CN109098213A - A kind of basement blocking method - Google Patents

A kind of basement blocking method Download PDF

Info

Publication number
CN109098213A
CN109098213A CN201810997332.XA CN201810997332A CN109098213A CN 109098213 A CN109098213 A CN 109098213A CN 201810997332 A CN201810997332 A CN 201810997332A CN 109098213 A CN109098213 A CN 109098213A
Authority
CN
China
Prior art keywords
hole
leak
pvc pipe
gap
basement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810997332.XA
Other languages
Chinese (zh)
Inventor
陈建光
刘荣旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Engineering Division Corp Ltd
Original Assignee
China Construction Fourth Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Engineering Division Corp Ltd filed Critical China Construction Fourth Engineering Division Corp Ltd
Priority to CN201810997332.XA priority Critical patent/CN109098213A/en
Publication of CN109098213A publication Critical patent/CN109098213A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/16Arrangement or construction of joints in foundation structures

Abstract

The invention discloses a kind of basement blocking methods, its step includes: step 1: cleaning: by leak hole, after the concrete that gap periphery is cleaned out and hole, gap periphery are loose cut using electric hammer, according to the principle of leak stopping after first diversion, if water burst is little and the lesser position in crack directly uses leak stopping king to block;Step 2: drainage: more anxious for water burst, pvc pipe is inserted in leak hole, gap central draft by crack or the larger position of leak bore hole size;Step 3: it blocks: pvc pipe periphery leak hole, gap is blocked with leak stopping king;Step 4: grout hole, embedded high pressure pouring syringe needle drilling: are bored using impact drill;Step 5: using high-pressure grout injector to pvc pipe high pressure pouring one-pack-type soluble polyurethane injection slurry, after the completion of perfusion, Water slop injector grouting: is removed after material completes solidification.The present invention have many advantages, such as blocking method is simple, practical operation is easy, economic cost is low, plugging effect is good, it is pollution-free and convenient for promote.

