CN104113014A - Upward carrying wire lifting trolley - Google Patents

Upward carrying wire lifting trolley Download PDF

Info

Publication number
CN104113014A
CN104113014A CN201410372238.7A CN201410372238A CN104113014A CN 104113014 A CN104113014 A CN 104113014A CN 201410372238 A CN201410372238 A CN 201410372238A CN 104113014 A CN104113014 A CN 104113014A
Authority
CN
China
Prior art keywords
rope
ground wire
pulley
wire
preformed armor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410372238.7A
Other languages
Chinese (zh)
Inventor
李占文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Maintenance Branch of State Grid Hebei Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Maintenance Branch of State Grid Hebei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Maintenance Branch of State Grid Hebei Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201410372238.7A priority Critical patent/CN104113014A/en
Publication of CN104113014A publication Critical patent/CN104113014A/en
Pending legal-status Critical Current

Links

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

The invention relates to a tool for installing or erecting lines or cables, particularly relates to a wire lifting tool for high-tension transmission line ground wires. The existing high-tension line ground wire lifting and erecting method is complex in operation, long in operating time and uncertain in working and the like. An upward carrying wire lifting trolley comprises a pulley mechanism, a tightening rope and an endless chain lever block; two ends of the tightening rope are connected with two ends of a ground wire preformed armor rod winding layer; the ground wire can be erected at a target position after wire winding operation through the tightening rope. The upward carrying wire lifting trolley has the advantages of simplifying high-tension line ground wire installing and erecting operation, greatly reducing operation time, enabling the ground wire preformed armor rod winding layer to be installed in place through operation for one time and being simple in design, easy to achieve, low in manufacturing and maintenance cost, applicable to various working occasions such as line installation and erection and wide in popularization and application prospect.

