CN107201753B - It is a kind of for basement or the high-pressure slip-casting blocking method of top plate of underground parking garage - Google Patents

It is a kind of for basement or the high-pressure slip-casting blocking method of top plate of underground parking garage Download PDF

Info

Publication number
CN107201753B
CN107201753B CN201710457743.5A CN201710457743A CN107201753B CN 107201753 B CN107201753 B CN 107201753B CN 201710457743 A CN201710457743 A CN 201710457743A CN 107201753 B CN107201753 B CN 107201753B
Authority
CN
China
Prior art keywords
injection slurry
crack
casting
slip
epoxy resin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710457743.5A
Other languages
Chinese (zh)
Other versions
CN107201753A (en
Inventor
马海斌
王林同
张运臣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin jiayide waterproof plugging Engineering Co.,Ltd.
Original Assignee
Weifang University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Weifang University filed Critical Weifang University
Priority to CN201710457743.5A priority Critical patent/CN107201753B/en
Publication of CN107201753A publication Critical patent/CN107201753A/en
Application granted granted Critical
Publication of CN107201753B publication Critical patent/CN107201753B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
    • CCHEMISTRY; METALLURGY
    • C08ORGANIC MACROMOLECULAR COMPOUNDS; THEIR PREPARATION OR CHEMICAL WORKING-UP; COMPOSITIONS BASED THEREON
    • C08FMACROMOLECULAR COMPOUNDS OBTAINED BY REACTIONS ONLY INVOLVING CARBON-TO-CARBON UNSATURATED BONDS
    • C08F120/00Homopolymers of compounds having one or more unsaturated aliphatic radicals, each having only one carbon-to-carbon double bond, and only one being terminated by only one carboxyl radical or a salt, anhydride, ester, amide, imide or nitrile thereof
    • C08F120/02Monocarboxylic acids having less than ten carbon atoms; Derivatives thereof
    • C08F120/52Amides or imides
    • C08F120/54Amides, e.g. N,N-dimethylacrylamide or N-isopropylacrylamide
    • C08F120/56Acrylamide; Methacrylamide
    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
    • C09JADHESIVES; NON-MECHANICAL ASPECTS OF ADHESIVE PROCESSES IN GENERAL; ADHESIVE PROCESSES NOT PROVIDED FOR ELSEWHERE; USE OF MATERIALS AS ADHESIVES
    • C09J163/00Adhesives based on epoxy resins; Adhesives based on derivatives of epoxy resins
    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
    • C09JADHESIVES; NON-MECHANICAL ASPECTS OF ADHESIVE PROCESSES IN GENERAL; ADHESIVE PROCESSES NOT PROVIDED FOR ELSEWHERE; USE OF MATERIALS AS ADHESIVES
    • C09J175/00Adhesives based on polyureas or polyurethanes; Adhesives based on derivatives of such polymers
    • C09J175/04Polyurethanes
    • C09J175/08Polyurethanes from polyethers

Landscapes

  • Chemical & Material Sciences (AREA)
  • Organic Chemistry (AREA)
  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Medicinal Chemistry (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Health & Medical Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Polymers & Plastics (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Sealing Material Composition (AREA)
  • Working Measures On Existing Buildindgs (AREA)
  • Polyurethanes Or Polyureas (AREA)

Abstract

This application provides a kind of for basement or the high-pressure slip-casting blocking method of top plate of underground parking garage, the very strong complementarity in terms of key performance between polyurethane modified epoxy resin class injection slurry and acrylic amide injection slurry is utilized, leakage is slightly mended using polyurethane modified epoxy resin class injection slurry, leakage is mended using acrylic amide injection slurry essence on this basis, to have complementary advantages, combination among the strong ones, and it maximizes favourable factors and minimizes unfavourable ones, realize the quick grouting for water plugging of basement or top plate of underground parking garage, improve leak stopping quality, improve the persistence of leak stopping, and do not destroy the original structure and function of building, meet architectural development needs at this stage.

