CN104118738A CN201410361758.8A CN201410361758A CN104118738A CN 104118738 A CN104118738 A CN 104118738A CN 201410361758 A CN201410361758 A CN 201410361758A CN 104118738 A CN104118738 A CN 104118738A
Authority
CN
China
Prior art keywords
car
line
open
top car
empty
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410361758.8A
Other languages
English (en)
Other versions
CN104118738B (zh
Inventor
赵昊
李北斗
屈建新
汪涛
朱昌进
王媛媛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Electric Construction Group Wuhan heavy industry equipment Co., Ltd.
Original Assignee
WUHAN ELECTRIC POWER EQUIPMENT PLANT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUHAN ELECTRIC POWER EQUIPMENT PLANT filed Critical WUHAN ELECTRIC POWER EQUIPMENT PLANT
Priority to CN201410361758.8A priority Critical patent/CN104118738B/zh
Publication of CN104118738A publication Critical patent/CN104118738A/zh
Application granted granted Critical
Publication of CN104118738B publication Critical patent/CN104118738B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Loading Or Unloading Of Vehicles (AREA)

Abstract

一种折返式翻车机翻卸系统,包括依次平行设置的重调机轨道、重车线、空车线、空调机轨道,重车线上设置有翻车机,重车线上近翻车机进车端的部位设置有夹轮器,重车线与空车线上近翻车机的出车端的部位设置有双向通过迁车台,重调机轨道上近翻车机出车端的部位设置有重调机,空调机轨道上设置有空调机,使用时,重调机先将整列敞车沿重车线依次通过迁车台、翻车机,再将敞车反向牵引至翻车机中进行翻卸,然后通过迁车台将翻卸后的敞车移至空车线,最后由空调机牵引其反向驶离。本设计不仅对线路布置要求低、布置灵活,而且皮带输送线路短、占地面积小、基建投资费用少。

