CN202444204U - Traction lifting device for high-altitude circuit tools and appliances - Google Patents

Traction lifting device for high-altitude circuit tools and appliances Download PDF

Info

Publication number
CN202444204U
CN202444204U CN2012200778955U CN201220077895U CN202444204U CN 202444204 U CN202444204 U CN 202444204U CN 2012200778955 U CN2012200778955 U CN 2012200778955U CN 201220077895 U CN201220077895 U CN 201220077895U CN 202444204 U CN202444204 U CN 202444204U
Authority
CN
China
Prior art keywords
traction
rope
rod body
hanging point
lifting device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2012200778955U
Other languages
Chinese (zh)
Inventor
李秋峰
邵俊英
邢长江
段广兴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Hebei Electric Power Co Ltd
Hengshui Power Supply Co of State Grid Hebei Electric Power Co Ltd
Raoyang Power Supply Co of State Grid Hebei Electric Power Co Ltd
State Grid Corp of China
Original Assignee
Raoyang county electric power bureau
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Raoyang county electric power bureau filed Critical Raoyang county electric power bureau
Priority to CN2012200778955U priority Critical patent/CN202444204U/en
Application granted granted Critical
Publication of CN202444204U publication Critical patent/CN202444204U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Supports For Plants (AREA)

Abstract

The utility model belongs to the technical field of a traction lifting device of power tools and appliances, and particularly discloses a traction lifting device for high-altitude circuit tools and appliances. The technical scheme is as follows: the traction lifting device comprises a lightweight rod body, wherein a traction pulley is arranged at the top end of the rod body, a first traction rope is arranged on the traction pulley, a lead hook is arranged on the rod body close to the middle, a second traction rope hanging point is arranged below the lead hook, a second traction rope is fixed on the second traction rope hanging point, a direction control rope hanging point is arranged at the lower end of the rod body, and a direction control rope is fixed on the directional control rope hanging point; and at first, the second traction rope crosses the high-altitude lead, the second traction rope drives the rod body to move upwards, and when the lead hook exceeds the lead, the directional control rope is drawn downwards, so that the hook is hung on the high-altitude lead, the first traction rope and the traction pulley lift a grounding wire and other tools and appliances, the grounding wire and other tools and appliances can be hung on the high-altitude lead without an ascending rod or tower, the labor intensity is reduced, and operation can be carried out under the conditions of ice adhesion on the tower, fog and other harsh environments.

Description

高空线路工器具牵引升降装置High-altitude line tool traction lifting device

技术领域 technical field

本实用新型属于电力工器具牵引升降装置技术领域,特别涉及一种高空线路工器具牵引升降装置。 The utility model belongs to the technical field of traction and lifting devices for electric tools, in particular to a traction and lifting device for high-altitude line tools.

背景技术 Background technique

在电力线路施工当中,施工前必须进行验电挂接地线,目前验电和挂接地线必须登杆或塔等,登杆操作不仅误工费时,同时也保障不了施工人员的人身安全。尤其遇到大雾或杆塔结冰等恶劣天气,时常因此而影响工程进度,使公司在工程施工方面遭受了较大的经济损失,又浪费了人力资源。 In the construction of power lines, it is necessary to carry out electric inspection and hang the ground wire before construction. At present, the electric inspection and the connection of the ground wire must be carried out on poles or towers. Especially in severe weather such as heavy fog or icing of towers, it often affects the progress of the project, causing the company to suffer large economic losses in project construction and wasting human resources.

实用新型内容 Utility model content

本实用新型解决的技术问题就是提供一种可方便将接地线等工器具提升至高空线路上、使用安全方便、不受天气影响的高空线路工器具牵引升降装置。 The technical problem solved by the utility model is to provide a traction and lifting device for high-altitude line tools that can conveniently lift ground wires and other tools to high-altitude lines, is safe and convenient to use, and is not affected by weather.

为解决上述技术问题,本实用新型采用的技术方案为: In order to solve the problems of the technologies described above, the technical solution adopted in the utility model is:

包括轻质杆体,在所述杆体顶端带有牵引滑轮,在所述牵引滑轮上设置有第一牵引绳,在所述杆体靠近中部设置有导线挂钩,在所述导线挂钩的下方设置有第二牵引绳挂点,在该第二牵引绳挂点上固定有第二牵引绳,在所述杆体的下端设置有方向控制绳挂点,在该方向控制绳挂点上固定有方向控制绳。 It includes a lightweight rod body with a traction pulley at the top of the rod body, a first traction rope is arranged on the traction pulley, a wire hook is arranged near the middle of the rod body, and a second wire hook is arranged below the wire hook. A traction rope hanging point is fixed with a second traction rope on the second traction rope hanging point, and a direction control rope hanging point is arranged at the lower end of the rod body, and a direction control rope is fixed on the direction control rope hanging point.