Description

On shoulder and carry line coaster
Technical field
The present invention relates to a kind of for installing, the instrument of overhead transmission line or cable, be specifically related to the Line tool of carrying of a kind of ultra-high-tension power transmission line ground wire and optical cable.
Background technology
While setting up ultra-high-tension power transmission line, need to install preformed armor rods and strain clamp additional being set up in the additional ground wire of electric tower cross-arm.Existing method of operation is generally: first, operating personnel are according to the installation site of field wiring situation estimation preformed armor rods and strain clamp; Secondly, operating personnel use special spiral shell button instrument to complete preformed armor rods and strain clamp installation; Finally, ground wire is inserted into electric tower cross-arm place.In installation process, the stressing conditions due to preformed armor rods and strain clamp and ground wire is comparatively complicated at the scene, and after setting up, the position of preformed armor rods and strain clamp is usually offset.If after ground wire has set up, there is relatively large deviation in the estimation of discovery preformed armor rods and strain clamp and installation site and target location, need to ground wire be dismantled and be moved to operating desk from electric tower cross-arm, again ground wire is inserted into electric tower cross-arm after readjusting preformed armor rods and strain clamp position.Existing method of operation complex steps, comparatively consuming time, even if skilled craftsman operates, the conservative estimation of its one-stop operation time is at least 4 hours.In addition, existing method of operation need to be estimated the installation site of preformed armor rods and strain clamp, needs operating personnel to possess the practical work experience compared with horn of plenty.In existing high-tension line there is the problems such as complicated operation, activity duration be long in carry line and the erection method of ground wire, and have certain work uncertainty.The upper anti-of high-tension line ground wire that proposes a kind of handled easily carried the Line tool, is problem demanding prompt solution in current installation, built on stilts and maintenance high-tension line.
Summary of the invention
For the deficiencies in the prior art, the invention provides a kind of shouldering on simple in structure, convenient and practical and carry line coaster, on this, shoulder and carry line coaster and can guarantee after ground wire sets up, the part that preformed armor rods and strain clamp are installed is accurately set up in target location, and reduction activity duration by a relatively large margin and reduce labour intensity.
For solving above technical problem, technical scheme of the present invention is:
In one, shoulder and carry line coaster, comprise the pulley mechanism and the tightening system that are fixedly installed on electric tower cross-arm; Wherein, pulley mechanism comprises pulley support and is arranged on the pulley in pulley support by rotating shaft; Tightening system comprises the rope connecting in turn , cucurbit and rope ; Rope be positioned at the groove of described pulley, rope and rope free end be fixedly connected with ground wire by knot that can be undone by a pull.
Concrete, described cucurbit is hand chain lever hoist.
Concrete, rope for nylon rope, rope comprise steel wire rope and nylon rope; One end of steel wire rope is connected with described cucurbit, and its other end is connected with nylon rope by U-shaped link.
Concrete, pulley mechanism is arranged on electric tower cross-arm top, and pulley mechanism is that on-fixed is connected or bolt connects with the connected mode of electric tower cross-arm.
The common composition of pulley mechanism, tightening system and the ground wire isosceles triangle vertical with electric tower cross-arm; Pulley mechanism is positioned at isosceles triangle vertex position, and ground wire forms the fixing base of length of isosceles triangle, and tightening system forms two waists of isosceles triangle, by cucurbit, tightening system is carried out to folding and unfolding to change the length of isosceles triangle two waists.
Beneficial effect of the present invention: the pulley mechanism that 1, is arranged on electric tower cross-arm top is shouldered the ground wire of carrying line coaster and carry on being and provided support, and has ensured to install overall working stability; 2, when pulley makes tightening system folding and unfolding, freely, protection tightening system is avoided wearing and tearing, extends tightening system useful life in motion; 3, the steel wire rope part of tightening system is positioned at pulley groove, is conducive to tightening system and carries out folding and unfolding when action, keeps the stable of its operation; 4, hand chain lever hoist is for device provides power, have volume little, from heavy and light, the feature such as simple to operate, easy to use; 5, tightening system two ends are fixedly connected with by knot that can be undone by a pull with the two ends of preformed armor rods winding layer on ground wire respectively, when site operation, can adjust at any time the position of two knots that can be undone by a pull according to the actual installation position of preformed armor rods winding layer, ensure that ground wire is inserted into after electric tower cross-arm, its preformed armor rods winding layer position can accurately be positioned at target location, if only use the one end in tightening system to be fixedly connected with and to propose line operation with ground wire, although can realize the anti-function of carrying line and overhead ground wire, the ground portion that adds preformed armor rods winding layer accurately cannot be set up in to target location; 6, the common composition of pulley mechanism, tightening system and the ground wire isosceles triangle vertical with electric tower cross-arm, has ensured to install overall stability.The present invention designs succinctly, easy to implement, make and maintenance cost lower, be applicable to various circuits and the workplace such as install, make somebody a mere figurehead, there is wide promotion and application prospect.
Brief description of the drawings
Fig. 1 is structural representation of the present invention.
Fig. 2 is the schematic diagram of Fig. 1 left view.
Wherein, 1 pulley, 2 pulley supports, 3 ropes , 4 cucurbits, 5 ropes , 5-1 steel wire rope, the U-shaped link of 5-2,5-3 nylon rope, 6, ground wire, 6-1 preformed armor rods winding layer, 7 electric tower cross-arms.
Embodiment
Below in conjunction with accompanying drawing, the invention will be further described.
With reference to Fig. 2, self-control pulley mechanism, its middle pulley 1 diameter of phi 280mm, pulley external diameter Φ 325mm, pulley rim width 37mm, pulley support 2 is that 2 block lengths are ∠ 45 × 45 × 5 angle steel of 100mm; The steel wire rope 5-1 part of tightening system is Φ 11mm steel wire rope, according to trigonometric function, in conjunction with lifting and the decline scope of the installation site of pulley mechanism, ground wire 6 target locations, ground wire 6, determines in tightening system and restricts 3, the length of the each several part such as steel wire rope 5-1, nylon rope 5-3.
On shoulder the operation of carrying line coaster and comprise the following steps: first, by on shoulder carry line coaster be arranged on ground wire preformed armor rods winding layer target location directly over, its key is the installation site of pulley mechanism, should ensure that the isosceles triangle being made up of pulley mechanism, tightening system and ground wire 6 is perpendicular to electric tower cross-arm 7; Secondly,, to the row unwrapping wire operation of cinch cord mechanism, will on tightening system, restrict 3 and rope 5 free end is fixed on respectively the two ends of preformed armor rods winding layer 6-1 on ground wire by knot that can be undone by a pull; Finally, tightening system is carried out to take-up operation, until on shoulder the target location of carrying line coaster ground wire 6 is promoted to electric tower cross-arm 7.In actual use, above shoulder the single operation time of carrying line coaster and be about 20 minutes.The present invention has simplified installation and the built on stilts operation of high-tension line ground wire, has significantly reduced the activity duration, and once-through operation can be in place ground wire preformed armor rods winding layer, has reached the technique effect of expection.
The above execution mode is only the preferred embodiments of the present invention, and is not the exhaustive of the feasible enforcement of the present invention.For persons skilled in the art, any apparent change of under the prerequisite that does not deviate from the principle of the invention and spirit, it having been done, within all should being contemplated as falling with claim protection range of the present invention.

Claims (3)

1. on, shoulder and carry a line coaster, it is characterized in that comprising the pulley mechanism and the tightening system that are fixedly installed on electric tower cross-arm (7); Described pulley mechanism comprises pulley support (2) and is arranged on the pulley (1) in pulley support (2) by rotating shaft; Described tightening system comprises the rope connecting in turn (3), cucurbit (4) and rope (5); Described rope (5) be positioned at the groove of described pulley (1), described rope (3) and rope (5) free end is fixedly connected with ground wire (6) by knot that can be undone by a pull.
2. according to shouldering and carry line coaster in one claimed in claim 1, it is characterized in that described cucurbit (4) is for hand chain lever hoist.
3. according to shouldering and carry line coaster in the one described in claim 1 or 2, it is characterized in that described rope (3) be nylon rope, described rope (5) comprise steel wire rope (5-1) and nylon rope (5-3); One end of described steel wire rope (5-1) is connected with described cucurbit (4), and its other end is connected with nylon rope (5-3) by U-shaped link (5-2).
CN201410372238.7A 2014-07-31 2014-07-31 Upward carrying wire lifting trolley Pending CN104113014A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410372238.7A CN104113014A (en) 2014-07-31 2014-07-31 Upward carrying wire lifting trolley

