CN107201753A - It is a kind of to be used for the high-pressure slip-casting blocking method of basement or top plate of underground parking garage - Google Patents

It is a kind of to be used for the high-pressure slip-casting blocking method of basement or top plate of underground parking garage Download PDF

Info

Publication number
CN107201753A
CN107201753A CN201710457743.5A CN201710457743A CN107201753A CN 107201753 A CN107201753 A CN 107201753A CN 201710457743 A CN201710457743 A CN 201710457743A CN 107201753 A CN107201753 A CN 107201753A
Authority
CN
China
Prior art keywords
injection slurry
casting
crack
slip
component
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710457743.5A
Other languages
Chinese (zh)
Other versions
CN107201753B (en
Inventor
马海斌
王林同
张运臣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin jiayide waterproof plugging Engineering Co.,Ltd.
Original Assignee
Weifang University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Weifang University filed Critical Weifang University
Priority to CN201710457743.5A priority Critical patent/CN107201753B/en
Publication of CN107201753A publication Critical patent/CN107201753A/en
Application granted granted Critical
Publication of CN107201753B publication Critical patent/CN107201753B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
    • CCHEMISTRY; METALLURGY
    • C08ORGANIC MACROMOLECULAR COMPOUNDS; THEIR PREPARATION OR CHEMICAL WORKING-UP; COMPOSITIONS BASED THEREON
    • C08FMACROMOLECULAR COMPOUNDS OBTAINED BY REACTIONS ONLY INVOLVING CARBON-TO-CARBON UNSATURATED BONDS
    • C08F120/00Homopolymers of compounds having one or more unsaturated aliphatic radicals, each having only one carbon-to-carbon double bond, and only one being terminated by only one carboxyl radical or a salt, anhydride, ester, amide, imide or nitrile thereof
    • C08F120/02Monocarboxylic acids having less than ten carbon atoms; Derivatives thereof
    • C08F120/52Amides or imides
    • C08F120/54Amides, e.g. N,N-dimethylacrylamide or N-isopropylacrylamide
    • C08F120/56Acrylamide; Methacrylamide
    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
    • C09JADHESIVES; NON-MECHANICAL ASPECTS OF ADHESIVE PROCESSES IN GENERAL; ADHESIVE PROCESSES NOT PROVIDED FOR ELSEWHERE; USE OF MATERIALS AS ADHESIVES
    • C09J163/00Adhesives based on epoxy resins; Adhesives based on derivatives of epoxy resins
    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
    • C09JADHESIVES; NON-MECHANICAL ASPECTS OF ADHESIVE PROCESSES IN GENERAL; ADHESIVE PROCESSES NOT PROVIDED FOR ELSEWHERE; USE OF MATERIALS AS ADHESIVES
    • C09J175/00Adhesives based on polyureas or polyurethanes; Adhesives based on derivatives of such polymers
    • C09J175/04Polyurethanes
    • C09J175/08Polyurethanes from polyethers

Landscapes

  • Chemical & Material Sciences (AREA)
  • Organic Chemistry (AREA)
  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Medicinal Chemistry (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Health & Medical Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Polymers & Plastics (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Sealing Material Composition (AREA)
  • Working Measures On Existing Buildindgs (AREA)
  • Polyurethanes Or Polyureas (AREA)

Abstract

It is used for the high-pressure slip-casting blocking method of basement or top plate of underground parking garage this application provides a kind of, it make use of the very strong complementarity in terms of key performance between polyurethane modified epoxy resin class injection slurry and acrylic amide injection slurry, seepage is slightly mended using polyurethane modified epoxy resin class injection slurry, on this basis seepage is mended using acrylic amide injection slurry essence, so as to have complementary advantages, combination among the strong ones, and maximize favourable factors and minimize unfavourable ones, realize the quick grouting for water plugging of basement or top plate of underground parking garage, improve leak stopping quality, improve the persistence of leak stopping, and do not destroy the original structure and function of building, meet architectural development needs at this stage.

