CN104029947A - Rectangular taper metal bin blockage clearing equipment and use method thereof - Google Patents

Rectangular taper metal bin blockage clearing equipment and use method thereof Download PDF

Info

Publication number
CN104029947A
CN104029947A CN201410245732.7A CN201410245732A CN104029947A CN 104029947 A CN104029947 A CN 104029947A CN 201410245732 A CN201410245732 A CN 201410245732A CN 104029947 A CN104029947 A CN 104029947A
Authority
CN
China
Prior art keywords
feed bin
block clearing
valve
square
stream
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410245732.7A
Other languages
Chinese (zh)
Other versions
CN104029947B (en
Inventor
李群辉
汤复华
杨书春
祝超
马明
王一鸣
王石
刘锡水
郝其昌
沈臻
姚俊男
方芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MAANSHAN HEAVENLY TECHNOLOGY Co Ltd
Original Assignee
MAANSHAN HEAVENLY TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MAANSHAN HEAVENLY TECHNOLOGY Co Ltd filed Critical MAANSHAN HEAVENLY TECHNOLOGY Co Ltd
Priority to CN201410245732.7A priority Critical patent/CN104029947B/en
Publication of CN104029947A publication Critical patent/CN104029947A/en
Application granted granted Critical
Publication of CN104029947B publication Critical patent/CN104029947B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses rectangular taper metal bin blockage clearing equipment and a use method thereof, and belongs to the technical field of mining and dressing equipment. The blockage clearing equipment adopts the structure that three layers of pneumatic flow aiding air ducts are arranged on four side surfaces of the exterior of the taper of a rectangular taper metal bin; a plurality of flow aiding nozzles are arranged on the pneumatic flow aiding air ducts; the flow aiding nozzles penetrate through the wall of the rectangular taper metal bin and enter the interior of the bin; flow aiding pipelines are arranged on left and right sides of the rectangular taper metal bin; a main flow aiding pipeline is connected with an air compressor through a second check valve, a fourth manual ball valve, a gas storage tank for flow aiding, a minimum pressure holding valve, a first check valve and a first manual ball valve in sequence; a gas storage tank for controlling is connected with a main control pipeline through a third manual ball valve; a blockage clearing machine is arranged on each of left and right sides at the position of a hollow throat at the lower part of the rectangular taper metal bin; a blockage clearing rod is arranged on each blockage clearing machine. The blockage clearing equipment has a simple structure, and is reliable in operation, and easy to maintain because the flow aiding pipelines are arranged outside the bin.

