CN104099943A - 地下连续墙与废弃地下人防工程交会处理方法 - Google Patents

地下连续墙与废弃地下人防工程交会处理方法 Download PDF

Info

Publication number
CN104099943A
CN104099943A CN201410306985.0A CN201410306985A CN104099943A CN 104099943 A CN104099943 A CN 104099943A CN 201410306985 A CN201410306985 A CN 201410306985A CN 104099943 A CN104099943 A CN 104099943A
Authority
CN
China
Prior art keywords
air defense
diaphragm wall
people
underground
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410306985.0A
Other languages
English (en)
Other versions
CN104099943B (zh
Inventor
刘文兵
应克忠
郑默
潘飞
马海贤
黄景新
袁正璞
朱善美
匡建国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fourth Engineering Co Ltd of CTCE Group
Original Assignee
Fourth Engineering Co Ltd of CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fourth Engineering Co Ltd of CTCE Group filed Critical Fourth Engineering Co Ltd of CTCE Group
Priority to CN201410306985.0A priority Critical patent/CN104099943B/zh
Publication of CN104099943A publication Critical patent/CN104099943A/zh
Application granted granted Critical
Publication of CN104099943B publication Critical patent/CN104099943B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

本发明公开了一种地下连续墙与废弃地下人防工程交会处理方法,步骤为:当埋深较浅的人防洞采取小面积开挖破除其拱顶结构,在地连墙两侧各修筑一堵封堵墙,然后采用分层回填至原地面;封堵墙为两道砖砌墙,中间预留空腔浇筑C30抗渗混凝土,达到P8抗渗等级,空腔内沿通道结构四周凿毛并粘贴遇水膨胀橡胶止水条,同时沿通道结构四周进行化学植筋,并与空腔内设置的双层双向钢筋网片焊接连接,最后在封堵墙面向地下连续墙侧采用双面自粘橡胶沥青防水卷材进行防水层施工;本发明结构设计合理,采用的施工方法解决了地下连续墙与地下人防交会难题和地下连续墙施工中漏浆的难题,同时有效的预治了后期车站主体开挖时地下连续墙接缝处渗漏水问题。

