CN104022459A - 10 KV distribution line pole-mounted wire suspension device - Google Patents

10 KV distribution line pole-mounted wire suspension device Download PDF

Info

Publication number
CN104022459A
CN104022459A CN201410238599.2A CN201410238599A CN104022459A CN 104022459 A CN104022459 A CN 104022459A CN 201410238599 A CN201410238599 A CN 201410238599A CN 104022459 A CN104022459 A CN 104022459A
Authority
CN
China
Prior art keywords
pole
pulley
anchor ear
distribution line
hold hoop
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410238599.2A
Other languages
Chinese (zh)
Inventor
李占柱
王振维
郭崇鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Liaoning Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Liaoning Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Liaoning Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201410238599.2A priority Critical patent/CN104022459A/en
Publication of CN104022459A publication Critical patent/CN104022459A/en
Pending legal-status Critical Current

Links

Landscapes

  • Electric Cable Installation (AREA)

Abstract

Disclosed is a 10 KV distribution line pole-mounted wire suspension device. The 10 KV distribution line pole-mounted wire suspension device comprises an upper hold hoop, a lower hold hoop, an upper pole, a lower pole, a first pulley, a second pulley, a hand-operated capstan, an electric capstan and a hoisting apparatus. The upper hold hoop and the lower hold hoop are clamped tight on an electric pole; the upper hold hoop and the lower hold hoop are of annular overall structures; the front end of the upper hold hoop is connected with the rear end of the upper pole; the front end of the lower hold hoop is connected with the rear end of the lower pole; the upper pole is hinged to the front end of the lower pole; the first pulley is installed on the upper pole through a support; the second pulley is installed at the position where the upper pole is hinged to the front end of the lower pole; the lower end of a steel wire rope is connected with the hoisting apparatus; and the steel wire rope is connected with the hand-operated capstan and the electric capstan through bypassing the first pulley and the second pulley. The advantages are as follows: conventionally, in case of tower crossing and corner tower maintenance work, the tension of a lead has to be changed, and adjustment by a tension puller is carried out each time, by use of the wire suspension device, the lead can be better fixed, displacement is not generated, and at the time when working time is saved, the construction quality is also ensured.