Description

Square cone-shaped metal feed bin block clearing equipment and using method
Technical field
The invention belongs to selecting and purchasing ore deposit equipment technical field, be specifically related to a kind of square cone-shaped metal feed bin block clearing equipment and using method.
Background technology
The ore dressing plant in current all kinds of mines, is all provided with ore storage warehouse, for regulating production procedure, distributes the selected path of ore, regulates into ore dressing amount balanced ore dressing process.Ore storage bin pattern can be divided into: the tapered funnel bin of square, V grooved disjunctor storehouse and cylinder flat-bottom bin etc.After ore puts in storage, due to physical factor differences such as ore water ratio, lumpiness, surface textures, cause that ore increases with the friction force of bulkhead, thereby ore can not overcome friction drag under self gravitation effect, slip out ore storage bin, cause the sticky wall of material to stop up.Again because material water ratio is higher, granularity is very thin, unit volume endoparticle surface sum is very large, thereby binding force increase, forming arcuation scaffold, storehouse internal perisporium has a large amount of material stocks not overcome outside internal friction discharge storehouse by deadweight, when slight, form well shape scaffold, when serious, material can not flow in storehouse, forms and stops up, and loses the function of ore storage bin completely.The Method of blockage removal of current use is: workman opens one and discloses material hole and disclose material on bulkhead, or is lowered to hand-held iron rod in ore storage bin and discloses material, or blows up with dynamite and dredge, and time has fatal accident and ore storage bin to damage to occur.
Stop up for solving feed bin scaffold, Chinese patent ZL200910144875.8 discloses a kind of square cone funnel type reinforced concrete ore storage bin, remove equipment and the using method of stopping up scaffold, the technical scheme that this patent is taked is: on the inwall of the inside of warehouse (instead of outside), add multilayer strength and help stream airduct, on airduct, being provided with the different strength of injection direction helps flow nozzle to jet in storehouse, also lay steel plate at four corner angle of funnel bin simultaneously, add pneumatic vibration hammer at steel plate rear portion, rapping steel plate, blow shake in conjunction with under storehouse materials inside is discharged outside storehouse.In this technical scheme, there is following point: first it can play a role to the not high powder of square cone funnel type reinforced concrete ore storage bin removing viscosity, but just helpless to removing heavy body powder, because of heavy body powder, to shake more real and more real, especially at feed bin trunnion place, cohesive powders has formed spherical, rolls in ore storage bin exit, form rolling scaffold, in storehouse, material cannot be discharged outside storehouse.This scheme in addition, helping stream airduct to be arranged in inside wall of ore bin, hinders supports for material down-sliding in storehouse, helps stream airduct serious wear, and must bring down stocks while installing, impact production.In storehouse, four jiaos of laying steel plate work capacitys are very large, add vibration hammer, and cost is high, to cohesive powders, shakes more real and more real, not applicable.Chinese patent 20092018742.7 and Chinese patent 200920187425.2, all for reinforced concrete ore storage bin, are mainly processed the material that viscosity is not high, are also reluctant to high-viscosity material.
Summary of the invention
The present invention is directed to the problems referred to above that prior art exists, a kind of tapered metal feed bin of square block clearing equipment and the using method that can remove heavy body powder is provided, ensure mineral processing production smooth feeding, and simple in structure, reliable operation, need not bring down stocks when installation, help stream pipeline to be placed on feed bin outside, be easy to Maintenance and Repair, avoided easy to wear in inside installation, hinder the drawback of supports for material down-sliding in storehouse; In the bottom of ore storage bin, material outlet place, is provided with cleaner in addition, and the block clearing bar of this cleaner can be smashed the material rolling at feed bin trunnion place and dispel to pieces, and material agglomerating viscosity is discharged outside storehouse.
The tapered metal feed bin of square provided by the present invention block clearing equipment, be provided with three layers of strength in four sides of the cone outside of the tapered metal feed bin of described square and help stream airduct, help on stream airduct and be provided with multiple flow nozzles 27 that help in described strength, the described flow nozzle 27 that helps enters in storehouse through the bulkhead of the tapered metal feed bin of described square, the described inwall that helps the air nozzle of flow nozzle 27 to be close to the tapered metal feed bin of described square, described in help flow nozzle 27 spout down, each nozzle is entering after feed bin, all seals with bulkhead with leakproofing material, described strength helps stream airduct to be connected with helping stream pipeline 24 by ecp butterfly valve 13, the described stream pipeline 24 that helps is connected by ecp ball valve 20 and the main stream pipeline 12 