Description

一种折返式翻车机翻卸系统及其使用方法
技术领域
本发明涉及一种用于翻卸铁路敞车的翻车机系统,尤其涉及一种折返式翻车机翻卸系统及其使用方法,适用于工矿企业专用线料场改造,可提高场地使用率,减少基建投资。
背景技术
目前,折返式式翻车机系统通常采用U字型布置方式。中国专利申请公布号为CN10250286A,申请公布日为2012年6月20日的发明专利公开了一种多功能折返式单车翻车机卸车系统及其操作方法,该卸车系统:由空车线、调车机轨道和重车线相平行组成的卸车系统一端装双车迁车台,重车线一侧上装单车翻车机,在该重车线的另一侧上装设夹轮器,在该夹轮器与单车翻车机之间的夹轮器端处设有摘钩点,在调车机轨道上装设拨车机,双车迁车台外侧装设与空车线相平行的推车机轨道,且该推车机轨道上装设推车机。虽然该发明,既适用于通用的摘钩敞车列的翻卸,又适用于专用的不摘钩敞车列翻卸,但仍然存在以下缺陷:
该发明采用的U型折返式布置翻车机系统通常位于进厂铁路重车线及空车线的末端,一方面,该系统对铁路布置要求高,输送皮带需要从线路的末端到矿场中央,占用面积大,线路长,且翻卸作业时需要长期占用重车线及空车线,另一方面,工矿企业专用线存在道叉多,弯道多,线路拥挤等情况,很多企业需要一边翻卸车辆一边装车,对铁路占用及线路配合的要求较高,而该系统无法满足企业的高要求,另外,由于翻车机系统设备基坑较深(最深20米),若基坑设置在特殊地质(地下水丰富)区,将会导致地基处理费用巨大。
发明内容
本发明的目的是克服现有技术中存在的对线路布置要求高,位置固定、皮带输送线路长、投资大的问题,提供一种对线路布置要求低、布置灵活、皮带输送线路短、投资少的折返式翻车机翻卸系统及其使用方法。
为实现以上目的,本发明的技术方案如下:
一种折返式翻车机翻卸系统,包括相互平行的重车线、重调机轨道、空车线、空调机轨道,所述重车线与重调机轨道相邻设置,空车线与空调机轨道相邻设置,且重车线上设置有翻车机、夹轮器,重调机轨道上设置有重调机,空调机轨道上设置有空调机;
所述重车线、空车线位于重调机轨道、空调机轨道之间,且迁车台为双向通过迁车台,夹轮器位于重车线上近翻车机的进车端的部位,重调机位于重调机轨道上近翻车机的出车端的部位。
一种上述折返式翻车机翻卸系统的使用方法,依次包括以下步骤:
步骤一:重调机推送整列敞车沿重车线前行,并依次通过迁车台、翻车机;
步骤二:当倒数第二节敞车到达夹轮器处时,先通过夹轮器将其固定,并将最后一节敞车与倒数第二节敞车摘钩,然后重调机反向牵引最后一节敞车进入翻车机进行翻卸,其中,所述反向是指与步骤一中的前行方向相反的方向;
步骤三:先由重调机将翻卸后的最后一节敞车牵送至迁车台,再由迁车台将翻卸后的最后一节敞车迁移至空车线以便于空调机将其沿前行方向推出迁车台,同时,开启夹轮器以松开倒数第二节敞车,并由重调机牵引未翻卸的余下敞车反向行驶,当倒数第三节敞车到达夹轮器处时,先通过夹轮器将其固定,并将倒数第二节敞车与倒数第三节敞车摘钩,然后重调机牵引倒数第二节敞车进入翻车机进行翻卸,重复上述过程,循环作业;
步骤四:先将所有翻卸完毕并由空调机推出迁车台后的空敞车集结在空车线上,然后集结完毕的空敞车由空调机反向牵引通过迁车台后驶离。
与现有技术相比,本发明的有益效果为:
1、本发明一种折返式翻车机翻卸系统及其使用方法中迁车台为双向通过迁车台,夹轮器位于重车线上近翻车机的进车端的部位,重调机位于重调机轨道上近翻车机的出车端的部位,使用时,重调机先将整列敞车沿重车线依次通过迁车台、翻车机,再将敞车反向牵引至翻车机中进行翻卸,然后通过迁车台将翻卸后的敞车移至空车线,最后由空调机牵引其反向驶离,即采用H型布置方式,该翻卸系统可布置于铁路线的中间节段,一方面,可实现根据线路情况、整列车长度、矿场方位综合优选布置,布置较为灵活,适应性较强,不仅有利于减少铁路专用线的变动,而且能够沿铁路线方向移动以避开特殊地质区,进而减少基建投资费用,适合企业专用线路的改造,另一方面,在该布置方式中,皮带无需从线路末端输送到矿场中央,输送路线较短。因此,本发明不仅对线路布置要求低、布置灵活,而且皮带输送线路短、基建投资费用少。
2、本发明一种折返式翻车机翻卸系统及其使用方法中重车线、空车线位于重调机轨道、空调机轨道之间,即重车线与空车线相邻设置,该设计将重车线与空车线距离缩短了1‐2m,可节省铁路投资、提高专用线的土地使用率、降低铁路建设的占地面积。因此,本发明减少了铁路投资以及占地面积。
附图说明
图1为本发明的结构示意图。
图中:重车线1、重调机轨道2、空车线3、空调机轨道4、翻车机5、进车端51、出车端52、重调机6、空调机7、迁车台8、夹轮器9。
具体实施方式
下面结合附图说明和具体实施方式对本发明作进一步详细的说明。
参见图1,一种折返式翻车机翻卸系统,包括相互平行的重车线1、重调机轨道2、空车线3、空调机轨道4,所述重车线1与重调机轨道2相邻设置,空车线3与空调机轨道4相邻设置,且重车线1上设置有翻车机5、夹轮器9,重车线1与空车线3上近翻车机5的出车端52的部位设置有迁车台8,重调机轨道2上设置有重调机6,空调机轨道4上设置有空调机7;
所述重车线1、空车线3位于重调机轨道2、空调机轨道4之间,且迁车台8为双向通过迁车台,夹轮器9位于重车线1上近翻车机5的进车端51的部位,重调机6位于重调机轨道2上近翻车机5的出车端52的部位。
一种上述折返式翻车机翻卸系统的使用方法,依次包括以下步骤:
步骤一:重调机6推送整列敞车沿重车线1前行,并依次通过迁车台8、翻车机4;
步骤二:当倒数第二节敞车到达夹轮器9处时,先通过夹轮器9将其固定,并将最后一节敞车与倒数第二节敞车摘钩,然后重调机6反向牵引最后一节敞车进入翻车机5进行翻卸,其中,所述反向是指与步骤一中的前行方向相反的方向;
步骤三:先由重调机6将翻卸后的最后一节敞车牵送至迁车台8,再由迁车台8将翻卸后的最后一节敞车迁移至空车线3以便于空调机6将其沿前行方向推出迁车台8,同时,开启夹轮器9以松开倒数第二节敞车,并由重调机6牵引未翻卸的余下敞车反向行驶,当倒数第三节敞车到达夹轮器9处时,先通过夹轮器9将其固定,并将倒数第二节敞车与倒数第三节敞车摘钩,然后重调机6牵引倒数第二节敞车进入翻车机5进行翻卸,重复上述过程,循环作业;
步骤四:先将所有翻卸完毕并由空调机6推出迁车台8后的空敞车集结在空车线3上,然后集结完毕的空敞车由空调机6反向牵引通过迁车台8后驶离。
本发明中所述双向通过迁车台是指其左、右两侧均可供敞车进入的迁车台。
实施例1:
参见图1,一种折返式翻车机翻卸系统,包括依次平行设置的重调机轨道2、重车线1、空车线3、空调机轨道4,重车线1上设置有翻车机5,重车线1上近翻车机5的进车端51的部位设置有夹轮器9,重车线1与空车线3上近翻车机5的出车端52的部位设置有迁车台8,且迁车台8为双向通过迁车台,重调机轨道2上近翻车机5的出车端52的部位设置有重调机6,空调机轨道4上设置有空调机7。
使用时,依次按照以下步骤进行:
步骤一:重调机6推送整列敞车沿重车线1前行,并依次通过迁车台8、翻车机4;
步骤二:当倒数第二节敞车到达夹轮器9处时,先通过夹轮器9将其固定,并将最后一节敞车与倒数第二节敞车摘钩,然后重调机6反向牵引最后一节敞车进入翻车机5进行翻卸,其中,所述反向是指与步骤一中的前行方向相反的方向;
步骤三:先由重调机6将翻卸后的最后一节敞车牵送至迁车台8,再由迁车台8将翻卸后的最后一节敞车迁移至空车线3以便于空调机6将其沿前行方向推出迁车台8,同时,开启夹轮器9以松开倒数第二节敞车,并由重调机6牵引未翻卸的余下敞车反向行驶,当倒数第三节敞车到达夹轮器9处时,先通过夹轮器9将其固定,并将倒数第二节敞车与倒数第三节敞车摘钩,然后重调机6牵引倒数第二节敞车进入翻车机5进行翻卸,重复上述过程,循环作业;
步骤四:先将所有翻卸完毕并由空调机6推出迁车台8后的空敞车集结在空车线3上,然后集结完毕的空敞车由空调机6反向牵引通过迁车台8后驶离。

