CN109653526A - Accomodation ground leak leak-blocking construction method - Google Patents
Accomodation ground leak leak-blocking construction method Download PDFInfo
- Publication number
- CN109653526A CN109653526A CN201811575437.2A CN201811575437A CN109653526A CN 109653526 A CN109653526 A CN 109653526A CN 201811575437 A CN201811575437 A CN 201811575437A CN 109653526 A CN109653526 A CN 109653526A
- Authority
- CN
- China
- Prior art keywords
- leak
- floor
- construction method
- slip casting
- accomodation ground
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
- E04G23/0203—Arrangements for filling cracks or cavities in building constructions
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
- E04G23/0203—Arrangements for filling cracks or cavities in building constructions
- E04G23/0211—Arrangements for filling cracks or cavities in building constructions using injection
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
- E04G23/0285—Repairing or restoring flooring
Abstract
The present invention relates to a kind of accomodation ground leak leak-blocking construction method, includes the following steps: that next layer of furred ceiling of the toilet floor that leak will occur is removed, check the position of leak and the toilet tile location in leak is marked;Floor tile and floor tile edge joint position are nearby found in the position that leak has marked, and are drilled using drill bit;In the floor that slip casting nail embedment has been drilled;High polymer elastic sealing agent is directly injected into floor by slip casting nail using high-pressure grout injector;Caulking polymer agent is tamped cracks on floor slab and leaking area by high-pressure slip-casting;Slip casting nail is extracted, drilling is subjected to joint filling using joint trimming agent.Accomodation ground leak leak-blocking construction method of the present invention, avoids ground from removing, and re-starts construction of waterproof layer, reduces labor intensity of workers, guarantees construction quality, improves construction efficiency, reduces construction cost.
Description
Technical field
The present invention relates to a kind of construction techniques, in particular to a kind of accomodation ground leak blocking construction
Method.
Background technique
After the completion of accomodation ground brick paving, installing the utensil in toilet is that other work posts are constructed, to pre-buried when construction
Pipeline etc. is collided, and waterproof layer cracking is caused, and can not be found at that time.Use through a period of time, leak is serious downstairs, hard-cover
Repairing the house, it is more to complain.
Fine fitment toilet warterproof finds the probability of leak after causing ground leak, the toilet of fine fitment to be moved in by breakage
It is very high, after the completion of ground paving due to living utensils such as mounting closets and downstairs swollen bolt drilling of furred ceiling etc. it is many think because
Element, toilet warterproof destruction cause leak not only to bring loss to oneself family, also will affect neighborhood relationship, corresponding furniture man
Electricity even leaks electricity because leak damages, and causes casualties.Meeting toilet water leakage situation most of home can select to ground
It is removed, re-starts construction of waterproof layer, wasted man power and money.
Summary of the invention
In view of the deficiency of the prior art, the present invention provides one kind ground is avoided to remove, and reduces labor intensity of workers,
Guarantee construction quality, improves the accomodation ground leak leak-blocking construction method of construction efficiency.
The technical solution used in the present invention is:
A kind of accomodation ground leak leak-blocking construction method, includes the following steps:
Next layer of furred ceiling for the toilet floor of leak occur is removed, checks the position of leak and in the toilet of leak
Brick position is marked;
Floor tile and floor tile edge joint position are nearby found in the position that leak has marked, and are drilled using drill bit;
In the floor that slip casting nail embedment has been drilled;
High polymer elastic sealing agent is directly injected into floor by slip casting nail using high-pressure grout injector;
Caulking polymer agent is tamped cracks on floor slab and leaking area by high-pressure slip-casting;Sealing agent water-swellable plays stifled
The effect of leakage;
Slip casting nail is extracted, drilling is subjected to joint filling using joint trimming agent;
And so on to all leaking areas carry out bored grouting.To not destructively face brick and the effect of play leak stopping.
The bit diameter is 3mm.
The drilling depth 8--10cm.Floor must not be punched;Reserved brickwork joint when the hole of 3mm is floor tile paving, thus
Do not destroy floor tile.