其附加技术特征为: Its additional technical features are:

在所述牵引滑轮上方设置有防脱挡板; An anti-off baffle is arranged above the traction pulley;

所述方向控制绳挂点为与所述杆体固定的第一拉环,所述方向控制绳固定在所述第一拉环上,所述第二牵引绳挂点为与所述杆体固定的第二拉环,所述第二牵引绳固定在所述第二拉环上; The hanging point of the direction control rope is the first pull ring fixed to the rod body, the direction control rope is fixed on the first pull ring, and the hanging point of the second traction rope is the second pull ring fixed to the rod body. Two pull rings, the second pull rope is fixed on the second pull ring;

在所述第一牵引绳的前端设置有牵引绳发射器。 A traction rope transmitter is arranged at the front end of the first traction rope.

本实用新型所提供的高空线路工器具牵引升降装置同现有技术相比具有以下优点:其一,由于包括轻质杆体,在所述杆体顶端带有牵引滑轮,在所述牵引滑轮上设置有第一牵引绳,在所述杆体靠近中部设置有导线挂钩,在所述导线挂钩的下方设置有第二牵引绳挂点,在该第二牵引绳挂点上固定有第二牵引绳,在所述杆体的下端设置有方向控制绳挂点,在该方向控制绳挂点上固定有方向控制绳,首先将第二牵引绳跨过高空的导线,然后拉动第二牵引绳,带动杆体上移,并通过方向控制绳控制杆体带有牵引滑轮的一侧向上,当导线挂钩超过导线时,向下拉动方向控制绳,使得挂钩挂在高空的导线上,并通过第一牵引绳和牵引滑轮升降接地线等工器具,不用登杆或塔就能将接地线等工器具挂在高空导线上,减少了劳动强度,在杆塔附冰、大雾等恶劣环境的条件下,同样可以进行操作,免登杆作业,降低高空作业风险,节省人力资源,降低企业成本,提高施工工效,为企业创造经济效益;其二,由于在所述牵引滑轮上方设置有防脱挡板,防止了工器具在升降过程中第一牵引绳从牵引滑轮中脱出,使用更加安全方便;其三,由于所述方向控制绳挂点为与所述杆体固定的第一拉环,所述方向控制绳固定在所述第一拉环上,所述第二牵引绳挂点为与所述杆体固定的第二拉环,所述第二牵引绳固定在所述第二拉环上,使用更加方便;其四,由于在所述第一牵引绳的前端设置有牵引绳发射器,前绝缘绳可以通过绝缘绳发射器跨越被验导线,不用灯杆即可完成。 Compared with the prior art, the high-altitude line tool traction lifting device provided by the utility model has the following advantages: First, because it includes a light rod body, there is a traction pulley at the top of the rod body, and a traction pulley is arranged on the traction pulley The first traction rope is provided with a wire hook near the middle of the rod body, and a second traction rope hanging point is arranged below the wire hook, and a second traction rope is fixed on the second traction rope hanging point. The lower end of the rod body is provided with a direction control rope hanging point, and a direction control rope is fixed on the direction control rope hanging point. First, the second traction rope is crossed over the high-altitude wire, and then the second traction rope is pulled to drive the rod body to move upward. And through the direction control rope to control the side of the rod body with the traction pulley upwards, when the wire hook exceeds the wire, pull the direction control rope downward so that the hook hangs on the high-altitude wire, and lifts the ground through the first traction rope and traction pulley Wires and other tools, grounding wires and other tools can be hung on high-altitude wires without climbing poles or towers, which reduces labor intensity. It can also be operated in harsh environments such as ice and fog on poles and towers, without climbing pole operation, reduce the risk of high-altitude operations, save human resources, reduce enterprise costs, improve construction efficiency, and create economic benefits for the enterprise; Among them, the first traction rope is released from the traction pulley, which is safer and more convenient to use; third, since the hanging point of the direction control rope is the first pull ring fixed to the rod body, the direction control rope is fixed on the first pull ring. On the draw ring, the hanging point of the second traction rope is the second draw ring fixed with the rod body, and the second traction rope is fixed on the second draw ring, which is more convenient to use; The front end of the first traction rope is provided with a traction rope transmitter, and the front insulating rope can cross the inspected wire through the insulation rope transmitter, which can be completed without a light pole.