Claims (2)

1.一种折返式翻车机翻卸系统,包括相互平行的重车线(1)、重调机轨道(2)、空车线(3)、空调机轨道(4),所述重车线(1)与重调机轨道(2)相邻设置,空车线(3)与空调机轨道4相邻设置,且重车线(1)上设置有翻车机(5)、夹轮器(9),重车线(1)与空车线(3)上近翻车机(5)的出车端(52)的部位设置有迁车台(8),重调机轨道(2)上设置有重调机(6),空调机轨道(4)上设置有空调机(7),其特征在于:
所述重车线(1)、空车线(3)位于重调机轨道(2)、空调机轨道(4)之间,且迁车台(8)为双向通过迁车台,夹轮器(9)位于重车线(1)上近翻车机(5)的进车端(51)的部位,重调机(6)位于重调机轨道(2)上近翻车机(5)的出车端(52)的部位。
2.一种权利要求1所述的折返式翻车机翻卸系统的使用方法,其特征在于:
该方法依次包括以下步骤:
步骤一:重调机(6)推送整列敞车沿重车线(1)前行,并依次通过迁车台(8)、翻车机(4);
步骤二:当倒数第二节敞车到达夹轮器(9)处时,先通过夹轮器(9)将其固定,并将最后一节敞车与倒数第二节敞车摘钩,然后重调机(6)反向牵引最后一节敞车进入翻车机(5)进行翻卸,其中,所述反向是指与步骤一中的前行方向相反的方向;
步骤三:先由重调机(6)将翻卸后的最后一节敞车牵送至迁车台(8),再由迁车台(8)将翻卸后的最后一节敞车迁移至空车线(3)以便于空调机(6)将其沿前行方向推出迁车台(8),同时,开启夹轮器(9)以松开倒数第二节敞车,并由重调机(6)牵引未翻卸的余下敞车反向行驶,当倒数第三节敞车到达夹轮器(9)处时,先通过夹轮器(9)将其固定,并将倒数第二节敞车与倒数第三节敞车摘钩,然后重调机(6)牵引倒数第二节敞车进入翻车机(5)进行翻卸,重复上述过程,循环作业;
步骤四:先将所有翻卸完毕并由空调机(6)推出迁车台(8)后的空敞车集结在空车线(3)上,然后集结完毕的空敞车由空调机(6)反向牵引通过迁车台(8)后驶离。
CN201410361758.8A 2014-07-28 2014-07-28 一种折返式翻车机翻卸系统及其使用方法 Active CN104118738B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410361758.8A CN104118738B (zh) 2014-07-28 2014-07-28 一种折返式翻车机翻卸系统及其使用方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410361758.8A CN104118738B (zh) 2014-07-28 2014-07-28 一种折返式翻车机翻卸系统及其使用方法

