CN102094426A - 一种重叠既有地下连续墙施工新的地下连续墙的成槽工艺 - Google Patents

一种重叠既有地下连续墙施工新的地下连续墙的成槽工艺 Download PDF

Info

Publication number
CN102094426A
CN102094426A CN 201110062058 CN201110062058A CN102094426A CN 102094426 A CN102094426 A CN 102094426A CN 201110062058 CN201110062058 CN 201110062058 CN 201110062058 A CN201110062058 A CN 201110062058A CN 102094426 A CN102094426 A CN 102094426A
Authority
CN
China
Prior art keywords
diaphragm wall
existing
knife rest
wall
continuous wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201110062058
Other languages
English (en)
Other versions
CN102094426B (zh
Inventor
沈炜东
倪俊强
徐波
田天长
来荣国
张纯东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 25th Bureau Group Co Ltd
Fifth Engineering Co Ltd of China Railway 25th Bureau Group Co Ltd
Original Assignee
China Railway 25th Bureau Group Co Ltd
Rail Transit Engineering Co Ltd of China Railway 25th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 25th Bureau Group Co Ltd, Rail Transit Engineering Co Ltd of China Railway 25th Bureau Group Co Ltd filed Critical China Railway 25th Bureau Group Co Ltd
Priority to CN2011100620585A priority Critical patent/CN102094426B/zh
Publication of CN102094426A publication Critical patent/CN102094426A/zh
Application granted granted Critical
Publication of CN102094426B publication Critical patent/CN102094426B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

本发明公开了一种重叠既有地下连续墙施工新的地下连续墙的成槽工艺。其通过导墙外放,铣槽机刀架向外倾斜,沿导墙以恒定的小斜率向下铣凿成槽。成槽过程中,通过铣槽机刀架的调整板调节刀架以一定斜率凿铣成槽能够避免铣槽机切削到既有连续墙,从而可靠的保护连续墙和铣槽机刀架,因而成槽过程更安全。同时,成槽过程中刀架倾斜凿铣,其受到的切削阻力也更小,切削更加顺畅,效率更高。

Description

一种重叠既有地下连续墙施工新的地下连续墙的成槽工艺
技术领域
 本发明涉及建筑物的地下基坑支护的地下连续墙的成槽工艺,特别是一种重叠既有地下连续墙施工地下连续墙的成槽工艺。
背景技术
 地下连续墙,是一种在地面以下用于支承建筑物负荷、截水、抗渗、挡土支护而构筑的连续墙体。因其具有刚度大,强度高、耐久性好,变形小等优点,常被用作建筑物的地下支护。受场地的限制,在地下连续墙的施工过程中,有时会遇到临近的其它建筑物的地下连续墙,这时需要重叠原有的地下连续墙修建新的地下连续墙。由于既有的地下连续墙,在成槽时,地层已经扰动,其附近的泥土、岩层已经软化,使得新建的地下连续墙两侧泥土的软硬不均,直接使用铣槽机成槽时,铣槽机刀架两侧受力不均,垂直度难以控制,可能出现严重偏槽现象,机器容易向既有连续墙的一侧发生倾斜,从而切削到既有连续墙,给连续墙结构带来破坏,同时也会对铣槽机造成严重的损坏,其成槽十分困难。
发明内容
本发明的目的在于提供一种方便、安全的重叠既有地下连续墙施工新的地下连续墙的成槽工艺。
本发明所述的重叠既有地下连续墙施工新的地下连续墙的成槽工艺,包括如下顺序的步骤:
距既有地下连续墙外放一小段距离施工导墙;
调整铣槽机刀架的向外倾斜一定角度,按外放的导墙,以向既有地下连续墙外侧倾斜0.3%-0.7%的固定斜率凿铣成槽;
反复提放刀架,削落槽与既有地下连续墙的夹层间的泥土;
采用单边带钢丝刷的重锤对既有地下连续墙面进行洗刷,清洗淤泥和未削落的岩土。
本发明所述的重叠既有地下连续墙施工新的地下连续墙的成槽工艺,其导墙外放,通过调节铣槽机刀架向外的倾斜角度,洗槽机可以0.3%-0.7%的恒定斜率沿导墙向下凿铣成槽,其能够避免铣槽机刀架切削到既有连续墙,而给地下连续墙和铣槽机刀架带来损伤,因而更加安全。同时,刀架略微倾斜,在向下铣槽的过程中,其受到的切削阻力也更小,切削更加顺畅,效率更高。
附图说明
图1 为一种重叠既有连续墙成槽的结构示意图。
具体实施方式
一种重叠既有地下连续墙施工新的地下连续墙的成槽工艺,包括如下顺序的步骤:先在距既有地下连续墙1外放15cm的距离处施工导墙2,如图1;通过调整铣槽机刀架的调整板,调整铣槽机刀架向外侧的倾斜角度,然后按外放的导墙2向下凿铣,凿铣过程中实时监测铣槽机刀架的倾斜角度(可通过铣槽机上安装的垂直度仪表进行监测),以保持铣槽机刀架的倾斜角度不变,一旦偏斜角度发生变化,可即时调节调整板,从而实现按向既有地下连续墙外侧倾斜以某一个固定斜率凿铣成槽3,在槽3与既有地下连续墙1间形成梯形夹层4;之后,反复提放刀架,削落槽与既有地下连续墙的夹层间的泥土;再采用单边带钢丝刷的重锤对既有地下连续墙面进行洗刷,清洗淤泥和未削落的岩土,以改善新旧连续墙的结合条件。成槽的斜率以0.3%-0.7%为宜,斜率过小,刀架仍有碰撞和切削既有连续墙的可能;斜率过大,槽与既有地下连续墙间梯形夹层厚度会过大,需要花费较大的工作量处理夹层,影响成槽的效率。