Description

It is a kind of for basement or the high-pressure slip-casting blocking method of top plate of underground parking garage
Technical field
The present invention relates to technical field of building construction, more particularly, to a kind of for basement or the height of top plate of underground parking garage Pressure grouting blocking method.
Background technique
Residential building basement roof percolating water phenomenon, reduces the service life of building, can also drastically influence underground The normal use situation of room.Patent CN 105369833A is related to a kind of basement roof leakage slip casting maintenance engineering method, but using biography Slip casting method of uniting carries out leak stopping, is limited by grouting equipment performance, grouting pressure 0.3Mpa.Water Seepage in Basement generally has centainly Pressure, especially basement roof bright water leakage, plugging material can not be perfused under artesian pressure in crack at all.Herein Under pressure, even if liquid be perfused is oily material, such as polyurethane or epoxy resin, entire basement may not be filled Crack, long-time service will cause secondary leak.
Top plate of underground parking garage is difficult to find leakage source since its construction is special;Once leaking, must be infused using back side Starch leaking stoppage repairing method.
At present frequently with grouting for water plugging restorative procedure be epoxy resin and polyurethane foam grouting for water plugging, epoxy resin is more For the structural strengthening of building, and polyurethane foam slip casting is chiefly used in the leak stopping processing of building.
Though polyurethane foam grouting for water plugging material has instant expansion water-stop feature in construction, there is also foaming bodies itself There may be gaps, and the shortcomings that day after-contraction, often occur as soon as the shortcomings that leaking again after construction 3 months, can not be complete Complete solution is determined the leakage problems of top plate of underground parking garage.
Polyurethane modified epoxy resin class injection slurry is a kind of novel adhesive, combines polyurethane resin and epoxy resin The advantages of: compression strength is up to 50MPa or more after solidification, and has certain elasticity;But slurries initial viscosity is big, infiltration coefficient It is small, it is difficult to be injected in very deep crack simultaneously.
And acrylic amide injection slurry gel time is short, slurries initial viscosity is low, can penetrate into concrete micro-cracks or hole In gap, gel very big telescopic resilience is waterproof after injection, but needs to do anti-chap processing after grout cures, and compression strength is low.
Therefore, how to realize the quick grouting for water plugging of basement or top plate of underground parking garage, improve leak stopping quality, improve leak stopping Persistence, and do not destroy the original structure and function of building, need to be current ability with the architectural development for meeting at this stage The technical issues of field technique personnel's urgent need to resolve.
Summary of the invention
The object of the present invention is to provide a kind of for basement or the high-pressure slip-casting blocking method of top plate of underground parking garage, the height Pressure grouting blocking method can be realized the quick grouting for water plugging of basement or top plate of underground parking garage, improve leak stopping quality, improve stifled The persistence of leakage, and the original structure and function of building are not destroyed, meet architectural development needs at this stage.
In order to solve the above technical problems, technical solution provided by the invention are as follows:
It is a kind of for basement or the high-pressure slip-casting blocking method of top plate of underground parking garage, comprising the following steps:
1) positioning leaks crack first, determines position and its length in crack, then cleans crack and its peripheral region, so Crack is sealed with leak stopping spirit afterwards;
2) according to the concrete structure thickness at crack, injected hole is being drilled at the 0-50mm of crack, and in injected hole In bury Water slop injector, injected hole cloth hole use the junction of the edges of two sheets of paper or inclined hole form, slip casting hole depth according to concrete thickness determine, pitch-row It is determined by on-site actual situations;
3) polyurethane modified epoxy resin class injection slurry is injected into the Water slop injector in step 2) with high-pressure slip-casting equipment, When grouting pressure is higher than 30MPa, stop slip casting;
Etc. 4) after the polyurethane modified epoxy resin class injection slurry solidification at crack openings, original Water slop injector is removed, and Continue the 5cm~10cm that drills on the basis of former injected hole, and buries new Water slop injector;
5) acrylic amide injection slurry is injected into the new Water slop injector in step 4) with high-pressure slip-casting equipment, until note Slurry pressure reach 100MPa or more or acrylic amide injection slurry from close on from Water slop injector or crack leak until;
6) after acrylic amide slip casting liquid grout, observation plugging effect overnight, if third should be continued there are also leaking Acrylamide injection slurry grouting operation, until breakthrough does not leak;
7) after success leak stopping, Water slop injector is removed, and closes injected hole with leak stopping spirit and entirely leaks crack.
Preferably, the polyurethane modified epoxy resin class injection slurry is dual-component polyurethane modified epoxy class gluing Agent, wherein component A is amino-terminated polyurethane elastomeric prepolymer body, and component B is bisphenol A type epoxy resin.
