CN109537925A - Basement bottom board crack restorative procedure - Google Patents
Basement bottom board crack restorative procedure Download PDFInfo
- Publication number
- CN109537925A CN109537925A CN201811371345.2A CN201811371345A CN109537925A CN 109537925 A CN109537925 A CN 109537925A CN 201811371345 A CN201811371345 A CN 201811371345A CN 109537925 A CN109537925 A CN 109537925A
- Authority
- CN
- China
- Prior art keywords
- slip casting
- crack
- bottom board
- hole
- restorative procedure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
- E04G23/0203—Arrangements for filling cracks or cavities in building constructions
- E04G23/0211—Arrangements for filling cracks or cavities in building constructions using injection
Abstract
The invention discloses a kind of basement bottom board crack restorative procedures, comprising the following steps: a. cleaning;B. it drills;C. mouth is buried;D. slip casting;E. mouth is torn open.The invention has the characteristics that method is simple, easily implement, repairing effect is good, guarantees construction quality.
Description
Technical field
The present invention relates to engineering fields, and in particular to a kind of basement bottom board crack restorative procedure.
Background technique
With the fast development of China's economy, the continuous quickening of urbanization process, Large Underground parking lot, market, people's air defense
Engineering is more and more, and for the basement of large area, soleplate crack will affect whole building quality.
Summary of the invention
Problem that the purpose of the present invention is to overcome the above shortcomings provides a kind of basement bottom board crack restorative procedure.
Present invention technical solution used for the above purpose is: basement bottom board crack restorative procedure, including with
Lower step: a. cleaning: detailed inspection, analysis leakage scenarios determine slip casting hole site and spacing, clean out the area for needing to construct
Domain cuts concrete screed-coat and substrate surface precipitate, it is ensured that surface is clean, soaks;
B. it drills: being drilled using boring bar tool along crack two sides, drilling has to pass through crack, but must not punch structure;
C. it buries mouth: grouting nozzle being installed in the hole being drilled, and is tightened, make around grouting nozzle the tight between drilling, it is water-tight;
D. slip casting: using high-pressure grout injector slip casting, after adjacent holes start pulp, holding pressure 3 ~ stop this hole note after five minutes
Slurry changes the adjacent injected hole of note;
E. tear mouth open: slip casting finishes, and confirmation can be removed after not leaking or knock out exposed grouting nozzle, then cleans out cured
The injection slurry that spill and leakage goes out.
Drilling and fracture interval are 20cm-30cm, spacing of wells 10cm-20cm in step b.
When step d, facade grouting sequence is from bottom to top that since one end, single hole is carried out continuously one by one for plane slip casting.
The invention has the characteristics that method is simple, easily implement, repairing effect is good, guarantees construction quality.
Specific embodiment
The present invention is a kind of basement bottom board crack restorative procedure, comprising the following steps:
A. clear up: detailed inspection, analysis leakage scenarios determine slip casting hole site and spacing, clean out the region for needing to construct,
Cut concrete screed-coat and substrate surface precipitate, it is ensured that surface is clean, soaks;
B. it drilling: being drilled using boring bar tool along crack two sides, drilling has to pass through crack, but must not punch structure,
Drilling is 20cm-30cm, spacing of wells 10cm-20cm with fracture interval;
C. bury mouth: grouting nozzle being installed in the hole being drilled, and is tightened with Special inner hexagon spanner, make around grouting nozzle with drilling
Between tight, it is water-tight;
D. slip casting: using high-pressure grout injector slip casting, and facade grouting sequence is from bottom to top that plane slip casting is since one end, single hole
It is carried out continuously one by one, after adjacent holes start pulp, holding pressure 3 ~ stop this hole slip casting after five minutes changes the adjacent injected hole of note;
E. tear mouth open: slip casting finishes, and confirmation can be removed after not leaking or knock out exposed grouting nozzle, then cleans out cured
The injection slurry that spill and leakage goes out.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto,
Anyone skilled in the art within the technical scope of the present disclosure, according to the technique and scheme of the present invention and its
Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.
Claims (3)
1. basement bottom board crack restorative procedure, it is characterised in that the following steps are included: a. is cleared up: detailed inspection, analysis leakage
Situation determines slip casting hole site and spacing, cleans out the region for needing to construct, and cuts concrete screed-coat and substrate surface is precipitated
Object, it is ensured that surface is clean, soaks;
B. it drills: being drilled using boring bar tool along crack two sides, drilling has to pass through crack, but must not punch structure;
C. it buries mouth: grouting nozzle being installed in the hole being drilled, and is tightened, make around grouting nozzle the tight between drilling, it is water-tight;
D. slip casting: using high-pressure grout injector slip casting, after adjacent holes start pulp, holding pressure 3 ~ stop this hole note after five minutes
Slurry changes the adjacent injected hole of note;
E. tear mouth open: slip casting finishes, and confirmation can be removed after not leaking or knock out exposed grouting nozzle, then cleans out cured
The injection slurry that spill and leakage goes out.