Description

A kind of basement blocking method
Technical field
The present invention relates to building fields, more particularly to a kind of basement blocking method.
Background technique
With economic continuous prosperity, the living standard of the people is continuously improved, the continuous blending of regional culture in addition, tradition Folk building style will be broken, basement is in building in outdoor ground room below.Below housing bottom Basement is built, building site efficiency can be improved.Some Tall Building Foundation buried depths are very big, this depth is made full use of to build Basement is made, economic effect and using effect are all good, however after outer wall of basement and basement bottom board construction, it may appear that hole Hole, construction joint, post-cast strip and crack location percolating water are mainly in work progress due to concrete vibrating leakiness, coagulation Soil maintenance is not in place, construction joint is not done as required and there are rotten, the fixed not in place and concrete raw materials of post-cast strip waterstop The reasons such as clay content is big lead to Water Seepage in Basement phenomenon.Current engineering under ground portion generally excavates relatively deeply, plus partly The level of ground water in area is higher, underground water occurs by aperture or gap in water state is emitted, for common Waterproof Construction Technique hardly possible To solve the problems, such as this.For this problem, the invention discloses a kind of basement blocking method, and the reality Jing Guo multiple projects It tramples, plugging effect is fine, is not in secondary seepage phenomenon after leak hole is blocked.
Summary of the invention
The object of the invention is that providing a kind of basement blocking method to solve the above-mentioned problems.
The present invention through the following technical solutions to achieve the above objectives:
A kind of basement blocking method, comprising the following steps:
Step 1: cleaning: by leak hole, the concrete that gap periphery is cleaned out and hole, gap periphery are loose use electricity After chiso-mallet removes, according to the principle of leak stopping after first diversion, if water burst is little and the lesser position in crack directly uses leak stopping king to block;Step Rapid two: drainage: pvc pipe is inserted in leak hole, in gap by, crack or leak bore hole size larger position more anxious for water burst Between drain;Step 3: it blocks: pvc pipe periphery leak hole, gap is blocked with leak stopping king;Step 4: it drilling: uses Impact drill bores grout hole, embedded high pressure pouring syringe needle;Step 5: grouting: using high-pressure grout injector to pvc pipe high pressure pouring list liquid Type soluble polyurethane injection slurry after the completion of perfusion, removes Water slop injector after material completes solidification.
Preferably, the number of pvc pipe is determined according to the size of leak hole leak flow velocity and leakage area in the step 2 Amount, pvc pipe diameter generally select 16mm.
Preferably, by the step 2 among pvc pipe insertion leakage area, then by the leak stopping king mixed from leak portion Position surrounding blocks, and leak stopping king, which blocks, to be layered in indentation hole along hole periphery, after first layer solidification, reinjects the second layer, directly It only drains to come from pvc pipe to water is final.
Preferably, grout hole will intersect at crack both sides in the step 4, apart from the general 5cm~10cm in crack side, bore Hole horizontal inclination angle a is generally 45 °~60 °, and the 2/3 of drilling to structural thickness is deep, has low past eminence to bore in proper order, pitch-row 25cm ~30cm is advisable, and avoids breaing up the concrete on crack side in drilling.
Preferably, grouting is according to from bottom to top in the step 5, and from left to right, the sequence of cross waits whole It after grouting mouth has all filled, returns first grouting mouth and fills again once, according to actual use situation, the filling mouth at some positions is needed It is irrigated 2~3 times, until entire leak hole is blocked, while the pressure of high-pressure grout injector is maintained at 300kpa.
Compared with the existing technology, the beneficial effects are mainly reflected as follows:
The present invention has that blocking method is simple, practical operation is easy, economic cost is low, plugging effect is good, pollution-free and convenient for pushing away The advantages that wide.
Specific embodiment
Preferred explanation is made to the present invention combined with specific embodiments below, but the invention is not limited to these embodiments.
Embodiment 1
Step 1: cleaning: by leak hole, the concrete that gap periphery is cleaned out and hole, gap periphery are loose use electricity It after chiso-mallet removes, specifies crack, the size of leak hole and leak flow velocity and determines whether leak stopping after first draining, if water burst is little and splits Stitching lesser position directly uses leak stopping king to block;Step 2: drainage: more anxious for water burst, crack or leak bore hole size are larger Pvc pipe is inserted in leak hole, gap central draft by position;Step 3: it blocks: pvc pipe periphery leak hole, gap is used Leak stopping king blocks;Step 4: grout hole, embedded high pressure pouring syringe needle drilling: are bored using impact drill;Step 5: grouting: make With high-pressure grout injector to pvc pipe high pressure pouring one-pack-type soluble polyurethane injection slurry, after the completion of perfusion, complete to solidify to material After remove Water slop injector.
Embodiment 2
The present embodiment the difference from embodiment 1 is that:
The quantity of pvc pipe is determined according to the size of leak hole leak flow velocity and leakage area in step 2, pvc pipe diameter is general Select 16mm.
Embodiment 3
The present embodiment the difference from embodiment 1 is that:
Among pvc pipe insertion leakage area, then the leak stopping king mixed will be blocked from leakage area surrounding, leak stopping in step 2 King, which blocks, to be layered in indentation hole along hole periphery, after first layer solidification, reinject the second layer, until water is final only from PVC It drains and in pipe.
Embodiment 4
The present embodiment the difference from embodiment 1 is that:
After equal leak stopping king has solidified (generally 15 minutes or more), brill grout hole, grout hole in step 4 are carried out by impact drill Crack both sides are intersected at, apart from the general 5cm~10cm in crack side, drilling horizontal inclination angle a is generally 45 °~60 °, and drilling is extremely The 2/3 of structural thickness is deep, has low past eminence to bore in proper order, and pitch-row is that 25cm~30cm is advisable, and buries again after being drilled into highest point Water slop injector since the category of general structure body cracking is irregular, therefore must be paid special attention to intersect with the plane of fracture when drilling, inject Just can be effective, it avoids breaing up the concrete on crack side in drilling, slip casting syringe needle is then inserted into pvc pipe hole and grout hole It is interior.
Embodiment 5
The present embodiment the difference from embodiment 1 is that:
Grouting is according to from bottom to top in step 5, from left to right, the sequence of cross, after waiting whole grouting mouths all to fill, It returns first grouting mouth to fill again once, according to actual use situation, the filling mouth at some positions is needed to be irrigated 2~3 Secondary, until entire leak hole is blocked, while the pressure of high-pressure grout injector is maintained at 300kpa, if note one minute is still not achieved It can stop to carry out slip casting again in 10 minutes when 300kpa, be infused again after waiting the liquid infused for the first time solidification and expansion, can prevent from infusing in this way On the outside of slurries outflow structure thus to save material, with high-pressure grout injector injection one-pack-type hydrophobicity foaming agent to discovery injection material Expect to ooze out in structural body surface, perfusion is completed, and is removed Water slop injector after material completes solidification, is removed extra foaming agent, determines Crack or hole and periphery no longer percolating water if exudation situation is still unable to improve, then are repaired with one-pack-type hydrophilic foam agent It mends.
Embodiment described above only expresses several embodiments of the invention, and the description thereof is more specific and detailed, but not Therefore energy is interpreted as the limitation of the invention patent range.It should be pointed out that for those of ordinary skill in the art, Without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to protection model of the invention It encloses.