附图说明 Description of drawings

图1为本实用新型所提供的高空线路工器具牵引升降装置的结构示意图; Fig. 1 is the structural schematic diagram of the traction and lifting device of high-altitude line tools provided by the utility model;

图2为图1所示高空线路工器具牵引升降装置的侧面视图。 Fig. 2 is a side view of the traction lifting device of the high-altitude line tool shown in Fig. 1 .

具体实施方式 Detailed ways

下面结合附图和具体实施例对本实用新型所提供的高空线路工器具牵引升降装置的结构做进一步的详细说明。 The structure of the traction and lifting device provided by the utility model will be further described in detail with reference to the accompanying drawings and specific embodiments.

如图1和图2所示,该高空线路工器具牵引升降装置包括轻质杆体1,轻质杆体1可以为空心薄皮铝方管,也可以为其他轻质材料,在杆体1的顶端带有牵引滑轮2,在牵引滑轮2上带有第一牵引绳3,在杆体1靠近中部设置有导线挂钩4,在导线挂钩4的下方设置有第二牵引绳挂点5,在该第二牵引绳挂点5上固定有第二牵引绳6,在杆体1的下端设置有方向控制绳挂点7,在该方向控制绳挂点7上固定有方向控制绳8。首先将第二牵引绳6跨过高空的导线,然后拉动第二牵引绳6,带动杆体1上移,并通过方向控制绳8控制杆体1带有牵引滑轮2的一侧向上,当导线挂钩4超过导线时,向下拉动方向控制绳8,使得导线挂钩4挂在高空的导线上,并通过第一牵引绳3和牵引滑轮2升降接地线等工器具,不用登杆或塔就能将接地线等工器具挂在高空导线上,减少了劳动强度,在杆塔附冰、大雾等恶劣环境的条件下,同样可以进行操作,免登杆作业,降低高空作业风险,节省人力资源,降低企业成本,提高施工工效,为企业创造经济效益。 As shown in Figures 1 and 2, the traction and lifting device for high-altitude line tools includes a lightweight rod body 1. The lightweight rod body 1 can be a hollow thin-skinned aluminum square tube or other lightweight materials. The traction pulley 2 has a first traction rope 3 on the traction pulley 2, a wire hook 4 is provided near the middle of the rod body 1, and a second traction rope hanging point 5 is provided below the conductor hook 4. On the second traction rope The hanging point 5 is fixed with a second traction rope 6, and the lower end of the rod body 1 is provided with a direction control rope hanging point 7, and a direction control rope 8 is fixed on the direction control rope hanging point 7. First, the second traction rope 6 is crossed over the high-altitude wire, then the second traction rope 6 is pulled to drive the rod body 1 to move upward, and the side of the rod body 1 with the traction pulley 2 is controlled by the direction control rope 8 to go upward, when the wire hook 4 When exceeding the wire, pull down the direction control rope 8, so that the wire hook 4 is hung on the high-altitude wire, and use tools such as the first traction rope 3 and the traction pulley 2 to lift the grounding wire, so that the grounding wire can be grounded without climbing a pole or a tower. Wires and other tools and equipment are hung on high-altitude wires, which reduces labor intensity. It can also be operated under harsh environments such as ice and fog on poles and towers. No need to climb poles to operate, reduce the risk of high-altitude operations, save human resources, and reduce business costs. Reduce costs, improve construction efficiency, and create economic benefits for enterprises.

在所述牵引滑轮2的上方设置有防脱挡板9,防止了工器具在升降过程中第一牵引绳3从牵引滑轮2中脱出,使用更加安全方便。 An anti-off baffle 9 is arranged above the traction pulley 2, which prevents the first traction rope 3 from detaching from the traction pulley 2 during the lifting process of the tool, making it safer and more convenient to use.

方向控制绳挂点7为与杆体1固定的第一拉环10,方向控制绳8固定在第一拉环10上,第二牵引绳挂点5为与杆体1固定的第二拉环11,第二牵引绳6固定在第二拉环11上,使用更加方便。 The direction control rope hanging point 7 is the first draw ring 10 fixed with the rod body 1, the direction control rope 8 is fixed on the first draw ring 10, and the second traction rope hanging point 5 is the second draw ring 11 fixed with the rod body 1, The second traction rope 6 is fixed on the second pull ring 11, which is more convenient to use.

