CN203850726U - Wire lifter on 10 kV power distribution telegraph pole - Google Patents

Wire lifter on 10 kV power distribution telegraph pole Download PDF

Info

Publication number
CN203850726U
CN203850726U CN201420288441.1U CN201420288441U CN203850726U CN 203850726 U CN203850726 U CN 203850726U CN 201420288441 U CN201420288441 U CN 201420288441U CN 203850726 U CN203850726 U CN 203850726U
Authority
CN
China
Prior art keywords
pole
pulley
hoop
rod
wire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420288441.1U
Other languages
Chinese (zh)
Inventor
李占柱
王振维
郭崇鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Benxi Power Supply Co of State Grid Liaoning Electric Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
Benxi Power Supply Co of State Grid Liaoning Electric Power Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Benxi Power Supply Co of State Grid Liaoning Electric Power Co Ltd, State Grid Corp of China SGCC filed Critical Benxi Power Supply Co of State Grid Liaoning Electric Power Co Ltd
Priority to CN201420288441.1U priority Critical patent/CN203850726U/en
Application granted granted Critical
Publication of CN203850726U publication Critical patent/CN203850726U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

一种10kV配电线路杆上吊线器,包括上抱箍,下抱箍,上杆,下杆,第一滑轮,第二滑轮,手动绞盘,电动绞盘,起吊装置;其中:上抱箍和下抱箍卡紧在电杆上,上抱箍和下抱箍整体结构均为环状,上抱箍前端与上杆后端连接,下抱箍前端与下杆的后端连接,上杆和下杆的前端铰接;第一滑轮通过支架安装在上杆上,第二滑轮安装在上杆和下杆前端铰接的位置;钢丝绳的下端连接起吊装置,钢丝绳绕过第二滑轮和第一滑轮连接手动绞盘和电动绞盘。本实用新型的优点:以前遇到跨越杆塔、转角杆塔上检修工作,导线弛度一定会发生变化,每次都要用紧线器调整,用吊线器就能很好的固定导线,使其不发生位移,在节约工时的同时保证了施工质量。

A 10kV power distribution line rod hanger, including an upper hoop, a lower hoop, an upper pole, a lower pole, a first pulley, a second pulley, a manual winch, an electric winch, and a lifting device; wherein: the upper hoop and the lower hoop The hoop is clamped on the pole, the overall structure of the upper hoop and the lower hoop are ring-shaped, the front end of the upper hoop is connected with the rear end of the upper pole, the front end of the lower hoop is connected with the rear end of the lower pole, and the upper pole and the lower pole are connected. The front end of the rod is hinged; the first pulley is installed on the upper rod through the bracket, and the second pulley is installed at the position where the front end of the upper rod and the lower rod are hinged; the lower end of the wire rope is connected to the lifting device, and the wire rope passes around the second pulley and the first pulley to connect the manual Winch and electric winch. The utility model has the advantages: in the past, the slackness of the wires will definitely change in the maintenance work on the crossing towers and corner towers, and the wire tensioner must be used to adjust each time, and the wire hanger can be used to fix the wires well so that Displacement occurs, which ensures the construction quality while saving man-hours.