Claims (5)

1. a kind of basement blocking method, it is characterised in that: the following steps are included: step 1: cleaning: by leak hole, gap After the concrete that periphery is cleaned out and hole, gap periphery are loose is cut using electric hammer, according to the principle of leak stopping after first diversion, If water burst is little and the lesser position in crack directly uses leak stopping king to block;Step 2: drainage:, crack or leakage more anxious for water burst Pvc pipe is inserted in leak hole, gap central draft by the larger position of water bore hole size;Step 3: it blocks: pvc pipe periphery is leaked Water hole hole, gap are blocked with leak stopping king;Step 4: grout hole, embedded high pressure pouring syringe needle drilling: are bored using impact drill; Step 5: grouting: using high-pressure grout injector to pvc pipe high pressure pouring one-pack-type soluble polyurethane injection slurry, after the completion of perfusion, Water slop injector is removed after material completes solidification.
2. a kind of basement blocking method according to claim 1, it is characterised in that: according to leakage hole in the step 2 The size of hole leak flow velocity and leakage area determines the quantity of pvc pipe, and pvc pipe diameter generally selects 16mm.
3. a kind of basement blocking method according to claim 1, it is characterised in that: insert pvc pipe in the step 2 Enter among leakage area, then block the leak stopping king mixed from leakage area surrounding, leak stopping king blocks should be along hole periphery point It is laminated into hole, only drains to come from pvc pipe until water is final.
4. a kind of basement blocking method according to claim 1, it is characterised in that: grout hole will be handed in the step 4 Fork is on crack both sides, and apart from the general 5cm~10cm in crack side, drilling horizontal inclination angle a is generally 45 °~60 °, drilling to structure The 2/3 of thickness is deep, has low past eminence to bore in proper order, and pitch-row is that 25cm~30cm is advisable, and avoids the coagulation on crack side in drilling Soil is broken up.
5. a kind of basement blocking method according to claim 1, it is characterised in that: in the step 5 grouting according to by Lower upward, from left to right, the sequence of cross after waiting whole grouting mouths all to fill, returns first grouting mouth and fills again Once, according to actual use situation, the filling mouth at some positions is needed to be irrigated 2~3 times, until entire leak hole is sealed It is stifled, while the pressure of high-pressure grout injector is maintained at 300kpa.
CN201810997332.XA 2018-08-29 2018-08-29 A kind of basement blocking method Pending CN109098213A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810997332.XA CN109098213A (en) 2018-08-29 2018-08-29 A kind of basement blocking method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810997332.XA CN109098213A (en) 2018-08-29 2018-08-29 A kind of basement blocking method

Publications (1)

Publication Number Publication Date
CN109098213A true CN109098213A (en) 2018-12-28