在第一牵引绳3的前端设置有牵引绳发射器12,牵引绳发射器12可以为包括外壳13、弹性拉绳14和发射杆15,第一牵引绳3固定在发射杆15上。当然,牵引绳发射器12还可以为其他已知的发射器。第一牵引绳3可以通过绝缘绳发射器7跨越被验导线,不用灯杆即可完成。 The front end of the first traction rope 3 is provided with a traction rope transmitter 12, which may include a casing 13, an elastic pull cord 14 and a launch rod 15, on which the first traction rope 3 is fixed. Of course, the pull rope transmitter 12 can also be other known transmitters. The first traction rope 3 can cross the inspected wire through the insulating rope transmitter 7, which can be completed without a light pole.

上述实施例只是对本实用新型的说明,因此,本实用新型的保护范围不仅仅局限于上述实施例,只要结构与本实用新型高空线路工器具牵引升降装置相同,就落在本实用新型保护的范围。 The above-mentioned embodiment is only an illustration of the utility model, therefore, the scope of protection of the utility model is not limited to the above-mentioned embodiment, as long as the structure is the same as the traction and lifting device of the utility model high-altitude line tool, it falls within the scope of the utility model protection .

Claims (4)

1.高空线路工器具牵引升降装置,其特征在于:包括轻质杆体,在所述杆体顶端带有牵引滑轮,在所述牵引滑轮上设置有第一牵引绳,在所述杆体靠近中部设置有导线挂钩,在所述导线挂钩的下方设置有第二牵引绳挂点,在该第二牵引绳挂点上固定有第二牵引绳,在所述杆体的下端设置有方向控制绳挂点,在该方向控制绳挂点上固定有方向控制绳。 1. The traction and lifting device for high-altitude line tools is characterized in that: it includes a light rod body, a traction pulley is provided on the top of the rod body, a first traction rope is arranged on the traction pulley, and a The wire hook is provided with a second traction rope hanging point below the wire hook, a second traction rope is fixed on the second traction rope hanging point, and a direction control rope hanging point is arranged at the lower end of the rod body. A direction control rope is fixed on the hanging point of the direction control rope. 2.根据权利要求1所述的高空线路工器具牵引升降装置,其特征在于:在所述牵引滑轮上方设置有防脱挡板。 2. The traction and lifting device for high-altitude line implements according to claim 1, characterized in that: an anti-off baffle is arranged above the traction pulley. 3.根据权利要求1所述的高空线路工器具牵引升降装置,其特征在于:所述方向控制绳挂点为与所述杆体固定的第一拉环,所述方向控制绳固定在所述第一拉环上,所述第二牵引绳挂点为与所述杆体固定的第二拉环,所述第二牵引绳固定在所述第二拉环上。 3. The traction and lifting device for high-altitude line tool according to claim 1, characterized in that: the hanging point of the direction control rope is the first pull ring fixed to the rod body, and the direction control rope is fixed on the second pull ring. On a pull ring, the hanging point of the second traction rope is a second pull ring fixed to the rod body, and the second pull rope is fixed on the second pull ring. 4.根据权利要求1所述的高空线路工器具牵引升降装置,其特征在于:在所述第一牵引绳的前端设置有牵引绳发射器。 4. The traction and lifting device for high-altitude line tool according to claim 1, characterized in that: a traction rope launcher is arranged at the front end of the first traction rope.
CN2012200778955U 2012-03-05 2012-03-05 Traction lifting device for high-altitude circuit tools and appliances Expired - Fee Related CN202444204U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012200778955U CN202444204U (en) 2012-03-05 2012-03-05 Traction lifting device for high-altitude circuit tools and appliances

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012200778955U CN202444204U (en) 2012-03-05 2012-03-05 Traction lifting device for high-altitude circuit tools and appliances

Publications (1)

Publication Number Publication Date
CN202444204U true CN202444204U (en) 2012-09-19

Family

ID=46825634

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012200778955U Expired - Fee Related CN202444204U (en) 2012-03-05 2012-03-05 Traction lifting device for high-altitude circuit tools and appliances

Country Status (1)