Description

It is a kind of to be used for the high-pressure slip-casting blocking method of basement or top plate of underground parking garage
Technical field
The present invention relates to technical field of building construction, it is used for the height of basement or top plate of underground parking garage more particularly, to a kind of Pressure grouting blocking method.
Background technology
Residential building basement roof percolating water phenomenon, reduces the service life of building, can also drastically influence underground The normal service condition of room.The A of patent CN 105369833 are related to a kind of basement roof seepage slip casting maintenance engineering method, but use Traditional slip casting method carries out leak stopping, is limited by grouting equipment performance, grouting pressure is 0.3Mpa.Water Seepage in Basement typically carries one The bright water leakage of fixed pressure, especially basement roof, crack can not irrigate loss circulation material at all under artesian pressure. Under this pressure, even if irrigated liquid is oily material, such as polyurethane or epoxy resin, under may not filling entirely Room crack, long-term use can cause secondary leak.
Top plate of underground parking garage is special due to its construction, it is difficult to find leakage source;Once generation seepage, must be using back side note Starch leaking stoppage repairing method.
At present frequently with grouting for water plugging restorative procedure be epoxy resin and polyurethane foam grouting for water plugging, epoxy resin is more For the structural strengthening of building, and polyurethane foam slip casting is used for the leak stopping processing of building.
Though polyurethane foam grouting for water plugging material has instant expansion water-stop feature in construction, there is also foaming body in itself Gap, and the shortcoming of day after-contraction are there may be, the shortcoming of seepage again is often occurred as soon as after constructing 3 months, can not be complete Complete solution is determined the leakage problems of top plate of underground parking garage.
Polyurethane modified epoxy resin class injection slurry is a kind of new adhesive, combines polyurethane resin and epoxy resin Advantage:Compression strength is up to more than 50MPa after solidification, and has certain elasticity;But slurries initial viscosity is big, infiltration coefficient It is small, it is difficult to be injected into very deep crack simultaneously.
And acrylic amide injection slurry gel time is short, slurries initial viscosity is low, can penetrate into concrete micro-cracks or hole In gap, gel very big telescopic resilience is waterproof after injection, but needs to do anti-chap processing after grout cures, and compression strength is low.
Therefore, the quick grouting for water plugging of basement or top plate of underground parking garage how is realized, leak stopping quality is improved, leak stopping is improved Persistence, and do not destroy the original structure and function of building, be current ability with the architectural development needs met at this stage The technical problem of field technique personnel's urgent need to resolve.
The content of the invention
It is used for the high-pressure slip-casting blocking method of basement or top plate of underground parking garage, the height it is an object of the invention to provide a kind of Pressure grouting blocking method can realize the quick grouting for water plugging of basement or top plate of underground parking garage, improve leak stopping quality, improve stifled The persistence of leakage, and the original structure and function of building are not destroyed, meet architectural development needs at this stage.
To solve above-mentioned technical problem, the technical scheme that the present invention is provided is:
It is a kind of to be used for the high-pressure slip-casting blocking method of basement or top plate of underground parking garage, comprise the following steps:
1) seepage crack is positioned first, position and its length in crack is determined, then cleans crack and its peripheral region, so Afterwards with leak stopping spirit sealing crack;
2) according to the concrete structure thickness at crack, injected hole is being drilled at the 0-50mm of crack, and in injected hole In bury Water slop injector, injected hole cloth hole uses the junction of the edges of two sheets of paper or inclined hole form, and slip casting hole depth determines according to concrete thickness, pitch-row Determined by on-site actual situations;
3) with high-pressure slip-casting equipment to step 2) in Water slop injector in inject polyurethane modified epoxy resin class injection slurry, When grouting pressure is higher than 30MPa, stop slip casting;
Etc. 4) after the polyurethane modified epoxy resin class injection slurry solidification at crack openings, original Water slop injector is pulled down, and Continue the 5cm~10cm that drills, and embedded new Water slop injector on the basis of former injected hole;
5) with high-pressure slip-casting equipment to step 4) in new Water slop injector in inject acrylic amide injection slurry, until note Slurry pressure reaches more than 100MPa, or acrylic amide injection slurry is from closing at Water slop injector or crack untill seepage;
6) after acrylic amide slip casting liquid grout is finished, observation plugging effect overnight, if also seepage, should proceed third Acrylamide injection slurry grouting operation, untill seepage does not occur for breakthrough;
7) after success leak stopping, Water slop injector is removed, and injected hole and whole seepage crack are closed with leak stopping spirit.
It is preferred that, the polyurethane modified epoxy resin class injection slurry is dual-component polyurethane modified epoxy class gluing Agent, wherein first component are amino-terminated polyurethane elastomeric prepolymer body, and second component is bisphenol A type epoxy resin.
