CN101299520A - Machine for lifting earth wire of ultrahigh-tension power transmission line - Google Patents

Machine for lifting earth wire of ultrahigh-tension power transmission line Download PDF

Info

Publication number
CN101299520A
CN101299520A CNA2008101500998A CN200810150099A CN101299520A CN 101299520 A CN101299520 A CN 101299520A CN A2008101500998 A CNA2008101500998 A CN A2008101500998A CN 200810150099 A CN200810150099 A CN 200810150099A CN 101299520 A CN101299520 A CN 101299520A
Authority
CN
China
Prior art keywords
base
support frame
transmission line
external support
power transmission
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2008101500998A
Other languages
Chinese (zh)
Other versions
CN101299520B (en
Inventor
王连柱
郑远新
王少敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
XI'AN POWER SUPPLY BUREAU
State Grid Corp of China SGCC
Original Assignee
XI'AN POWER SUPPLY BUREAU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XI'AN POWER SUPPLY BUREAU filed Critical XI'AN POWER SUPPLY BUREAU
Priority to CN2008101500998A priority Critical patent/CN101299520B/en
Publication of CN101299520A publication Critical patent/CN101299520A/en
Application granted granted Critical
Publication of CN101299520B publication Critical patent/CN101299520B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

The invention discloses a high tension transmission line ground wire raiser, including a base arranged on the cross arm head of the above of the stringing pole, an external holding frame arranged on the base and a pulley rotating freely in the vertical direction arranged in the external holding frame, wherein the pulley is a roller of the dish shape and arranged with a groove for the insulated single rope to move along the cirumferential direction, and a fastener is arranged on the base. The invention not only has simple structure and convenient installation and use, but also the stress of the cross arm is vertical to the ground in the operation process, which solves the problems of the non normal stress of the ground wire in the lifting process, reduces the overhaul cost and relieves the labor intensity of the field operation staff, meanwhile saves time, wherein the time is shortened for a half; the falling and the lifting of the ground wire in the operation are free and once for all, the lift stroke is not limited and is safe and reliable, which can effectively solves the problems of long distance and dynamic falling and lifting of the ground wire.