Claims (1)

1.一种重叠既有地下连续墙施工新的地下连续墙的成槽工艺,包括如下顺序的步骤:
距既有地下连续墙外放一小段距离施工导墙;
调整铣槽机刀架的向外倾斜一定角度,按外放的导墙,以向既有地下连续墙外侧倾斜0.3%-0.7%的固定斜率凿铣成槽;
反复提放刀架,削落槽与既有地下连续墙的夹层间的泥土;
采用单边带钢丝刷的重锤对既有地下连续墙面进行洗刷,清洗淤泥和未削落的岩土。
CN2011100620585A 2011-03-15 2011-03-15 一种重叠既有地下连续墙施工新的地下连续墙的成槽工艺 Active CN102094426B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011100620585A CN102094426B (zh) 2011-03-15 2011-03-15 一种重叠既有地下连续墙施工新的地下连续墙的成槽工艺

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011100620585A CN102094426B (zh) 2011-03-15 2011-03-15 一种重叠既有地下连续墙施工新的地下连续墙的成槽工艺

Publications (2)

Publication Number Publication Date
CN102094426A true CN102094426A (zh) 2011-06-15
CN102094426B CN102094426B (zh) 2012-02-29

Family

ID=44127677

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011100620585A Active CN102094426B (zh) 2011-03-15 2011-03-15 一种重叠既有地下连续墙施工新的地下连续墙的成槽工艺

Country Status (1)

Country Link
CN (1) CN102094426B (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104099943A (zh) * 2014-06-30 2014-10-15 中铁四局集团第四工程有限公司 地下连续墙与废弃地下人防工程交会处理方法
CN110159190A (zh) * 2019-04-08 2019-08-23 中铁隧道集团二处有限公司 地下连续墙成槽遇地下搅拌桩处理施工方法
CN112359839A (zh) * 2020-11-17 2021-02-12 中建八局科技建设有限公司 利用老地连墙快速完成基坑土方与支撑流水施工方法

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6470607B1 (en) * 2000-08-04 2002-10-29 Scc Technology, Inc. Excavating method for constructing underground walls
CN101343868A (zh) * 2008-08-19 2009-01-14 上海建工股份有限公司 跨城市管线地下连续墙施工方法

