CN104022459A - 10 KV distribution line pole-mounted wire suspension device - Google Patents
10 KV distribution line pole-mounted wire suspension device Download PDFInfo
- Publication number
- CN104022459A CN104022459A CN201410238599.2A CN201410238599A CN104022459A CN 104022459 A CN104022459 A CN 104022459A CN 201410238599 A CN201410238599 A CN 201410238599A CN 104022459 A CN104022459 A CN 104022459A
- Authority
- CN
- China
- Prior art keywords
- hoop
- pole
- pulley
- rod
- distribution line
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Electric Cable Installation (AREA)
Abstract
一种10KV配电线路杆上吊线器,包括上抱箍,下抱箍,上杆,下杆,第一滑轮,第二滑轮,手动绞盘,电动绞盘,起吊装置;其中:上抱箍和下抱箍卡紧在电杆上,上抱箍和下抱箍整体结构均为环状,上抱箍前端与上杆后端连接,下抱箍前端与下杆的后端连接,上杆和下杆的前端铰接;第一滑轮通过支架安装在上杆上,第二滑轮安装在上杆和下杆前端铰接的位置;钢丝绳的下端连接起吊装置,钢丝绳绕过第二滑轮和第一滑轮连接手动绞盘和电动绞盘。本发明的优点:以前遇到跨越杆塔、转角杆塔上检修工作,导线弛度一定会发生变化,每次都要用紧线器调整,用吊线器就能很好的固定导线,使其不发生位移,在节约工时的同时保证了施工质量。
A 10KV power distribution line rod hanger, including an upper hoop, a lower hoop, an upper pole, a lower pole, a first pulley, a second pulley, a manual winch, an electric winch, and a lifting device; wherein: the upper hoop and the lower hoop The hoop is clamped on the pole, the overall structure of the upper hoop and the lower hoop are ring-shaped, the front end of the upper hoop is connected with the rear end of the upper pole, the front end of the lower hoop is connected with the rear end of the lower pole, and the upper pole and the lower pole are connected. The front end of the rod is hinged; the first pulley is installed on the upper rod through the bracket, and the second pulley is installed at the position where the front ends of the upper rod and the lower rod are hinged; the lower end of the wire rope is connected to the lifting device, and the wire rope passes around the second pulley and the first pulley to connect the manual Winch and electric winch. Advantages of the present invention: in the past, the slack of the wires will definitely change in the maintenance work on crossing towers and corner towers, and each time it must be adjusted with a wire tensioner, and the wire hanger can be used to fix the wires well so that it does not happen Displacement ensures construction quality while saving man-hours.
Description
技术领域technical field
本发明涉及电力系统施工辅助工具领域,特别涉及了一种10KV配电线路杆上吊线器。The invention relates to the field of construction auxiliary tools for electric power systems, in particular to a wire hanger for a 10KV power distribution line pole.
背景技术Background technique
配电线路施工作业、检修作业过程中会遇到很多费体力的工作例如:有些吊车无法到达的杆塔,需要起吊电缆与架空线路接引,只有用很多人力共同完成;山上的跨越杆塔更换立瓶或者绝缘子时,由于距离远导线重量大,肩膀扛不起来导线或者扛起导线向较长一档滑动,导线上方没有更高的支点其他人也无法帮助;转角杆塔更换立瓶或者绝缘子时,导线向内角方向拉力很大无法固定导线等等类似的情况,为了解决这些问题,用最少的人力完成最艰巨的任务,需要结构合理的辅助工具。During the construction and maintenance of power distribution lines, there will be a lot of labor-intensive work. For example, some towers that cannot be reached by cranes need to be connected with lifting cables and overhead lines, which can only be completed with a lot of manpower; Or in the case of insulators, due to the long distance and heavy weight of the wires, the shoulders cannot carry the wires or carry the wires to slide to the longer gear. There is no higher fulcrum above the wires and other people cannot help; when the corner tower replaces the vertical bottle or insulator, the wire The pull force in the direction of the inner corner is too large to fix the wire and so on. In order to solve these problems and complete the most difficult tasks with the least manpower, auxiliary tools with reasonable structure are needed.