that helps, the described stream pipeline 24 that helps is arranged on the left and right sides of the tapered feed bin of described square, described master help stream pipeline 12 successively by the second boiler check valve 10, the 4th manual ball valve 9, help stream storage tank 8, minimal pressure hold-off valve 7, the first boiler check valve 3 and the first manual ball valve 2 and Air compressor 1 to be connected, described Air compressor 1 is connected with storage tank 4 with control by described the first manual ball valve 2, the first boiler check valve 3 successively, described control with storage tank 4 with described in help stream storage tank 8 to be connected by the second manual ball valve 5, described control is connected by the 3rd manual ball valve 6 and main control pipeline 11 with storage tank 4, electric cabinet 33 is connected by wire and ecp ball valve 20 and the first two-position two-way solenoid valve 15, left and right, trunnion place, bottom at the tapered metal feed bin of described square respectively arranges a cleaner 16, described cleaner 16 is provided with block clearing bar 17, described block clearing bar 17 is solid drawn pipe, one end of described block clearing bar 17 is fixed on described cleaner 16, the other end of described block clearing bar 17 is equipped with air blast nozzle and extends transversely into the trunnion place, bottom of the tapered metal feed bin of square, the admission port of the automatic reciprocating air cylinder on described cleaner 16 is connected with pilot piping 25 through the second two-position two-way solenoid valve 18, the admission port of described block clearing bar 17 is connected with helping stream pipeline 24 through the first two-position two-way solenoid valve 15.
The using method of the tapered metal feed bin of square provided by the present invention block clearing equipment is specific as follows:
In the time that stopping up appears in the tapered metal feed bin of described square, by electric cabinet by manually sending block clearing signal, to spraying and help stream pressurized air in the tapered metal feed bin of described square, compressed-air actuated pressure is controlled between 0.4~0.8MPa, the order of its injection is from bottom to up, each jet time is no more than 3 seconds, and every layer can be repeated repeatedly jetly, and each time gap is not less than 3 seconds; When block clearing, open the discharging opening of the tapered metal feed bin of described square, in the time that discharging opening is found the agglomerating spherical rolling of viscous material, start described cleaner and utilize block clearing bar to remove rolling scaffold.
Electric control loop, is by electric signal, controls and is contained in electromagnetic valve on ecp butterfly valve 13, and the break-make of the folding control gas circuit of electromagnetic valve, realizes the object of Pneumatic auxiliary stream block clearing.Electric control loop is made up of electric cabinet 33 and distribution box with protectors 31, distribution box with protectors 32, and controlling voltage is direct current DC24V, is to be converted through A/D by alternating current 220V.Between electric cabinet 33 and distribution box with protectors 31, distribution box with protectors 32, connect with wire.
The present invention has following technical characterstic:
(1) the present invention, by reducing material with the friction force between bulkhead, has solved obstruction scaffold and the sticky wall problem of the tapered metal warehouse of heavy body powder square.
(2) the present invention is provided with cleaner, and the sticky group of rolling that high viscosity powder can be formed, smashs to pieces and dispel, and abolishes rolling scaffold.
(3) the present invention can improve the degree of utilization 1/5~1/4 of ore storage bin effective volume, can effectively regulate the harmony that enters ore dressing amount in production procedure, thereby improves ore dressing quality and production efficiency.
(4) the present invention is simple in structure, and reliable operation is easy to operate, is applicable to newly-built ore storage bin and selects, and is also applicable to old ore storage bin transformation.
(5) the present invention is applicable to heavy body powder, the block clearing of high-moisture percentage powder and broken arch.
(6) the present invention has thoroughly removed the personal injury that artificial block clearing and broken arch are brought, social benefit, remarkable in economical benefits.
Brief description of the drawings
Fig. 1 is that block clearing equipment body of the present invention is faced structural representation;
Fig. 2 is block clearing equipment body plan structure schematic diagram of the present invention;
Fig. 3 is block clearing equipment body vertical profile structural representation of the present invention;
Fig. 4 is block clearing device systems principle schematic of the present invention.