Publications (2)

Publication Number Publication Date
CN104118738A true CN104118738A (zh) 2014-10-29
CN104118738B CN104118738B (zh) 2016-04-20

Family

ID=51764416

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410361758.8A Active CN104118738B (zh) 2014-07-28 2014-07-28 一种折返式翻车机翻卸系统及其使用方法

Country Status (1)

Country Link
CN (1) CN104118738B (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106115305A (zh) * 2016-08-14 2016-11-16 哈尔滨热电有限责任公司 安装在翻车机迁车台上的推车器
CN110282459A (zh) * 2019-07-19 2019-09-27 大连华锐重工集团股份有限公司 双臂式重、空合一的折返式翻车机卸车系统
CN111332951A (zh) * 2020-03-11 2020-06-26 焦瑞敏 燃料智能接卸管控系统及控制方法
CN112919159A (zh) * 2021-03-18 2021-06-08 中国电建集团武汉重工装备有限公司 一种升降式翻车机迁车台转运机构及其使用方法
CN113511524A (zh) * 2021-04-22 2021-10-19 华电曹妃甸重工装备有限公司 一种翻车机翻卸作业方法
CN115476897A (zh) * 2022-10-11 2022-12-16 中国电建集团武汉重工装备有限公司 一种翻车机重车线解列调度方法

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040105739A1 (en) * 2002-11-25 2004-06-03 Mccrory Kevin Richard Trailer-tilting, load-discharge apparatus and method
CN2885794Y (zh) * 2005-11-09 2007-04-04 大连华锐股份有限公司 高效折返式双车翻车机卸车系统
CN201287976Y (zh) * 2008-09-28 2009-08-12 大连华锐股份有限公司 一种折返式翻车机卸车系统
CN101798026B (zh) * 2010-03-29 2012-06-06 大连华锐重工集团股份有限公司 一种不摘钩专用敞车用折返式翻车机卸车系统
CN101362556B (zh) * 2008-09-28 2012-08-22 大连华锐重工集团股份有限公司 折返式翻车机卸车系统
CN202807927U (zh) * 2012-09-20 2013-03-20 河北省电力勘测设计研究院 直达折返式翻车机卸车系统
CN103072830A (zh) * 2013-02-21 2013-05-01 中冶赛迪工程技术股份有限公司 一种新型翻车机系统
CN103552856A (zh) * 2013-11-15 2014-02-05 大连华锐重工集团股份有限公司 高效折返式翻车机卸车系统
CN203529498U (zh) * 2013-11-15 2014-04-09 大连华锐重工集团股份有限公司 高效折返式翻车机卸车系统
CN103723530A (zh) * 2014-01-14 2014-04-16 中冶北方(大连)工程技术有限公司 铁路运输自动翻卸系统
CN203667623U (zh) * 2014-01-14 2014-06-25 中冶北方(大连)工程技术有限公司 铁路运输自动翻卸系统
CN204078945U (zh) * 2014-07-28 2015-01-07 武汉电力设备厂 一种折返式翻车机翻卸系统