Family

ID=64864149

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810997332.XA Pending CN109098213A (en) 2018-08-29 2018-08-29 A kind of basement blocking method

Country Status (1)

Country Link
CN (1) CN109098213A (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110030021A (en) * 2019-06-04 2019-07-19 中铁九局集团第七工程有限公司 Existing railway tunnel overhaul polyurethane leak-stopping agent high-pressure grouting construction
CN110241837A (en) * 2019-07-08 2019-09-17 中国建筑第四工程局有限公司 A kind of construction method for preventing basement bottom board from cracking under high artesian geological conditions
CN110424432A (en) * 2019-07-24 2019-11-08 中铁十六局集团城市建设发展有限公司 Basement mine pit bed course blocking method under a kind of hydraulic pressure infiltration condition
CN110952644A (en) * 2019-12-31 2020-04-03 黑龙江科顺防水堵漏技术有限公司 Leakage detection and leakage stoppage integrated device and method
CN111663579A (en) * 2020-05-28 2020-09-15 上海宝冶集团有限公司 Plugging method for acrylic coagulation slurry in blind groove
CN112031038A (en) * 2020-08-14 2020-12-04 中国十七冶集团有限公司 Water level pressure grouting plugging method
CN112609754A (en) * 2020-12-16 2021-04-06 中国建筑第四工程局有限公司 Basement shear wall leakage blocking method and structure
CN112942440A (en) * 2021-04-27 2021-06-11 黑龙江科顺防水堵漏技术有限公司 Process method for plugging settlement expansion joint
CN113775199A (en) * 2021-09-28 2021-12-10 黑龙江科顺防水堵漏技术有限公司 Wall heat preservation and water leakage repairing integrated device and process method thereof
CN114215113A (en) * 2021-12-07 2022-03-22 江苏乐年少建筑科技发展有限公司 Waterproof and leaking stoppage method for water leakage of underground building caused by concrete cracks
CN114837208A (en) * 2022-05-16 2022-08-02 中铁七局集团郑州工程有限公司 Method for disposing leakage water of underground diaphragm wall
CN114892736A (en) * 2022-05-31 2022-08-12 四川童燊防水工程有限公司 Underground building bottom plate crack injection grouting method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006036563A (en) * 2004-07-23 2006-02-09 Asuton:Kk Method of repairing concrete
CN105369833A (en) * 2015-10-15 2016-03-02 昆明风行防水材料有限公司 Grouting maintenance construction method for basement roof leakage
CN105442862A (en) * 2015-11-19 2016-03-30 江苏鼎达建筑新技术有限公司 Method for leakage water plugging, strengthening and repairing against concrete crack

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006036563A (en) * 2004-07-23 2006-02-09 Asuton:Kk Method of repairing concrete
CN105369833A (en) * 2015-10-15 2016-03-02 昆明风行防水材料有限公司 Grouting maintenance construction method for basement roof leakage
CN105442862A (en) * 2015-11-19 2016-03-30 江苏鼎达建筑新技术有限公司 Method for leakage water plugging, strengthening and repairing against concrete crack

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
方俊弟: "浅析地下室的渗漏与治理", 《河南建材》 *
栗书宁: "地下室混凝土外墙防水堵漏", 《山西建筑》 *