Description

Machine for lifting earth wire of ultrahigh-tension power transmission line
Technical field
The present invention relates to ultra-high-tension power transmission line repair and maintenance technical field, especially relate to a kind of machine for lifting earth wire of ultrahigh-tension power transmission line.
Background technology
In recent years, because climate change is to damage to crops caused by thunder, windburn that ultra-high-tension power transmission line caused, and situation such as incident outside destroy causes all generations again and again of high-voltage power line conductive ground wire damage accident in the urban development construction.Because overhead ground wire is positioned at the superiors of whole ultra-high-tension power transmission line, thereby repair and during the optical cable reparation overhauls, often need pitch and promote ground wire in lead wire and earth wire; In addition, ground wire also can be done the aerial slideway of other conducting wire mendings.Therefore, ground wire pitches, enhancing rate increases thereupon.But, in line maintenance, pitch significantly and the mode that promotes ground wire rests on the traditional handicraft always.
Mainly there is following problem in traditional handicraft: 1, in the ultra-high-tension power transmission line maintenance, influence that ground wire pitches and to promote uncertainty a lot, its ground wire pitches and the distance that promotes is the scope of repairing according to the lead needs and content and fixed, but, existing instrument range of lift of the same type has only about 300mm, can not satisfy the line maintenance job requirement; 2, line maintenance operating environment complexity uses the short instrument of existing range of lift to promote, complicated operation and all need secondary operation mostly, and cost of overhaul height not only, and also labour intensity is big; 3, because in the design of stringing shaft tower, all be subjected to pressure and Horizontal Tension vertically downward on the cross-arm of fixing cord, and pitch and promote in the ground line process in traditional handicraft, most of tool bearing forces situation all can not satisfy above-mentioned vertical stressed requirement in the shaft tower design; 4, along with shaft tower double loop and multiloop employing, cross-arm constantly extends thereupon, and manpower is shouldered and lifted and can't launch; 5, poor stability, existing instrument of the same type is repaiied in the lifting process at lead, mostly be that nature hangs, thereby in its use, very easily skid off the cross-arm head, and not, do not take the corresponding backup protection measure that prevents wire dropping simultaneously now at the corresponding backup protection measure that skids off behind the cross-arm head yet; 6, because the hand of not hesitating of instrument, thereby manpower increases, and expense strengthens and safety can't guarantee that simultaneously, the controllability to institute's tool using in line maintenance is not strong; 7, operational method is lack of standardization, and nonstandard operating type directly has influence on the popularization of standardized work.In a word, the existing tool stroke that promotes ground wire is shorter, and can not solve long distance and dynamic ground wire pitch and promote in the problem that exists.
Summary of the invention
Technical problem to be solved by this invention is at above-mentioned deficiency of the prior art, a kind of machine for lifting earth wire of ultrahigh-tension power transmission line is provided, it is simple in structure and use easy and simple to handle, reduced labour intensity, can effectively solve long distance and dynamic ground wire pitch and promote in existing problem.
For solving the problems of the technologies described above, the technical solution used in the present invention is: a kind of machine for lifting earth wire of ultrahigh-tension power transmission line, it is characterized in that: comprise base on the cross-arm head that is installed in stringing tower bar top, be installed in the external support frame on the base and be installed in the external support frame and coaster that can in the vertical direction freely rotate, described coaster is a discoid roller and along the circumferential direction is provided with the groove that moves for the single rope of insulation on it that described base is provided with securing member.
Described external support frame and coaster are connected and fixed to screw rod by the level of passing the two, and screw rod passes from the center of coaster, between screw rod and coaster bearing are installed.
Described base is a dovetail mount, and it is made up of dovetail groove and the base support that is fixed on dovetail groove below; Described external support frame below is provided with the plug connector corresponding with dovetail groove; External support frame and base carry out plug-in mounting by plug connector and dovetail groove to be fixed; One end of described dovetail groove is for stopping end, and the other end is an insertion end; The described end that stops is provided with the connecting plate that stops usefulness, and described insertion end is provided with system and moves back pin.
Have a plurality of through holes on the described external support frame.
Described base is made up of left and right sides two halves, and the front and back side of described two halves is provided with hold-down nut and the two is connected and fixed by two long bolts in front and back that pass hold-down nut respectively, and the adjustment end of long bolt is provided with wing nut.
Described plug connector and external support frame are welded as a whole, and the both sides, front and back of external support frame top connect by connecting rod.
Described base is the base of hook-hang type, and the bottom of its base support is provided with back hook; Described securing member is a jackscrew, and jackscrew is installed in the below of described go back to hook.
The present invention compared with prior art has the following advantages, and 1, not only simple in structure, processing and fabricating is convenient; 2, adopt external support frame and the split type structure of base, the structure of its base with the pyramidal structure of concrete construction operation shaft tower corresponding, the structure that specifically is firm banking place on the cross-arm head with tower bar top is corresponding, in actual use, only need dispose corresponding base at different turriforms, each several part structure on the base then can be general, provides cost savings and use easy and simple to handle, use greatly; 3, its external support frame and base carry out aggregate erection by matching used plug connector and dovetail groove, one end of described dovetail groove stops fixing by connecting plate, the other end is that insertion end is provided with system and moves back pin, thereby install very easy, at first select corresponding base and this base is fixedly mounted on the cross-arm head of shaft tower of institute's job execution, again the external support frame is inserted mounted base and get final product at concrete pyramidal structure; 4, safe, operation process can satisfy the every requirement in " electric power safety working regulation "; 5, in the operating process, cross-arm is stressed perpendicular to the ground, has solved a stressed off plumb difficult problem in the ground wire lifting; 6, use is easy and simple to handle, and operation is clear, is easy to standardization; 7, reduce the cost of overhaul, alleviated the field operation personnel labor intensity; 8, save time, shortened half than the existing used time of instrument of the same type, and the operating personnel has reduced by a people on the tower, has improved the ability to ward off risks in the upkeep operation; 9, ground wire pitches and promotes up and down freely and can one-time-reach-place in the operation.To sum up, lift stroke of the present invention is not limited, can effectively solve long distance and dynamic ground wire pitch and promote in existing problem.
Below by drawings and Examples, technical scheme of the present invention is described in further detail.
Description of drawings
Fig. 1 is the structural representation of coaster of the present invention and external support frame.
Fig. 2 is the A-A cutaway view of Fig. 1.
Fig. 3 is the structural representation of base portion of the present invention.
Description of reference numerals:
The 1-screw rod; 2-external support frame; The 3-through hole;
The 4-coaster; The 5-plug connector; The 6-base;
The 7-dovetail groove; The 8-nut; The 9-bearing;
The 10-connecting rod; The 11-pad; The 12-jackscrew;
The 13-wing nut; The 14-long bolt; The 15-hold-down nut;
The 16-system is moved back pin; The 17-plug connector.
Embodiment
As Fig. 1, Fig. 2 and shown in Figure 3, the present invention includes base 6 on the cross-arm head that is installed in stringing tower bar top, be installed in the external support frame 2 on the base 6 and be installed in its external support frame 2 and coasters 4 that can in the vertical direction freely rotates, and coaster 4 is a discoid roller and along the circumferential direction is provided with on it for the single mobile groove of restricting of insulation.That is to say that the structure of base 6 is corresponding with the cross-arm header structure of the different turriform stringing tower bars that it is installed,, select the base mounted thereto 6 of corresponding construction, and base 6 is provided with corresponding supporting securing member according to the structure of cross-arm head.In the actual job process, earlier base 6 is fixedly mounted on the cross-arm head of the shaft tower top of being overhauled, again external support frame 2 is installed on the base 6 that is fixed.
Wherein, external support frame 2 and coaster 4 are connected and fixed to screw rod 1 by the level of passing the two, and screw rod 1 passes from the center of coaster 4, fixes by nut 8 at the movable end of screw rod 1, and externally are lined with pad 11 between bracing frame 2 and the nut 8.In addition, 4 on screw rod 1 and coaster are equipped with bearing 9, realize that by bearing 9 coaster 4 freely rotates around screw rod 1 in the vertical direction.In the actual mechanical process,, externally have a plurality of through holes 3 on the bracing frame 2 for reducing the weight of whole ground wire raiser.In this specific embodiment, the both sides, front and back of external support frame 2 have four through holes 3.
And described base 6 is a dovetail mount, and it is made up of dovetail groove 7 and the base support 17 that is fixed on dovetail groove 7 belows.External support frame 2 belows are provided with the plug connector 5 corresponding with dovetail groove 7, and external support frame 2 and base 6 carry out plug-in mounting by plug connector 5 and dovetail groove 7 to be fixed, and plug connector 5 is welded as a whole with external support frame 2.According to the pyramidal structure of concrete operation shaft tower, mainly be the structure of fixing this ground wire lifter base 6 places on the cross-arm head of shaft tower top, the base 6 of being furnished with different structure base support 17 is used in corresponding selection.In the actual job,, only need tackle split type base 6 mutually and adjust and get final product, thereby this ground wire lifter has versatility at different turriforms.In the present embodiment, base 6 is the base of hook-hang type, and the bottom of its base support 17 is provided with back hook.And securing member is a jackscrew 12, and jackscrew 12 is installed in the below of described go back to hook, by jackscrew 12 base 6 is stepped up to be fixed on the cross-arm head.
In addition, the both sides, front and back of external support frame 2 tops connect by connecting rod 10.One end of described dovetail groove 7 is for stopping end, and the other end is an insertion end; And it stops that end is provided with the connecting plate that stops usefulness, and insertion end is provided with system and moves back pin 16.In the actual installation process, will coaster 4 be installed on the screw rod 1 from external support frame 2 tops earlier, connecting rod 10 will be installed afterwards again, reinforce by 10 pairs of whole external support framves 2 of connecting rod.
In addition, base 6 is made up of left and right sides two halves, is combined into the hook-hang type base of an integral body by left and right sides two parts.The front and back side of described two halves is provided with a hold-down nut 15 and two halves is connected and fixed by two long bolts 14 in front and back that pass hold-down nut 15 respectively, and the adjustment end of long bolt 14 is provided with wing nut 13.In the practice, at first, select the corresponding base 6 of being furnished with different structure base support 17 according to the pyramidal structure of concrete operation shaft tower; Again base 6 is installed on the cross-arm head of institute's operation shaft tower, during installation, earlier the wing nut 13 of adjusting end by rotation long bolt 14 adds base 6 from front and back and fastens, and the rotation jackscrew 12 that is positioned at base 6 belows fastens from up and down base 6 being added again, thereby installs very easy.
The course of work of the present invention is: at first by the operation personnel shaft tower on the rope band that will insulate, the ground crew is by rising to coaster the cross-arm head place above the shaft tower with the present invention leading of installing at the bottom of the tower, and earlier base 6 is fixed on the cross-arm head by the operating personnel on the shaft tower, external support frame 2 is installed on base 6 again, with being with the single rope of the insulation of getting on to import in the coaster 4 of external support frame 2 inside, tie afterwards with a single ground wire that will promote of restricting; Install the shaft tower bottom of being overhauled passing through by the ground crew then leads a coaster, the other end of the single rope of above-mentioned traction is packed into lead in the coaster; And after receiving the instruction of loosening single rope, the operating personnel throws off the fixedly gold utensil of ground wire and the fixed connection point of cross-arm head on the shaft tower, and the ground wire of the Dan Shengyi end fix around single rope of coaster 4 by pulling by the ground crew pitches to overhauling the position and carrying out measures again; At last, tighten up the Dan Shengzhi hitch point after having overhauled again, the operating personnel is fixed on the gold utensil of above-mentioned disengagement on the cross-arm head again on the tower, untie single rope afterwards, remove the present invention and also cooperate the ground crew that it is pitched to ground, and on the shaft tower operating personnel with shaft tower under single rope band, end-of-job.
The above; it only is preferred embodiment of the present invention; be not that the present invention is imposed any restrictions, everyly any simple modification that above embodiment did, change and equivalent structure changed, all still belong in the protection range of technical solution of the present invention according to the technology of the present invention essence.