The present invention compared with the prior art the utility model has the advantages that
Accomodation ground leak leak-blocking construction method of the present invention, avoids ground from removing, and re-starts construction of waterproof layer, reduces worker
Labor intensity guarantees construction quality, improves construction efficiency, reduces construction cost.
Detailed description of the invention
Fig. 1 is the construction schematic diagram of accomodation ground leak leak-blocking construction method of the present invention;
Fig. 2 is the A-A schematic cross-sectional view of Fig. 1.
Main component symbol description in attached drawing:
In figure:
1, floor tile 2, slip casting nail
3, grouting pipe 4, high polymer elastic sealing agent
5, high-pressure grout injector 6, operating handle
7, leak source 8, waterproof layer
9, floor.
Specific embodiment
Referring to the drawings and embodiment the present invention will be described in detail:
Attached drawing 1-2 includes the following steps: it is found that a kind of accomodation ground leak leak-blocking construction method
Next layer of furred ceiling for the toilet floor of leak occur is removed, checks the position of leak and in the toilet of leak
Brick position is marked, and marks leak source 7;
Floor tile and floor tile edge joint position are nearby found in the position that leak has marked, and are drilled using drill bit;
In the floor 9 that 2 embedment of slip casting nail has been drilled;
High polymer elastic sealing agent 4 is directly injected into floor 9 by slip casting nail 5 using high-pressure grout injector 5;
Caulking polymer agent is tamped cracks on floor slab and leaking area by high-pressure slip-casting;Sealing agent water-swellable plays stifled
The effect of leakage;
Slip casting nail is extracted, drilling is subjected to joint filling using joint trimming agent;
And so on to all leaking areas carry out bored grouting.To not destructively face brick 1 and the effect of play leak stopping.
The bit diameter is 3mm.
The drilling depth 8--10cm.Floor 9 must not be punched;Reserved brickwork joint when the hole of 3mm is floor tile paving, from
Without destroying floor tile 1.
Accomodation ground leak leak-blocking construction method of the present invention, avoids ground from removing, and re-starts construction of waterproof layer, reduces
Labor intensity of workers guarantees construction quality, improves construction efficiency, reduces construction cost.
The above described is only a preferred embodiment of the present invention, not making in any form to structure of the invention
Limitation.Any simple modification, equivalent change and modification to the above embodiments according to the technical essence of the invention,
Belong within the scope of technical solution of the present invention.
Claims (3)
1. a kind of accomodation ground leak leak-blocking construction method, which comprises the steps of:
Next layer of furred ceiling for the toilet floor of leak occur is removed, checks the position of leak and in the toilet of leak
Brick position is marked;
Floor tile and floor tile edge joint position are nearby found in the position that leak has marked, and are drilled using drill bit;
In the floor that slip casting nail embedment has been drilled;
High polymer elastic sealing agent is directly injected into floor by slip casting nail using high-pressure grout injector;
Caulking polymer agent is tamped cracks on floor slab and leaking area by high-pressure slip-casting;
Slip casting nail is extracted, drilling is subjected to joint filling using joint trimming agent;
And so on to all leaking areas carry out bored grouting.