Preferably, the amino-terminated polyurethane elastomeric prepolymer body is proportionally mixed by isocyanates with polyol It closes, is synthesized under argon atmosphere protection and chlorobenzoyl chloride catalytic action, then proportionally react, obtain with common aromatic amine Amino-terminated polyurethane elastomeric prepolymer body.
Preferably, the isocyanates is toluene di-isocyanate(TDI), and the polyol is polyether polyol, described Common aromatic amine is m-xylene diamine;
The amino-terminated polyurethane elastomeric prepolymer body is mixed by toluene di-isocyanate(TDI) and polyether polyol according to molar ratio 4:1 It closes, is synthesized under argon atmosphere protection and chlorobenzoyl chloride catalytic action, then with m-xylene diamine according to toluene di-isocyanate(TDI): Polyether polyol: the molar ratio that m-xylene diamine is 4:1:2 reacts, and obtains amino-terminated polyurethane elastomeric prepolymer body.
Preferably, the acrylic amide injection slurry is two-component water soluble acrylamido gelling agent, and wherein component A is third Acrylamide solution, mass concentration are 5%~20%, and B component is acrylamide polymerization initiator and the aqueous solution for polymerizeing adjuvant.
Preferably, the component A is made of the raw material of following weight percent: 5%~20% acrylamide, 1% Disodium hydrogen phosphate, 0.5%~2% triethylene tetramine and the water of surplus.
Preferably, the B component is made of the raw material of following weight percent: 2%~8% ammonium persulfate, 1%~ The water of 3% sodium sulfite, 1%~5% sodium chlorate and surplus.
Preferably, the high-pressure slip-casting equipment is plunger pump, and highest outlet pressure is 150MPa.
The application has beneficial technical effect below:
(1) the method for the present invention carries out basement or the leakage with pressure of top plate of underground parking garage is repaired, and does not cut the earth, does not demolish walls, nothing Building original structure need to be destroyed, can be constructed with water, short construction period while remediation efficiency is greatly improved, ensure that leak stopping The structure safety of building after reparation.
(2) polyurethane modified epoxy resin class injection slurry of the present invention can form the elastomer with reticular structure, Gu After being melted into film, it is firmly combined with concrete, the leakage of acrylic amide injection slurry under the conditions of high-pressure slip-casting can be prevented, influence leak stopping Effect.
(3) cost performance height, A, the B component initial viscosity of acrylic amide injection slurry of the present invention are small, slip casting gel Imporosity, elongation is good, does not crack for a long time, and can polymerize under conditions of construction temperature minimum zero degrees celsius, acrylamide The content of the polymerization initiator and polymerization adjuvant in B component in class injection slurry is adjustable, guarantees A, B component in any construction temperature Simultaneously gel time was maintained in 1~5 minute the lower generation polymerization of degree.
(4) two-component water soluble acrylamido's gelling agent property prepared by the present invention is stablized, and Storage period is long, uses letter It is single, it is very big to ensure that construction safety.
(5) slip casting pump pressure of the present invention is high, can guarantee that acrylic amide injection slurry is sufficient filling with basement or ground Lower garage foig forms T-shaped repairing, fully ensures that the long-term effect of pressurization sealing.
Specific embodiment
For a further understanding of the present invention, the preferred embodiment of the invention is described below with reference to embodiment, still It should be appreciated that these descriptions only further illustrate feature and advantage of the invention, rather than to the limit of the claims in the present invention System.
This application provides a kind of for basement or the high-pressure slip-casting blocking method of top plate of underground parking garage, including following step It is rapid:
1) positioning leaks crack first, determines position and its length in crack, then cleans crack and its peripheral region, so Crack is sealed with leak stopping spirit afterwards;
2) according to the concrete structure thickness at crack, injected hole is being drilled at the 0-50mm of crack, and in injected hole In bury Water slop injector, injected hole cloth hole use the junction of the edges of two sheets of paper or inclined hole form, slip casting hole depth according to concrete thickness determine, pitch-row It is determined by on-site actual situations;
3) polyurethane modified epoxy resin class injection slurry is injected into the Water slop injector in step 2) with high-pressure slip-casting equipment, When grouting pressure is higher than 30MPa, stop slip casting;
Etc. 4) after the polyurethane modified epoxy resin class injection slurry solidification at crack openings, original Water slop injector is removed, and Continue the 5cm~10cm that drills on the basis of former injected hole, and buries new Water slop injector;
5) acrylic amide injection slurry is injected into the new Water slop injector in step 4) with high-pressure slip-casting equipment, until note Slurry pressure reach 100MPa or more or acrylic amide injection slurry from close on from Water slop injector or crack leak until;
6) after acrylic amide slip casting liquid grout, observation plugging effect overnight, if third should be continued there are also leaking Acrylamide injection slurry grouting operation, until breakthrough does not leak;
7) after success leak stopping, Water slop injector is removed, and closes injected hole with leak stopping spirit and entirely leaks crack.
In one embodiment of the application, the polyurethane modified epoxy resin class injection slurry changes for dual-component polyurethane Property epoxy resin adhesive, wherein component A be amino-terminated polyurethane elastomeric prepolymer body, component B be bisphenol type epoxy tree Rouge.
In one embodiment of the application, the amino-terminated polyurethane elastomeric prepolymer body by isocyanates with it is polyhydroxylated It closes object proportionally to mix, synthesizes under argon atmosphere protection and chlorobenzoyl chloride catalytic action, then pressed with common aromatic amine It is reacted according to ratio, obtains amino-terminated polyurethane elastomeric prepolymer body.
In one embodiment of the application, the isocyanates is toluene di-isocyanate(TDI), the polyol For polyether polyol, the common aromatic amine is m-xylene diamine;
The amino-terminated polyurethane elastomeric prepolymer body is mixed by toluene di-isocyanate(TDI) and polyether polyol according to molar ratio 4:1 It closes, is synthesized under argon atmosphere protection and chlorobenzoyl chloride catalytic action, then with m-xylene diamine according to toluene di-isocyanate(TDI): Polyether polyol: the molar ratio that m-xylene diamine is 4:1:2 reacts, and obtains amino-terminated polyurethane elastomeric prepolymer body.
In one embodiment of the application, the acrylic amide injection slurry is two-component water soluble acrylamido gel Agent, wherein component A is acrylamide solution, and mass concentration is 5%~20%, and B component is acrylamide polymerization initiator and gathers Close the aqueous solution of adjuvant.
In one embodiment of the application, the component A is made of the raw material of following weight percent: 5%~20% Acrylamide, 1% disodium hydrogen phosphate, 0.5%~2% triethylene tetramine and surplus water.
In one embodiment of the application, the B component is made of the raw material of following weight percent: 2%~8% Ammonium persulfate, 1%~3% sodium sulfite, 1%~5% sodium chlorate and surplus water.
In one embodiment of the application, the high-pressure slip-casting equipment is plunger pump, and highest outlet pressure is 150MPa.
Leak stopping principle provided by the present application for basement or the high-pressure slip-casting blocking method of top plate of underground parking garage:
Compression strength is up to 50MPa or more after the solidification of polyurethane modified epoxy resin class injection slurry, but its slurries initially glues Degree is big, and infiltration coefficient is small, is difficult to be injected in very deep very thin crack, and elasticity is moderate;
And compression strength is low after the solidification of acrylic amide injection slurry, and need to do anti-chap processing, but its slurries initial viscosity Low, infiltration coefficient is big, can penetrate into micro-cracks or hole, and gel time is short, and gel has very big telescopic resilience, after injection It is waterproof;
As it can be seen that polyurethane modified epoxy resin class injection slurry and acrylic amide injection slurry, compression strength after solidification Aspect, pre-large post-small, pre-large post-small in terms of initial viscosity, pre-small post-large in terms of infiltration coefficient, elasticity side after solidification Face, pre-small post-large, the two has very strong complementarity at least in terms of four key performances;
It is moderate up to 50MPa or more, elasticity using compression strength after the solidification of polyurethane modified epoxy resin class injection slurry Feature allows it as the support frame after fracture plugging grout cures, as the coagulum after the entire grout cures of skeletal support, It is the same similar to the concrete after the coarse aggregate support solidification in concrete, using at the beginning of polyurethane modified epoxy resin class injection slurry Beginning viscosity is big, infiltration coefficient is small, is difficult the feature injected in very deep very thin crack, allows big seam in its filling cracks, etc. Many tiny gaps or cavity are formed after it is solidified, among coagulum, so that big seam in a disguised form is become crack;
Low using acrylic amide injection slurry initial viscosity, infiltration coefficient is big, can penetrate into spy in micro-cracks or hole Point, many tiny gaps or sky that the coagulum centre after filling up the solidification of polyurethane modified epoxy resin class injection slurry is formed Hole, and since grouting pressure is in 100MPa or more, the acrylic amide injection slurry for allowing infiltration coefficient big fills up almost institute Fine gap among coagulum or cavity after the solidification of some polyurethane modified epoxy resin class injection slurries, and due to acryloyl The injected hole of amine injection slurry be continue on the basis of polyurethane modified epoxy resin class injection slurry injected hole drill 5cm~ 10cm, so that the slip casting entrance of acrylic amide injection slurry is solidifying after being opened in the solidification of polyurethane modified epoxy resin class injection slurry Gu inside object, acrylic amide injection slurry is the center portion from the coagulum after the solidification of polyurethane modified epoxy resin class injection slurry Around edge spread, after the two all solidifies, obtain be the coagulum of polyurethane modified epoxy resin class injection slurry from the outside It is wrapped in the coagulum of acrylic amide injection slurry, as the hard plate first of one side protects the inside lower spun gold hapalonychia of intensity, There is the outer guard of the coagulum of polyurethane modified epoxy resin class injection slurry, is no longer needed to after the solidification of acrylic amide injection slurry Do anti-chap processing as in traditional handicraft, time saving and energy saving cost-saving, and due to acrylic amide injection slurry have it is very big Telescopic resilience, the fine gap among coagulum or third in cavity after the solidification of polyurethane modified epoxy resin class injection slurry After the solidification of acrylamide injection slurry, the coagulum of acrylic amide injection slurry can be largely expanded, by polyurethane modified epoxy tree Lipid injection slurry solidification after coagulum among many tiny gaps or cavity further turgor and sealing, thus significantly Improve plugging effect;
Present invention take advantage of that the very strong complementarity in terms of certain key performances between the two, utilization are polyurethane-modified Epoxy resin injection slurry slightly mends leakage, mends leakage using acrylic amide injection slurry essence on this basis, is changed using polyurethane Property the big seam of epoxy resin injection slurry leak stopping, on this basis utilize acrylic amide injection slurry leak stopping fine crack, utilize polyurethane Modified epoxy class injection slurry forms hard support frame, forms skeleton using acrylic amide injection slurry on this basis In soft filler, using polyurethane modified epoxy resin class injection slurry formed outer guard, on this basis utilize propylene Amides injection slurry forms the intumescent filler object of inside, thus have complementary advantages, combination among the strong ones, and maximize favourable factors and minimize unfavourable ones, realize underground The quick grouting for water plugging of room or top plate of underground parking garage, improves leak stopping quality, improves the persistence of leak stopping, and do not destroy building The original structure and function of object meet architectural development needs at this stage.
There is no limit using in the art to processing equipment unmentioned in the above method and technological parameter by the present invention Processing equipment and technological parameter known to technical staff.
For a further understanding of the present invention, below with reference to embodiment to provided by the invention a kind of for basement or underground The high-pressure slip-casting blocking method of shed deckhead is described in detail, and protection scope of the present invention is not limited by the following examples.
Embodiment 1:
Cell top plate of underground parking garage leakage in Weifang is repaired: the following steps are included:
1) positioning leaks crack first, determines position and its length in crack, then cleans crack and its peripheral region, so Crack is sealed with leak stopping spirit afterwards;
2) according to the concrete structure thickness at crack, injected hole is being drilled at the 10mm of crack, and in injected hole Embedded Water slop injector, injected hole cloth hole use the junction of the edges of two sheets of paper or inclined hole form, and slip casting hole depth determines that pitch-row is pressed according to concrete thickness On-site actual situations determine;
3) polyurethane modified epoxy resin class injection slurry is injected into the Water slop injector in step 2) with high-pressure slip-casting equipment, When grouting pressure is higher than 30MPa, stop slip casting;
The polyurethane modified epoxy resin class injection slurry is dual-component polyurethane modified epoxy class adhesive, wherein Component A is amino-terminated polyurethane elastomeric prepolymer body, and component B is bisphenol A type epoxy resin;
The amino-terminated polyurethane elastomeric prepolymer body is mixed by toluene di-isocyanate(TDI) and polyether polyol according to molar ratio 4:1 It closes, is synthesized under argon atmosphere protection and chlorobenzoyl chloride catalytic action, then with m-xylene diamine according to toluene di-isocyanate(TDI): Polyether polyol: the molar ratio that m-xylene diamine is 4:1:2 reacts, and obtains amino-terminated polyurethane elastomeric prepolymer body;
Etc. 4) after the polyurethane modified epoxy resin class injection slurry solidification at crack openings, original Water slop injector is removed, and Continue the 6cm that drills on the basis of former injected hole, and buries new Water slop injector;
The acrylic amide injection slurry is two-component water soluble acrylamido gelling agent, and wherein component A is acrylamide Solution, mass concentration 15%, B component are acrylamide polymerization initiator and the aqueous solution for polymerizeing adjuvant;
The component A is made of the raw material of following weight percent: 15% acrylamide, 1% disodium hydrogen phosphate, 1% triethylene tetramine and the water of surplus;
The B component is made of the raw material of following weight percent: 5% ammonium persulfate, 2% sodium sulfite, 3% The water of sodium chlorate and surplus;
5) acrylic amide injection slurry is injected into the new Water slop injector in step 4) with high-pressure slip-casting equipment, until note Slurry pressure reach 100MPa or more or acrylic amide injection slurry from close on from Water slop injector or crack leak until;
6) after acrylic amide slip casting liquid grout, observation plugging effect overnight, if third should be continued there are also leaking Acrylamide injection slurry grouting operation, until breakthrough does not leak;
7) after success leak stopping, Water slop injector is removed, and closes injected hole with leak stopping spirit and entirely leaks crack.
The above description of the embodiment is only used to help understand the method for the present invention and its core ideas.It should be pointed out that pair For those skilled in the art, without departing from the principle of the present invention, the present invention can also be carried out Some improvements and modifications, these improvements and modifications also fall within the scope of protection of the claims of the present invention.
The foregoing description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. A variety of modifications for these embodiments are it will be apparent that as defined herein one for those skilled in the art As principle can realize in other embodiments without departing from the spirit or scope of the present invention.Therefore, the present invention will It will not be intended to be limited to the embodiments shown herein, and be to fit to consistent with the principles and novel features disclosed herein Widest range.

Claims (6)

1. a kind of for basement or the high-pressure slip-casting blocking method of top plate of underground parking garage, which comprises the following steps:
1) positioning leaks crack first, determines position and its length in crack, then cleans crack and its peripheral region, then uses Leak stopping spirit seals crack;
2) according to the concrete structure thickness at crack, injected hole is being drilled at the 0-50mm of crack, and is being buried in injected hole If Water slop injector, injected hole cloth hole uses the junction of the edges of two sheets of paper or inclined hole form, and slip casting hole depth determines that pitch-row is by existing according to concrete thickness Field actual conditions determine;
3) polyurethane modified epoxy resin class injection slurry is injected into the Water slop injector in step 2) with high-pressure slip-casting equipment, work as note When starching pressure higher than 30MPa, stop slip casting;
Etc. 4) after the polyurethane modified epoxy resin class injection slurry solidification at crack openings, original Water slop injector is removed, and in original Continue the 5cm~10cm that drills on the basis of injected hole, and buries new Water slop injector;
5) acrylic amide injection slurry is injected into the new Water slop injector in step 4) with high-pressure slip-casting equipment, until slip casting pressure Power reach 100MPa or more or acrylic amide injection slurry from close on from Water slop injector or crack leak until;
6) after acrylic amide slip casting liquid grout, observation plugging effect overnight, if acryloyl should be continued there are also leaking Amine injection slurry grouting operation, until breakthrough does not leak;
7) after success leak stopping, Water slop injector is removed, and closes injected hole with leak stopping spirit and entirely leaks crack;
The polyurethane modified epoxy resin class injection slurry is dual-component polyurethane modified epoxy class adhesive, wherein first group Part is amino-terminated polyurethane elastomeric prepolymer body, and component B is bisphenol A type epoxy resin;
The acrylic amide injection slurry is two-component water soluble acrylamido gelling agent, and wherein component A is acrylamide solution, Mass concentration is 5%~20%, and B component is acrylamide polymerization initiator and the aqueous solution for polymerizeing adjuvant.
2. high-pressure slip-casting blocking method according to claim 1, which is characterized in that the amino-terminated polyurethane elastomeric prepolymer Body is proportionally mixed by isocyanates with polyol, is closed under argon atmosphere protection and chlorobenzoyl chloride catalytic action At then proportionally being reacted with common aromatic amine, obtain amino-terminated polyurethane elastomeric prepolymer body.
3. high-pressure slip-casting blocking method according to claim 2, which is characterized in that the isocyanates is toluene diisocyanate Acid esters, the polyol are polyether polyol, and the common aromatic amine is m-xylene diamine;
The amino-terminated polyurethane elastomeric prepolymer body is mixed with polyether polyol according to molar ratio 4:1 by toluene di-isocyanate(TDI), It is synthesized under argon atmosphere protection and chlorobenzoyl chloride catalytic action, then with m-xylene diamine according to toluene di-isocyanate(TDI): poly- Ethoxylated polyhydric alcohol: the molar ratio that m-xylene diamine is 4:1:2 reacts, and obtains amino-terminated polyurethane elastomeric prepolymer body.
4. high-pressure slip-casting blocking method according to claim 1, which is characterized in that the component A is by following weight percent Several raw materials are made: 5%~20% acrylamide, 1% disodium hydrogen phosphate, 0.5%~2% triethylene tetramine and remaining The water of amount.
5. high-pressure slip-casting blocking method according to claim 1, which is characterized in that the B component is by following weight percent Several raw materials are made: 2%~8% ammonium persulfate, 1%~3% sodium sulfite, 1%~5% sodium chlorate and surplus Water.
6. high-pressure slip-casting blocking method according to claim 1, which is characterized in that the high-pressure slip-casting equipment is plunger Pump, highest outlet pressure are 150MPa.
CN201710457743.5A 2017-06-16 2017-06-16 It is a kind of for basement or the high-pressure slip-casting blocking method of top plate of underground parking garage Active CN107201753B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710457743.5A CN107201753B (en) 2017-06-16 2017-06-16 It is a kind of for basement or the high-pressure slip-casting blocking method of top plate of underground parking garage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710457743.5A CN107201753B (en) 2017-06-16 2017-06-16 It is a kind of for basement or the high-pressure slip-casting blocking method of top plate of underground parking garage

Publications (2)

Publication Number Publication Date
CN107201753A CN107201753A (en) 2017-09-26
CN107201753B true CN107201753B (en) 2019-04-05

Family

ID=59907454

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710457743.5A Active CN107201753B (en) 2017-06-16 2017-06-16 It is a kind of for basement or the high-pressure slip-casting blocking method of top plate of underground parking garage

Country Status (1)

Country Link
CN (1) CN107201753B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109882203B (en) * 2019-03-08 2021-02-23 山东高速集团有限公司 Combined filling and reinforcing process
CN110241837A (en) * 2019-07-08 2019-09-17 中国建筑第四工程局有限公司 A kind of construction method for preventing basement bottom board from cracking under high artesian geological conditions

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3511417A1 (en) * 1985-03-29 1986-10-02 BMC Acrylchemie GmbH, 5632 Wermelskirchen Process for increasing the weathering resistance and/or strength of a porous article
CN1912315A (en) * 2006-08-23 2007-02-14 李克彪 Processing method of anti-leakage and leakage stoppage for ancient coave temple
CN1924534A (en) * 2005-08-29 2007-03-07 李海军 Method for detection and stopping leak for concrete buildings leakage source
CN104234090A (en) * 2014-09-04 2014-12-24 江苏南通三建集团有限公司 Method for treating crack water seepage of concrete floor and wall body
CN105369833A (en) * 2015-10-15 2016-03-02 昆明风行防水材料有限公司 Grouting maintenance construction method for basement roof leakage
CN105442862A (en) * 2015-11-19 2016-03-30 江苏鼎达建筑新技术有限公司 Method for leakage water plugging, strengthening and repairing against concrete crack
CN105484269A (en) * 2015-10-20 2016-04-13 中铁十六局集团北京轨道交通工程建设有限公司 Leakage prevention construction method of foundation pit support structure under blasting condition
CN105952174A (en) * 2016-05-04 2016-09-21 卢武策 Concrete roofing and ground anti-seepage leak-proof agent and anti-seepage leak-proof method
CN106544961A (en) * 2016-11-03 2017-03-29 辽宁工程技术大学 A kind of distress in concrete blocking method