Claims (7)

1. machine for lifting earth wire of ultrahigh-tension power transmission line, it is characterized in that: comprise base (6) on the cross-arm head that is installed in stringing tower bar top, be installed in the external support frame (2) on the base (6) and be installed in the external support frame (2) and coaster (4) that can in the vertical direction freely rotate, described coaster (4) is a discoid roller and along the circumferential direction is provided with the groove that moves for the single rope of insulation on it that described base (6) is provided with securing member.
2. according to the described machine for lifting earth wire of ultrahigh-tension power transmission line of claim 1, it is characterized in that: described external support frame (2) and coaster (4) are connected and fixed to screw rod (1) by the level of passing the two, screw rod (1) passes from the center of coaster (4), between screw rod (1) and coaster (4) bearing (9) is installed.
3. according to claim 1 or 2 described machine for lifting earth wire of ultrahigh-tension power transmission line, it is characterized in that: described base (6) is a dovetail mount, and it is made up of dovetail groove (7) and the base support (17) that is fixed on dovetail groove (7) below; Described external support frame (2) below is provided with the plug connector (5) corresponding with dovetail groove (7); External support frame (2) and base (6) carry out plug-in mounting by plug connector (5) and dovetail groove (7) to be fixed; One end of described dovetail groove (7) is for stopping end, and the other end is an insertion end; The described end that stops is provided with the connecting plate that stops usefulness, and described insertion end is provided with system and moves back pin (16).
4. according to claim 1 or 2 described machine for lifting earth wire of ultrahigh-tension power transmission line, it is characterized in that: have a plurality of through holes (3) on the described external support frame (2).
5. according to claim 1 or 2 described machine for lifting earth wire of ultrahigh-tension power transmission line, it is characterized in that: described base (6) is made up of left and right sides two halves, the front and back side of described two halves is provided with hold-down nut (15) and the two is connected and fixed by two long bolts in front and back (14) that pass hold-down nut (15) respectively, and the adjustment end of long bolt (14) is provided with wing nut (13).
6. according to the described machine for lifting earth wire of ultrahigh-tension power transmission line of claim 3, it is characterized in that: described plug connector (5) is welded as a whole with external support frame (2), and the both sides, front and back of external support frame (2) top connect by connecting rod (10).
7. according to the described machine for lifting earth wire of ultrahigh-tension power transmission line of claim 3, it is characterized in that: described base (6) is the base of hook-hang type, and the bottom of its base support (17) is provided with back hook; Described securing member is jackscrew (12), and jackscrew (12) is installed in the below of described go back to hook.
CN2008101500998A 2008-06-23 2008-06-23 Machine for lifting earth wire of ultrahigh-tension power transmission line Active CN101299520B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008101500998A CN101299520B (en) 2008-06-23 2008-06-23 Machine for lifting earth wire of ultrahigh-tension power transmission line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008101500998A CN101299520B (en) 2008-06-23 2008-06-23 Machine for lifting earth wire of ultrahigh-tension power transmission line

Publications (2)

Publication Number Publication Date
CN101299520A true CN101299520A (en) 2008-11-05
CN101299520B CN101299520B (en) 2010-07-21

Family

ID=40079251

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008101500998A Active CN101299520B (en) 2008-06-23 2008-06-23 Machine for lifting earth wire of ultrahigh-tension power transmission line