Description

Rope hoister on a kind of 10kV distribution line pole
Technical field
The utility model relates to electric power system construction aid field, particularly rope hoister on a kind of 10kV distribution line pole.
Background technology
For example in distribution line construction operation, upkeep operation process, can run into the physical work of a lot of expenses: the shaft tower that some crane cannot arrive, need to lift by crane cable and overhead transmission line and connect and draw, only have and jointly complete with a lot of manpowers; When crossing pole on mountain is changed vertical bottle or insulator, because distance wire weight is large, shoulder can not shouldered wire or is lifted wire with hands to long one grade of slip, and wire top does not have higher fulcrum, and other people also can do nothing to help; When corner pole is changed vertical bottle or insulator, the inside angular direction of wire pulling force very greatly cannot fixing cord etc. similar situation, in order to address these problems, complete difficult task, the rational aid of Structure of need with minimum manpower.
Utility model content
The purpose of this utility model is the construction operation efficiency in order to improve the electric power system under complex environment, and spy provides rope hoister on a kind of 10kV distribution line pole.
The utility model provides rope hoister on a kind of 10kV distribution line pole, it is characterized in that: rope hoister on described 10kV distribution line pole, comprises anchor ear 1, lower anchor ear 2, upper boom 3, lower beam 4, the first pulley 5, the second pulleys 6, hand winch 7, electric capstan 8, boom hoisting 9;
Wherein: upper anchor ear 1 and lower anchor ear 2 are clamped on electric pole, and upper anchor ear 1 and lower anchor ear 2 overall structures are ring-type, and upper anchor ear 1 front end is connected with upper boom 3 rear ends, and lower anchor ear 2 front ends are connected with the rear end of lower beam 4, and the front end of upper boom 3 and lower beam 4 is hinged; The first pulley 5 is arranged on upper boom 3 by support, and the second pulley 6 is arranged on upper boom 3 and the hinged position of lower beam 4 front ends; The lower end connecting hoisting device 9 of steel wire rope, steel wire rope is walked around the second pulley 6 and is connected hand winch 7 and electric capstan 8 with the first pulley 5.
Described upper boom 3 and lower beam 4 are channel-section steel structure.
Described boom hoisting 9 is suspension hook structure or line clamping device.
In the time that two grades of wire tensions are balanced or lift by crane cable or other weight, select suspension hook, when running into two grades of unbalanced situations of wire tension, in order to prevent that wire from sliding, conducting wire sag is changed, select wire clamp lifting.
Advantage of the present utility model:
Rope hoister on 10kV distribution line pole described in the utility model, save 3/4ths manpower, operating efficiency improves four times, ran in the past service work on crossing pole, corner pole, wire sag is bound to change, and all uses wire grip adjustment at every turn, with just well fixing cord of energy of rope hoister, it is not subjected to displacement, in saving man-hour, has ensured construction quality.
Brief description of the drawings
Below in conjunction with drawings and the embodiments, the utility model is described in further detail:
Fig. 1 is rope hoister theory structure schematic diagram on 10kV distribution line pole.
Embodiment
Embodiment 1
The present embodiment provides rope hoister on a kind of 10kV distribution line pole, it is characterized in that: rope hoister on described 10kV distribution line pole, comprises anchor ear 1, lower anchor ear 2, upper boom 3, lower beam 4, the first pulley 5, the second pulleys 6, hand winch 7, electric capstan 8, boom hoisting 9;
Wherein: upper anchor ear 1 and lower anchor ear 2 are clamped on electric pole, and upper anchor ear 1 and lower anchor ear 2 overall structures are ring-type, and upper anchor ear 1 front end is connected with upper boom 3 rear ends, and lower anchor ear 2 front ends are connected with the rear end of lower beam 4, and the front end of upper boom 3 and lower beam 4 is hinged; The first pulley 5 is arranged on upper boom 3 by support, and the second pulley 6 is arranged on upper boom 3 and the hinged position of lower beam 4 front ends; The lower end connecting hoisting device 9 of steel wire rope, steel wire rope is walked around the second pulley 6 and is connected hand winch 7 and electric capstan 8 with the first pulley 5.
Described upper boom 3 and lower beam 4 are channel-section steel structure.
Described boom hoisting 9 is suspension hook structure.
Embodiment 2
The present embodiment provides rope hoister on a kind of 10kV distribution line pole, it is characterized in that: rope hoister on described 10kV distribution line pole, comprises anchor ear 1, lower anchor ear 2, upper boom 3, lower beam 4, the first pulley 5, the second pulleys 6, hand winch 7, electric capstan 8, boom hoisting 9;
Wherein: upper anchor ear 1 and lower anchor ear 2 are clamped on electric pole, and upper anchor ear 1 and lower anchor ear 2 overall structures are ring-type, and upper anchor ear 1 front end is connected with upper boom 3 rear ends, and lower anchor ear 2 front ends are connected with the rear end of lower beam 4, and the front end of upper boom 3 and lower beam 4 is hinged; The first pulley 5 is arranged on upper boom 3 by support, and the second pulley 6 is arranged on upper boom 3 and the hinged position of lower beam 4 front ends; The lower end connecting hoisting device 9 of steel wire rope, steel wire rope is walked around the second pulley 6 and is connected hand winch 7 and electric capstan 8 with the first pulley 5.
Described upper boom 3 and lower beam 4 are channel-section steel structure.
Described boom hoisting 9 is line clamping device.
Embodiment 3
The present embodiment provides rope hoister on a kind of 10kV distribution line pole, it is characterized in that: rope hoister on described 10kV distribution line pole, comprises anchor ear 1, lower anchor ear 2, upper boom 3, lower beam 4, the first pulley 5, the second pulleys 6, hand winch 7, electric capstan 8, boom hoisting 9;
Wherein: upper anchor ear 1 and lower anchor ear 2 are clamped on electric pole, and upper anchor ear 1 and lower anchor ear 2 overall structures are ring-type, and upper anchor ear 1 front end is connected with upper boom 3 rear ends, and lower anchor ear 2 front ends are connected with the rear end of lower beam 4, and the front end of upper boom 3 and lower beam 4 is hinged; The first pulley 5 is arranged on upper boom 3 by support, and the second pulley 6 is arranged on upper boom 3 and the hinged position of lower beam 4 front ends; The lower end connecting hoisting device 9 of steel wire rope, steel wire rope is walked around the second pulley 6 and is connected hand winch 7 and electric capstan 8 with the first pulley 5.
Described upper boom 3 and lower beam 4 are channel-section steel structure.
Described boom hoisting 9 is suspension hook structure.