发明内容Contents of the invention
本发明的目的是为了提高在复杂环境下的电力系统的施工作业效率,特提供了一种10KV配电线路杆上吊线器。The purpose of the present invention is to improve the construction operation efficiency of the electric power system in a complicated environment, and especially provides a wire hanger on a pole of a 10KV power distribution line.
本发明提供了一种10KV配电线路杆上吊线器,其特征在于:所述的10KV配电线路杆上吊线器,包括上抱箍1,下抱箍2,上杆3,下杆4,第一滑轮5,第二滑轮6,手动绞盘7,电动绞盘8,起吊装置9;The invention provides a 10KV power distribution line pole hanger, characterized in that: the 10KV power distribution line pole hanger includes an upper hoop 1, a lower hoop 2, an upper pole 3, a lower pole 4, The first pulley 5, the second pulley 6, the manual winch 7, the electric winch 8, the hoisting device 9;
其中:上抱箍1和下抱箍2卡紧在电杆上,上抱箍1和下抱箍2整体结构均为环状,上抱箍1前端与上杆3后端连接,下抱箍2前端与下杆4的后端连接,上杆3和下杆4的前端铰接;第一滑轮5通过支架安装在上杆3上,第二滑轮6安装在上杆3和下杆4前端铰接的位置;钢丝绳的下端连接起吊装置9,钢丝绳绕过第二滑轮6和第一滑轮5连接手动绞盘7和电动绞盘8。Among them: the upper hoop 1 and the lower hoop 2 are clamped on the pole, the overall structure of the upper hoop 1 and the lower hoop 2 are ring-shaped, the front end of the upper hoop 1 is connected with the rear end of the upper pole 3, and the lower hoop 2. The front end is connected to the rear end of the lower rod 4, and the front ends of the upper rod 3 and the lower rod 4 are hinged; the first pulley 5 is installed on the upper rod 3 through a bracket, and the second pulley 6 is installed on the front end of the upper rod 3 and the lower rod 4. The lower end of the wire rope is connected to the lifting device 9, and the wire rope goes around the second pulley 6 and the first pulley 5 to connect the manual winch 7 and the electric winch 8.
所述的上杆3和下杆4为槽钢结构。The upper rod 3 and the lower rod 4 are channel steel structures.
所述的起吊装置9为吊钩结构或线夹装置。The lifting device 9 is a hook structure or a wire clamp device.
当两档导线拉力均衡或者起吊电缆或其它重物时选择吊钩,当遇到两档导线拉力不均衡的情况,为了防止导线滑动使得导线弧垂发生变化,选用线夹起吊。When the tension of the two wires is balanced or when lifting cables or other heavy objects, the hook is selected. When the tension of the two wires is unbalanced, in order to prevent the wire from sliding and the wire sag to change, the wire clip is used for lifting.
本发明的优点:Advantages of the present invention:
本发明所述的10KV配电线路杆上吊线器,节省四分之三的人力,工作效率提高四倍,以前遇到跨越杆塔、转角杆塔上检修工作,导线弛度一定会发生变化,每次都要用紧线器调整,用吊线器就能很好的固定导线,使其不发生位移,在节约工时的同时保证了施工质量。The 10KV power distribution line pole hanger of the present invention saves three-quarters of manpower and improves the work efficiency by four times. In the past, the slack of the wires will definitely change when encountering maintenance work on crossing pole towers and corner pole towers. It must be adjusted with a wire tensioner, and the wire hanger can be used to fix the wire well so that it does not shift, which saves man-hours and ensures the construction quality.
附图说明Description of drawings
下面结合附图及实施方式对本发明作进一步详细的说明:Below in conjunction with accompanying drawing and embodiment the present invention is described in further detail:
图1为10KV配电线路杆上吊线器原理结构示意图。Figure 1 is a schematic structural diagram of the principle structure of a hanger on a pole of a 10KV distribution line.
具体实施方式Detailed ways
实施例1Example 1
本实施例提供了一种10KV配电线路杆上吊线器,其特征在于:所述的10KV配电线路杆上吊线器,包括上抱箍1,下抱箍2,上杆3,下杆4,第一滑轮5,第二滑轮6,手动绞盘7,电动绞盘8,起吊装置9;This embodiment provides a 10KV distribution line pole hanger, characterized in that: the 10KV distribution line pole hanger includes an upper hoop 1, a lower hoop 2, an upper pole 3, and a lower pole 4 , first pulley 5, second pulley 6, manual winch 7, electric winch 8, lifting device 9;
其中:上抱箍1和下抱箍2卡紧在电杆上,上抱箍1和下抱箍2整体结构均为环状,上抱箍1前端与上杆3后端连接,下抱箍2前端与下杆4的后端连接,上杆3和下杆4的前端铰接;第一滑轮5通过支架安装在上杆3上,第二滑轮6安装在上杆3和下杆4前端铰接的位置;钢丝绳的下端连接起吊装置9,钢丝绳绕过第二滑轮6和第一滑轮5连接手动绞盘7和电动绞盘8。Among them: the upper hoop 1 and the lower hoop 2 are clamped on the pole, the overall structure of the upper hoop 1 and the lower hoop 2 are ring-shaped, the front end of the upper hoop 1 is connected with the rear end of the upper pole 3, and the lower hoop 2. The front end is connected to the rear end of the lower rod 4, and the front ends of the upper rod 3 and the lower rod 4 are hinged; the first pulley 5 is installed on the upper rod 3 through a bracket, and the second pulley 6 is installed on the front end of the upper rod 3 and the lower rod 4. The lower end of the wire rope is connected to the lifting device 9, and the wire rope goes around the second pulley 6 and the first pulley 5 to connect the manual winch 7 and the electric winch 8.
所述的上杆3和下杆4为槽钢结构。The upper rod 3 and the lower rod 4 are channel steel structures.
所述的起吊装置9为吊钩结构。The lifting device 9 is a hook structure.
实施例2Example 2
本实施例提供了一种10KV配电线路杆上吊线器,其特征在于:所述的10KV配电线路杆上吊线器,包括上抱箍1,下抱箍2,上杆3,下杆4,第一滑轮5,第二滑轮6,手动绞盘7,电动绞盘8,起吊装置9;This embodiment provides a 10KV distribution line pole hanger, characterized in that: the 10KV distribution line pole hanger includes an upper hoop 1, a lower hoop 2, an upper pole 3, and a lower pole 4 , first pulley 5, second pulley 6, manual winch 7, electric winch 8, lifting device 9;
其中:上抱箍1和下抱箍2卡紧在电杆上,上抱箍1和下抱箍2整体结构均为环状,上抱箍1前端与上杆3后端连接,下抱箍2前端与下杆4的后端连接,上杆3和下杆4的前端铰接;第一滑轮5通过支架安装在上杆3上,第二滑轮6安装在上杆3和下杆4前端铰接的位置;钢丝绳的下端连接起吊装置9,钢丝绳绕过第二滑轮6和第一滑轮5连接手动绞盘7和电动绞盘8。Among them: the upper hoop 1 and the lower hoop 2 are clamped on the pole, the overall structure of the upper hoop 1 and the lower hoop 2 are ring-shaped, the front end of the upper hoop 1 is connected with the rear end of the upper pole 3, and the lower hoop 2. The front end is connected to the rear end of the lower rod 4, and the front ends of the upper rod 3 and the lower rod 4 are hinged; the first pulley 5 is installed on the upper rod 3 through a bracket, and the second pulley 6 is installed on the front end of the upper rod 3 and the lower rod 4. The lower end of the wire rope is connected to the lifting device 9, and the wire rope goes around the second pulley 6 and the first pulley 5 to connect the manual winch 7 and the electric winch 8.
所述的上杆3和下杆4为槽钢结构。The upper rod 3 and the lower rod 4 are channel steel structures.
所述的起吊装置9为线夹装置。The lifting device 9 is a wire clamp device.
实施例3Example 3
本实施例提供了一种10KV配电线路杆上吊线器,其特征在于:所述的10KV配电线路杆上吊线器,包括上抱箍1,下抱箍2,上杆3,下杆4,第一滑轮5,第二滑轮6,手动绞盘7,电动绞盘8,起吊装置9;This embodiment provides a 10KV distribution line pole hanger, characterized in that: the 10KV distribution line pole hanger includes an upper hoop 1, a lower hoop 2, an upper pole 3, and a lower pole 4 , first pulley 5, second pulley 6, manual winch 7, electric winch 8, lifting device 9;
其中:上抱箍1和下抱箍2卡紧在电杆上,上抱箍1和下抱箍2整体结构均为环状,上抱箍1前端与上杆3后端连接,下抱箍2前端与下杆4的后端连接,上杆3和下杆4的前端铰接;第一滑轮5通过支架安装在上杆3上,第二滑轮6安装在上杆3和下杆4前端铰接的位置;钢丝绳的下端连接起吊装置9,钢丝绳绕过第二滑轮6和第一滑轮5连接手动绞盘7和电动绞盘8。Among them: the upper hoop 1 and the lower hoop 2 are clamped on the pole, the overall structure of the upper hoop 1 and the lower hoop 2 are ring-shaped, the front end of the upper hoop 1 is connected with the rear end of the upper pole 3, and the lower hoop 2. The front end is connected to the rear end of the lower rod 4, and the front ends of the upper rod 3 and the lower rod 4 are hinged; the first pulley 5 is installed on the upper rod 3 through a bracket, and the second pulley 6 is installed on the front end of the upper rod 3 and the lower rod 4. The lower end of the wire rope is connected to the lifting device 9, and the wire rope goes around the second pulley 6 and the first pulley 5 to connect the manual winch 7 and the electric winch 8.
所述的上杆3和下杆4为槽钢结构。The upper rod 3 and the lower rod 4 are channel steel structures.
所述的起吊装置9为吊钩结构。The lifting device 9 is a hook structure.
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201410238599.2A CN104022459A (en) | 2014-05-30 | 2014-05-30 | 10 KV distribution line pole-mounted wire suspension device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201410238599.2A CN104022459A (en) | 2014-05-30 | 2014-05-30 | 10 KV distribution line pole-mounted wire suspension device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN104022459A true CN104022459A (en) | 2014-09-03 |
Family
ID=51439088
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201410238599.2A Pending CN104022459A (en) | 2014-05-30 | 2014-05-30 | 10 KV distribution line pole-mounted wire suspension device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN104022459A (en) |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105071296A (en) * | 2015-09-08 | 2015-11-18 | 国家电网公司 | Structurally-improved high-voltage distribution line rod pole-mounted line hoisting device |
| CN105712231A (en) * | 2016-04-15 | 2016-06-29 | 国网上海市电力公司 | Special pulley block for hot-line vertical rod tool of hot-line work bucket arm vehicle |
| CN108565746A (en) * | 2018-02-11 | 2018-09-21 | 国网山东省电力公司平阴县供电公司 | A kind of electrification installation panel switches mast-up |
| CN112850538A (en) * | 2021-01-13 | 2021-05-28 | 国网山东省电力公司宁津县供电公司 | Conductor lifter on distribution line pole |
| CN116142994A (en) * | 2022-12-30 | 2023-05-23 | 国网北京市电力公司 | A line switch installation and hoisting device and method |
| CN116395587A (en) * | 2023-02-17 | 2023-07-07 | 国网新疆电力有限公司昌吉供电公司 | A portable suspension device for cement poles |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN202657877U (en) * | 2012-07-17 | 2013-01-09 | 山东电力集团公司枣庄供电公司 | Circuit equipment construction lifting frame |
| JP2013128357A (en) * | 2011-12-19 | 2013-06-27 | Tokyo Electric Power Co Inc:The | Reconstructing method of steel tower for overhead transmission line |
| CN203850726U (en) * | 2014-05-30 | 2014-09-24 | 国家电网公司 | Wire lifter on 10 kV power distribution telegraph pole |