Country Status (1)

Country Link
CN (1) CN101299520B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101593943B (en) * 2008-12-30 2011-05-25 浙江省送变电工程公司 Sag trimmer of split conductor of overhead power transmission line
CN104113014A (en) * 2014-07-31 2014-10-22 国家电网公司 Upward carrying wire lifting trolley
CN109029393A (en) * 2018-07-13 2018-12-18 中国能源建设集团安徽省电力设计院有限公司 For assisting the photoelectricity instrument of alignment in the thick forest of mountain area
CN110768165A (en) * 2019-12-09 2020-02-07 云南电网有限责任公司昆明供电局 Device for replacing whole string of tension insulators at cross arm end and wire end of direct-current transmission line
CN116365451A (en) * 2023-02-01 2023-06-30 辽宁汉华信息工程有限公司 Portable electric disassembling tool for overhead LTU of 10kV distribution line

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101593943B (en) * 2008-12-30 2011-05-25 浙江省送变电工程公司 Sag trimmer of split conductor of overhead power transmission line
CN104113014A (en) * 2014-07-31 2014-10-22 国家电网公司 Upward carrying wire lifting trolley
CN109029393A (en) * 2018-07-13 2018-12-18 中国能源建设集团安徽省电力设计院有限公司 For assisting the photoelectricity instrument of alignment in the thick forest of mountain area
CN109029393B (en) * 2018-07-13 2023-12-12 中国能源建设集团安徽省电力设计院有限公司 Photoelectric instrument for assisting line setting in mountain area close forest
CN110768165A (en) * 2019-12-09 2020-02-07 云南电网有限责任公司昆明供电局 Device for replacing whole string of tension insulators at cross arm end and wire end of direct-current transmission line
CN116365451A (en) * 2023-02-01 2023-06-30 辽宁汉华信息工程有限公司 Portable electric disassembling tool for overhead LTU of 10kV distribution line

Also Published As

Publication number Publication date
CN101299520B (en) 2010-07-21

Similar Documents

Publication Publication Date Title
CN101409434B (en) Ground wire raiser
CN101299520B (en) Machine for lifting earth wire of ultrahigh-tension power transmission line
CN109110616B (en) Overhead telescopic construction elevator roof beam for elevator shaft traction and installation and use method thereof
CN202997425U (en) Hoisting device capable of replacing suspension type insulator chain under electrified state
CN201176373Y (en) Hoisting device for pylon
CN107425475B (en) Overhead ground wire lifter and lifting in-place method thereof
CN102659043B (en) Improved sustaining wall rod dismantling device of tower type crane
CN201312084Y (en) Ground wire raiser
CN114962160B (en) High-efficiency installation device and method for high-tower drum equipment
CN202405695U (en) Lifting tool for overhead ground wire of steel pipe pole
CN102664377B (en) Double-cross arm assembler for single lever and double-cross arm mounting method
CN201219184Y (en) Ground wire lifting mechanism for high tension power line
CN203715115U (en) Supporting point structure for self-hoisting system of portal crane
CN201645413U (en) Simple gin-pole mechanism for demolishing internal climbing tower crane
CN114592429A (en) Tied arch bridge arch rib and wind brace auxiliary splicing construction system and construction method
CN202899720U (en) Steel pole provided with foot treadles and used for high-tension transmission line iron tower
CN202004370U (en) Tool for transferring overhead ground wires in process of modification of pole tower
CN112499486A (en) Portable transformer lifter and operation method thereof
CN202578116U (en) Single-person on-pole assembler for dual-fan cross arm
CN201580966U (en) Fixing support of cabinet top hydraulic lifting device for large-scale gas cabinet
CN216613815U (en) Derrick mast device is used in TYD installation
CN220945101U (en) Rigid support with adjustable door machine landing leg installs
CN217627073U (en) Wireless transmission engineering construction cable hoist device
CN220030055U (en) Lower guide shoe dismounting tool for small-space operation
CN213231328U (en) Portable portable high altitude construction accessory hoisting machine constructs

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE GRID CORPORATION OF CHINA

Effective date: 20121203

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20121203

Address after: 710032 No. 159 East Ring Road, Shaanxi, Xi'an

Patentee after: Xi'an Power Supply Bureau

Patentee after: State Grid Corporation of China

Address before: 710032 No. 159 East Ring Road, Shaanxi, Xi'an

Patentee before: Xi'an Power Supply Bureau