Description

Rope hoister on a kind of 10KV distribution line pole
Technical field
The present invention relates to electric power system construction aid field, particularly rope hoister on a kind of 10KV distribution line pole.
Background technology
For example in distribution line construction operation, upkeep operation process, can run into the physical work of a lot of expenses: the shaft tower that some crane cannot arrive, need to lift by crane cable and overhead transmission line and connect and draw, only have with a lot of manpowers and jointly complete; When the crossing pole on mountain is changed vertical bottle or insulator, because distance wire weight is large, shoulder can not shouldered wire or is lifted wire with hands to long one grade of slip, and wire top does not have higher fulcrum, and other people also can do nothing to help; When corner pole is changed vertical bottle or insulator, the inside angular direction of wire pulling force very greatly cannot fixing cord etc. similar situation, in order to address these problems, with minimum manpower, complete difficult task, the rational aid of Structure of need.
Summary of the invention
The object of the invention is in order to improve the construction operation efficiency of the electric power system under complex environment, spy provides rope hoister on a kind of 10KV distribution line pole.
The invention provides rope hoister on a kind of 10KV distribution line pole, it is characterized in that: rope hoister on described 10KV distribution line pole, comprises anchor ear 1, lower anchor ear 2, upper boom 3, lower beam 4, the first pulley 5, the second pulleys 6, hand winch 7, electric capstan 8, boom hoisting 9;
Wherein: upper anchor ear 1 and lower anchor ear 2 are clamped on electric pole, and upper anchor ear 1 and lower anchor ear 2 overall structures are ring-type, and upper anchor ear 1 front end is connected with upper boom 3 rear ends, and lower anchor ear 2 front ends are connected with the rear end of lower beam 4, and the front end of upper boom 3 and lower beam 4 is hinged; The first pulley 5 is arranged on upper boom 3 by support, and the second pulley 6 is arranged on upper boom 3 and the hinged position of lower beam 4 front ends; The lower end connecting hoisting device 9 of steel wire rope, steel wire rope is walked around the second pulley 6 and is connected hand winch 7 and electric capstan 8 with the first pulley 5.
Described upper boom 3 and lower beam 4 are channel-section steel structure.
Described boom hoisting 9 is suspension hook structure or line clamping device.
When two grades of wire tensions are balanced or lift by crane cable or other weight, select suspension hook, when running into two grades of unbalanced situations of wire tension, in order to prevent that wire from sliding, conducting wire sag is changed, select wire clamp lifting.
Advantage of the present invention:
Rope hoister on 10KV distribution line pole of the present invention, save 3/4ths manpower, operating efficiency improves four times, ran in the past service work on crossing pole, corner pole, wire sag is bound to change, and all will use wire grip adjustment at every turn, with rope hoister good fixing cord just, it is not subjected to displacement, when saving man-hour, has guaranteed construction quality.
Accompanying drawing explanation
Below in conjunction with drawings and the embodiments, the present invention is further detailed explanation:
Fig. 1 is rope hoister theory structure schematic diagram on 10KV distribution line pole.
Embodiment
Embodiment 1
The present embodiment provides rope hoister on a kind of 10KV distribution line pole, it is characterized in that: rope hoister on described 10KV distribution line pole, comprises anchor ear 1, lower anchor ear 2, upper boom 3, lower beam 4, the first pulley 5, the second pulleys 6, hand winch 7, electric capstan 8, boom hoisting 9;
Wherein: upper anchor ear 1 and lower anchor ear 2 are clamped on electric pole, and upper anchor ear 1 and lower anchor ear 2 overall structures are ring-type, and upper anchor ear 1 front end is connected with upper boom 3 rear ends, and lower anchor ear 2 front ends are connected with the rear end of lower beam 4, and the front end of upper boom 3 and lower beam 4 is hinged; The first pulley 5 is arranged on upper boom 3 by support, and the second pulley 6 is arranged on upper boom 3 and the hinged position of lower beam 4 front ends; The lower end connecting hoisting device 9 of steel wire rope, steel wire rope is walked around the second pulley 6 and is connected hand winch 7 and electric capstan 8 with the first pulley 5.
Described upper boom 3 and lower beam 4 are channel-section steel structure.
Described boom hoisting 9 is suspension hook structure.
Embodiment 2
The present embodiment provides rope hoister on a kind of 10KV distribution line pole, it is characterized in that: rope hoister on described 10KV distribution line pole, comprises anchor ear 1, lower anchor ear 2, upper boom 3, lower beam 4, the first pulley 5, the second pulleys 6, hand winch 7, electric capstan 8, boom hoisting 9;
Wherein: upper anchor ear 1 and lower anchor ear 2 are clamped on electric pole, and upper anchor ear 1 and lower anchor ear 2 overall structures are ring-type, and upper anchor ear 1 front end is connected with upper boom 3 rear ends, and lower anchor ear 2 front ends are connected with the rear end of lower beam 4, and the front end of upper boom 3 and lower beam 4 is hinged; The first pulley 5 is arranged on upper boom 3 by support, and the second pulley 6 is arranged on upper boom 3 and the hinged position of lower beam 4 front ends; The lower end connecting hoisting device 9 of steel wire rope, steel wire rope is walked around the second pulley 6 and is connected hand winch 7 and electric capstan 8 with the first pulley 5.
Described upper boom 3 and lower beam 4 are channel-section steel structure.
Described boom hoisting 9 is line clamping device.
Embodiment 3
The present embodiment provides rope hoister on a kind of 10KV distribution line pole, it is characterized in that: rope hoister on described 10KV distribution line pole, comprises anchor ear 1, lower anchor ear 2, upper boom 3, lower beam 4, the first pulley 5, the second pulleys 6, hand winch 7, electric capstan 8, boom hoisting 9;
Wherein: upper anchor ear 1 and lower anchor ear 2 are clamped on electric pole, and upper anchor ear 1 and lower anchor ear 2 overall structures are ring-type, and upper anchor ear 1 front end is connected with upper boom 3 rear ends, and lower anchor ear 2 front ends are connected with the rear end of lower beam 4, and the front end of upper boom 3 and lower beam 4 is hinged; The first pulley 5 is arranged on upper boom 3 by support, and the second pulley 6 is arranged on upper boom 3 and the hinged position of lower beam 4 front ends; The lower end connecting hoisting device 9 of steel wire rope, steel wire rope is walked around the second pulley 6 and is connected hand winch 7 and electric capstan 8 with the first pulley 5.
Described upper boom 3 and lower beam 4 are channel-section steel structure.
Described boom hoisting 9 is suspension hook structure.

Claims (3)

1. rope hoister on a 10KV distribution line pole, it is characterized in that: rope hoister on described 10KV distribution line pole, comprise anchor ear (1), lower anchor ear (2), upper boom (3), lower beam (4), the first pulley (5), the second pulley (6), hand winch (7), electric capstan (8), boom hoisting (9);
Wherein: upper anchor ear (1) and lower anchor ear (2) are clamped on electric pole, upper anchor ear (1) and lower anchor ear (2) overall structure are ring-type, upper anchor ear (1) front end is connected with upper boom (3) rear end, lower anchor ear (2) front end is connected with the rear end of lower beam (4), and the front end of upper boom (3) and lower beam (4) is hinged; It is upper that the first pulley (5) is arranged on upper boom (3) by support, and the second pulley (6) is arranged on upper boom (3) and the hinged position of lower beam (4) front end; The lower end connecting hoisting device (9) of steel wire rope, steel wire rope is walked around the second pulley (6) and is connected hand winch (7) and electric capstan (8) with the first pulley (5).
2. according to rope hoister on 10KV distribution line pole claimed in claim 1, it is characterized in that: described upper boom (3) and lower beam (4) are channel-section steel structure.
3. according to rope hoister on 10KV distribution line pole claimed in claim 1, it is characterized in that: described boom hoisting (9) is suspension hook structure or line clamping device.
CN201410238599.2A 2014-05-30 2014-05-30 10 KV distribution line pole-mounted wire suspension device Pending CN104022459A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410238599.2A CN104022459A (en) 2014-05-30 2014-05-30 10 KV distribution line pole-mounted wire suspension device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410238599.2A CN104022459A (en) 2014-05-30 2014-05-30 10 KV distribution line pole-mounted wire suspension device

