage integrated device and method
CN111021427A (en) * 2019-12-27 2020-04-17 江苏新大高空工程有限公司 Effluent water treatment process for sewage tank
CN111350215A (en) * 2020-02-19 2020-06-30 陕西省建筑科学研究院有限公司 Minimally invasive repairing method for basement exterior wall waterproof layer
CN113718969A (en) * 2021-07-26 2021-11-30 中国十七冶集团有限公司 Basement outer wall crack waterproof treatment device and crack plugging method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100566643B1 (en) * 2005-11-23 2006-03-31 주식회사 토펙엔지니어링 건축사사무소 Installing structure of outer wall protector for protecting of the ground construction
CN102493494A (en) * 2011-12-12 2012-06-13 山东建筑大学 Method for sealing vertical cracks of basement concrete structures by using microbial grouting
CN202787329U (en) * 2012-08-17 2013-03-13 浙江省东海建设有限公司 Large leakage treatment structure for underground continuous wall
CN103306320A (en) * 2013-06-24 2013-09-18 中国十七冶集团有限公司 Method for treating crack water seepage of shear wall of basement
CN103362144A (en) * 2013-07-05 2013-10-23 天津二十冶建设有限公司 Construction method for improving permeability resistance of superlong concrete wall of underground structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100566643B1 (en) * 2005-11-23 2006-03-31 주식회사 토펙엔지니어링 건축사사무소 Installing structure of outer wall protector for protecting of the ground construction
CN102493494A (en) * 2011-12-12 2012-06-13 山东建筑大学 Method for sealing vertical cracks of basement concrete structures by using microbial grouting
CN202787329U (en) * 2012-08-17 2013-03-13 浙江省东海建设有限公司 Large leakage treatment structure for underground continuous wall
CN103306320A (en) * 2013-06-24 2013-09-18 中国十七冶集团有限公司 Method for treating crack water seepage of shear wall of basement
CN103362144A (en) * 2013-07-05 2013-10-23 天津二十冶建设有限公司 Construction method for improving permeability resistance of superlong concrete wall of underground structure

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
索静兰: "化学灌浆处理砼裂缝技术", 《技术与市场》, vol. 21, no. 1, 31 January 2014 (2014-01-31), pages 90 *

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105625447A (en) * 2014-12-26 2016-06-01 中国铁建大桥工程局集团有限公司 Plugging construction method for underground structure in soft soil area
CN105369833A (en) * 2015-10-15 2016-03-02 昆明风行防水材料有限公司 Grouting maintenance construction method for basement roof leakage
CN105421803A (en) * 2015-11-02 2016-03-23 中国三冶集团有限公司 Maintenance method for building interior wall surface mildewing
CN105350556A (en) * 2015-11-10 2016-02-24 中交一航局第四工程有限公司 New material underground structure leakage stoppage construction technology
CN105442862A (en) * 2015-11-19 2016-03-30 江苏鼎达建筑新技术有限公司 Method for leakage water plugging, strengthening and repairing against concrete crack
CN105442862B (en) * 2015-11-19 2018-02-27 江苏鼎达建筑新技术有限公司 A kind of distress in concrete infiltration water collision reinforcement and repair method
CN105507606A (en) * 2015-12-02 2016-04-20 江苏南通三建集团有限公司 Method for reinforcing columns of underground garages
CN105937308A (en) * 2016-06-24 2016-09-14 武大巨成结构股份有限公司 Basement bottom plate seepage crack grouting structure and grouting method thereof
CN106049868A (en) * 2016-07-01 2016-10-26 重庆市铜梁区长进防水材料厂 Indoor leakage-prevention construction method
CN107201753B (en) * 2017-06-16 2019-04-05 潍坊学院 It is a kind of for basement or the high-pressure slip-casting blocking method of top plate of underground parking garage
CN107201753A (en) * 2017-06-16 2017-09-26 潍坊学院 It is a kind of to be used for the high-pressure slip-casting blocking method of basement or top plate of underground parking garage
CN108952206A (en) * 2018-09-07 2018-12-07 中铁十四局集团第四工程有限公司 A kind of restorative procedure in the discontinuous crack of concrete construction body
CN109457735A (en) * 2018-11-16 2019-03-12 中铁二十三局集团第四工程有限公司 A kind of concrete wall and the restorative procedure in bottom plate infiltration crack
CN110144896A (en) * 2019-05-21 2019-08-20 湖南宏禹工程集团有限公司 Concrete defect leak quick blocking restorative procedure in a kind of underground space engineering
CN110241837A (en) * 2019-07-08 2019-09-17 中国建筑第四工程局有限公司 A kind of construction method for preventing basement bottom board from cracking under high artesian geological conditions
CN111021427A (en) * 2019-12-27 2020-04-17 江苏新大高空工程有限公司 Effluent water treatment process for sewage tank
CN110952644A (en) * 2019-12-31 2020-04-03 黑龙江科顺防水堵漏技术有限公司 Leakage detection and leakage stoppage integrated device and method
CN110952644B (en) * 2019-12-31 2021-04-02 黑龙江科顺防水堵漏技术有限公司 Leakage detection and leakage stoppage integrated device and process method thereof
CN111350215A (en) * 2020-02-19 2020-06-30 陕西省建筑科学研究院有限公司 Minimally invasive repairing method for basement exterior wall waterproof layer
CN113718969A (en) * 2021-07-26 2021-11-30 中国十七冶集团有限公司 Basement outer wall crack waterproof treatment device and crack plugging method

Similar Documents

Publication Publication Date Title
CN104389623B (en) Shield tunnel prefabricated tunnel segment lining back stratum grouting device
CN106381840B (en) Fracture plugging grouting method under a kind of high pressure moving water state
CN103643657A (en) Deep-hole chemical grouting construction method applied to water leakage treatment of hydroelectric dam
CN105297741B (en) Upper-soft lower-hard ground explosion causes foundation pit enclosure structure to pierce water burst prevention and controls
KR20050114193A (en) A grout carrying out mehtod for paste backfill grouting at the cave
CN215669744U (en) Masonry structure basement seepage slip casting repair structure
CN106480993B (en) Administration structure and construction method in a kind of construction exterior wall leak repairing reinforcement
CN103046513A (en) Method for coating and sealing fracture of bed rock in uncovered heavy consolidation grouting
CN104895583B (en) Tunnel surrounding rock control method combining pressure relief and slip-casting reinforcement
CN106320331A (en) Construction method for penetrating block stone layer of pore-forming system of high-pressure jet grouting pile
CN113323440A (en) Concrete gap repairing and anti-seepage treatment method
CN106498965A (en) A kind of karst area water sealing consolidation construction method
CN105155541A (en) Double-slurry closing construction method for sump
CN105484266B (en) The grouting equipment and its construction method of a kind of multifunctional information
CN204551447U (en) Mucky soil cement mixing pile drill bit of drilling machine
CN104131532B (en) A kind of blocking method for karst and structure
CN105442861A (en) Method for restoring water leakage air face of toilet drainage pipeline
CN207959289U (en) Structure is repaired in a kind of leak for basement post-pouring zone position
CN112482415B (en) Consolidation grouting method for underground cavern under high external water pressure and flowing water condition
CN109252531A (en) The waterproof curtain construction method that mixing pile or rotary churning pile are combined with sleeve valve barrel grouting
CN204982923U (en) Foundation ditch stagnant water curtain reinforcement structure
CN104234090A (en) Method for treating crack water seepage of concrete floor and wall body
CN105781580A (en) Tunnel crack repair method
CN104234090B (en) A kind of administer concrete floor, wall body slit infiltration method
CN115233742A (en) Construction method for preventing seepage and stopping leakage by multiple composite seepage in deep, medium and shallow

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: No. 131, Haiman City, Jiangsu Province, Haimen City, Jiangsu

Patentee after: JIANGSU NANTONG SANJIAN CONSTRUCTION GROUP Co.,Ltd.

Address before: No. 131, Haiman City, Jiangsu Province, Haimen City, Jiangsu

Patentee before: NANTONG NO.3 CONSTRUCTION GROUP Co.,Ltd.

CP01 Change in the name or title of a patent holder
PP01 Preservation of patent right

Effective date of registration: 20221101

Granted publication date: 20170104