In figure: 1: Air compressor; 2: the first manual ball valves; 3: the first boiler check valve; 4: control storage tank; 5: the second manual ball valves; 6: the three manual ball valves; 7: minimal pressure hold-off valve; 8: help stream storage tank; 9: the four manual ball valves; 10: the second boiler check valve: 11: main control pipeline; 12: the main stream pipeline that helps; 13: ecp butterfly valve; 14: the first ecp actrs; 15: the first two-position two-way solenoid valves; 16: cleaner: 17: block clearing bar; 18; The second two-position two-way solenoid valve; 19: source of the gas is processed three linked piece; 20: ecp ball valve; 21: the second ecp actrs; 22: the three two-position two-way solenoid valves; 23: help stream pipeline air-pressure gauge; 24: help stream pipeline; 25: pilot piping; 26: pilot piping air-pressure gauge; 27: help flow nozzle; 28: the three layers of nozzle block; 29: second layer nozzle block; 30: ground floor nozzle block; 31: left distribution box with protectors; 32: right distribution box with protectors; 33: electric cabinet; 34: ore storage bin; 35: trunnion; 36: belt feeder; 37: ore storage bin cone wall; 38: cleaner fixed mount.
Detailed description of the invention
For further describing the present invention, below in conjunction with drawings and Examples, the tapered metal feed bin of square of the present invention block clearing Apparatus and operation method is described in more detail.
On four ore storage bin cone walls 37 of ore storage bin 34, on each cone wall, be respectively equipped with three groups and help flow nozzle group, ground floor nozzle block 30 (basecoat), be equipped with 4 and help flow nozzle 27, second layer nozzle block 29, is equipped with 6 and helps 27, the three layers of nozzle block 28 of flow nozzle, be equipped with 8 and help flow nozzle 27, four faces, ground floor, has 16 and helps flow nozzle, the second layer has 24 and helps 27, the three layers of flow nozzles to have 32 to help flow nozzle 27.Each nozzle block is provided with an ecp butterfly valve 13 and the first ecp actr 14, and each conical surface has 3 ecp butterfly valves 13.It is to penetrate separately bulkhead 37 to enter in storehouse that each nozzle helps stream 27, and with sealing between bulkhead, prevents that in storehouse, material leaks.Each ecp butterfly valve 13, fixing with ore storage bin cone wall 37 by support.The admission port of each ecp butterfly valve 13, with helping stream pipeline 24 to be connected, helps stream pipeline 24 to join with ecp ball valve 20; The admission port of ecp ball valve 20 helps circulation flow path 12 to communicate with main, the main 12 points of left and right two-way of stream pipeline that help, converging rear same the second boiler check valve 10 connects, the second boiler check valve 10 is through the 4th manual ball valve 9 and help stream storage tank 8 UNICOMs, the first ecp actr 14 (butterfly valve is used) on each operated pneumatic valve, and the second ecp actr 21 (ball valve with) all with pilot piping 25 UNICOMs, process three linked piece 19 UNICOMs with the 3rd two-position two-way solenoid valve 22, source of the gas again, connect the 3rd manual ball valve 6 and control storage tank 4 through main control pipeline 11.11 points of left and right two-way of main control pipeline, enter the 3rd manual ball valve 6 jointly.Cleaner 6 is arranged on trunnion 35 by cleaner fixed mount 38, and cleaner fixed mount 38 is welded on trunnion 35.The admission port of the automatic reciprocating air cylinder on cleaner 16 is connected with pilot piping 25 through the second two-position two-way solenoid valve 18, and the admission port of block clearing bar 17 communicates with helping stream pipeline 24 through the first two-position two-way solenoid valve 15.
Air compressor 1 is screw-rod air compressor, and blast is 0.8MPa, and air quantity is 6m 3/ min, the high pressure gas that extrude are through manual ball valve 2, boiler check valve 3, enter and control with storage tank 4, enter and help stream storage tank 8 through minimal pressure hold-off valve 7 simultaneously, the effect of minimal pressure hold-off valve 7, is to ensure that the control pressure of storage tank 4 is not less than 4MPa at work, for making to save energy in inflation, can open manual ball valve 5 at the inflation initial stage, control storage tank 4 is communicated with helping stream storage tank 8, after the gas of substituting the bad for the good, close.
In the time that ore storage bin 34 occurs to stop up, can carry out block clearing by following method:
In normally working, Air compressor 1 is in open state, and in the time controlling with storage tank 4 and help stream to be all filled to 0.7MPa with storage tank 8, Air compressor 1 can self-servicely be shut down, energy Auto Power On when air pressure is low, and the pressure of whole air-channel system is higher than 0.4MPa.In the time that feed bin needs block clearing, operating personal is connected and is controlled power supply, now, green light on electric cabinet 33 panels, A.C. voltmeter shows AC220V, DC voltmeter shows DC24V, then connect pneumatic ball valve 20, with the second two-position two-way solenoid valve 18, open respectively and helped gas source and control source of the gas, open pressurized air and start to help stream.
When feed bin bottom, trunnion 35 places are stopped up, and open cleaner 16, connect the second two-position two-way solenoid valve 18, make cylinder make automatic reciprocating motion, connect the first two-position two-way solenoid valve 15, dispel sticky group to block clearing bar 17 air feed.In the time of block clearing, belt feeder 36 must turn round, otherwise obstruction is more serious, each block clearing, and duration of ventilation does not exceed 3 seconds, and time gap is not lower than 3 seconds.On pilot piping, compression indicator 26 is housed, help on stream pipeline compression indicator 23 is housed, in ore storage bin left side, distribution box with protectors 31 is housed, distribution box with protectors 32 is equipped with on right side.