Publications (1)

Publication Number Publication Date
CN104022459A true CN104022459A (en) 2014-09-03

Family

ID=51439088

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410238599.2A Pending CN104022459A (en) 2014-05-30 2014-05-30 10 KV distribution line pole-mounted wire suspension device

Country Status (1)

Country Link
CN (1) CN104022459A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105071296A (en) * 2015-09-08 2015-11-18 国家电网公司 Structurally-improved high-voltage distribution line rod pole-mounted line hoisting device
CN105712231A (en) * 2016-04-15 2016-06-29 国网上海市电力公司 Special pulley block for hot-line vertical rod tool of hot-line work bucket arm vehicle
CN108565746A (en) * 2018-02-11 2018-09-21 国网山东省电力公司平阴县供电公司 A kind of electrification installation panel switches mast-up
CN112850538A (en) * 2021-01-13 2021-05-28 国网山东省电力公司宁津县供电公司 Conductor lifter on distribution line pole
CN116142994A (en) * 2022-12-30 2023-05-23 国网北京市电力公司 Hoisting device and method for installing line switch

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202657877U (en) * 2012-07-17 2013-01-09 山东电力集团公司枣庄供电公司 Circuit equipment construction lifting frame
JP2013128357A (en) * 2011-12-19 2013-06-27 Tokyo Electric Power Co Inc:The Reconstructing method of steel tower for overhead transmission line
CN203850726U (en) * 2014-05-30 2014-09-24 国家电网公司 Wire lifter on 10 kV power distribution telegraph pole

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013128357A (en) * 2011-12-19 2013-06-27 Tokyo Electric Power Co Inc:The Reconstructing method of steel tower for overhead transmission line
CN202657877U (en) * 2012-07-17 2013-01-09 山东电力集团公司枣庄供电公司 Circuit equipment construction lifting frame
CN203850726U (en) * 2014-05-30 2014-09-24 国家电网公司 Wire lifter on 10 kV power distribution telegraph pole

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105071296A (en) * 2015-09-08 2015-11-18 国家电网公司 Structurally-improved high-voltage distribution line rod pole-mounted line hoisting device
CN105712231A (en) * 2016-04-15 2016-06-29 国网上海市电力公司 Special pulley block for hot-line vertical rod tool of hot-line work bucket arm vehicle
CN108565746A (en) * 2018-02-11 2018-09-21 国网山东省电力公司平阴县供电公司 A kind of electrification installation panel switches mast-up
CN112850538A (en) * 2021-01-13 2021-05-28 国网山东省电力公司宁津县供电公司 Conductor lifter on distribution line pole
CN116142994A (en) * 2022-12-30 2023-05-23 国网北京市电力公司 Hoisting device and method for installing line switch

Similar Documents

Publication Publication Date Title
CN103613031A (en) Simple transformer hoisting device
CN104022459A (en) 10 KV distribution line pole-mounted wire suspension device
CN203850726U (en) Wire lifter on 10 kV power distribution telegraph pole
CN103545751A (en) Overhead power transmission line ground-wire optical-cable fitting replacement bracket
CN103269036A (en) Tensioning resistant cross arm lifting machine
CN105071296A (en) Structurally-improved high-voltage distribution line rod pole-mounted line hoisting device
CN102992203B (en) Simple hoisting device for steel structure bridge installation
CN202094562U (en) Suspension type synchronous hoisting system for pipe type bus
CN102237654B (en) Method for replacing jumper string using tool at double angle hanging point
CN202197048U (en) Double angle steel hanging point lifting and connecting tool for tower use
CN102761077A (en) Insulating hoisting bracket for strain insulator string of 1000kV extra-high alternating current line
CN204179569U (en) A kind of sister block wire grip of electric transmission line erection
CN203865920U (en) Steel wire rope winding structure for large-tonnage crane hoisting mechanism
CN203529710U (en) Special device for hoisting cable reel
CN202967922U (en) Simple hoisting device for mounting steel structural bridge
CN203345975U (en) Hoisting steel wire rope mounting device and tower crane
CN104724615A (en) Penetrating and winding method of large-diameter variable-amplitude steel wire rope of large moving-arm type tower crane
CN202840363U (en) Insulated lifting bracket for tension insulator chain of 1000-kV extra-high voltage alternating current circuit
CN204980974U (en) Pulley gear is used to drilling rod hoisting cable direction of geological drilling rig
CN104283156A (en) Wire lifting device for power distribution line
CN202474699U (en) Portable heavy object transmitter for telegraph pole
CN103552919A (en) Crane hook moving device
CN203423430U (en) Insulator maintenance device
CN202131996U (en) Steel wire rope traction device of rotary drilling machine
CN203553744U (en) An ultra extra high voltage AC-DC overhead transmission line ground wire optical cable armour clamp replacing apparatus

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20140903

RJ01 Rejection of invention patent application after publication