2. accomodation ground leak leak-blocking construction method according to claim 1, it is characterised in that: the bit diameter is
3mm。
3. accomodation ground leak leak-blocking construction method according to claim 1, it is characterised in that: the drilling depth 8--
10cm。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811575437.2A CN109653526A (en) | 2018-12-22 | 2018-12-22 | Accomodation ground leak leak-blocking construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811575437.2A CN109653526A (en) | 2018-12-22 | 2018-12-22 | Accomodation ground leak leak-blocking construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109653526A true CN109653526A (en) | 2019-04-19 |
Family
ID=66115807
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811575437.2A Pending CN109653526A (en) | 2018-12-22 | 2018-12-22 | Accomodation ground leak leak-blocking construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109653526A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112443170A (en) * | 2019-08-30 | 2021-03-05 | 福建亦大日月工程有限公司 | Glue pouring base for repairing floor tiles and repairing method |
CN113669509A (en) * | 2021-09-02 | 2021-11-19 | 苏州佳固士新材料科技有限公司 | Indoor wall-penetrating pipe leakage repairing method |
CN113775199A (en) * | 2021-09-28 | 2021-12-10 | 黑龙江科顺防水堵漏技术有限公司 | Wall heat preservation and water leakage repairing integrated device and process method thereof |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100596694B1 (en) * | 2006-02-16 | 2006-07-05 | 대한주택공사 | A packer assembly and construction method using it |
CN107165434A (en) * | 2017-06-16 | 2017-09-15 | 潍坊学院 | A kind of high-pressure slip-casting blocking method for toilet floor |
CN107975248A (en) * | 2016-10-24 | 2018-05-01 | 俞岳峰 | A kind of toilet leak method for maintaining |
-
2018
- 2018-12-22 CN CN201811575437.2A patent/CN109653526A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100596694B1 (en) * | 2006-02-16 | 2006-07-05 | 대한주택공사 | A packer assembly and construction method using it |
CN107975248A (en) * | 2016-10-24 | 2018-05-01 | 俞岳峰 | A kind of toilet leak method for maintaining |
CN107165434A (en) * | 2017-06-16 | 2017-09-15 | 潍坊学院 | A kind of high-pressure slip-casting blocking method for toilet floor |
Non-Patent Citations (1)
Title |
---|
佚名: "卫生间渗漏的治理及预防", 《百度文库》 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112443170A (en) * | 2019-08-30 | 2021-03-05 | 福建亦大日月工程有限公司 | Glue pouring base for repairing floor tiles and repairing method |
CN113669509A (en) * | 2021-09-02 | 2021-11-19 | 苏州佳固士新材料科技有限公司 | Indoor wall-penetrating pipe leakage repairing method |
CN113775199A (en) * | 2021-09-28 | 2021-12-10 | 黑龙江科顺防水堵漏技术有限公司 | Wall heat preservation and water leakage repairing integrated device and process method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109653526A (en) | Accomodation ground leak leak-blocking construction method | |
CN202730973U (en) | Concrete outer wall bolt hole leakproof structure | |
CN105220713B (en) | The waterproof construction of outer wall of basement subsiding crack | |
CN110258538B (en) | Soil nail reinforced buffer type manual hole digging pile and construction method thereof | |
CN109057385A (en) | Engineering method is repaired in the fixed pin part slip casting of inlet of a kind of hollowing inner-outer wall ceramic tile, stone material | |
CN105442861A (en) | Method for restoring water leakage air face of toilet drainage pipeline | |
CN109025344A (en) | Engineering method is repaired in the comprehensive slip casting of inlet fixed pin of a kind of hollowing inner-outer wall ceramic tile, stone material | |
CN107975248A (en) | A kind of toilet leak method for maintaining | |
CN109537925A (en) | Basement bottom board crack restorative procedure | |
CN109339118A (en) | A kind of basement bottom board leakage-resistant device and construction method | |
CN110905053A (en) | Construction method for indoor drainage pipeline penetrating through floor slab | |
CN107514150A (en) | A kind of construction technology of utilization space displacement method reconstruction Durable Water Repellant | |
CN109779287A (en) | Microdilatancy water-proof emulsion construction technology | |
KR102321316B1 (en) | floor space waterproofing construction method | |
CN103485352A (en) | Construction method for blocking depressurization well by adopting accelerated cement | |
KR100789216B1 (en) | Drain board construction with a nail gun and method of draim board consruction using the same | |
KR20210105091A (en) | How to repair the leaky part of the roof floor | |
KR101849531B1 (en) | Maintenance methods for waterproofing the bathroom and kitchen floor | |
CN208293792U (en) | A kind of quick service waterproof construction for toilet warterproof rupture | |
CN216234080U (en) | Water receiving bucket for building sewer leakage | |
CN208534084U (en) | A kind of tile decorative surface point face reinforcing repairerment engineering method anchor studs | |
CN103774902A (en) | Seepage preventing and leakage stopping method for sewage plant aeration tank | |
TWI604109B (en) | Water stop structure with adjustable height of water stop pier and its application method | |
CN107975189A (en) | A kind of roof structure and its crack repairing method | |
TWI324210B (en) |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190419 |