Country Link
CN (1) CN202444204U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105162039A (en) * 2015-09-21 2015-12-16 国网辽宁省电力有限公司鞍山供电公司 Portable grounding wire transmitter and using method
CN110212324A (en) * 2019-05-31 2019-09-06 广东电网有限责任公司 A kind of hanging device and method of voltage levels temporary ground wire
CN115528453A (en) * 2022-09-20 2022-12-27 华北电力大学(保定) Ground wire clamp device that ground articulates

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105162039A (en) * 2015-09-21 2015-12-16 国网辽宁省电力有限公司鞍山供电公司 Portable grounding wire transmitter and using method
CN110212324A (en) * 2019-05-31 2019-09-06 广东电网有限责任公司 A kind of hanging device and method of voltage levels temporary ground wire
CN115528453A (en) * 2022-09-20 2022-12-27 华北电力大学(保定) Ground wire clamp device that ground articulates

Similar Documents

Publication Publication Date Title
CN102545103B (en) Overhead power line electricity testing and grounding line hanging and disassembling tool and operation method
CN206412696U (en) An insulating block based on the construction of the rotor UAV
CN205452953U (en) A working device that uses a rotor drone to enter a strong electric field
CN106013924B (en) A kind of electric force pole tower
CN103337812A (en) Overhead power line traction device
CN203998746U (en) Portable suspension installation
CN202444206U (en) Wire clamp for grounding wire
CN202429945U (en) Hoisting device for power supply facility
CN203367873U (en) A walking-pulley cleaner
CN207320711U (en) Unmanned plane carries unwrapping wire maintenance rope device
CN202444205U (en) Grounding wire which people can hang without mounting a pole
CN104242142B (en) The installation method of suspension type tube type bus
CN203902839U (en) Electrified foreign object clearing unmanned aerial vehicle
CN202395384U (en) Operation tool for multiloop of 110-220kV electric transmission line
CN204633283U (en) A kind of built on stilts general cable hook suspension device
CN106921124B (en) Power transmission line overhead ground wire damper resetting apparatus
CN204243605U (en) Power line tension string composite insulator changes hook special
CN204760966U (en) Anti -creep rattan of acting as go -between cover
CN204967142U (en) Join in marriage comprehensive electrified maintenance of net and carry lineman's utensil
CN202131996U (en) Steel wire rope traction device of rotary drilling machine
CN204376301U (en) A kind of twister scavenge unit of transmission line
CN202424016U (en) Pulley device for electric power circuit maintenance
CN204474184U (en) One just climbs formula tower crane
CN205141333U (en) Earth connection hangs specialized tool
CN205646648U (en) Cabling drafting tool and cable laying system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: HENGSHUI POWER SUPPLY BRANCH COMPANY, STATE GRID H

Effective date: 20140717

Owner name: STATE GRID CORPORATION OF CHINA

Free format text: FORMER OWNER: STATE GRID HEBEI RAOYANG POWER SUPPLY COMPANY

Effective date: 20140717

C41 Transfer of patent application or patent right or utility model
C56 Change in the name or address of the patentee

Owner name: STATE GRID HEBEI RAOYANG POWER SUPPLY COMPANY

Free format text: FORMER NAME: RAOYANG POWER AUTHORITY

COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 053900 HENGSHUI, HEBEI PROVINCE TO: 100031 XICHENG, BEIJING

CP01 Change in the name or title of a patent holder

Address after: 053900, No. 71, Ping'an West Road, Raoyang County, Hebei, Hengshui

Patentee after: STATE GRID HEBEI RAOYANG COUNTY POWER SUPPLY Co.,Ltd.

Address before: 053900, No. 71, Ping'an West Road, Raoyang County, Hebei, Hengshui

Patentee before: Raoyang County Electric Power Bureau

TR01 Transfer of patent right

Effective date of registration: 20140717

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Patentee after: State Grid Corporation of China

Patentee after: STATE GRID HEBEI ELECTRIC POWER COMPANY HENGSHUI POWER SUPPLY BRANCH

Patentee after: STATE GRID HEBEI ELECTRIC POWER Co.

Patentee after: STATE GRID HEBEI RAOYANG COUNTY POWER SUPPLY Co.,Ltd.

Address before: 053900, No. 71, Ping'an West Road, Raoyang County, Hebei, Hengshui

Patentee before: STATE GRID HEBEI RAOYANG COUNTY POWER SUPPLY Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120919

Termination date: 20180305