-
2014
- 2014-05-30 CN CN201410238599.2A patent/CN104022459A/en active Pending
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2013128357A (en) * | 2011-12-19 | 2013-06-27 | Tokyo Electric Power Co Inc:The | Reconstructing method of steel tower for overhead transmission line |
| CN202657877U (en) * | 2012-07-17 | 2013-01-09 | 山东电力集团公司枣庄供电公司 | Circuit equipment construction lifting frame |
| CN203850726U (en) * | 2014-05-30 | 2014-09-24 | 国家电网公司 | Wire lifter on 10 kV power distribution telegraph pole |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105071296A (en) * | 2015-09-08 | 2015-11-18 | 国家电网公司 | Structurally-improved high-voltage distribution line rod pole-mounted line hoisting device |
| CN105712231A (en) * | 2016-04-15 | 2016-06-29 | 国网上海市电力公司 | Special pulley block for hot-line vertical rod tool of hot-line work bucket arm vehicle |
| CN108565746A (en) * | 2018-02-11 | 2018-09-21 | 国网山东省电力公司平阴县供电公司 | A kind of electrification installation panel switches mast-up |
| CN112850538A (en) * | 2021-01-13 | 2021-05-28 | 国网山东省电力公司宁津县供电公司 | Conductor lifter on distribution line pole |
| CN116142994A (en) * | 2022-12-30 | 2023-05-23 | 国网北京市电力公司 | A line switch installation and hoisting device and method |
| CN116395587A (en) * | 2023-02-17 | 2023-07-07 | 国网新疆电力有限公司昌吉供电公司 | A portable suspension device for cement poles |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104022459A (en) | 10 KV distribution line pole-mounted wire suspension device | |
| CN103613031A (en) | Simple transformer hoisting device | |
| CN203850726U (en) | Wire lifter on 10 kV power distribution telegraph pole | |
| CN105071296A (en) | Structurally-improved high-voltage distribution line rod pole-mounted line hoisting device | |
| CN104362544A (en) | Pulley type tower head clamp | |
| CN102992203B (en) | Simple hoisting device for steel structure bridge installation | |
| CN102237654B (en) | Method for replacing jumper string using tool at double angle hanging point | |
| CN205123121U (en) | Action bars is strideed across to electric wire | |
| CN202197048U (en) | Double angle steel hanging point lifting and connecting tool for tower use | |
| CN104836156A (en) | Synthetic insulator simple ladder | |
| CN105133916A (en) | Auxiliary hanging bracket for mounting of upper frame on telegraph pole | |
| CN205985954U (en) | Transformer substation's " V type " suspends strain insulator string hoisting support in midair | |
| CN104283156B (en) | Wire lifting device for power distribution line | |
| CN204179569U (en) | A kind of sister block wire grip of electric transmission line erection | |
| CN104444778B (en) | A kind of coil of strip lifting device | |
| CN202967922U (en) | Simple hoisting device for mounting steel structural bridge | |
| CN203423430U (en) | Insulator maintenance device | |
| CN202474699U (en) | Portable heavy object transmitter for telegraph pole | |
| CN202488076U (en) | Two-way cable pulley | |
| CN207339070U (en) | A Light Duty Replacement Insulator String Tool | |
| CN204156423U (en) | 500kV jumper string wire clamp thread-lifting hook | |
| CN204118597U (en) | A kind of line lifter for distribution line | |
| CN203976285U (en) | With the matching used allocated radio lifting of two electric poles guide chain | |
| CN103628728B (en) | A kind of for electric tower firm support structure | |
| CN204927955U (en) | Support of using when overhead transmission line let -down ground wire, optical cable |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20140903 |