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6470607B1 (en) * 2000-08-04 2002-10-29 Scc Technology, Inc. Excavating method for constructing underground walls
CN101343868A (zh) * 2008-08-19 2009-01-14 上海建工股份有限公司 跨城市管线地下连续墙施工方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
《山西建筑》 20090331 周铁峰 双轮铣槽机在地下连续墙施工中的应用 155-156 1 第35卷, 第8期 2 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104099943A (zh) * 2014-06-30 2014-10-15 中铁四局集团第四工程有限公司 地下连续墙与废弃地下人防工程交会处理方法
CN104099943B (zh) * 2014-06-30 2016-05-04 中铁四局集团第四工程有限公司 地下连续墙与废弃地下人防工程交会处理方法
CN110159190A (zh) * 2019-04-08 2019-08-23 中铁隧道集团二处有限公司 地下连续墙成槽遇地下搅拌桩处理施工方法
CN112359839A (zh) * 2020-11-17 2021-02-12 中建八局科技建设有限公司 利用老地连墙快速完成基坑土方与支撑流水施工方法
CN112359839B (zh) * 2020-11-17 2021-10-15 中建八局科技建设有限公司 利用老地连墙快速完成基坑土方与支撑流水施工方法

Also Published As

Publication number Publication date
CN102094426B (zh) 2012-02-29

Similar Documents

Publication Publication Date Title
KR101963874B1 (ko) 단일 원반 절삭 롤러들을 갖춘 하이드로밀 휠
WO2012064948A3 (en) System and method of configuring drilling tools utilizing a critical depth of cut control curve
CN102094426B (zh) 一种重叠既有地下连续墙施工新的地下连续墙的成槽工艺
WO2011047133A3 (en) Manhole remover
KR20110079703A (ko) 자항 호퍼 준설선용 드래그 헤드 및 이 드래그 헤드를 이용해 준설하기 위한 준설 방법
CN201771429U (zh) 一种螺旋钻头
CN103628898B (zh) 一种用于防止巷道底鼓的连续墙支护方法
CN203822299U (zh) 岩巷掘进机截割装置及其切削刀盘
CN203145836U (zh) 一种软土地基灌注桩强制切削钻头
CN111014819A (zh) 一种基于绳锯工艺的钢筋砼底板切割方法
CN203822318U (zh) 岩巷掘进机截割装置及其切削刀盘
CN105065011A (zh) 软土盾构切削桩基的施工方法
JP2006144387A (ja) ケーソンの構造
CN209369820U (zh) 复合式隧道掘进机刀盘
CN106522572A (zh) 历史保护建筑物有限空间内构筑大空间地下通道施工方法
CN106089222B (zh) 一种用于砂岩泥岩单护盾tbm掘进方法
CN206276955U (zh) 井盖锥形安装沉孔加工刀具
CN205778548U (zh) 一种新型钻头结构
CN103696698A (zh) 一种注浆扫孔钻头
CN208039282U (zh) 组合式生态护坡装置
CN112323891A (zh) 一种在岩石基础中切割管沟的施工方法
CN204646114U (zh) 一种切割桩孔内废弃锚索的钻头
CN205291149U (zh) 一种分解冲击应力的安全切割刀具
CN103061367B (zh) 四锯锯槽机
CN108166770B (zh) 关于建筑结构柱切割免支撑的一种切除方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20170720

Address after: Three road 266100 in Shandong province Qingdao city Laoshan District No. 25 Keyuan latitude

Co-patentee after: China Railway 25th Bureau Group Co., Ltd.

Patentee after: THE 5TH ENGINEERING CO., LTD. OF CHINA RAILWAY 25TH BUREAU GROUP

Address before: 510600, No. 55, Zhongshan Road, Yuexiu District, Guangdong, Guangzhou

Co-patentee before: China Railway 25th Bureau Group Co., Ltd.

Patentee before: Railway Transportation Engineering Co., Ltd. of China Railway 25th Bureau Group