It is preferred that, the amino-terminated polyurethane elastomeric prepolymer body is proportionally mixed by isocyanates with polyol Close, synthesized under argon atmosphere protection and chlorobenzoyl chloride catalytic action, then proportionally react, obtain with common aromatic amine Amino-terminated polyurethane elastomeric prepolymer body.
It is preferred that, the isocyanates is toluene di-isocyanate(TDI), and the polyol is PPG, described Common aromatic amine is m-xylene diamine;
The amino-terminated polyurethane elastomeric prepolymer body is by toluene di-isocyanate(TDI) and PPG according to mol ratio 4:1 mixes Close, synthesized under argon atmosphere protection and chlorobenzoyl chloride catalytic action, then with m-xylene diamine according to toluene di-isocyanate(TDI): PPG:M-xylene diamine is 4:1:2 molar ratio reaction, obtains amino-terminated polyurethane elastomeric prepolymer body.
It is preferred that, the acrylic amide injection slurry is bi-component water soluble acrylamido's gel, and wherein component A is third Acrylamide solution, mass concentration is 5%~20%, and B component is acrylamide polymerization initiator and the aqueous solution for polymerizeing adjuvant.
It is preferred that, the component A is made up of the raw material of following percetage by weight:5%~20% acrylamide, 1% The water of disodium hydrogen phosphate, 0.5%~2% triethylene tetramine and surplus.
It is preferred that, the B component is made up of the raw material of following percetage by weight:2%~8% ammonium persulfate, 1%~ The water of 3% sodium sulfite, 1%~5% sodium chlorate and surplus.
It is preferred that, the high-pressure slip-casting equipment is plunger pump, and highest outlet pressure is 150MPa.
The application has following beneficial technique effect:
(1) the inventive method carries out basement or the seepage with pressure of top plate of underground parking garage is repaired, and does not cut the earth, does not demolish walls, nothing Building original structure need to be destroyed, can be constructed with water, short construction period, while remediation efficiency is greatly improved, it is ensured that leak stopping The structure safety of building after reparation.
(2) polyurethane modified epoxy resin class injection slurry of the present invention, can form the elastomer with network structure, Gu It is melted into after film, is firmly combined with concrete, the seepage of acrylic amide injection slurry under the conditions of high-pressure slip-casting can be prevented, influences leak stopping Effect.
(3) cost performance height, A, the B component initial viscosity of acrylic amide injection slurry of the present invention are small, slip casting gel Imporosity, elongation is good, do not ftracture for a long time, and can polymerize under conditions of the minimum zero degrees celsius of construction temperature, acrylamide Polymerization initiator in B component in class injection slurry and polymerize adjuvant content it is adjustable, it is ensured that A, B component are in any construction temperature Simultaneously gel time was maintained in 1~5 minute the lower generation polymerization of degree.
(4) bi-component water soluble acrylamido's gel property prepared by the present invention is stable, and Storage period is long, uses letter It is single, it is very big to ensure that construction safety.
(5) slip casting pump pressure of the present invention is high, can guarantee that acrylic amide injection slurry is sufficient filling with basement or ground Lower garage foig, forms T-shaped repairing, fully ensures that the long-term effect of pressurization sealing.
Embodiment
For a further understanding of the present invention, the preferred embodiment of the invention is described with reference to embodiment, still It should be appreciated that these descriptions simply further illustrate the feature and advantage of the present invention, rather than to the limit of the claims in the present invention System.
It is used for the high-pressure slip-casting blocking method of basement or top plate of underground parking garage, including following step this application provides a kind of Suddenly:
1) seepage crack is positioned first, position and its length in crack is determined, then cleans crack and its peripheral region, so Afterwards with leak stopping spirit sealing crack;
2) according to the concrete structure thickness at crack, injected hole is being drilled at the 0-50mm of crack, and in injected hole In bury Water slop injector, injected hole cloth hole uses the junction of the edges of two sheets of paper or inclined hole form, and slip casting hole depth determines according to concrete thickness, pitch-row Determined by on-site actual situations;
3) with high-pressure slip-casting equipment to step 2) in Water slop injector in inject polyurethane modified epoxy resin class injection slurry, When grouting pressure is higher than 30MPa, stop slip casting;
Etc. 4) after the polyurethane modified epoxy resin class injection slurry solidification at crack openings, original Water slop injector is pulled down, and Continue the 5cm~10cm that drills, and embedded new Water slop injector on the basis of former injected hole;
5) with high-pressure slip-casting equipment to step 4) in new Water slop injector in inject acrylic amide injection slurry, until note Slurry pressure reaches more than 100MPa, or acrylic amide injection slurry is from closing at Water slop injector or crack untill seepage;
6) after acrylic amide slip casting liquid grout is finished, observation plugging effect overnight, if also seepage, should proceed third Acrylamide injection slurry grouting operation, untill seepage does not occur for breakthrough;
7) after success leak stopping, Water slop injector is removed, and injected hole and whole seepage crack are closed with leak stopping spirit.
In one embodiment of the application, the polyurethane modified epoxy resin class injection slurry changes for dual-component polyurethane Property epoxy resin adhesive, wherein first component be amino-terminated polyurethane elastomeric prepolymer body, second component be bisphenol type epoxy tree Fat.
In one embodiment of the application, the amino-terminated polyurethane elastomeric prepolymer body by isocyanates with it is polyhydroxylated Compound is proportionally mixed, and is synthesized, is then pressed with common aromatic amine under argon atmosphere protection and chlorobenzoyl chloride catalytic action According to ratio reaction, amino-terminated polyurethane elastomeric prepolymer body is obtained.
In one embodiment of the application, the isocyanates is toluene di-isocyanate(TDI), the polyol For PPG, the common aromatic amine is m-xylene diamine;
The amino-terminated polyurethane elastomeric prepolymer body is by toluene di-isocyanate(TDI) and PPG according to mol ratio 4:1 mixes Close, synthesized under argon atmosphere protection and chlorobenzoyl chloride catalytic action, then with m-xylene diamine according to toluene di-isocyanate(TDI): PPG:M-xylene diamine is 4:1:2 molar ratio reaction, obtains amino-terminated polyurethane elastomeric prepolymer body.
In one embodiment of the application, the acrylic amide injection slurry is bi-component water soluble acrylamido's gel Agent, wherein component A are acrylamide solution, and mass concentration is 5%~20%, and B component is acrylamide polymerization initiator and poly- Close the aqueous solution of adjuvant.
In one embodiment of the application, the component A is made up of the raw material of following percetage by weight:5%~20% Acrylamide, 1% disodium hydrogen phosphate, the water of 0.5%~2% triethylene tetramine and surplus.
In one embodiment of the application, the B component is made up of the raw material of following percetage by weight:2%~8% Ammonium persulfate, 1%~3% sodium sulfite, the water of 1%~5% sodium chlorate and surplus.
In one embodiment of the application, the high-pressure slip-casting equipment is plunger pump, and highest outlet pressure is 150MPa.
The leak stopping principle for the high-pressure slip-casting blocking method for being used for basement or top plate of underground parking garage that the application is provided:
Compression strength is up to more than 50MPa after the solidification of polyurethane modified epoxy resin class injection slurry, but its slurries initially glues Degree is big, and infiltration coefficient is small, it is difficult to be injected into very deep very thin crack, elasticity is moderate;
And compression strength is low after the solidification of acrylic amide injection slurry, and anti-chap processing, but its slurries initial viscosity need to be done Low, infiltration coefficient is big, can penetrate into micro-cracks or hole, gel time is short, and gel has very big telescopic resilience, after injection It is waterproof;
It can be seen that, polyurethane modified epoxy resin class injection slurry and acrylic amide injection slurry, compression strength after solidification Aspect, pre-large post-small, pre-large post-small in terms of initial viscosity, pre-small post-large in terms of infiltration coefficient, elasticity side after solidification Face, pre-small post-large, the two has very strong complementarity at least in terms of four key performances;
Compression strength is moderate up to more than 50MPa, elasticity after being solidified using polyurethane modified epoxy resin class injection slurry Feature, allows it as the support frame after fracture plugging grout cures, as the coagulum after the whole grout cures of skeletal support, It is the same similar to the concrete after the coarse aggregate support solidification in concrete, using at the beginning of polyurethane modified epoxy resin class injection slurry Beginning viscosity is big, infiltration coefficient is small, be difficult the characteristics of being injected into very deep very thin crack, the big seam allowed in its filling cracks, etc. Many tiny gaps or cavity are formed after it solidifies, in the middle of coagulum, so that big seam in a disguised form is become crack;
Low using acrylic amide injection slurry initial viscosity, infiltration coefficient is big, the spy that can penetrate into micro-cracks or hole Point, fills up many tiny gaps formed in the middle of the coagulum after the solidification of polyurethane modified epoxy resin class injection slurry or sky Hole, and because grouting pressure is in more than 100MPa so that the big acrylic amide injection slurry of infiltration coefficient can fill up almost institute Fine gap in the middle of coagulum or cavity after the solidification of some polyurethane modified epoxy resin class injection slurries, and due to acryloyl The injected hole of amine injection slurry be on the basis of polyurethane modified epoxy resin class injection slurry injected hole continue drill 5cm~ 10cm so that the slip casting entrance of acrylic amide injection slurry is to be opened in coagulating after the solidification of polyurethane modified epoxy resin class injection slurry Gu inside thing, acrylic amide injection slurry is the center portion from the coagulum after the solidification of polyurethane modified epoxy resin class injection slurry To surrounding edge spread, after the two all solidifies, obtain be the coagulum of polyurethane modified epoxy resin class injection slurry from the outside The coagulum of acrylic amide injection slurry is wrapped in, as the hard plate first of one side protects the relatively low spun gold hapalonychia of the inside intensity, There is the outer guard of the coagulum of polyurethane modified epoxy resin class injection slurry, without again after the solidification of acrylic amide injection slurry Do anti-chap processing as in traditional handicraft, time saving and energy saving cost-saving, and due to acrylic amide injection slurry have it is very big Telescopic resilience, third in fine gap in the middle of coagulum or cavity after polyurethane modified epoxy resin class injection slurry solidifies After the solidification of acrylamide injection slurry, the coagulum of acrylic amide injection slurry can be largely expanded, by polyurethane modified epoxy tree Lipid injection slurry solidification after coagulum in the middle of many tiny gaps or cavity further turgor with sealing so that significantly Improve plugging effect;
Present invention take advantage of that the very strong complementarity in terms of some key performances therebetween, using polyurethane-modified Epoxy resin injection slurry slightly mends seepage, mends seepage using acrylic amide injection slurry essence on this basis, is changed using polyurethane The property big seam of epoxy resin injection slurry leak stopping, is carefully stitched using the leak stopping of acrylic amide injection slurry, utilizes polyurethane on this basis Modified epoxy class injection slurry forms hard support frame, and acrylic amide injection slurry formation skeleton is utilized on this basis In soft filler, using polyurethane modified epoxy resin class injection slurry formation outer guard, propylene is utilized on this basis Intumescent filler thing on the inside of the formation of amide-type injection slurry, so that have complementary advantages, combination among the strong ones, and maximize favourable factors and minimize unfavourable ones, realize underground Room or the quick grouting for water plugging of top plate of underground parking garage, improve leak stopping quality, improve the persistence of leak stopping, and do not destroy building The original structure and function of thing, meet architectural development needs at this stage.
The present invention is not limited NM processing equipment and technological parameter in the above method, using in the art Processing equipment known to technical staff and technological parameter.
For a further understanding of the present invention, basement or underground are used for one kind that the present invention is provided with reference to embodiment The high-pressure slip-casting blocking method of shed deckhead is described in detail, and protection scope of the present invention is not limited by the following examples.
Embodiment 1:
Weifang cell top plate of underground parking garage seepage is repaired:Comprise the following steps:
1) seepage crack is positioned first, position and its length in crack is determined, then cleans crack and its peripheral region, so Afterwards with leak stopping spirit sealing crack;
2) according to the concrete structure thickness at crack, injected hole is being drilled at the 10mm of crack, and in injected hole Embedded Water slop injector, injected hole cloth hole uses the junction of the edges of two sheets of paper or inclined hole form, and slip casting hole depth determines that pitch-row is pressed according to concrete thickness On-site actual situations are determined;
3) with high-pressure slip-casting equipment to step 2) in Water slop injector in inject polyurethane modified epoxy resin class injection slurry, When grouting pressure is higher than 30MPa, stop slip casting;
The polyurethane modified epoxy resin class injection slurry is dual-component polyurethane modified epoxy class adhesive, wherein First component is amino-terminated polyurethane elastomeric prepolymer body, and second component is bisphenol A type epoxy resin;
The amino-terminated polyurethane elastomeric prepolymer body is by toluene di-isocyanate(TDI) and PPG according to mol ratio 4:1 mixes Close, synthesized under argon atmosphere protection and chlorobenzoyl chloride catalytic action, then with m-xylene diamine according to toluene di-isocyanate(TDI): PPG:M-xylene diamine is 4:1:2 molar ratio reaction, obtains amino-terminated polyurethane elastomeric prepolymer body;
Etc. 4) after the polyurethane modified epoxy resin class injection slurry solidification at crack openings, original Water slop injector is pulled down, and Continue the 6cm that drills, and embedded new Water slop injector on the basis of former injected hole;
The acrylic amide injection slurry is bi-component water soluble acrylamido's gel, and wherein component A is acrylamide Solution, mass concentration is 15%, and B component is acrylamide polymerization initiator and the aqueous solution for polymerizeing adjuvant;
The component A is made up of the raw material of following percetage by weight:15% acrylamide, 1% disodium hydrogen phosphate, 1% triethylene tetramine and the water of surplus;
The B component is made up of the raw material of following percetage by weight:5% ammonium persulfate, 2% sodium sulfite, 3% The water of sodium chlorate and surplus;
5) with high-pressure slip-casting equipment to step 4) in new Water slop injector in inject acrylic amide injection slurry, until note Slurry pressure reaches more than 100MPa, or acrylic amide injection slurry is from closing at Water slop injector or crack untill seepage;
6) after acrylic amide slip casting liquid grout is finished, observation plugging effect overnight, if also seepage, should proceed third Acrylamide injection slurry grouting operation, untill seepage does not occur for breakthrough;
7) after success leak stopping, Water slop injector is removed, and injected hole and whole seepage crack are closed with leak stopping spirit.
The explanation of above example is only intended to the method and its core concept for helping to understand the present invention.It should be pointed out that pair , under the premise without departing from the principles of the invention, can also be to present invention progress for those skilled in the art Some improvement and modification, these are improved and modification is also fallen into the protection domain of the claims in the present invention.
The foregoing description of the disclosed embodiments, enables professional and technical personnel in the field to realize or using the present invention. A variety of modifications for these embodiments are it will be apparent that defined herein one for those skilled in the art As principle can realize in other embodiments without departing from the spirit or scope of the present invention.Therefore, the present invention will It will not be intended to be limited to the embodiments shown herein, and be to fit to consistent with principles disclosed herein and features of novelty Widest range.