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040105739A1 (en) * 2002-11-25 2004-06-03 Mccrory Kevin Richard Trailer-tilting, load-discharge apparatus and method
CN2885794Y (zh) * 2005-11-09 2007-04-04 大连华锐股份有限公司 高效折返式双车翻车机卸车系统
CN201287976Y (zh) * 2008-09-28 2009-08-12 大连华锐股份有限公司 一种折返式翻车机卸车系统
CN101362556B (zh) * 2008-09-28 2012-08-22 大连华锐重工集团股份有限公司 折返式翻车机卸车系统
CN101798026B (zh) * 2010-03-29 2012-06-06 大连华锐重工集团股份有限公司 一种不摘钩专用敞车用折返式翻车机卸车系统
CN202807927U (zh) * 2012-09-20 2013-03-20 河北省电力勘测设计研究院 直达折返式翻车机卸车系统
CN103072830A (zh) * 2013-02-21 2013-05-01 中冶赛迪工程技术股份有限公司 一种新型翻车机系统
CN103552856A (zh) * 2013-11-15 2014-02-05 大连华锐重工集团股份有限公司 高效折返式翻车机卸车系统
CN203529498U (zh) * 2013-11-15 2014-04-09 大连华锐重工集团股份有限公司 高效折返式翻车机卸车系统
CN103723530A (zh) * 2014-01-14 2014-04-16 中冶北方(大连)工程技术有限公司 铁路运输自动翻卸系统
CN203667623U (zh) * 2014-01-14 2014-06-25 中冶北方(大连)工程技术有限公司 铁路运输自动翻卸系统
CN204078945U (zh) * 2014-07-28 2015-01-07 武汉电力设备厂 一种折返式翻车机翻卸系统

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106115305A (zh) * 2016-08-14 2016-11-16 哈尔滨热电有限责任公司 安装在翻车机迁车台上的推车器
CN110282459A (zh) * 2019-07-19 2019-09-27 大连华锐重工集团股份有限公司 双臂式重、空合一的折返式翻车机卸车系统
CN110282459B (zh) * 2019-07-19 2023-07-25 大连华锐重工集团股份有限公司 双臂式重、空合一的折返式翻车机卸车系统
CN111332951A (zh) * 2020-03-11 2020-06-26 焦瑞敏 燃料智能接卸管控系统及控制方法
CN112919159A (zh) * 2021-03-18 2021-06-08 中国电建集团武汉重工装备有限公司 一种升降式翻车机迁车台转运机构及其使用方法
CN113511524A (zh) * 2021-04-22 2021-10-19 华电曹妃甸重工装备有限公司 一种翻车机翻卸作业方法
CN115476897A (zh) * 2022-10-11 2022-12-16 中国电建集团武汉重工装备有限公司 一种翻车机重车线解列调度方法
CN115476897B (zh) * 2022-10-11 2024-07-05 中国电建集团武汉重工装备有限公司 一种翻车机重车线解列调度方法

Also Published As

Publication number Publication date
CN104118738B (zh) 2016-04-20

Similar Documents

Publication Publication Date Title
CN104118738B (zh) 一种折返式翻车机翻卸系统及其使用方法
CN205311636U (zh) 地铁车厢乘客拥挤状况预展示系统
CN105324325A (zh) 用于将袋装松散材料装载至道路运输车辆的设备和方法
CN204078945U (zh) 一种折返式翻车机翻卸系统
CN102556079B (zh) 提高列车运行效率的控制方法
CN103896031B (zh) 一种铸件清理线自转运系统
CN202807927U (zh) 直达折返式翻车机卸车系统
CN102039902B (zh) 台车搬送装置
CN102060201B (zh) 由迁车台侧进出列车的翻车机卸煤装置的布置方法
CN204960941U (zh) 一种盾构隧道施工用的电瓶车连接装置
CN109083653A (zh) 一种编组机车
CN103144977B (zh) 两用贯通式翻车机卸车系统及其操作方法
CN103204391B (zh) 以专用铁路敞车为主兼顾通用铁路敞车的大型多车翻车机
CN202358704U (zh) 多功能折返式单车翻车机卸车系统
CN203667456U (zh) 一种输送轨道车双轨十字交叉过轨装置
CN203143725U (zh) 两用贯通式翻车机卸车系统
CN205370062U (zh) 一种立体车库
CN205397578U (zh) 高效多功能折返式翻车机卸车系统
CN103420181A (zh) 矿车双轨式卸载系统
CN209635248U (zh) 一种侧向架轨上轨小车
CN101913505B (zh) Crtsⅱ型轨道板横向出板方法及板场
CN202466322U (zh) 一种移动式十字交叉轨道衔接装置
CN204415215U (zh) 沙料卸载系统
CN206267598U (zh) 轿车、公交车两用立体停车库
CN203567710U (zh) 一种矿用窄轨高速载人客车制动系统

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 430064 Wuchang District of Hubei province Wuhan City Baishazhou special No. 1

Patentee after: China Electric Construction Group Wuhan heavy industry equipment Co., Ltd.

Address before: 430064 Wuchang District of Hubei province Wuhan City Baishazhou special No. 1

Patentee before: Wuhan Electric Power Equipment Plant