CN105937308A - Basement bottom plate seepage crack grouting structure and grouting method thereof - Google Patents
Basement bottom plate seepage crack grouting structure and grouting method thereof Download PDFInfo
- Publication number
- CN105937308A CN105937308A CN201610478714.2A CN201610478714A CN105937308A CN 105937308 A CN105937308 A CN 105937308A CN 201610478714 A CN201610478714 A CN 201610478714A CN 105937308 A CN105937308 A CN 105937308A
- Authority
- CN
- China
- Prior art keywords
- crack
- infiltration
- basement bottom
- slurry outlet
- outlet nozzle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
- E04G23/0203—Arrangements for filling cracks or cavities in building constructions
- E04G23/0211—Arrangements for filling cracks or cavities in building constructions using injection
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Electrochemistry (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
The invention provides a basement bottom plate seepage crack grouting structure and a grouting method thereof. A seepage crack (2) is distributed in a basement bottom plate (1) in the grouting structure in the thickness direction, a flow guide hole (3) is obliquely formed in the basement bottom plate (1), the bottom end of the flow guide hole (3) intersects with the seepage crack (2), sealant is arranged on the surface of the seepage crack (2), and one or more grout outlet nozzles (4) are buried in the seepage crack (2) in the length direction. According to the grouting method, by drilling the oblique flow guide hole (3), a water-free environment is created for grouting of the seepage crack (2), and then the seepage crack (2) is processed through a pressure grouting mode. The problem that in the prior art, a lot of water exists in the seepage crack of the basement bottom plate is effectively handled.
Description
Technical field
The present invention relates to a kind of slip casting structure, a kind of basement bottom board infiltration crack slip casting structure and slip casting thereof
Engineering method.
Background technology
Along with the fast development of China's economy, the continuous quickening of urbanization process, construction scale of projects increases day by day, how really
While protecting construction engineering quality, building can be made again permanent, safe use to go down, gradually become governments at all levels and society
The focus of meeting all circles.In numerous engineering constructions, concrete uses face ratio wide, and the crack problem of concrete is simultaneously
Through becoming problem relatively conventional in construction quality;Distress in concrete divides according to local environment can be divided into dry and cracked seam and infiltration substantially
Two kinds of crack.
Not having the crack of open fire in dry and cracked seam i.e. crack, this fracture unit mode ratio is more conventional, and it is typically with chemistry note
The mode of slurry carries out crack treatment.Infiltration crack, owing to there being the existence of water, can not effectively process, particularly basement all the time
The infiltration crack treatment of base plate is always difficult point.
Summary of the invention
Present invention aims to existing can not the effective problem such as process to basement bottom board infiltration crack, it is provided that a kind of ground
Lower room base plate infiltration crack slip casting structure and slip casting construction method thereof.
For achieving the above object, used technical solution is the present invention: a kind of basement bottom board infiltration crack slip casting structure,
Including basement bottom board, on described basement bottom board, through-thickness is distributed infiltration crack, angularly disposed on basement bottom board
Having pod apertures, described pod apertures bottom to intersect with infiltration crack, described infiltration fracture faces is provided with fluid sealant, and infiltration is split
Sew on and be alongst embedded with one or more slurry outlet nozzle.
Described pod apertures and basement bottom board angle of intersection are 45 degree.
Described pod apertures bottom is intersected in the middle part of infiltration crack.
Spacing between described adjacent slurry outlet nozzle is 30cm.
The slip casting construction method of a kind of basement bottom board infiltration crack slip casting structure, comprises the following steps:
Step one, first along being that pod apertures is beaten in 45 degree of directions with basement bottom board angle of intersection, makes this pod apertures and seeps water in crack
Portion crosses;Step 2, then cleaning infiltration crack, bury slurry outlet nozzle underground on infiltration crack the most at a certain distance,
With fluid sealant, infiltration fracture faces is all sealed again;Step 3, after the sealing glue solidifying of water crack seam surface for seep, along water conservancy diversion
Hole starts from infiltration one end, crack toward other end slip casing by pressure, and slurry outlet nozzle is to emit clear water to be followed by emitting underflow, if only burying underground at the beginning
One slurry outlet nozzle, then blocking after this slurry outlet nozzle emerges underflow, if burying multiple slurry outlet nozzle underground, then treating that first slurry outlet nozzle is emerged clearly
During water, close other slurry outlet nozzles, then emerge first slurry outlet nozzle of underflow rear enclosed at first slurry outlet nozzle, and successively to remainder
Slurry outlet nozzle carry out aforesaid operations, slip casing by pressure amount herein by formula below control: average thickness x crack, penetration of fracture x crack is long
Degree.