Claims (8)

1. a kind of be used for the high-pressure slip-casting blocking method of basement or top plate of underground parking garage, it is characterised in that comprises the following steps:
1) seepage crack is positioned first, position and its length in crack is determined, then cleans crack and its peripheral region, Ran Houyong Leak stopping spirit sealing crack;
2) according to the concrete structure thickness at crack, injected hole is being drilled at the 0-50mm of crack, and buried in injected hole If Water slop injector, injected hole cloth hole uses the junction of the edges of two sheets of paper or inclined hole form, and slip casting hole depth is determined according to concrete thickness, and pitch-row is by existing Field actual conditions are determined;
3) with high-pressure slip-casting equipment to step 2) in Water slop injector in inject polyurethane modified epoxy resin class injection slurry, work as note When starching pressure higher than 30MPa, stop slip casting;
Etc. 4) after the polyurethane modified epoxy resin class injection slurry solidification at crack openings, original Water slop injector is pulled down, and in original Continue the 5cm~10cm that drills, and embedded new Water slop injector on the basis of injected hole;
5) with high-pressure slip-casting equipment to step 4) in new Water slop injector in inject acrylic amide injection slurry, until slip casting pressure Power reaches more than 100MPa, or acrylic amide injection slurry is from closing at Water slop injector or crack untill seepage;
6) after acrylic amide slip casting liquid grout is finished, observation plugging effect overnight, if also seepage, should proceed acryloyl Amine injection slurry grouting operation, untill seepage does not occur for breakthrough;
7) after success leak stopping, Water slop injector is removed, and injected hole and whole seepage crack are closed with leak stopping spirit.
2. high-pressure slip-casting blocking method according to claim 1, it is characterised in that the polyurethane modified epoxy resin class Injection slurry is dual-component polyurethane modified epoxy class adhesive, and wherein first component is amino-terminated polyurethane elastomeric prepolymer body, Second component is bisphenol A type epoxy resin.
3. high-pressure slip-casting blocking method according to claim 2, it is characterised in that the amino-terminated polyurethane elastomeric prepolymer Body is proportionally mixed by isocyanates with polyol, is closed under argon atmosphere protection and chlorobenzoyl chloride catalytic action Into then proportionally being reacted with common aromatic amine, obtain amino-terminated polyurethane elastomeric prepolymer body.
4. high-pressure slip-casting blocking method according to claim 3, it is characterised in that the isocyanates is toluene diisocyanate Acid esters, the polyol is PPG, and the common aromatic amine is m-xylene diamine;
The amino-terminated polyurethane elastomeric prepolymer body is by toluene di-isocyanate(TDI) and PPG according to mol ratio 4:1 mixing, Synthesized under argon atmosphere protection and chlorobenzoyl chloride catalytic action, then with m-xylene diamine according to toluene di-isocyanate(TDI):It is poly- Ethoxylated polyhydric alcohol:M-xylene diamine is 4:1:2 molar ratio reaction, obtains amino-terminated polyurethane elastomeric prepolymer body.
5. high-pressure slip-casting blocking method according to claim 1, it is characterised in that the acrylic amide injection slurry is double Component water soluble acrylamido's gel, wherein component A are acrylamide solution, and mass concentration is 5%~20%, and B component is Acrylamide polymerization initiator and the aqueous solution for polymerizeing adjuvant.
6. high-pressure slip-casting blocking method according to claim 5, it is characterised in that the component A is by following weight percent Several raw materials are made:5%~20% acrylamide, 1% disodium hydrogen phosphate, 0.5%~2% triethylene tetramine and remaining The water of amount.
7. high-pressure slip-casting blocking method according to claim 5, it is characterised in that the B component is by following weight percent Several raw materials are made:2%~8% ammonium persulfate, 1%~3% sodium sulfite, 1%~5% sodium chlorate and surplus Water.
8. high-pressure slip-casting blocking method according to claim 1, it is characterised in that the high-pressure slip-casting equipment is plunger Pump, highest outlet pressure is 150MPa.
CN201710457743.5A 2017-06-16 2017-06-16 It is a kind of for basement or the high-pressure slip-casting blocking method of top plate of underground parking garage Active CN107201753B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710457743.5A CN107201753B (en) 2017-06-16 2017-06-16 It is a kind of for basement or the high-pressure slip-casting blocking method of top plate of underground parking garage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710457743.5A CN107201753B (en) 2017-06-16 2017-06-16 It is a kind of for basement or the high-pressure slip-casting blocking method of top plate of underground parking garage