2. basement bottom board crack as described in claim 1 restorative procedure, it is characterised in that: in step b between drilling and crack
Away from for 20cm-30cm, spacing of wells 10cm-20cm.
3. basement bottom board crack as described in claim 1 restorative procedure, it is characterised in that: when step d, facade grouting sequence
For from bottom to top, since one end, single hole is carried out continuously one by one for plane slip casting.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811371345.2A CN109537925A (en) | 2018-11-18 | 2018-11-18 | Basement bottom board crack restorative procedure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811371345.2A CN109537925A (en) | 2018-11-18 | 2018-11-18 | Basement bottom board crack restorative procedure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109537925A true CN109537925A (en) | 2019-03-29 |
Family
ID=65848101
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811371345.2A Withdrawn CN109537925A (en) | 2018-11-18 | 2018-11-18 | Basement bottom board crack restorative procedure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109537925A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110241837A (en) * | 2019-07-08 | 2019-09-17 | 中国建筑第四工程局有限公司 | A kind of construction method for preventing basement bottom board from cracking under high artesian geological conditions |
CN112049233A (en) * | 2020-08-20 | 2020-12-08 | 韶关市新城兴建筑工程有限公司 | Basement terrace seepage water repairing method |
CN112250354A (en) * | 2020-09-11 | 2021-01-22 | 广田建设工程有限公司 | Concrete crack repairing slurry and process for repairing concrete crack |
-
2018
- 2018-11-18 CN CN201811371345.2A patent/CN109537925A/en not_active Withdrawn
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110241837A (en) * | 2019-07-08 | 2019-09-17 | 中国建筑第四工程局有限公司 | A kind of construction method for preventing basement bottom board from cracking under high artesian geological conditions |
CN112049233A (en) * | 2020-08-20 | 2020-12-08 | 韶关市新城兴建筑工程有限公司 | Basement terrace seepage water repairing method |
CN112250354A (en) * | 2020-09-11 | 2021-01-22 | 广田建设工程有限公司 | Concrete crack repairing slurry and process for repairing concrete crack |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109537925A (en) | Basement bottom board crack restorative procedure | |
CN106321121A (en) | Vibration disturbance resistant crack leaking stoppage and reinforcement method applied to underground works | |
CN202730973U (en) | Concrete outer wall bolt hole leakproof structure | |
CN107201910A (en) | For shaking traffic tunnel fracture plugging and reinforcement means under bumpy weather | |
CN106088364A (en) | A kind of Novel underground room antiseep attachment structure and construction method thereof | |
CN105003087A (en) | Ground hollow detection and repair method based on infrared imaging | |
CN105350556A (en) | New material underground structure leakage stoppage construction technology | |
CN108104502A (en) | Ancient building brick wall surface protection and crack repairing method based on structural integrity | |
CN101936113B (en) | Method for grouting sealing of gap between steel door frame of protective sealed door and wall | |
CN108203983A (en) | A kind of deep foundation pit supporting structure and method | |
CN101672187B (en) | Anti-seepage water treatment method | |
CN109024313A (en) | A kind of lossless Concrete Paving Layer of Bridge Floor crack treatment construction method | |
CN109057385A (en) | Engineering method is repaired in the fixed pin part slip casting of inlet of a kind of hollowing inner-outer wall ceramic tile, stone material | |
CN113323440A (en) | Concrete gap repairing and anti-seepage treatment method | |
CN206143827U (en) | Underground works crack repairing structure | |
CN109025344A (en) | Engineering method is repaired in the comprehensive slip casting of inlet fixed pin of a kind of hollowing inner-outer wall ceramic tile, stone material | |
CN205558920U (en) | Fissured repair structure of last lining cutting of tunnel wall | |
CN208718016U (en) | A kind of precast caisson of assembled architecture | |
CN109653526A (en) | Accomodation ground leak leak-blocking construction method | |
CN207959289U (en) | Structure is repaired in a kind of leak for basement post-pouring zone position | |
CN107975248A (en) | A kind of toilet leak method for maintaining | |
CN208072433U (en) | A kind of interim precipitation steel sleeve being used for basic posthole and catch pit | |
CN109779287A (en) | Microdilatancy water-proof emulsion construction technology | |
CN204533836U (en) | Pipeline through-flooring leakage-resistant device | |
CN105781580A (en) | Tunnel crack repair method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20190329 |
|
WW01 | Invention patent application withdrawn after publication |