When the fracture length that seeps water is more than 2m, 1m can be spaced and offer pod apertures, and repeat the above steps one to three again.
Compared with prior art, the invention has the beneficial effects as follows:
By arranging pod apertures water conservancy diversion in the present invention, create water-less environment for infiltration crack slip casting, then use the side of slip casing by pressure
Infiltration crack is processed by formula, can be widely applied in basement bottom board crack such that it is able to effectively process the most a large amount of existence
Basement bottom board infiltration crack in the difficult problem of existence of water.
Accompanying drawing explanation
Fig. 1 is present configuration schematic diagram.
Fig. 2 is slip casing by pressure floor map in the present invention.
In figure, basement bottom board 1, crack 2 of seeping water, pod apertures 3, slurry outlet nozzle 4.
Detailed description of the invention
Illustrate that the present invention is described in further detail with detailed description of the invention below in conjunction with accompanying drawing.
Seeing Fig. 1 to Fig. 2, a kind of basement bottom board infiltration crack slip casting structure, including basement bottom board 1;At the bottom of described basement
On plate 1, through-thickness is distributed infiltration crack 2.Angularly disposed on basement bottom board 1 have pod apertures 3, described pod apertures 3 bottom
Intersect with infiltration crack 2.Described infiltration crack 2 surface configuration has fluid sealant, infiltration to be alongst embedded with one on crack 2
Individual or multiple slurry outlet nozzles 4.
Seeing Fig. 1 to Fig. 2, described pod apertures 3 is 45 degree with basement bottom board 1 angle of intersection.
Seeing Fig. 1, described pod apertures 3 bottom is intersected in the middle part of infiltration crack 2.Infiltration crack 2 is that a kind of two ends are relatively thin, middle
The crack of drum, pod apertures 3 is just heaved position in the middle part of crack 2 in 45 degree angles intersect with being seeped water under normal circumstances.
Seeing Fig. 2, the spacing between described adjacent slurry outlet nozzle 4 is 30cm.
See Fig. 1 to Fig. 2, the slip casting construction method of a kind of basement bottom board infiltration crack slip casting structure, by arranging pod apertures 3 water conservancy diversion,
Create water-less environment for infiltration crack 2 slip casting, then use the mode of slip casing by pressure that infiltration crack 2 is processed, specifically include
Following steps:
Step one, first along being that pod apertures 3 is beaten in 45 degree of directions with basement bottom board 1 angle of intersection, makes this pod apertures 3 and infiltration crack
Cross in the middle part of in the of 2.
Step 2, then cleaning infiltration crack 2, bury slurry outlet nozzle 4 underground on infiltration crack 2 the most at a certain distance, this
Individual spacing is typically to be about 30cm;With fluid sealant, surface, infiltration crack 2 is all sealed again.
Step 3, after the sealing glue solidifying on 2 surfaces is stitched in water crack for seep, starts from infiltration one end, crack 2 toward the other end along pod apertures 3
Slip casing by pressure, slurry outlet nozzle 4 is to emit clear water to be followed by emitting underflow at the beginning, if only burying a slurry outlet nozzle 4 underground, then treats this slurry outlet nozzle 4
Block after underflow of emerging.If burying multiple slurry outlet nozzle 4 underground, then, when first slurry outlet nozzle 4 emerges clear water, close other slurry outlet nozzles 4,
Then emerge first slurry outlet nozzle 4 of underflow rear enclosed at first slurry outlet nozzle 4, and successively remaining slurry outlet nozzle 4 is carried out above-mentioned behaviour
Make.Slip casing by pressure amount herein is controlled by formula below: penetration of fracture x crack average thickness x fracture length.
Concrete, when crack 2 length that seeps water is more than 2m, 1m can be spaced and offer pod apertures 3, and repeat the above steps one to three again.
See Fig. 1 to Fig. 2, the composite can be widely applied in basement bottom board 1 crack such that it is able to effectively process and deposit in a large number at present
Basement bottom board 1 infiltration crack 2 in there is the difficult problem of water, it is ensured that construction quality.
Above content is to combine concrete preferred implementation further description made for the present invention, it is impossible to assert the present invention
Be embodied as be confined to these explanations.For general technical staff of the technical field of the invention, without departing from this
On the premise of inventive concept, it is also possible to make some simple deduction or replace, said structure all should be considered as belonging to the guarantor of the present invention
Protect scope.
Claims (6)
1. a basement bottom board infiltration crack slip casting structure, it is characterised in that: include basement bottom board (1), described underground
The upper through-thickness of room base plate (1) is distributed infiltration crack (2), and basement bottom board (1) is the most angularly disposed pod apertures (3),
Described pod apertures (3) bottom is intersected with infiltration crack (2), and described infiltration crack (2) surface configuration has fluid sealant, oozes
One or more slurry outlet nozzle (4) alongst it is embedded with in water crack seam (2).
A kind of basement bottom board infiltration crack slip casting structure the most according to claim 1, it is characterised in that: described water conservancy diversion
Hole (3) and basement bottom board (1) angle of intersection are 45 degree.
A kind of basement bottom board infiltration crack slip casting structure the most according to claim 1, it is characterised in that: described water conservancy diversion
Hole (3) bottom is intersected with infiltration crack (2) middle part.
A kind of basement bottom board infiltration crack slip casting structure the most according to claim 1, it is characterised in that: described adjacent go out
Spacing between slurry mouth (4) is 30cm.
5. the slip casting construction method of a basement bottom board infiltration crack slip casting structure, it is characterised in that comprise the following steps:
Step one, first edge are 45 degree with infiltration base plate (1) angle of intersection and beat pod apertures (3), make this pod apertures (3) and ooze
Water crack seam (2) middle part crosses;
Step 2, then cleaning infiltration crack (2), bury pulp underground in infiltration crack (2) the most at a certain distance
Mouth (4), then with fluid sealant, infiltration crack (2) surface is all sealed;
Step 3, after the sealing glue solidifying on water crack for seep seam (2) surface, starts from infiltration crack (2) along pod apertures (3)
One end is toward other end slip casing by pressure, and slurry outlet nozzle (4) is to emit clear water to be followed by emitting underflow at the beginning, if only burying a slurry outlet nozzle (4) underground,
Then block after this slurry outlet nozzle (4) emerges underflow,
If burying multiple slurry outlet nozzle (4) underground, then, when first slurry outlet nozzle (4) emerges clear water, close other slurry outlet nozzles (4), so
After emerge first slurry outlet nozzle (4) of underflow rear enclosed first slurry outlet nozzle (4), and successively remaining slurry outlet nozzle (4) is entered
Row aforesaid operations,
Slip casing by pressure amount herein is controlled by formula below: penetration of fracture x crack average thickness x fracture length.
The slip casting construction method of a kind of basement bottom board the most according to claim 5 infiltration crack slip casting structure, it is characterised in that
Also include below step:
When crack (2) length that seeps water is more than 2m, 1m can be spaced and offer pod apertures (3), repeat the above steps one to three again.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610478714.2A CN105937308A (en) | 2016-06-24 | 2016-06-24 | Basement bottom plate seepage crack grouting structure and grouting method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610478714.2A CN105937308A (en) | 2016-06-24 | 2016-06-24 | Basement bottom plate seepage crack grouting structure and grouting method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105937308A true CN105937308A (en) | 2016-09-14 |
Family
ID=56872256
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610478714.2A Pending CN105937308A (en) | 2016-06-24 | 2016-06-24 | Basement bottom plate seepage crack grouting structure and grouting method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105937308A (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101200978A (en) * | 2007-12-19 | 2008-06-18 | 南通华新建工集团有限公司 | Reinforcing measures for balcony crevasse |
US20100092248A1 (en) * | 2008-10-10 | 2010-04-15 | Chen Man Kim | Packer structure |
CN103174112A (en) * | 2013-03-28 | 2013-06-26 | 葛洲坝集团试验检测有限公司 | Grouting method of penetrability concrete cracks |
CN103806922A (en) * | 2014-03-06 | 2014-05-21 | 华星诚森科技(北京)有限公司 | Traction grouting process |
CN104234090A (en) * | 2014-09-04 | 2014-12-24 | 江苏南通三建集团有限公司 | Method for treating crack water seepage of concrete floor and wall body |
CN105369833A (en) * | 2015-10-15 | 2016-03-02 | 昆明风行防水材料有限公司 | Grouting maintenance construction method for basement roof leakage |
CN205822824U (en) * | 2016-06-24 | 2016-12-21 | 武大巨成结构股份有限公司 | A kind of basement bottom board infiltration crack slip casting structure |
-
2016
- 2016-06-24 CN CN201610478714.2A patent/CN105937308A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101200978A (en) * | 2007-12-19 | 2008-06-18 | 南通华新建工集团有限公司 | Reinforcing measures for balcony crevasse |
US20100092248A1 (en) * | 2008-10-10 | 2010-04-15 | Chen Man Kim | Packer structure |
CN103174112A (en) * | 2013-03-28 | 2013-06-26 | 葛洲坝集团试验检测有限公司 | Grouting method of penetrability concrete cracks |
CN103806922A (en) * | 2014-03-06 | 2014-05-21 | 华星诚森科技(北京)有限公司 | Traction grouting process |
CN104234090A (en) * | 2014-09-04 | 2014-12-24 | 江苏南通三建集团有限公司 | Method for treating crack water seepage of concrete floor and wall body |
CN105369833A (en) * | 2015-10-15 | 2016-03-02 | 昆明风行防水材料有限公司 | Grouting maintenance construction method for basement roof leakage |
CN205822824U (en) * | 2016-06-24 | 2016-12-21 | 武大巨成结构股份有限公司 | A kind of basement bottom board infiltration crack slip casting structure |
Non-Patent Citations (2)
Title |
---|
卫龙武等: "《建筑物评估、加固与改造(第2版)》", 31 January 2006, 江苏科学技术出版社 * |
袁邦权等: "《复合注浆技术在地下室裂缝渗漏治理中的应用》", 《中国建筑防水》 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2018233149A1 (en) | Argillaceous soft rock roadway partition multi-granularity grouting reinforcement method | |
CN204023501U (en) | A kind of reinforcement Anti-seeping technology structure for earth and rockfill dam | |
CN109098213A (en) | A kind of basement blocking method | |
CN105804410B (en) | Prefabricated concrete structure is vertically connected with dividing storehouse slip casing by pressure method | |
CN106544961A (en) | A kind of distress in concrete blocking method | |
CN215669744U (en) | Masonry structure basement seepage slip casting repair structure | |
CN110512801A (en) | A kind of anti-crack concrete structure and its construction method | |
CN105484204A (en) | Stone masonry dam or concrete dam sealing anti-seepage reinforcement structure and construction method thereof | |
CN204551447U (en) | Mucky soil cement mixing pile drill bit of drilling machine | |
CN205822824U (en) | A kind of basement bottom board infiltration crack slip casting structure | |
CN107653991B (en) | A kind of building, ground deformation slot construction method | |
CN105937308A (en) | Basement bottom plate seepage crack grouting structure and grouting method thereof | |
CN209353301U (en) | Asphaltic concrete core wall and dam foundation impervious wall connection structure | |
CN208072433U (en) | A kind of interim precipitation steel sleeve being used for basic posthole and catch pit | |
CN209603074U (en) | A kind of ruggedized construction of geomembrane and concrete walls connecting portion | |
CN218027470U (en) | Take glutinous rice mortar stone structure of building of multidirectional hole | |
CN203347182U (en) | Water-impermeable structural layer for toilet | |
CN202718306U (en) | Front check throat and protective corner integrated water drip | |
CN109779287A (en) | Microdilatancy water-proof emulsion construction technology | |
CN103031887B (en) | Construction method and water guide system of house bathroom water guide system | |
CN109356102A (en) | Asphaltic concrete core wall and dam foundation impervious wall connection structure | |
CN211446944U (en) | Lining structure of deep foundation pit underground structure | |
CN209099797U (en) | A kind of lossless reparation structure of building basement foig | |
CN216339388U (en) | Hydraulic tunnel crack treatment structure | |
CN208088305U (en) | A kind of foundation pit water burst fast plugging device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160914 |
|
RJ01 | Rejection of invention patent application after publication |