Publications (2)

Publication Number Publication Date
CN107201753A true CN107201753A (en) 2017-09-26
CN107201753B CN107201753B (en) 2019-04-05

Family

ID=59907454

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710457743.5A Active CN107201753B (en) 2017-06-16 2017-06-16 It is a kind of for basement or the high-pressure slip-casting blocking method of top plate of underground parking garage

Country Status (1)

Country Link
CN (1) CN107201753B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109882203A (en) * 2019-03-08 2019-06-14 齐鲁交通发展集团有限公司建设管理分公司 A kind of joint filling reinforcement process
CN110241837A (en) * 2019-07-08 2019-09-17 中国建筑第四工程局有限公司 A kind of construction method for preventing basement bottom board from cracking under high artesian geological conditions

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3511417A1 (en) * 1985-03-29 1986-10-02 BMC Acrylchemie GmbH, 5632 Wermelskirchen Process for increasing the weathering resistance and/or strength of a porous article
CN1912315A (en) * 2006-08-23 2007-02-14 李克彪 Processing method of anti-leakage and leakage stoppage for ancient coave temple
CN1924534A (en) * 2005-08-29 2007-03-07 李海军 Method for detection and stopping leak for concrete buildings leakage source
CN104234090A (en) * 2014-09-04 2014-12-24 江苏南通三建集团有限公司 Method for treating crack water seepage of concrete floor and wall body
CN105369833A (en) * 2015-10-15 2016-03-02 昆明风行防水材料有限公司 Grouting maintenance construction method for basement roof leakage
CN105442862A (en) * 2015-11-19 2016-03-30 江苏鼎达建筑新技术有限公司 Method for leakage water plugging, strengthening and repairing against concrete crack
CN105484269A (en) * 2015-10-20 2016-04-13 中铁十六局集团北京轨道交通工程建设有限公司 Leakage prevention construction method of foundation pit support structure under blasting condition
CN105952174A (en) * 2016-05-04 2016-09-21 卢武策 Concrete roofing and ground anti-seepage leak-proof agent and anti-seepage leak-proof method
CN106544961A (en) * 2016-11-03 2017-03-29 辽宁工程技术大学 A kind of distress in concrete blocking method

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3511417A1 (en) * 1985-03-29 1986-10-02 BMC Acrylchemie GmbH, 5632 Wermelskirchen Process for increasing the weathering resistance and/or strength of a porous article
CN1924534A (en) * 2005-08-29 2007-03-07 李海军 Method for detection and stopping leak for concrete buildings leakage source
CN1912315A (en) * 2006-08-23 2007-02-14 李克彪 Processing method of anti-leakage and leakage stoppage for ancient coave temple
CN104234090A (en) * 2014-09-04 2014-12-24 江苏南通三建集团有限公司 Method for treating crack water seepage of concrete floor and wall body
CN105369833A (en) * 2015-10-15 2016-03-02 昆明风行防水材料有限公司 Grouting maintenance construction method for basement roof leakage
CN105484269A (en) * 2015-10-20 2016-04-13 中铁十六局集团北京轨道交通工程建设有限公司 Leakage prevention construction method of foundation pit support structure under blasting condition
CN105442862A (en) * 2015-11-19 2016-03-30 江苏鼎达建筑新技术有限公司 Method for leakage water plugging, strengthening and repairing against concrete crack
CN105952174A (en) * 2016-05-04 2016-09-21 卢武策 Concrete roofing and ground anti-seepage leak-proof agent and anti-seepage leak-proof method
CN106544961A (en) * 2016-11-03 2017-03-29 辽宁工程技术大学 A kind of distress in concrete blocking method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
山东交通科技: "地铁车站工程砼裂缝渗漏水堵漏施工处理技术", 《山东交通科技》 *
张建华: "地铁车站针孔法高压灌浆堵漏施工技术", 《施工技术》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109882203A (en) * 2019-03-08 2019-06-14 齐鲁交通发展集团有限公司建设管理分公司 A kind of joint filling reinforcement process
CN110241837A (en) * 2019-07-08 2019-09-17 中国建筑第四工程局有限公司 A kind of construction method for preventing basement bottom board from cracking under high artesian geological conditions

Also Published As

Publication number Publication date
CN107201753B (en) 2019-04-05

Similar Documents

Publication Publication Date Title
CN107060116B (en) A kind of high-pressure slip-casting blocking method for building settlement seam
US3623330A (en) Sealing off formation having pores in civil engineering or architectural construction work
CN109457735A (en) A kind of concrete wall and the restorative procedure in bottom plate infiltration crack
KR101907141B1 (en) Sealing composition for umbrella arch method and process for preparing the same
CN106480993B (en) Administration structure and construction method in a kind of construction exterior wall leak repairing reinforcement
CN107165434B (en) A kind of high-pressure slip-casting blocking method for toilet floor
CN215669744U (en) Masonry structure basement seepage slip casting repair structure
CN107201753B (en) It is a kind of for basement or the high-pressure slip-casting blocking method of top plate of underground parking garage
CN206143827U (en) Underground works crack repairing structure
CN112459010A (en) Hydraulic engineering concrete dam leakage-repairing reinforcing grouting method
CN108915690B (en) Novel method for preventing water gushing of vertical shaft well wall in vertical shaft aquifer tunneling
CN112832826A (en) Tunnel deformation joint plugging construction process
CN111809670A (en) Leaking stoppage grouting and reinforcing construction method for basement exterior wall construction joint
CN111472818A (en) Grouting construction method for water seepage of tunnel
CN110241837A (en) A kind of construction method for preventing basement bottom board from cracking under high artesian geological conditions
CN112252491B (en) Seepage-proofing device for concrete structure deformation joint and construction process thereof
CN110159307A (en) A kind of tunnel multilayer grouting process
JP3996009B2 (en) Two-part waterstop composition
CN111809606A (en) Basement exterior wall leaking stoppage grouting and reinforcing construction method
KR20090022207A (en) Water leakage maintenance structure and method of joint using high efficiency grout materials
KR102378409B1 (en) Pressure type grouting apparatus for reinforcing the ground and construction method using the same
CN213979354U (en) Anti-seepage device for concrete structure deformation joint
CN214462853U (en) Self-healing concrete micro-crack repairing structure
CN1225974A (en) Technology for quickly resuming normal construction after wellhole submerged by sudden water
JP2001020532A (en) Method for modifying and reinforcing concrete

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20211029

Address after: Room 801, 85 Kefeng Road, Huangpu District, Guangzhou City, Guangdong Province

Patentee after: Yami Technology (Guangzhou) Co., Ltd

Address before: No. 5147, Dongfeng East Street, Weifang, Shandong 261000

Patentee before: WEIFANG University

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220218

Address after: 300000 room 1101, gate 2, building 8, Yingrun Park, Zhongbei Avenue, Zhongbei Town, Xiqing District, Tianjin

Patentee after: Tianjin jiayide waterproof plugging Engineering Co.,Ltd.

Address before: Room 801, 85 Kefeng Road, Huangpu District, Guangzhou City, Guangdong Province

Patentee before: Yami Technology (Guangzhou) Co.,Ltd.

TR01 Transfer of patent right