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3511417A1 (en) * 1985-03-29 1986-10-02 BMC Acrylchemie GmbH, 5632 Wermelskirchen Process for increasing the weathering resistance and/or strength of a porous article
CN1924534A (en) * 2005-08-29 2007-03-07 李海军 Method for detection and stopping leak for concrete buildings leakage source
CN1912315A (en) * 2006-08-23 2007-02-14 李克彪 Processing method of anti-leakage and leakage stoppage for ancient coave temple
CN104234090A (en) * 2014-09-04 2014-12-24 江苏南通三建集团有限公司 Method for treating crack water seepage of concrete floor and wall body
CN105369833A (en) * 2015-10-15 2016-03-02 昆明风行防水材料有限公司 Grouting maintenance construction method for basement roof leakage
CN105484269A (en) * 2015-10-20 2016-04-13 中铁十六局集团北京轨道交通工程建设有限公司 Leakage prevention construction method of foundation pit support structure under blasting condition
CN105442862A (en) * 2015-11-19 2016-03-30 江苏鼎达建筑新技术有限公司 Method for leakage water plugging, strengthening and repairing against concrete crack
CN105952174A (en) * 2016-05-04 2016-09-21 卢武策 Concrete roofing and ground anti-seepage leak-proof agent and anti-seepage leak-proof method
CN106544961A (en) * 2016-11-03 2017-03-29 辽宁工程技术大学 A kind of distress in concrete blocking method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
地铁车站工程砼裂缝渗漏水堵漏施工处理技术;山东交通科技;《山东交通科技》;20080630;第52-54页
地铁车站针孔法高压灌浆堵漏施工技术;张建华;《施工技术》;20151231;第44卷;第433-435页

Also Published As

Publication number Publication date
CN107201753A (en) 2017-09-26

Similar Documents

Publication Publication Date Title
CN107060116B (en) A kind of high-pressure slip-casting blocking method for building settlement seam
US3623330A (en) Sealing off formation having pores in civil engineering or architectural construction work
CN103898873A (en) Water seepage plugging construction method of shaft construction seams under high water head
CN107165434B (en) A kind of high-pressure slip-casting blocking method for toilet floor
CN106480993B (en) Administration structure and construction method in a kind of construction exterior wall leak repairing reinforcement
CN215669744U (en) Masonry structure basement seepage slip casting repair structure
CN107201753B (en) It is a kind of for basement or the high-pressure slip-casting blocking method of top plate of underground parking garage
CN110984160B (en) Underwater repair method for water seepage crack of concrete panel
CN110396186A (en) A kind of hydrophilic polyether, preparation method and its usage
KR101881338B1 (en) Construction method for soil sheathing structure having zero pressure grouting cut off wall and soil sheathing structure constructed by the same
CN112459010A (en) Hydraulic engineering concrete dam leakage-repairing reinforcing grouting method
CN100425803C (en) Composite lining suitable for surrounding rock after-deformation
CN110159307A (en) A kind of tunnel multilayer grouting process
CN110241837A (en) A kind of construction method for preventing basement bottom board from cracking under high artesian geological conditions
JP3996009B2 (en) Two-part waterstop composition
CN214462853U (en) Self-healing concrete micro-crack repairing structure
JP2010270288A (en) Chemical liquid injection material using water-absorbing resin having surface covered with hydrophilic polymer compound as coating material and chemical liquid injection construction method
JP2001020532A (en) Method for modifying and reinforcing concrete
CN114412503A (en) Composite separation protection method for preventing landfill leachate from eroding tunnel lining structure
KR19980067712A (en) Injectable liquid for preventing or leaking concrete structures and waterproofing method using the infused liquid
CN111809669A (en) Basement post-cast strip leaking stoppage grouting and reinforcing construction method
Shen et al. Optimization of Exothermic, Foaming, and Mechanical Properties of Modified Polyurethane as Filling Material for Goaf Sealing Wall
CN113186963A (en) Tower crane foundation pit decompression grouting construction method
CN213417825U (en) Anti-seepage leaking stoppage construction structure based on deep foundation pit
CN213979354U (en) Anti-seepage device for concrete structure deformation joint

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20211029

Address after: Room 801, 85 Kefeng Road, Huangpu District, Guangzhou City, Guangdong Province

Patentee after: Yami Technology (Guangzhou) Co., Ltd

Address before: No. 5147, Dongfeng East Street, Weifang, Shandong 261000

Patentee before: WEIFANG University

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220218

Address after: 300000 room 1101, gate 2, building 8, Yingrun Park, Zhongbei Avenue, Zhongbei Town, Xiqing District, Tianjin

Patentee after: Tianjin jiayide waterproof plugging Engineering Co.,Ltd.

Address before: Room 801, 85 Kefeng Road, Huangpu District, Guangzhou City, Guangdong Province

Patentee before: Yami Technology (Guangzhou) Co.,Ltd.

TR01 Transfer of patent right