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110030021A (en) * 2019-06-04 2019-07-19 中铁九局集团第七工程有限公司 Existing railway tunnel overhaul polyurethane leak-stopping agent high-pressure grouting construction
CN110241837A (en) * 2019-07-08 2019-09-17 中国建筑第四工程局有限公司 A kind of construction method for preventing basement bottom board from cracking under high artesian geological conditions
CN110424432B (en) * 2019-07-24 2021-09-24 中铁十六局集团城市建设发展有限公司 Basement well cushion layer plugging method under water pressure permeation condition
CN110424432A (en) * 2019-07-24 2019-11-08 中铁十六局集团城市建设发展有限公司 Basement mine pit bed course blocking method under a kind of hydraulic pressure infiltration condition
CN110952644A (en) * 2019-12-31 2020-04-03 黑龙江科顺防水堵漏技术有限公司 Leakage detection and leakage stoppage integrated device and method
CN110952644B (en) * 2019-12-31 2021-04-02 黑龙江科顺防水堵漏技术有限公司 Leakage detection and leakage stoppage integrated device and process method thereof
CN111663579A (en) * 2020-05-28 2020-09-15 上海宝冶集团有限公司 Plugging method for acrylic coagulation slurry in blind groove
CN112031038A (en) * 2020-08-14 2020-12-04 中国十七冶集团有限公司 Water level pressure grouting plugging method
CN112609754A (en) * 2020-12-16 2021-04-06 中国建筑第四工程局有限公司 Basement shear wall leakage blocking method and structure
CN112942440A (en) * 2021-04-27 2021-06-11 黑龙江科顺防水堵漏技术有限公司 Process method for plugging settlement expansion joint
CN113775199A (en) * 2021-09-28 2021-12-10 黑龙江科顺防水堵漏技术有限公司 Wall heat preservation and water leakage repairing integrated device and process method thereof
CN114215113A (en) * 2021-12-07 2022-03-22 江苏乐年少建筑科技发展有限公司 Waterproof and leaking stoppage method for water leakage of underground building caused by concrete cracks
CN114837208A (en) * 2022-05-16 2022-08-02 中铁七局集团郑州工程有限公司 Method for disposing leakage water of underground diaphragm wall
CN114892736A (en) * 2022-05-31 2022-08-12 四川童燊防水工程有限公司 Underground building bottom plate crack injection grouting method

Similar Documents

Publication Publication Date Title
CN109098213A (en) A kind of basement blocking method
CN103277120B (en) A kind of non-fully deeply freeze vertical thaw after water burst prevention and controls
CN108517899A (en) Mouth high-pressure grouting leak stopping processing method is buried in the leakage drilling of deep basal pit diaphram wall
CN101260672B (en) Weak surface rock slope grouting method and anchor tube for grouting
CN103924987B (en) A kind of SMW engineering method stake tunnel shielding portal seepage-proof structure and construction method thereof
CN106480993B (en) Administration structure and construction method in a kind of construction exterior wall leak repairing reinforcement
CN106592614B (en) The method for blocking of leakage point in foundation pit waterproof of man
CN202745937U (en) Hidden trench for concentrated seepage water guidance and drainage of existing tunnel in cold area
CN105386435B (en) It is a kind of to be used for the double-liquid grouting system and its construction technology of cement and water glass solution
CN105369833A (en) Grouting maintenance construction method for basement roof leakage
CN215669744U (en) Masonry structure basement seepage slip casting repair structure
CN105484266B (en) The grouting equipment and its construction method of a kind of multifunctional information
CN110438998A (en) A kind of outer bored grouting raising has become the structure and method of pile bearing capacity
CN108130901B (en) The construction method of Karst grouting
CN102174818A (en) Controlled impermeable leaking stoppage grout-extruding water-stopping technology of strong water permeable stratum of quaternary system
CN105731978A (en) Grouting slurry for reinforcing tunnel face of jacking culvert of fine-sand layer and grouting method
CN205369234U (en) Freeze high pressure jet grouting pile
CN110241837A (en) A kind of construction method for preventing basement bottom board from cracking under high artesian geological conditions
CN106939619A (en) A kind of anti-vibration for underground engineering disturbs the leak stopping reinforcement means of voids and pits
CN108915705B (en) A kind of baffle grouting construction method blocked for shield export & import leak
CN106677190A (en) Grouting construction method for underwater pebble bed foundation pit curtain
CN110144918A (en) Hypogee dewatering well antiseepage plugging construction method
CN206360137U (en) Administration structure in one kind construction exterior wall mending-leakage reinforcement
CN105350557B (en) One kind is suitable for deeper soft clay area water-stop curtain method
CN108266207A (en) A kind of push pipe export & import water-stopping method and device suitable for deep water-rich sand layer area

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181228

RJ01 Rejection of invention patent application after publication