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410372238.7A CN104113014A (en) 2014-07-31 2014-07-31 Upward carrying wire lifting trolley

Publications (1)

Publication Number Publication Date
CN104113014A true CN104113014A (en) 2014-10-22

Family

ID=51709703

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410372238.7A Pending CN104113014A (en) 2014-07-31 2014-07-31 Upward carrying wire lifting trolley

Country Status (1)

Country Link
CN (1) CN104113014A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104538887A (en) * 2014-12-01 2015-04-22 国家电网公司 Lifting converter of lightning wire
CN108695771A (en) * 2018-07-24 2018-10-23 国网辽宁省电力有限公司本溪供电公司 Transmission line of electricity OPGW optical cable preformed armor rods install Special-purpose lifting tool
CN108861156A (en) * 2017-05-11 2018-11-23 上海大屯能源股份有限公司 A method of Ka Cang occurs for processing coal bunker

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101299520A (en) * 2008-06-23 2008-11-05 西安供电局 Machine for lifting earth wire of ultrahigh-tension power transmission line
CN101969183A (en) * 2010-09-16 2011-02-09 四川电力送变电建设公司 Saddle-type line-lifting device and construction method thereof
CN202474680U (en) * 2012-01-16 2012-10-03 湖北省电力公司孝感供电公司 Ground wire lifting pulley yoke used on intermediate support of power transmission line
CN103545751A (en) * 2013-10-16 2014-01-29 国家电网公司 Overhead power transmission line ground-wire optical-cable fitting replacement bracket
CN203983863U (en) * 2014-07-31 2014-12-03 国家电网公司 On shoulder and carry line coaster

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101299520A (en) * 2008-06-23 2008-11-05 西安供电局 Machine for lifting earth wire of ultrahigh-tension power transmission line
CN101969183A (en) * 2010-09-16 2011-02-09 四川电力送变电建设公司 Saddle-type line-lifting device and construction method thereof
CN202474680U (en) * 2012-01-16 2012-10-03 湖北省电力公司孝感供电公司 Ground wire lifting pulley yoke used on intermediate support of power transmission line
CN103545751A (en) * 2013-10-16 2014-01-29 国家电网公司 Overhead power transmission line ground-wire optical-cable fitting replacement bracket
CN203983863U (en) * 2014-07-31 2014-12-03 国家电网公司 On shoulder and carry line coaster

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104538887A (en) * 2014-12-01 2015-04-22 国家电网公司 Lifting converter of lightning wire
CN104538887B (en) * 2014-12-01 2017-10-03 国家电网公司 A kind of lightning conducter lifts converter
CN108861156A (en) * 2017-05-11 2018-11-23 上海大屯能源股份有限公司 A method of Ka Cang occurs for processing coal bunker
CN108695771A (en) * 2018-07-24 2018-10-23 国网辽宁省电力有限公司本溪供电公司 Transmission line of electricity OPGW optical cable preformed armor rods install Special-purpose lifting tool

Similar Documents

Publication Publication Date Title
CN104743455A (en) Load Guiding Arrangement
CN106099754B (en) A kind of 10kV overhead distributions insulation platform for live operation and its installation method
CN105839988A (en) Self-vertical positioning pole erecting device and construction method thereof
CN105186378A (en) Power transmission line channel crossing protection mechanism
CN204118585U (en) A kind of installation cross-arm auxiliary support apparatus
CN106229889B (en) A kind of transmission line of electricity lifting device for aerial wires
CN104113014A (en) Upward carrying wire lifting trolley
CN103001146A (en) Steel pipe pole operation platform and usage method thereof
CN203983863U (en) On shoulder and carry line coaster
CN103779809B (en) The two oidiospore wire pitch operational method of charged adjustment
CN203850726U (en) Wire lifter on 10 kV power distribution telegraph pole
CN202405695U (en) Lifting tool for overhead ground wire of steel pipe pole
CN102761077A (en) Insulating hoisting bracket for strain insulator string of 1000kV extra-high alternating current line
CN105366565A (en) Auxiliary hoisting device for high-tension cable tower
CN102403674A (en) Live-wire work insulating cross arm
CN103601033B (en) Bundling wire square forming device
CN105119203A (en) Lifting tool for comprehensive live overhaul of distribution network
CN102191874A (en) Insulating cross arm with movable arc grooves
CN202474699U (en) Portable heavy object transmitter for telegraph pole
KR100907433B1 (en) Connection apparatus of light weight buffer metal for high-tension wire
CN204118374U (en) The earth lead point protection device in succession of earth connection
CN202474756U (en) Crossing net
CN105449612A (en) A conductive wire insulation support plate apparatus
CN203423430U (en) Insulator maintenance device
CN202444204U (en) Traction lifting device for high-altitude circuit tools and appliances

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20141022

RJ01 Rejection of invention patent application after publication