Claims (3)

1.一种10kV配电线路杆上吊线器,其特征在于:所述的10kV配电线路杆上吊线器,包括上抱箍(1),下抱箍(2),上杆(3),下杆(4),第一滑轮(5),第二滑轮(6),手动绞盘(7),电动绞盘(8),起吊装置(9);  1. A 10kV power distribution line pole hanger, characterized in that: the 10kV power distribution line pole hanger includes an upper hoop (1), a lower hoop (2), an upper pole (3), Lower rod (4), first pulley (5), second pulley (6), manual winch (7), electric winch (8), lifting device (9); 其中:上抱箍(1)和下抱箍(2)卡紧在电杆上,上抱箍(1)和下抱箍(2)整体结构均为环状,上抱箍(1)前端与上杆(3)后端连接,下抱箍(2)前端与下杆(4)的后端连接,上杆(3)和下杆(4)的前端铰接;第一滑轮(5)通过支架安装在上杆(3)上,第二滑轮(6)安装在上杆(3)和下杆(4)前端铰接的位置;钢丝绳的下端连接起吊装置(9),钢丝绳绕过第二滑轮(6)和第一滑轮(5)连接手动绞盘(7)和电动绞盘(8)。  Among them: the upper hoop (1) and the lower hoop (2) are clamped on the pole, the overall structure of the upper hoop (1) and the lower hoop (2) is ring-shaped, and the front end of the upper hoop (1) is connected to the The rear end of the upper rod (3) is connected, the front end of the lower hoop (2) is connected with the rear end of the lower rod (4), and the front ends of the upper rod (3) and the lower rod (4) are hinged; the first pulley (5) passes through the bracket Installed on the upper pole (3), the second pulley (6) is installed at the hinged position of the front end of the upper pole (3) and the lower pole (4); the lower end of the wire rope is connected to the hoisting device (9), and the wire rope walks around the second pulley ( 6) Connect the manual winch (7) and the electric winch (8) with the first pulley (5). the 2.按照权利要求1所述的10kV配电线路杆上吊线器,其特征在于:所述的上杆(3)和下杆(4)为槽钢结构。  2. The pole hanger for 10kV distribution lines according to claim 1, characterized in that: the upper pole (3) and the lower pole (4) are channel steel structures. the 3.按照权利要求1所述的10kV配电线路杆上吊线器,其特征在于:所述的起吊装置(9)为吊钩结构或线夹装置。  3. The wire hanger on the pole of 10kV distribution line according to claim 1, characterized in that: the lifting device (9) is a hook structure or a wire clamp device. the
CN201420288441.1U 2014-05-30 2014-05-30 Wire lifter on 10 kV power distribution telegraph pole Expired - Lifetime CN203850726U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420288441.1U CN203850726U (en) 2014-05-30 2014-05-30 Wire lifter on 10 kV power distribution telegraph pole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420288441.1U CN203850726U (en) 2014-05-30 2014-05-30 Wire lifter on 10 kV power distribution telegraph pole

Publications (1)

Publication Number Publication Date
CN203850726U true CN203850726U (en) 2014-09-24

Family

ID=51563698

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420288441.1U Expired - Lifetime CN203850726U (en) 2014-05-30 2014-05-30 Wire lifter on 10 kV power distribution telegraph pole

Country Status (1)

Country Link
CN (1) CN203850726U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104022459A (en) * 2014-05-30 2014-09-03 国家电网公司 10 KV distribution line pole-mounted wire suspension device
CN107288405A (en) * 2016-03-30 2017-10-24 国网辽宁省电力有限公司本溪供电公司 A kind of electronic, dual-use manual standing device
CN107487744A (en) * 2017-06-20 2017-12-19 国网山东省电力公司曹县供电公司 Rope hoister
CN112850538A (en) * 2021-01-13 2021-05-28 国网山东省电力公司宁津县供电公司 Conductor lifter on distribution line pole

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104022459A (en) * 2014-05-30 2014-09-03 国家电网公司 10 KV distribution line pole-mounted wire suspension device
CN107288405A (en) * 2016-03-30 2017-10-24 国网辽宁省电力有限公司本溪供电公司 A kind of electronic, dual-use manual standing device
CN107487744A (en) * 2017-06-20 2017-12-19 国网山东省电力公司曹县供电公司 Rope hoister
CN107487744B (en) * 2017-06-20 2019-04-30 国网山东省电力公司曹县供电公司 wire hanger
CN112850538A (en) * 2021-01-13 2021-05-28 国网山东省电力公司宁津县供电公司 Conductor lifter on distribution line pole

Similar Documents

Publication Publication Date Title
CN103545751B (en) Overhead transmission line ground wire optical cable fittings replacement bracket
CN203850726U (en) Wire lifter on 10 kV power distribution telegraph pole
CN103613031A (en) Simple transformer hoisting device
CN104022459A (en) 10 KV distribution line pole-mounted wire suspension device
CN107834434A (en) Crossing method for the construction of transmission line of electricity tension stringing
CN104078888A (en) Auxiliary tool for suspending conducting wire
CN103269036A (en) Tension cross arm hoist
CN203998746U (en) Portable suspension installation
CN104362544A (en) Pulley type tower head clamp
CN102992203B (en) Simple hoisting device for steel structure bridge installation
CN202094562U (en) Suspension type synchronous hoisting system for pipe type bus
CN104283156B (en) Wire lifting device for power distribution line
CN102354929B (en) V-shaped insulator string suspension device
CN205985954U (en) Transformer substation's " V type " suspends strain insulator string hoisting support in midair
CN102237654B (en) Method for replacing jumper string using tool at double angle hanging point
CN202197048U (en) Double angle steel hanging point lifting and connecting tool for tower use
CN202967922U (en) Simple hoisting device for mounting steel structural bridge
CN103219673A (en) Pulley-type tightener
CN203345975U (en) Hoisting steel wire rope mounting device and tower crane
CN102923600B (en) Reverse pulley fixing device
CN202276117U (en) Hanging device for V-shaped insulator strips
CN204118597U (en) A kind of line lifter for distribution line
CN203423430U (en) Insulator maintenance device
CN209562017U (en) A tight pulley block device
CN110635388A (en) An eight-split large cross-section wire tension stringing pulley hanger and its disassembly method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20140924