Description

地下连续墙与废弃地下人防工程交会处理方法
技术领域
本发明涉及地铁车站地下围护结构与废弃人防工程交会,尤其是地下连续墙与地下废弃人防交会地段施工方法。
背景技术
城市轨道交通工程地铁车站多位于城市繁华路段,道路上各种管线和周边建、构筑物密集。人防通道与地铁围护结构(地下连续墙、钻孔桩)局部立体交叉和重叠,在进行围护结构施工前,必须对废弃人防结构进行妥善处理,以免发生地下连续墙护壁泥浆的流失而无法成槽(孔)、或水下混凝土浇筑时造成混凝土大量流失和地下连续墙侵入主体结构的现象。
发明内容
本发明的目的是为了提供一种施工简单安全可靠的地下连续墙与废弃地下人防工程交会处理方法。
本发明是通过以下技术方案来实现的:
地下连续墙与废弃地下人防工程交会处理方法,对于不同的人防洞埋深及分布情况所相应采取的施工步骤分别为:
当埋深较浅的人防洞采取小面积开挖破除其拱顶结构,在地连墙两侧各修筑一堵封堵墙,然后采用分层回填至原地面;所述的封堵墙为两道砖砌墙,中间预留空腔浇筑C30抗渗混凝土,达到P8抗渗等级,空腔内沿通道结构四周凿毛并粘贴遇水膨胀橡胶止水条,同时沿通道结构四周进行化学植筋,并与空腔内设置的双层双向钢筋网片焊接连接,最后在封堵墙面向地下连续墙侧采用双面自粘橡胶沥青防水卷材进行防水层施工;
当埋深较深的人防洞采取人防两端封堵,中间灌注砂浆,对基坑土体无任何扰动,封堵孔回填密实后,再用高压旋喷桩进一步加固周边土体,保证土体安全稳定;所述的两端封堵是在同槽段人防通道两端采用清障机将人防结构破碎并清除,采用粘土将孔洞分层回填至原地面,回填土范围内采用高压旋喷桩进行土体加固,中间段每隔2m采用清障机钻孔至人防通道底板,成孔后及时采用M10砂浆灌注填充。
所述的人防洞内净宽2.3m,净高2.5m,砖混结构,拱顶埋深5~14米。
所述的8处人防通道与地下连续墙在地下横向交会,110m人防通道与地下连续墙同槽。
本发明的优点是:
本发明结构设计合理,采用了合理的施工方法解决了地下连续墙与地下人防交会难题,可解决地下连续墙施工中漏浆的难题,同时也有效的预治了后期车站主体开挖时地下连续墙接缝处渗漏水问题。通过对地下人防合理的处理方法,确保了地下连续墙的质量及周边建筑物及管线的安全稳定。
附图说明                                             
图1 为本发明封堵墙示意图。
图2为本发明人防两端封堵平面图。
具体实施方式
参见附图,地下连续墙与废弃地下人防工程交会处理方法,对于不同的人防洞埋深及分布情况所相应采取的施工步骤分别为:
当埋深较浅的人防洞采取小面积开挖破除其拱顶结构,在地连墙两侧各修筑一堵封堵墙1,然后采用分层回填至原地面;所述的封堵墙1为两道砖砌墙,中间预留空腔浇筑C30抗渗混凝土,达到P8抗渗等级,空腔内沿通道结构四周凿毛并粘贴遇水膨胀橡胶止水条,同时沿通道结构四周进行化学植筋3,并与空腔内设置的双层双向钢筋网片2焊接连接,最后在封堵墙1面向地下连续墙侧采用双面自粘橡胶沥青防水卷材进行防水层施工;
当埋深较深的人防洞采取人防两端封堵,中间灌注砂浆,对基坑土体无任何扰动,封堵孔6回填密实后,再用高压旋喷桩进一步加固周边土体,保证土体安全稳定;所述的两端封堵是在同槽段人防通道两端采用清障机将人防结构破碎并清除,采用粘土将孔洞分层回填至原地面,回填土范围内采用高压旋喷桩进行土体加固,中间段每隔2m采用清障机钻孔至人防通道4底板,成孔后及时采用M10砂浆灌注填充。
所述的人防洞内净宽2.3m,净高2.5m,砖混结构,拱顶埋深5~14米。
所述的8处人防通道4与地下连续墙5在地下横向交会,110m人防通道与地下连续墙同槽。
1)参见附图1
在人防与地下连续墙交会处打设U型钢板桩,支护长度为整个开挖面。开挖垂直深度至人防通道底板,破除整体人防通道。在地下连续墙两侧各修筑一堵挡土防渗封堵墙。封堵墙采用两道砖砌墙,中间预留空腔浇筑C30(P8)抗渗混凝土。空腔内沿通道结构四周凿毛并粘贴遇水膨胀橡胶止水条,同时沿通道结构四周进行化学植筋,并与空腔内设置的双层双向钢筋网片焊接连接,最后在封堵墙面向地下连续墙侧采用双面自粘橡胶沥青防水卷材进行防水层施工。
2)参见附图2
同槽段人防通道两端采用清障机将人防结构破碎并清除,采用粘土将孔洞分层回填至原地面,回填土范围内采用高压旋喷桩进行土体加固。中间段每隔2m采用清障机钻孔至人防通道底板,成孔后及时采用M10砂浆灌注填充,各孔位既作为灌注孔,又兼做排气孔及观察孔。待砂浆强度达到设计强度后,先采用成槽机挖土至人防拱顶,再换冲击钻破除人防结构及砂浆填充层,通过人防通道后仍采用成槽机正常成槽。

Claims (3)

