CN102493494A - Method for sealing vertical cracks of basement concrete structures by using microbial grouting - Google Patents

Method for sealing vertical cracks of basement concrete structures by using microbial grouting Download PDF

Info

Publication number
CN102493494A
CN102493494A CN2011104131889A CN201110413188A CN102493494A CN 102493494 A CN102493494 A CN 102493494A CN 2011104131889 A CN2011104131889 A CN 2011104131889A CN 201110413188 A CN201110413188 A CN 201110413188A CN 102493494 A CN102493494 A CN 102493494A
Authority
CN
China
Prior art keywords
crack
fill orifice
fill
bacterium liquid
liquid
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011104131889A
Other languages
Chinese (zh)
Other versions
CN102493494B (en
Inventor
贾强
张鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Jian special special engineering Co., Ltd.
Original Assignee
Shandong Jianzhu University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Jianzhu University filed Critical Shandong Jianzhu University
Priority to CN 201110413188 priority Critical patent/CN102493494B/en
Publication of CN102493494A publication Critical patent/CN102493494A/en
Application granted granted Critical
Publication of CN102493494B publication Critical patent/CN102493494B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention discloses a method for sealing vertical cracks of basement concrete structures by using microbial grouting, which seals the cracks by using a method of grouting into cracks on the inner sides of walls. In particular, the method comprises the steps of punching holes, cleaning the holes, sealing the surfaces of the cracks, preparing bacterium fluid and nutritive salt solution, grouting the bacterium fluid, grouting the nutritive salt solution, and sealing and plugging grouting holes. The bacterium fluid can induce calcium chloride to generate calcium carbonate sedimentary to effectively fill, seal and plug the cracks and the grouting holes. Water injection tests and observation after raining show that the original cracks are obviously reduced in water seepage.

Description

The method in the vertical crack of microorganism grout sealing Basement Concrete Structures
Technical field
The present invention relates to the shutoff and the restorative procedure of distress in concrete in a kind of civil engineering, the method in the vertical crack of especially a kind of microorganism grout sealing Basement Concrete Structures.
Background technology
According in recent years national basement in high rise building investigation being found that the cracking quantity of basement in high rise building exterior wall accounts for by about 85% of investigation engineering sum, the phenomenon that the crack appears in base plate accounts for by about 10% of investigation sum.Simultaneously analysis of survey results is found that in the various negative consequences that caused by the crack, seepage accounts for 60%.Therefore, the Crack Control problem of concrete structure just becomes one of important research project in the construction work.Particularly over the past two decades, after the pumping commercial concrete obtained extensive use, the problem that the crack produces was outstanding day by day.
The blocking method of existing basement has a lot, but effect is all undesirable.Reason has two aspects: after (1) basement built up, wall outside backfill was difficult in exterior wall and repairs; (2) mostly existing patching material is the material of organic or hydrophobic, and problem of aging is arranged, and the coefficient of expansion and concrete are inconsistent.Therefore, leakage problems becomes old, big, the difficult problem of puzzlement engineering circle.Repairing method of microorganism is a kind of method of novel repairing concrete crack, and product is consistent with former concrete, should not ftracture after the reparation.Grouting agent is liquid, is easy to infiltrate in the seam, in seam, forms deposition.The durability and the intensity of the concrete material after the reparation all are greatly increased, and good with the associativity of concrete material.
Utilizing microorganism diagenesis recovery technique is a kind of international advanced technology of subject crossing.Its mechanism is to utilize microorganism induction to generate mineral deposition to fill up and the rehabilitating concrete defective: some basophilous edaphon utilizes the urease that self produces that hydrolysis of urea is ammonia and carbon dioxide; The increase of decomposing the ammonia quantity that generates can cause the rising of pH value on every side, thereby causes the deposition of calcium carbonate.In inducing the process of tosca, action of microorganisms is not only the generation urease, but also for the deposition of calcium carbonate the place of nucleation is provided.In civil engineering, the microorganism recovery technique mainly is to utilize cultured microorganism to induce tosca rehabilitating concrete defective, and shutoff and ground processing etc. are carried out in the crack at present.The application of the Cheng Xiao of Tsing-Hua University brightness patent " a kind of microorganism cause cement or concrete and production method and application " (CN200810105947.3); Propose to utilize Pasteur bacillus bacterium liquid that can produce urase and the fluid,matching that contains urea and mineral calcium salt to mix; Reaction under certain condition get final product microorganism cause cement or concrete method, but do not provide especially the method that specifically mends a split about basement.
One Chinese patent application 200810019165.8 discloses a kind of microorganism reparation cement-based material crack method and nutrient solution and reparation nutrient solution of utilizing.It adopts microbial inoculum and reparation nutrient solution is injected cement stony fracture seam, carries out maintenance.But this method and useless relating to bacterium liquid and concrete grammar, the step of repairing in the nutrient solution injection crack.
Summary of the invention
The objective of the invention is provides the method in the vertical crack of a kind of microorganism grout sealing Basement Concrete Structures for overcoming the deficiency of above-mentioned prior art, and this method is easy to operate, and crack closure is effective, is easy to construction.
For realizing above-mentioned purpose, the present invention adopts following technical proposals:
The method in the vertical crack of a kind of microorganism grout sealing Basement Concrete Structures; The outside of outer wall of basement is waterproofing course and fill stratum, if vertical crack appears in concrete exterior wall, is difficult in the wall outer side excavation and bankets; Expose the crack; Again shutoff is carried out in the crack, adopted the method dead-end fracture that is in the milk in the latasuture in the body of wall, step is following:
(1) punching
In the vertical crack, because the trickling downwards under the deadweight effect of microbial inoculum and nutritive salt liquid, and the crack is thinner, and directly perfusion fluid is difficult to get into the depths, crack, therefore, adopts the vertical fill orifice that is provided with at interval along the crack;
(2) clear hole
Fill orifice inner concrete residue is removed clean;
(3) fracture faces sealing
Parcel one deck absorbent cotton on the surface in crack, and then wrap up two-layer gauze, with adhesive plaster absorbent cotton and gauze are fixed again; Clear water can ooze out from absorbent cotton and gauze, but the bacterium particle diameter is bigger, and the meeting block is in the crack;
(4) bacterium liquid and nutrient salt solution preparation
Prepare 3-5 with fermentation tank and rise the Pasteur bacillus, enzymatic activity OD600 is greater than 1; Preparation contains the calcium chloride of 1mol/L and the nutrient salt solution of 1mol/L urea;
(5) perfusion bacterium liquid
In the crack, pour into bacterium liquid from the fill orifice of below, treat that bacterium liquid penetrates into behind the crack and when fill orifice overflows, change to fill orifice continuation and pour into bacterium liquid, in all fill orifices, fill;
(6) perfusion nutrient salt solution
The bacterium liquid liquid level of waiting for fill orifice descends, and after the bacterium liquid of volume more than 80% infiltrates the crack, in fill orifice, injects the calcium chloride that contains 1mol/L of twice bacteria liquid amount and the nutrient salt solution of 1mol/L urea respectively;
(7) continued perfusion bacterium liquid in follow-up 4 days
Pour into one time bacterium liquid follow-up 4 day every day, method for filling is with (5) step;
(8) continued the perfusion nutrient salt solution in follow-up 9 days
Pour into the one time of nutrition salting liquid follow-up 9 day every day, method for filling is with (6) step;
(9) shutoff of fill orifice
Once fill coarse sand in the fill orifice, perfusion bacterium liquid 5 days and nutrient salt solution 10 days, repeating step (5) is to step (8); The tosca thing that bacterium liquid induces calcium chloride to generate can be filled crack and fill orifice and shutoff effectively.
Fill orifice is tilted to down in the said step (1), is convenient to liquid and infiltrates, and the hole depth of fill orifice is the 1/2-3/4 of wall thickness, the vertical spacing 300-500mm in hole.
Adopt compressed air that fill orifice inner concrete residue is blown off in the said step (2); In fill orifice, inject clear water again, fill orifice is cleaned.
The invention has the beneficial effects as follows effectively shutoff crack, through water injection test with rain after observation, the water percolating capacity in former crack obviously reduces.Utilize non-metal ultrasonic detector that seam is striden in the crack and survey (Fig. 3, when 5 points in Fig. 4 centre joint both sides are ultrasonic listening couplant); Reduce to about 40 microseconds by 70~80 microseconds in the time of hyperacoustic and (see table 1); Explain closely knit product has been arranged in the crack; Therefore ultrasonic wave can pass from product, and needn't walk around the crack, reduces during sound.
During table 1 hyperacoustic
Figure BDA0000118985760000031
Description of drawings
Fig. 1 is the present invention's sketch map when implementing;
Fig. 2-Fig. 5 is the photo of on-the-spot shutoff test; Wherein, Fig. 2 is the punch out step photo, and Fig. 3 is a fracture faces sealing photo, and Fig. 4 is perfusion bacterium liquid and nutrient solution photo; Fig. 5 is the calcium carbonate product photo in the fill orifice;
1. concrete of basement exterior walls wherein, 2. vertical crack, 3. fill stratum, 4. fill orifice, 5. absorbent cotton and gauze.
The specific embodiment
Below in conjunction with accompanying drawing and embodiment the present invention is further specified.
The method in the vertical crack of a kind of microorganism grout sealing Basement Concrete Structures, like Fig. 1-shown in Figure 5, the outside of concrete of basement exterior wall 1 is waterproofing course and fill stratum 3; If vertical crack 2 appears in concrete of basement exterior wall 1; Be difficult in the wall outer side excavation and banket, expose vertical crack 2, again shutoff is carried out in the crack; Adopt the method dead-end fracture that is in the milk in the latasuture in the body of wall, step is following:
(1) punching
In the vertical crack, because the trickling downwards under the deadweight effect of microbial inoculum and nutritive salt liquid, and the crack is thinner, and directly perfusion fluid is difficult to get into the depths, crack, therefore, adopts the vertical fill orifice 4 that is provided with at interval along the crack; Fill orifice 4 is tilted to down, is convenient to liquid and infiltrates, and the hole depth of fill orifice 4 is the 1/2-3/4 of wall thickness, the vertical spacing 300-500mm in hole;
(2) clear hole
Adopt compressed air that fill orifice 4 inner concrete residues are blown off; In fill orifice 4, inject clear water again, fill orifice 4 is cleaned.
(3) fracture faces sealing
Parcel one deck absorbent cotton on the surface in crack, and then wrap up two-layer gauze, with adhesive plaster that absorbent cotton and gauze 5 is fixing again; Clear water can ooze out from absorbent cotton and gauze 5, but the bacterium particle diameter is bigger, and the meeting block is in the crack;
(4) bacterium liquid and nutrient salt solution preparation
Prepare 3-5 with fermentation tank and rise the Pasteur bacillus, enzymatic activity OD600 is greater than 1; Preparation contains the calcium chloride of 1mol/L and the nutrient salt solution of 1mol/L urea;
(5) perfusion bacterium liquid
In the crack, pour into bacterium liquid from the fill orifice 4 of below, treat that bacterium liquid penetrates into behind the crack and when fill orifice overflows, change to a fill orifice 4 continuation and pour into the bacterium liquid, in all fill orifices 4, fill;
(6) perfusion nutrient salt solution
The bacterium liquid liquid level of waiting for fill orifice 4 descends, and the bacterium liquid more than 80% injects the calcium chloride that contains 1mol/L of twice bacteria liquid amount and the nutrient salt solution of 1mol/L urea respectively after infiltrating the crack in fill orifice 4;
(7) continued perfusion bacterium liquid in follow-up 4 days
Pour into one time bacterium liquid follow-up 4 day every day, method for filling is with (5) step;
(8) continued the perfusion nutrient salt solution in follow-up 9 days
Pour into the one time of nutrition salting liquid follow-up 9 day every day, method for filling is with (6) step;
(9) shutoff of fill orifice
Once fill coarse sand in the fill orifice 4, perfusion bacterium liquid 5 days and nutrient salt solution 10 days, repeating step (5) is to step (8); The tosca thing that bacterium liquid induces calcium chloride to generate can be filled crack and fill orifice and shutoff effectively.
Though the above-mentioned accompanying drawing specific embodiments of the invention that combines is described; But be not restriction to protection domain of the present invention; One of ordinary skill in the art should be understood that; On the basis of technical scheme of the present invention, those skilled in the art need not pay various modifications that creative work can make or distortion still in protection scope of the present invention.

Claims (3)

1. the method in the vertical crack of microorganism grout sealing Basement Concrete Structures, the outside of outer wall of basement is waterproofing course and fill stratum, if vertical crack appears in concrete exterior wall; Being difficult in the wall outer side excavation bankets; Expose the crack, again shutoff is carried out in the crack, it is characterized in that; Adopt the method dead-end fracture that is in the milk in the latasuture in the body of wall, step is following:
(1) punching
In the vertical crack, because the trickling downwards under the deadweight effect of microbial inoculum and nutritive salt liquid, and the crack is thinner, and directly perfusion fluid is difficult to get into the depths, crack, therefore, adopts the vertical fill orifice that is provided with at interval along the crack;
(2) clear hole
Fill orifice inner concrete residue is removed clean;
(3) fracture faces sealing
Parcel one deck absorbent cotton on the surface in crack, and then wrap up two-layer gauze, with adhesive plaster absorbent cotton and gauze are fixed again; Clear water can ooze out from absorbent cotton and gauze, but the bacterium particle diameter is bigger, and the meeting block is in the crack;
(4) bacterium liquid and nutrient salt solution preparation
Prepare 3-5 with fermentation tank and rise the Pasteur bacillus, enzymatic activity OD600 is greater than 1; Preparation contains the calcium chloride of 1mol/L and the nutrient salt solution of 1mol/L urea;
(5) perfusion bacterium liquid
In the crack, pour into bacterium liquid from the fill orifice of below, treat that bacterium liquid penetrates into behind the crack and when fill orifice overflows, change to fill orifice continuation and pour into bacterium liquid, in all fill orifices, fill;
(6) perfusion nutrient salt solution
The bacterium liquid liquid level of waiting for fill orifice descends, and the bacterium liquid more than 80% injects the calcium chloride that contains 1mol/L of twice bacteria liquid amount and the nutrient salt solution of 1mol/L urea respectively after infiltrating the crack in fill orifice;
(7) continued perfusion bacterium liquid in follow-up 4 days
Pour into one time bacterium liquid follow-up 4 day every day, method for filling is with (5) step;
(8) continued the perfusion nutrient salt solution in follow-up 9 days
Pour into the one time of nutrition salting liquid follow-up 9 day every day, method for filling is with (6) step;
(9) shutoff of fill orifice
Once fill coarse sand in the fill orifice, perfusion bacterium liquid 5 days and nutrient salt solution 10 days, repeating step (5) is to step (8); The tosca thing that bacterium liquid induces calcium chloride to generate can be filled crack and fill orifice and shutoff effectively.
2. the method for claim 1 is characterized in that, fill orifice is tilted to down in the said step (1), is convenient to liquid and infiltrates, and the hole depth of fill orifice is the 1/2-3/4 of wall thickness, the vertical spacing 300-500mm in hole.
3. the method for claim 1 is characterized in that, adopts compressed air that fill orifice inner concrete residue is blown off in the said step (2); In fill orifice, inject clear water again, fill orifice is cleaned.
CN 201110413188 2011-12-12 2011-12-12 Method for sealing vertical cracks of basement concrete structures by using microbial grouting Active CN102493494B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110413188 CN102493494B (en) 2011-12-12 2011-12-12 Method for sealing vertical cracks of basement concrete structures by using microbial grouting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110413188 CN102493494B (en) 2011-12-12 2011-12-12 Method for sealing vertical cracks of basement concrete structures by using microbial grouting

Publications (2)

Publication Number Publication Date
CN102493494A true CN102493494A (en) 2012-06-13
CN102493494B CN102493494B (en) 2013-09-04

Family

ID=46185350

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110413188 Active CN102493494B (en) 2011-12-12 2011-12-12 Method for sealing vertical cracks of basement concrete structures by using microbial grouting

Country Status (1)

Country Link
CN (1) CN102493494B (en)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104196131A (en) * 2014-09-11 2014-12-10 山东建筑大学 Method for plugging cast-in-situ concrete slab or base-plate crack with microbe-sedimented calcium carbonate
CN104234090A (en) * 2014-09-04 2014-12-24 江苏南通三建集团有限公司 Method for treating crack water seepage of concrete floor and wall body
CN104818719A (en) * 2015-03-16 2015-08-05 山东建筑大学 Microorganism grouting method capable of improving early-stage calcium carbonate deposit volume
CN105019480A (en) * 2015-06-05 2015-11-04 湖南省第五工程有限公司 Construction treatment method for building cracks
CN106223962A (en) * 2016-08-18 2016-12-14 东南大学 Microorganism grouting method after a kind of Shield Tunnel in Soft Soil lining segment wall
CN104234090B (en) * 2014-09-04 2017-01-04 江苏南通三建集团有限公司 A kind of administer concrete floor, wall body slit infiltration method
CN106285723A (en) * 2016-08-30 2017-01-04 东南大学 Microorganism grouting device and method after a kind of shield tunnel liner wall
CN109778834A (en) * 2019-01-09 2019-05-21 南京大学 A method of utilizing microbial control soil body dry shrinkage and cracking
CN109838113A (en) * 2019-03-04 2019-06-04 山东建筑大学 Microorganism induction generates the method that calcium carbonate blocks Basement Crack
CN110863517A (en) * 2019-12-12 2020-03-06 昆明理工大学 Method for sealing and blocking leakage of storage yard by utilizing microbial induction
CN110907328A (en) * 2019-11-29 2020-03-24 中国海洋石油集团有限公司 Experimental device and method for plugging and seepage-proofing rock fractures based on MICP technology
CN111877564A (en) * 2020-08-07 2020-11-03 山东建筑大学 Microbial grouting anchoring method and structure of external grouting pipe
CN112198025A (en) * 2020-09-29 2021-01-08 中国海洋大学 Test method for plugging rock cracks based on microbial grouting technology
CN113216682A (en) * 2021-05-20 2021-08-06 江苏大学 Method for repairing vertical surface cracks in situ by using calcium carbonate precipitation induced by microorganisms
CN113307656A (en) * 2021-05-29 2021-08-27 兰州理工大学 Method for repairing concrete cracks by using microorganisms
CN114875942A (en) * 2022-06-21 2022-08-09 中国煤炭地质总局勘查研究总院 Waterproof curtain gap plugging device and technology based on microbial mineralization

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004123437A (en) * 2002-10-01 2004-04-22 Fujikura Ltd Material and method of repairing concrete crack
CN1778934A (en) * 2005-10-10 2006-05-31 东南大学 Preparation of calcium carbonate by microbe deposition
CN101270369A (en) * 2008-05-06 2008-09-24 清华大学 Microorganism cause concrete or concrete, producing method and application thereof
CN101302484A (en) * 2008-01-15 2008-11-12 东南大学 Method for recovering cement-based material crack by means of microorganism, culture fluid and repair nutrient fluid
CN101402518A (en) * 2008-10-23 2009-04-08 马鞍山市天锦云漆业有限公司 Patching material for building tear and construction process thereof
WO2009098091A2 (en) * 2008-02-05 2009-08-13 Biomim-Greenloop Sa Impermeability rehabilitation of civil engineering structures
CN102071710A (en) * 2010-11-26 2011-05-25 清华大学 Plugging repair method for concrete structure crack in soils

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004123437A (en) * 2002-10-01 2004-04-22 Fujikura Ltd Material and method of repairing concrete crack
CN1778934A (en) * 2005-10-10 2006-05-31 东南大学 Preparation of calcium carbonate by microbe deposition
CN101302484A (en) * 2008-01-15 2008-11-12 东南大学 Method for recovering cement-based material crack by means of microorganism, culture fluid and repair nutrient fluid
WO2009098091A2 (en) * 2008-02-05 2009-08-13 Biomim-Greenloop Sa Impermeability rehabilitation of civil engineering structures
CN101270369A (en) * 2008-05-06 2008-09-24 清华大学 Microorganism cause concrete or concrete, producing method and application thereof
CN101402518A (en) * 2008-10-23 2009-04-08 马鞍山市天锦云漆业有限公司 Patching material for building tear and construction process thereof
CN102071710A (en) * 2010-11-26 2011-05-25 清华大学 Plugging repair method for concrete structure crack in soils

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
袁雄洲: "水泥基材料裂缝微生物修复技术的研究与进展", 《硅酸盐学报》 *

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104234090A (en) * 2014-09-04 2014-12-24 江苏南通三建集团有限公司 Method for treating crack water seepage of concrete floor and wall body
CN104234090B (en) * 2014-09-04 2017-01-04 江苏南通三建集团有限公司 A kind of administer concrete floor, wall body slit infiltration method
CN104196131A (en) * 2014-09-11 2014-12-10 山东建筑大学 Method for plugging cast-in-situ concrete slab or base-plate crack with microbe-sedimented calcium carbonate
CN104818719A (en) * 2015-03-16 2015-08-05 山东建筑大学 Microorganism grouting method capable of improving early-stage calcium carbonate deposit volume
CN105019480A (en) * 2015-06-05 2015-11-04 湖南省第五工程有限公司 Construction treatment method for building cracks
CN106223962A (en) * 2016-08-18 2016-12-14 东南大学 Microorganism grouting method after a kind of Shield Tunnel in Soft Soil lining segment wall
CN106223962B (en) * 2016-08-18 2018-10-23 东南大学 Microorganism grouting method after a kind of Shield Tunnel in Soft Soil lining segment wall
CN106285723A (en) * 2016-08-30 2017-01-04 东南大学 Microorganism grouting device and method after a kind of shield tunnel liner wall
CN106285723B (en) * 2016-08-30 2018-05-08 东南大学 Microorganism grouting device and method after a kind of shield tunnel liner wall
CN109778834B (en) * 2019-01-09 2021-03-30 南京大学 Method for preventing soil body from drying shrinkage cracking by using microorganisms
CN109778834A (en) * 2019-01-09 2019-05-21 南京大学 A method of utilizing microbial control soil body dry shrinkage and cracking
CN109838113A (en) * 2019-03-04 2019-06-04 山东建筑大学 Microorganism induction generates the method that calcium carbonate blocks Basement Crack
CN110907328A (en) * 2019-11-29 2020-03-24 中国海洋石油集团有限公司 Experimental device and method for plugging and seepage-proofing rock fractures based on MICP technology
CN110863517A (en) * 2019-12-12 2020-03-06 昆明理工大学 Method for sealing and blocking leakage of storage yard by utilizing microbial induction
CN111877564A (en) * 2020-08-07 2020-11-03 山东建筑大学 Microbial grouting anchoring method and structure of external grouting pipe
CN112198025A (en) * 2020-09-29 2021-01-08 中国海洋大学 Test method for plugging rock cracks based on microbial grouting technology
CN112198025B (en) * 2020-09-29 2021-12-31 中国海洋大学 Test method for plugging rock cracks based on microbial grouting technology
CN113216682A (en) * 2021-05-20 2021-08-06 江苏大学 Method for repairing vertical surface cracks in situ by using calcium carbonate precipitation induced by microorganisms
CN113307656A (en) * 2021-05-29 2021-08-27 兰州理工大学 Method for repairing concrete cracks by using microorganisms
CN114875942A (en) * 2022-06-21 2022-08-09 中国煤炭地质总局勘查研究总院 Waterproof curtain gap plugging device and technology based on microbial mineralization

Also Published As

Publication number Publication date
CN102493494B (en) 2013-09-04

Similar Documents

Publication Publication Date Title
CN102493494B (en) Method for sealing vertical cracks of basement concrete structures by using microbial grouting
CN102493493B (en) Method for plugging horizontal fissures of basement concrete structure by grouting microorganisms
CN104196131B (en) The cast-in-place slab-type apartment building plate of microbiological precipitation of CaCO 3 blocking concrete or soleplate crack method
Zhang et al. Microbial‑induced carbonate precipitation (MICP) technology: a review on the fundamentals and engineering applications
CN109838113B (en) Method for plugging cracks of basement roof and outer wall by utilizing microbial grouting
CN105507232B (en) A kind of microorganism flat board grouting device and method for reinforcing Liquefaction Foundation
Yang et al. Seepage control in sand using bioslurry
CA2591097C (en) Microbial biocementation
Liu et al. Geotechnical engineering properties of soils solidified by microbially induced CaCO3 precipitation (MICP)
CN113216682B (en) Method for repairing vertical surface cracks in situ by using calcium carbonate precipitation induced by microorganisms
CN107060116B (en) A kind of high-pressure slip-casting blocking method for building settlement seam
CN101270369A (en) Microorganism cause concrete or concrete, producing method and application thereof
CN101644047A (en) Method of adhering loose sands employing microbial mineralization
CN110438974B (en) Microbial solidification kit and method for in-situ solidification of calcareous sand
CN105220681A (en) A kind of method of microorganism-electric field joint reinforcement Liquefaction Foundation
CN109184255A (en) A method of utilizing microorganism grout sealing outer wall of basement crack
CN106884424A (en) A kind of device and construction method that microorganism solidification is carried out in thin silt
CN112211176A (en) Microorganism grouting and drainage curing pile and construction method and application thereof
CN113152375B (en) Permeability reducing method for sandy river
KR101550258B1 (en) Microbial bio patch for concrete crack repairing and concrete crack repairing method using the same
CN111877269A (en) Method for repairing poor rock mass in hydro-fluctuation belt of reservoir area by microorganisms
CN114657971A (en) Microbial microcapsule, preparation method thereof and application of microbial microcapsule in curing soft soil foundation
CN212714817U (en) Artifical lake bottom concrete crack repair system
CN104773975B (en) A kind of high additive regeneration mineral aggregate/asphalt and preparation method thereof
CN114482087B (en) Method for curing side slope by microorganism mineralization filling-magnesia carbonization slurry spraying

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20170330

Address after: 250014 Heping Road, Lixia District, Shandong, Ji'nan, China, No. 47

Patentee after: Shandong Jian special special engineering Co., Ltd.

Address before: Feng Ming Licheng District Lingang Development Zone, 250101 Ji'nan Road, Shandong Province

Patentee before: Shandong Construction University

TR01 Transfer of patent right