Claims (2)

1. the tapered metal feed bin of square block clearing equipment, it is characterized in that: four sides of the cone outside of the tapered metal feed bin of described square are provided with three layers of strength and help stream airduct, help on stream airduct and be provided with multiple flow nozzles (27) that help in described strength, the described flow nozzle (27) that helps enters in storehouse through the bulkhead of the tapered metal feed bin of described square, the described inwall that helps the air nozzle of flow nozzle (27) to be close to the tapered metal feed bin of described square, described in help flow nozzle (27) spout down, described strength helps stream airduct to be connected with helping stream pipeline (24) by ecp butterfly valve (13), the described stream pipeline (24) that helps is connected by ecp ball valve (20) and the main stream pipeline (12) that helps, the described left and right sides that helps stream pipeline (24) to be arranged on the tapered feed bin of described square, described master helps stream pipeline (12) successively by the second boiler check valve (10), the 4th manual ball valve (9), help stream storage tank (8), minimal pressure hold-off valve (7), the first boiler check valve (3) and the first manual ball valve (2) are connected with Air compressor (1), described Air compressor (1) is connected with storage tank (4) with control by described the first manual ball valve (2), the first boiler check valve (3) successively, described for control storage tank (4) with described in help stream to be connected by the second manual ball valve (5) with storage tank (8), described for control storage tank (4) be connected by the 3rd manual ball valve (6) and main control pipeline (11), electric cabinet (33) is connected by wire and ecp ball valve (20) and the first two-position two-way solenoid valve (15), left and right, trunnion place, bottom at the tapered metal feed bin of described square respectively arranges a cleaner (16), described cleaner (16) is provided with block clearing bar (17), described block clearing bar (17) is solid drawn pipe, one end of described block clearing bar (17) is fixed on described cleaner (16), the other end of described block clearing bar (17) is equipped with air blast nozzle and extends transversely into the trunnion place, bottom of the tapered metal feed bin of square, the admission port of the automatic reciprocating air cylinder on described cleaner (16) is connected through the same pilot piping of the second two-position two-way solenoid valve (18) (25), the admission port of described block clearing bar (17) through the first two-position two-way solenoid valve (15) with described in help stream pipeline (24) be connected.
2. the using method of the tapered metal feed bin of square block clearing equipment described in claim 1, it is characterized in that the method is specific as follows: in the time that stopping up appears in the tapered metal feed bin of described square, by electric cabinet by manually sending block clearing signal, to spraying and help stream pressurized air in the tapered metal feed bin of described square, compressed-air actuated pressure is controlled between 0.4MPa~0.8MPa, and the order of its injection is from bottom to up, and each jet time is no more than 3 seconds, every layer can be repeated repeatedly jetly, and each time gap is not less than 3 seconds; When block clearing, open the discharging opening of the tapered metal feed bin of described square, in the time that discharging opening is found the agglomerating spherical rolling of viscous material, start described cleaner and utilize block clearing bar to remove rolling scaffold.
CN201410245732.7A 2014-06-04 2014-06-04 Square cone-shaped metal feed bin block clearing equipment and using method Active CN104029947B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410245732.7A CN104029947B (en) 2014-06-04 2014-06-04 Square cone-shaped metal feed bin block clearing equipment and using method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410245732.7A CN104029947B (en) 2014-06-04 2014-06-04 Square cone-shaped metal feed bin block clearing equipment and using method

Publications (2)

Publication Number Publication Date
CN104029947A true CN104029947A (en) 2014-09-10
CN104029947B CN104029947B (en) 2016-03-23

Family

ID=51460996

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410245732.7A Active CN104029947B (en) 2014-06-04 2014-06-04 Square cone-shaped metal feed bin block clearing equipment and using method

Country Status (1)

Country Link
CN (1) CN104029947B (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104670748A (en) * 2015-02-28 2015-06-03 深圳市中意能源设备有限公司 Blower and blowing blockage remover
CN105217180A (en) * 2015-09-17 2016-01-06 安徽江南化工股份有限公司 A kind of Automatic Arch device for ANFO mixing loading truck
CN105460442A (en) * 2015-12-28 2016-04-06 莱歇研磨机械制造(上海)有限公司 Powder-bin heat-tracing flow assisting system
CN108100506A (en) * 2017-12-30 2018-06-01 河南鼎盛铝业有限公司 Ceramic superconductivity high pressure rotary-cut blockage-clearing device
CN108622558A (en) * 2018-05-30 2018-10-09 太重煤机有限公司 Anti- coal bunker heap device for coal
CN109132249A (en) * 2018-09-30 2019-01-04 北京晟时电力科技有限公司 A kind of clear library method of safety and environmental protection and material storage system
CN109516006A (en) * 2018-11-16 2019-03-26 马鞍山钢铁股份有限公司 One plant feed bin blockage-clearing device and its application method
JP2019112095A (en) * 2017-12-22 2019-07-11 オリエンタル白石株式会社 Sediment hopper
CN111284926A (en) * 2020-03-05 2020-06-16 中钢集团马鞍山矿山研究总院股份有限公司 Intelligent bin-clearing and flow-assisting device for inverted-cone-shaped steel cylinder bin and using method of intelligent bin-clearing and flow-assisting device
CN111284923A (en) * 2020-03-05 2020-06-16 中钢集团马鞍山矿山研究总院股份有限公司 Rectangular flat-bottom feeding bin with intelligent anti-blocking and blockage clearing functions
CN112938200A (en) * 2021-04-08 2021-06-11 国能龙源环保有限公司 Low moisture content solid material cooling presses down dirt cloth wind multi-stage device
JP2022046547A (en) * 2017-12-22 2022-03-23 オリエンタル白石株式会社 Method for using soil hopper

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3955717A (en) * 1969-08-06 1976-05-11 Landau Richard E Methods and apparatus for flowing archable materials
GB8300661D0 (en) * 1983-01-11 1983-02-09 Badham C Valves for fluid materials
DE3233281A1 (en) * 1982-09-08 1984-03-08 Adolf 6960 Osterburken Lesk Pneumatic discharge aid for bulk materials
DE3716047A1 (en) * 1987-05-14 1988-12-01 Behn Maschf Method and device for operating a filling apparatus for dust-like or granular material
CN101654177A (en) * 2009-09-05 2010-02-24 中钢集团马鞍山矿山研究院有限公司 Device for eliminating blocking stocks from reinforced concrete ore bin and using method thereof
CN202152176U (en) * 2011-08-03 2012-02-29 安徽开乐专用车辆股份有限公司 Pipeline of material and air separating device for cleaning powder-particle material tanker with air
CN203877257U (en) * 2014-06-04 2014-10-15 马鞍山市天工科技有限公司 Rectangular conical metal stock bin unblocking device

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3955717A (en) * 1969-08-06 1976-05-11 Landau Richard E Methods and apparatus for flowing archable materials
DE3233281A1 (en) * 1982-09-08 1984-03-08 Adolf 6960 Osterburken Lesk Pneumatic discharge aid for bulk materials
GB8300661D0 (en) * 1983-01-11 1983-02-09 Badham C Valves for fluid materials
GB2134220A (en) * 1983-01-11 1984-08-08 Colin Badham Improvements relating to valves for fluid materials
DE3716047A1 (en) * 1987-05-14 1988-12-01 Behn Maschf Method and device for operating a filling apparatus for dust-like or granular material
CN101654177A (en) * 2009-09-05 2010-02-24 中钢集团马鞍山矿山研究院有限公司 Device for eliminating blocking stocks from reinforced concrete ore bin and using method thereof
CN202152176U (en) * 2011-08-03 2012-02-29 安徽开乐专用车辆股份有限公司 Pipeline of material and air separating device for cleaning powder-particle material tanker with air
CN203877257U (en) * 2014-06-04 2014-10-15 马鞍山市天工科技有限公司 Rectangular conical metal stock bin unblocking device

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104670748A (en) * 2015-02-28 2015-06-03 深圳市中意能源设备有限公司 Blower and blowing blockage remover
CN105217180A (en) * 2015-09-17 2016-01-06 安徽江南化工股份有限公司 A kind of Automatic Arch device for ANFO mixing loading truck
CN105217180B (en) * 2015-09-17 2017-10-20 安徽江南化工股份有限公司 A kind of Automatic Arch device for ANFO mixing loading truck
CN105460442A (en) * 2015-12-28 2016-04-06 莱歇研磨机械制造(上海)有限公司 Powder-bin heat-tracing flow assisting system
JP2022046547A (en) * 2017-12-22 2022-03-23 オリエンタル白石株式会社 Method for using soil hopper
JP7043677B1 (en) 2017-12-22 2022-03-29 オリエンタル白石株式会社 How to use the earth and sand hopper
JP2019112095A (en) * 2017-12-22 2019-07-11 オリエンタル白石株式会社 Sediment hopper
CN108100506A (en) * 2017-12-30 2018-06-01 河南鼎盛铝业有限公司 Ceramic superconductivity high pressure rotary-cut blockage-clearing device
CN108622558A (en) * 2018-05-30 2018-10-09 太重煤机有限公司 Anti- coal bunker heap device for coal
CN109132249A (en) * 2018-09-30 2019-01-04 北京晟时电力科技有限公司 A kind of clear library method of safety and environmental protection and material storage system
CN109516006A (en) * 2018-11-16 2019-03-26 马鞍山钢铁股份有限公司 One plant feed bin blockage-clearing device and its application method
CN111284923A (en) * 2020-03-05 2020-06-16 中钢集团马鞍山矿山研究总院股份有限公司 Rectangular flat-bottom feeding bin with intelligent anti-blocking and blockage clearing functions
CN111284926A (en) * 2020-03-05 2020-06-16 中钢集团马鞍山矿山研究总院股份有限公司 Intelligent bin-clearing and flow-assisting device for inverted-cone-shaped steel cylinder bin and using method of intelligent bin-clearing and flow-assisting device
CN112938200A (en) * 2021-04-08 2021-06-11 国能龙源环保有限公司 Low moisture content solid material cooling presses down dirt cloth wind multi-stage device

Also Published As

Publication number Publication date
CN104029947B (en) 2016-03-23

Similar Documents

Publication Publication Date Title
CN104029947B (en) Square cone-shaped metal feed bin block clearing equipment and using method
CN203877257U (en) Rectangular conical metal stock bin unblocking device
CN206927269U (en) A kind of Pneumatic block clearing device for being used to avoiding, eliminating inclined chute blocking
CN207191965U (en) The high flat four outlets armored concrete feed bin blockage-clearing device of cylinder
CN101654177B (en) Device for eliminating blocking stocks from reinforced concrete ore bin and using method thereof
CN205042815U (en) Pulsed highly -compressed air cleaning device that jets
CN102000644A (en) Steel plate pretreatment production line
CN201472921U (en) Equipment for clearing shed material blocked in pneumatic scatter-type reinforced concrete ore bin
CN109516006A (en) One plant feed bin blockage-clearing device and its application method
CN102580955B (en) Multipoint loosening and dredging device utilizing compressed air
CN104385150A (en) Flow-controllable continuous sandblasting machine
CN105215001A (en) Pulse of compressed air blast cleaning device
CN104907940A (en) Sand-spraying dust-removing equipment
CN203921709U (en) The blockage-clearing device of V flute profile disjunctor ferro-concrete feed bin
CN104029945A (en) Unblocking device for cylindrical flat-bottom-shaped reinforced concretebunker
CN203877256U (en) Blockage removal device for cylindrical flat-bottom reinforced concrete bin
CN102530439B (en) Blockage bridging removal machine for ore bin
CN202449449U (en) Powder transfer tank assembly and powder truck
CN207191966U (en) Big barrel dliameter cylindrical reinforced concrete feed bin blockage-clearing device
CN203450637U (en) Program-controlled coal discharging device for raw coal cabin
CN212952155U (en) Gasification blockage clearing device for powdery material warehouse top
CN213975413U (en) Wear-resisting anti-blocking device for cement kiln mixing bunker
CN104384038A (en) Spraying device
CN204299588U (en) From the wet concrete sprayer stirred
CN110424396A (en) A kind of crawler type whitewashing integrated system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
CB02 Change of applicant information

Address after: 243000 Anhui city of Ma'anshan Province Economic and Technological Development Zone No. 9 Ranlu Zhu

Applicant after: MAANSHAN TIANGONG TECHNOLOGY CO., LTD.

Address before: 243000 Anhui city of Ma'anshan Province Economic and Technological Development Zone No. 9 Ranlu Zhu

Applicant before: Maanshan Heavenly Technology Co., Ltd.

COR Change of bibliographic data
GR01 Patent grant