1.地下连续墙与废弃地下人防工程交会处理方法,其特征在于:对于不同的人防洞埋深及分布情况所相应采取的施工步骤分别为:
当埋深较浅的人防洞采取小面积开挖破除其拱顶结构,在地连墙两侧各修筑一堵封堵墙,然后采用分层回填至原地面;所述的封堵墙为两道砖砌墙,中间预留空腔浇筑C30抗渗混凝土,达到P8抗渗等级,空腔内沿通道结构四周凿毛并粘贴遇水膨胀橡胶止水条,同时沿通道结构四周进行化学植筋,并与空腔内设置的双层双向钢筋网片焊接连接,最后在封堵墙面向地下连续墙侧采用双面自粘橡胶沥青防水卷材进行防水层施工;
当埋深较深的人防洞采取人防两端封堵,中间灌注砂浆,对基坑土体无任何扰动,封堵孔回填密实后,再用高压旋喷桩进一步加固周边土体,保证土体安全稳定;所述的两端封堵是在同槽段人防通道两端采用清障机将人防结构破碎并清除,采用粘土将孔洞分层回填至原地面,回填土范围内采用高压旋喷桩进行土体加固,中间段每隔2m采用清障机钻孔至人防通道底板,成孔后及时采用M10砂浆灌注填充。
2.根据权利要求1所述的地下连续墙与废弃地下人防工程交会处理方法,其特征在于:所述的人防洞内净宽2.3m,净高2.5m,砖混结构,拱顶埋深5~14米。
3.根据权利要求1所述的地下连续墙与废弃地下人防工程交会处理方法,其特征在于:所述的8处人防通道与地下连续墙在地下横向交会,110m人防通道与地下连续墙同槽。
CN201410306985.0A 2014-06-30 2014-06-30 地下连续墙与废弃地下人防工程交会处理方法 Active CN104099943B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410306985.0A CN104099943B (zh) 2014-06-30 2014-06-30 地下连续墙与废弃地下人防工程交会处理方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410306985.0A CN104099943B (zh) 2014-06-30 2014-06-30 地下连续墙与废弃地下人防工程交会处理方法

Publications (2)

Publication Number Publication Date
CN104099943A true CN104099943A (zh) 2014-10-15
CN104099943B CN104099943B (zh) 2016-05-04

Family

ID=51668459

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410306985.0A Active CN104099943B (zh) 2014-06-30 2014-06-30 地下连续墙与废弃地下人防工程交会处理方法

Country Status (1)

Country Link
CN (1) CN104099943B (zh)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107059926A (zh) * 2017-06-02 2017-08-18 上海市政工程设计研究总院(集团)有限公司 一种综合管廊临时封堵墙施工方法
CN110778341A (zh) * 2019-11-01 2020-02-11 中建八局轨道交通建设有限公司 施工竖井和施工横通道的回填施工方法
CN110792101A (zh) * 2019-11-04 2020-02-14 广东省重工建筑设计院有限公司 地下建筑的实施方法及地下建筑
CN111379307A (zh) * 2020-02-26 2020-07-07 广州市第四建筑工程有限公司 基于地下老旧人防工事的市政污水管工程的施工方法
CN111396121A (zh) * 2020-02-26 2020-07-10 广州市第四建筑工程有限公司 一种地下老旧人防工事免开挖回填施工方法
CN111396084A (zh) * 2020-02-26 2020-07-10 广州市第四建筑工程有限公司 一种内部积水的地下老旧人防工事回填施工方法
CN112523259A (zh) * 2020-12-08 2021-03-19 上海金鹿建设(集团)有限公司 一种人防拆除方法及基坑施工方法
CN114108654A (zh) * 2021-12-06 2022-03-01 中交第四公路工程局有限公司 一种承压水上船坞侵入基坑区域清障施工方法
CN114439267A (zh) * 2022-02-16 2022-05-06 浙大城市学院 特大型独立式地下车库改造为道路结构及其施工方法
CN114961842A (zh) * 2021-12-28 2022-08-30 江西正越建设工程有限公司 一种地下老旧人防巷道回填的施工方法

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1681396A2 (fr) * 2005-01-12 2006-07-19 Freyssinet Pont dont la dalle supérieure comporte des oreilles
CN102094426A (zh) * 2011-03-15 2011-06-15 中铁二十五局集团轨道交通工程有限公司 一种重叠既有地下连续墙施工新的地下连续墙的成槽工艺

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1681396A2 (fr) * 2005-01-12 2006-07-19 Freyssinet Pont dont la dalle supérieure comporte des oreilles
CN102094426A (zh) * 2011-03-15 2011-06-15 中铁二十五局集团轨道交通工程有限公司 一种重叠既有地下连续墙施工新的地下连续墙的成槽工艺

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
徐建伟: "钻孔切割法清除地下障碍物的施工技术", 《建筑施工》 *

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107059926A (zh) * 2017-06-02 2017-08-18 上海市政工程设计研究总院(集团)有限公司 一种综合管廊临时封堵墙施工方法
CN110778341A (zh) * 2019-11-01 2020-02-11 中建八局轨道交通建设有限公司 施工竖井和施工横通道的回填施工方法
CN110792101B (zh) * 2019-11-04 2021-11-23 广东省重工建筑设计院有限公司 地下建筑的实施方法及地下建筑
CN110792101A (zh) * 2019-11-04 2020-02-14 广东省重工建筑设计院有限公司 地下建筑的实施方法及地下建筑
CN111379307A (zh) * 2020-02-26 2020-07-07 广州市第四建筑工程有限公司 基于地下老旧人防工事的市政污水管工程的施工方法
CN111396121A (zh) * 2020-02-26 2020-07-10 广州市第四建筑工程有限公司 一种地下老旧人防工事免开挖回填施工方法
CN111396084A (zh) * 2020-02-26 2020-07-10 广州市第四建筑工程有限公司 一种内部积水的地下老旧人防工事回填施工方法
CN112523259A (zh) * 2020-12-08 2021-03-19 上海金鹿建设(集团)有限公司 一种人防拆除方法及基坑施工方法
CN114108654A (zh) * 2021-12-06 2022-03-01 中交第四公路工程局有限公司 一种承压水上船坞侵入基坑区域清障施工方法
CN114961842A (zh) * 2021-12-28 2022-08-30 江西正越建设工程有限公司 一种地下老旧人防巷道回填的施工方法
CN114439267A (zh) * 2022-02-16 2022-05-06 浙大城市学院 特大型独立式地下车库改造为道路结构及其施工方法
WO2023155469A1 (zh) * 2022-02-16 2023-08-24 浙大城市学院 特大型独立式地下车库改造为道路结构及其施工方法
CN114439267B (zh) * 2022-02-16 2024-03-22 浙大城市学院 特大型独立式地下车库改造为道路结构及其施工方法
US11952728B2 (en) 2022-02-16 2024-04-09 Hangzhou City University Road structure reconstructed from large-scale independent underground garage and construction method thereof

Also Published As

Publication number Publication date
CN104099943B (zh) 2016-05-04

Similar Documents

Publication Publication Date Title
CN104099943B (zh) 地下连续墙与废弃地下人防工程交会处理方法
CN105464686B (zh) 既有设施下多层地下空间幕架式暗挖施工方法及支护结构
CN103590425B (zh) 一种泥炭质软土地层地铁车站施工工艺
CN104675403B (zh) 一种地下空间施工方法及支护结构
CN103741714B (zh) 地下工程全盖挖逆作法施工方法
CN102704957B (zh) 一种用于浅埋大型地下结构建造的棚架法
CN105002913B (zh) 一种强透水地层深基坑封底止水结构及其施工方法
CN105464134B (zh) 既有设施下多层地下空间顺逆结合施工方法及支护结构
CN104612143B (zh) 一种溶洞/土洞地质条件下的钻孔复合桩结构
CN105178326B (zh) 上软下硬富水地层基坑工程围护结构止水方法
CN104131575A (zh) 一种岩溶高度发育地层坝基的堵漏排水方法
CN104264688A (zh) 人工挖孔变截面桩支护施工工艺
CN103938634B (zh) 一种深基坑支护结构及施工方法
CN108612117A (zh) 一种海底大跨市政隧道挡水结构及施工方法
CN105804007B (zh) 一种基于滩涂软基的加筋土岸墙结构
CN104404974A (zh) 高承压水厚砂卵石地层深基坑注浆封底结构及其施工工艺
CN107012871B (zh) 一种悬挂式围护深大长基坑装配式结构的逆作施工方法
CN103114609A (zh) 新、旧地下连续墙的连接装置及施工方法
CN103572764A (zh) 超深人工挖孔桩护壁止水结构及其施工方法
CN108867673A (zh) 一种基于抽水帷幕的基坑中地下水治理方法
CN105040707B (zh) 组合密排桩深基坑支护围护结构的施工方法
CN103104021A (zh) 昔格达地层路堑边坡防排水系统
CN107489106A (zh) 一种岩石河床水中承台施工方法
CN202954371U (zh) 垂向组合式防渗止水帷幕结构
CN207862925U (zh) 一种注浆护筒装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant