CN104029947B - Square cone-shaped metal feed bin block clearing equipment and using method - Google Patents

Square cone-shaped metal feed bin block clearing equipment and using method Download PDF

Info

Publication number
CN104029947B
CN104029947B CN201410245732.7A CN201410245732A CN104029947B CN 104029947 B CN104029947 B CN 104029947B CN 201410245732 A CN201410245732 A CN 201410245732A CN 104029947 B CN104029947 B CN 104029947B
Authority
CN
China
Prior art keywords
feed bin
square
block clearing
metal feed
valve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410245732.7A
Other languages
Chinese (zh)
Other versions
CN104029947A (en
Inventor
李群辉
汤复华
杨书春
祝超
马明
王一鸣
王石
刘锡水
郝其昌
沈臻
姚俊男
方芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MAANSHAN TIANGONG TECHNOLOGY Co Ltd
Original Assignee
MAANSHAN TIANGONG TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MAANSHAN TIANGONG TECHNOLOGY Co Ltd filed Critical MAANSHAN TIANGONG TECHNOLOGY Co Ltd
Priority to CN201410245732.7A priority Critical patent/CN104029947B/en
Publication of CN104029947A publication Critical patent/CN104029947A/en
Application granted granted Critical
Publication of CN104029947B publication Critical patent/CN104029947B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Cleaning In General (AREA)

Abstract

The present invention discloses a kind of square cone-shaped metal feed bin block clearing equipment and using method, belongs to selecting and purchasing ore deposit equipment technical field.This block clearing equipment is provided with three layers of strength in four sides of the cone outside of the tapered metal feed bin of square to help stream airduct, help stream airduct is provided with in strength and multiplely help flow nozzle, the bulkhead helping flow nozzle to pass the tapered metal feed bin of square enters in storehouse, help stream pipeline to be arranged on the left and right sides of the tapered feed bin of square, main help stream pipeline successively by the second boiler check valve, the 4th manual ball valve, help stream storage tank, minimal pressure hold-off valve, the first boiler check valve and the first manual ball valve and Air compressor to be connected; Control storage tank is connected by the 3rd manual ball valve and main control pipeline; About the trunnion place, bottom of the tapered metal feed bin of square, respectively arrange a cleaner, cleaner is provided with block clearing bar.Block clearing device structure provided by the invention is simple, reliable operation, helps stream pipeline to be arranged on feed bin outside, is easy to Maintenance and Repair.

Description

Square cone-shaped metal feed bin block clearing equipment and using method
Technical field
The invention belongs to selecting and purchasing ore deposit equipment technical field, be specifically related to a kind of square cone-shaped metal feed bin block clearing equipment and using method.
Background technology
The ore dressing plant in current all kinds of mine, is all provided with ore storage storehouse, for regulating production procedure, distributing ore and being selected in path, regulating into ore dressing amount, balanced ore dressing process.Ore storage bin pattern can be divided into: the tapered funnel bin of square, V grooved disjunctor storehouse and cylinder flat-bottom bin etc.After ore puts in storage, because the physical factors such as ore water ratio, lumpiness, surface texture are different, cause ore to increase with the friction force of bulkhead, thus ore can not overcome friction drag under self gravitation effect, slips out ore storage bin, causes material to glue wall blocking.Again because material water ratio is higher, granularity is very thin, unit volume endoparticle surface sum is very large, thus binding force increases, and forms arcuation scaffold, and storehouse internal perisporium has a large amount of material stock can not overcome outside internal friction discharge storehouse by deadweight, well shape scaffold is formed time slight, time serious, material can not flow in storehouse, forms blocking, loses the function of ore storage bin completely.The Method of blockage removal of current use is: workman opens one and discloses material hole and disclose material on bulkhead, or under enter hand-held iron rod in ore storage bin and disclose material, or blow up with dynamite and dredge, in time, has fatal accident and ore storage bin to damage to occur.
For solving the blocking of feed bin scaffold, Chinese patent ZL200910144875.8 discloses a kind of square cone funnel type reinforced concrete ore storage bin, remove equipment and the using method of blocking scaffold, the technical scheme that this patent is taked is: on the inwall of the inside (instead of outside) of warehouse, add multilayer strength help stream airduct, airduct is provided with the different strength of injection direction helps flow nozzle jet in storehouse, also lay steel plate at funnel bin four corner angle simultaneously, pneumatic vibration hammer is added at steel plate rear portion, rapping steel plate, blow shake combine under storehouse materials inside is discharged outside storehouse.Following point is there is: first it can play a role to the powder that square cone funnel type reinforced concrete ore storage bin removes viscosity not high in this technical scheme, but it is just helpless to removing heavy body powder, because of heavy body powder, shake more real and more real, especially at feed bin trunnion place, cohesive powders has been formed spherical, rolls in ore storage bin exit, form rolling scaffold, in storehouse, material cannot be discharged outside storehouse.This scheme in addition, helping stream airduct to be arranged in inside wall of ore bin, hinders supports for material down-sliding in storehouse, and help stream airduct serious wear, and must bring down stocks when installing, impact is produced.In storehouse, steel plate work capacity is laid very greatly in corner, and add vibration hammer, cost is high, to cohesive powders, shakes more real and more real, not applicable.Chinese patent 20092018742.7 and Chinese patent 200920187425.2 are all for reinforced concrete ore storage bin, and the material that main process viscosity is not high is also reluctant to high-viscosity material.
Summary of the invention
The present invention is directed to the problems referred to above that prior art exists, a kind of square tapered metal feed bin block clearing equipment and the using method that can remove heavy body powder are provided, ensure mineral processing production smooth feeding, and structure is simple, reliable operation, need not bring down stocks during installation, stream pipeline is helped to be placed on feed bin outside, be easy to Maintenance and Repair, avoid in inside installation easy to wear, hinder the drawback of supports for material down-sliding in storehouse; In addition in the bottom of ore storage bin, material outlet place, is provided with cleaner, and the material rolled at feed bin trunnion place can be smashed to pieces and dispel by the block clearing bar of this cleaner, is discharged outside storehouse by material agglomerating for viscosity.
Square provided by the present invention tapered metal feed bin block clearing equipment, be provided with three layers of strength in four sides of the cone outside of the tapered metal feed bin of described square and help stream airduct, help stream airduct is provided with in described strength and multiplely help flow nozzle 27, the described flow nozzle 27 that helps enters in storehouse through the bulkhead of the tapered metal feed bin of described square, the described inwall helping the air nozzle of flow nozzle 27 to be close to the tapered metal feed bin of described square, described in help the spout of flow nozzle 27 down, each nozzle, after entering feed bin, all seals with bulkhead with leakproofing material, described strength helps stream airduct to be flowed pipeline 24 by ecp butterfly valve 13 and be connected with helping, the described stream pipeline 24 that helps is flowed pipeline 12 be connected by ecp ball valve 20 and main helping, the described stream pipeline 24 that helps is arranged on the left and right sides of the tapered feed bin of described square, described master help stream pipeline 12 successively by the second boiler check valve 10, the 4th manual ball valve 9, help stream storage tank 8, minimal pressure hold-off valve 7, first boiler check valve 3 and the first manual ball valve 2 to be connected with Air compressor 1, described Air compressor 1 is connected with control storage tank 4 by described first manual ball valve 2, first boiler check valve 3 successively, described control storage tank 4 is connected by the second manual ball valve 5 with the described stream storage tank 8 that helps, and described control storage tank 4 is connected with main control pipeline 11 by the 3rd manual ball valve 6, electric cabinet 33 is connected by wire and ecp ball valve 20 and the first two-position two-way solenoid valve 15, about the trunnion place, bottom of described square tapered metal feed bin, a cleaner 16 is respectively set, described cleaner 16 is provided with block clearing bar 17, described block clearing bar 17 is solid drawn pipe, one end of described block clearing bar 17 is fixed on described cleaner 16, the other end of described block clearing bar 17 is equipped with air blast nozzle and extends transversely into the trunnion place, bottom of the tapered metal feed bin of square, the admission port of the automatic reciprocating air cylinder on described cleaner 16 is connected with pilot piping 25 through the second two-position two-way solenoid valve 18, the admission port of described block clearing bar 17 flows pipeline 24 through the first two-position two-way solenoid valve 15 and is connected with helping.
The using method of square provided by the present invention tapered metal feed bin block clearing equipment is specific as follows:
When there is blocking in the tapered metal feed bin of described square, by electric cabinet by manually sending block clearing signal, spray in the tapered metal feed bin of described square and help stream pressurized air, compressed-air actuated Stress control is between 0.4 ~ 0.8MPa, its order of spraying is from bottom to up, each jet time is no more than 3 seconds, and every layer can be repeated repeatedly jet, and each time gap is not less than 3 seconds; During block clearing, open the discharging opening of the tapered metal feed bin of described square, when the agglomerating spherical rolling of discharging opening discovery viscous material, start described cleaner and utilize block clearing bar to remove rolling scaffold.
Electric control loop is the signal by electricity, controls the electromagnetic valve be contained on ecp butterfly valve 13, and the folding of electromagnetic valve controls the break-make of gas circuit, realizes the object of Pneumatic auxiliary stream block clearing.Electric control loop is made up of electric cabinet 33 and distribution box with protectors 31, distribution box with protectors 32, and control voltage is direct current DC24V, is to be converted through A/D by alternating current 220V.Electric cabinet 33 connects with wire with between distribution box with protectors 31, distribution box with protectors 32.
The present invention has following technical characterstic:
(1) the present invention is by reducing material with the friction force between bulkhead, solves the blocking scaffold of the tapered metal warehouse of heavy body powder square and sticky wall problem.
(2) the present invention is provided with cleaner, and the sticky group of the rolling that high viscosity powder can be formed, smashs to pieces and dispel, abolish rolling scaffold.
(3) the present invention can improve the degree of utilization 1/5 ~ 1/4 of ore storage bin effective volume, can effectively regulate in production procedure the harmony entering ore dressing amount, thus improves ore dressing quality and production efficiency.
(4) structure of the present invention is simple, and reliable operation is easy to operate, is applicable to newly-built ore storage bin and selects, and is also applicable to the transformation of old ore storage bin.
(5) the present invention is applicable to heavy body powder, the block clearing of high-moisture percentage powder and broken arch.
(6) the present invention thoroughly relieves the personal injury that artificial block clearing and broken arch are brought, social benefit, remarkable in economical benefits.
Accompanying drawing explanation
Fig. 1 is that block clearing equipment body of the present invention faces structural representation;
Fig. 2 is block clearing equipment body plan structure schematic diagram of the present invention;
Fig. 3 is block clearing equipment body vertical profile structural representation of the present invention;
Fig. 4 is block clearing device systems principle schematic of the present invention.
In figure: 1: Air compressor; 2: the first manual ball valves; 3: the first boiler check valve; 4: control storage tank; 5: the second manual ball valves; 6: the three manual ball valves; 7: minimal pressure hold-off valve; 8: help stream storage tank; 9: the four manual ball valves; 10: the second boiler check valve: 11: main control pipeline; 12: master helps stream pipeline; 13: ecp butterfly valve; 14: the first ecp actrs; 15: the first two-position two-way solenoid valves; 16: cleaner: 17: block clearing bar; 18; Second two-position two-way solenoid valve; 19: source of the gas process three linked piece; 20: ecp ball valve; 21: the second ecp actrs; 22: the three two-position two-way solenoid valves; 23: help stream pipeline air-pressure gauge; 24: help stream pipeline; 25: pilot piping; 26: pilot piping air-pressure gauge; 27: help flow nozzle; 28: third layer nozzle block; 29: second layer nozzle block; 30: ground floor nozzle block; 31: left distribution box with protectors; 32: right distribution box with protectors; 33: electric cabinet; 34: ore storage bin; 35: trunnion; 36: belt feeder; 37: ore storage bin cone wall; 38: cleaner fixed mount.
Detailed description of the invention
For further describing the present invention, below in conjunction with drawings and Examples, square of the present invention tapered metal feed bin block clearing Apparatus and operation method is described in more detail.
On four ore storage bin cone walls 37 of ore storage bin 34, each cone wall is respectively equipped with three groups and helps flow nozzle group, ground floor nozzle block 30 (basecoat), be equipped with 4 and help flow nozzle 27, second layer nozzle block 29, is equipped with 6 and helps flow nozzle 27, third layer nozzle block 28, be equipped with 8 and help flow nozzle 27, four faces, ground floor, has 16 and helps flow nozzle, the second layer has 24 and helps flow nozzle 27, and third layer has 32 and helps flow nozzle 27.Each nozzle block is provided with an ecp butterfly valve 13 and the first ecp actr 14, and each conical surface has 3 ecp butterfly valves 13.Each nozzle helps stream 27 to be penetrate separately bulkhead 37 to enter in storehouse, and seals with between bulkhead, prevents material in storehouse from leaking.Each ecp butterfly valve 13, is fixed with ore storage bin cone wall 37 by support.The admission port of each ecp butterfly valve 13 is connected with helping stream pipeline 24, helps stream pipeline 24 to connect with ecp ball valve 20; The admission port of ecp ball valve 20 helps circulation flow path 12 to communicate with main, main helping flows pipeline about 12 points two-way, converge rear same second boiler check valve 10 to connect, second boiler check valve 10 flows storage tank 8 UNICOM through the 4th manual ball valve 9 with helping, the first ecp actr 14 (butterfly valve is used) on each operated pneumatic valve, and the second ecp actr 21 (ball valve with) all with pilot piping 25 UNICOM, again with the 3rd two-position two-way solenoid valve 22, source of the gas process three linked piece 19 UNICOM, connect the 3rd manual ball valve 6 through main control pipeline 11 and control storage tank 4.Main control pipeline about 11 points two-way, enter the 3rd manual ball valve 6 jointly.Cleaner 6 is arranged on trunnion 35 by cleaner fixed mount 38, and cleaner fixed mount 38 is welded on trunnion 35.The admission port of the automatic reciprocating air cylinder on cleaner 16 is connected with pilot piping 25 through the second two-position two-way solenoid valve 18, and the admission port of block clearing bar 17 flows pipeline 24 through the first two-position two-way solenoid valve 15 and communicates with helping.
Air compressor 1 is screw-rod air compressor, and blast is 0.8MPa, and air quantity is 6m 3/ min, the high pressure gas extruded are through manual ball valve 2, boiler check valve 3, enter control storage tank 4, entering through minimal pressure hold-off valve 7 simultaneously and help stream storage tank 8, the effect of minimal pressure hold-off valve 7, is ensure that the pressure of control storage tank 4 is not less than 4MPa at work, for making to save energy in inflation, manual ball valve 5 can be opened at the inflation initial stage, control storage tank 4 is communicated with helping stream storage tank 8, close after gas of substituting the bad for the good.
When blocking occurs ore storage bin 34, carry out block clearing by following method:
In normal work, Air compressor 1 is in open state, and when control storage tank 4 with when helping stream storage tank 8 to be all filled to 0.7MPa, Air compressor 1 can self-servicely be shut down, and energy Auto Power On when air pressure is low, the pressure of whole air-channel system is higher than 0.4MPa.When feed bin needs block clearing, operating personal is connected and is controlled power supply, now, green light on electric cabinet 33 panel, A.C. voltmeter display AC220V, DC voltmeter display DC24V, then pneumatic ball valve 20 is connected, with the second two-position two-way solenoid valve 18, open respectively and help gas source and control source of the gas, open pressurized air and start to help stream.
When feed bin bottom, trunnion 35 place blocks, and opens cleaner 16, connects the second two-position two-way solenoid valve 18, makes cylinder make automatic reciprocating motion, connects the first two-position two-way solenoid valve 15, dispels sticky group to block clearing bar 17 air feed.When block clearing, belt feeder 36 must operate, otherwise blocking is more serious, and each block clearing, duration of ventilation does not exceed 3 seconds, and time gap is not lower than 3 seconds.On pilot piping, compression indicator 26 is housed, help on stream pipeline and compression indicator 23 is housed, distribution box with protectors 31 is housed on the left of ore storage bin, and distribution box with protectors 32 is equipped with on right side.

Claims (2)

1. square tapered metal feed bin block clearing equipment, it is characterized in that: four sides of the cone outside of the tapered metal feed bin of described square are provided with three layers of strength and help stream airduct, help stream airduct is provided with in described strength and multiplely help flow nozzle (27), the described flow nozzle (27) that helps enters in storehouse through the bulkhead of the tapered metal feed bin of described square, the described inwall helping the air nozzle of flow nozzle (27) to be close to the tapered metal feed bin of described square, described in help the spout of flow nozzle (27) down, described strength helps stream airduct to be flowed pipeline (24) by ecp butterfly valve (13) and be connected with helping, described stream pipeline (24) that helps is flowed pipeline (12) be connected by ecp ball valve (20) and main helping, the described left and right sides helping stream pipeline (24) to be arranged on the tapered feed bin of described square, described master helps stream pipeline (12) successively by the second boiler check valve (10), 4th manual ball valve (9), help stream storage tank (8), minimal pressure hold-off valve (7), first boiler check valve (3) and the first manual ball valve (2) are connected with Air compressor (1), described Air compressor (1) is connected with control storage tank (4) by described first manual ball valve (2), the first boiler check valve (3) successively, described control storage tank (4) and the described stream storage tank (8) that helps are connected by the second manual ball valve (5), and described control storage tank (4) is connected by the 3rd manual ball valve (6) and main control pipeline (11), electric cabinet (33) is connected by wire and ecp ball valve (20) and the first two-position two-way solenoid valve (15), a cleaner (16) is respectively set about the trunnion place, bottom of the tapered metal feed bin of described square, described cleaner (16) is provided with block clearing bar (17), described block clearing bar (17) is solid drawn pipe, one end of described block clearing bar (17) is fixed on described cleaner (16), the other end of described block clearing bar (17) is equipped with air blast nozzle and extends transversely into the trunnion place, bottom of the tapered metal feed bin of square, the admission port of the automatic reciprocating air cylinder on described cleaner (16) is connected through the second two-position two-way solenoid valve (18) same to pilot piping (25), the admission port of described block clearing bar (17) flows pipeline (24) be connected through the first two-position two-way solenoid valve (15) and described helping.
2. the using method of the tapered metal feed bin of square described in claim 1 block clearing equipment, it is characterized in that the method is specific as follows: when blocking appears in the tapered metal feed bin of described square, by electric cabinet by manually sending block clearing signal, spray in the tapered metal feed bin of described square and help stream pressurized air, compressed-air actuated Stress control is between 0.4MPa ~ 0.8MPa, and its order of spraying is from bottom to up, and each jet time is no more than 3 seconds, every layer can be repeated repeatedly jet, and each time gap is not less than 3 seconds; During block clearing, open the discharging opening of the tapered metal feed bin of described square, when the agglomerating spherical rolling of discharging opening discovery viscous material, start described cleaner and utilize block clearing bar to remove rolling scaffold.
CN201410245732.7A 2014-06-04 2014-06-04 Square cone-shaped metal feed bin block clearing equipment and using method Active CN104029947B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410245732.7A CN104029947B (en) 2014-06-04 2014-06-04 Square cone-shaped metal feed bin block clearing equipment and using method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410245732.7A CN104029947B (en) 2014-06-04 2014-06-04 Square cone-shaped metal feed bin block clearing equipment and using method

Publications (2)

Publication Number Publication Date
CN104029947A CN104029947A (en) 2014-09-10
CN104029947B true CN104029947B (en) 2016-03-23

Family

ID=51460996

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410245732.7A Active CN104029947B (en) 2014-06-04 2014-06-04 Square cone-shaped metal feed bin block clearing equipment and using method

Country Status (1)

Country Link
CN (1) CN104029947B (en)

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104670748A (en) * 2015-02-28 2015-06-03 深圳市中意能源设备有限公司 Blower and blowing blockage remover
CN105217180B (en) * 2015-09-17 2017-10-20 安徽江南化工股份有限公司 A kind of Automatic Arch device for ANFO mixing loading truck
CN105460442B (en) * 2015-12-28 2019-02-15 莱歇研磨机械制造(上海)有限公司 A kind of powder cabin heat tracing helps streaming system
JP2019112095A (en) * 2017-12-22 2019-07-11 オリエンタル白石株式会社 Sediment hopper
JP7043677B1 (en) * 2017-12-22 2022-03-29 オリエンタル白石株式会社 How to use the earth and sand hopper
CN108100506A (en) * 2017-12-30 2018-06-01 河南鼎盛铝业有限公司 Ceramic superconductivity high pressure rotary-cut blockage-clearing device
CN108622558A (en) * 2018-05-30 2018-10-09 太重煤机有限公司 Anti- coal bunker heap device for coal
CN109132249B (en) * 2018-09-30 2020-09-15 北京晟时电力科技有限公司 Material storage system
CN109516006A (en) * 2018-11-16 2019-03-26 马鞍山钢铁股份有限公司 One plant feed bin blockage-clearing device and its application method
CN111284926A (en) * 2020-03-05 2020-06-16 中钢集团马鞍山矿山研究总院股份有限公司 Intelligent bin-clearing and flow-assisting device for inverted-cone-shaped steel cylinder bin and using method of intelligent bin-clearing and flow-assisting device
CN111284923A (en) * 2020-03-05 2020-06-16 中钢集团马鞍山矿山研究总院股份有限公司 Rectangular flat-bottom feeding bin with intelligent anti-blocking and blockage clearing functions
CN112938200B (en) * 2021-04-08 2022-04-22 国能龙源环保有限公司 Low moisture content solid material cooling presses down dirt cloth wind multi-stage device

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3955717A (en) * 1969-08-06 1976-05-11 Landau Richard E Methods and apparatus for flowing archable materials
DE3233281A1 (en) * 1982-09-08 1984-03-08 Adolf 6960 Osterburken Lesk Pneumatic discharge aid for bulk materials
GB2134220A (en) * 1983-01-11 1984-08-08 Colin Badham Improvements relating to valves for fluid materials
DE3716047A1 (en) * 1987-05-14 1988-12-01 Behn Maschf Method and device for operating a filling apparatus for dust-like or granular material
CN101654177B (en) * 2009-09-05 2011-05-11 中钢集团马鞍山矿山研究院有限公司 Device for eliminating blocking stocks from reinforced concrete ore bin and using method thereof
CN202152176U (en) * 2011-08-03 2012-02-29 安徽开乐专用车辆股份有限公司 Pipeline of material and air separating device for cleaning powder-particle material tanker with air
CN203877257U (en) * 2014-06-04 2014-10-15 马鞍山市天工科技有限公司 Rectangular conical metal stock bin unblocking device

Also Published As

Publication number Publication date
CN104029947A (en) 2014-09-10

Similar Documents

Publication Publication Date Title
CN104029947B (en) Square cone-shaped metal feed bin block clearing equipment and using method
CN107416471B (en) A kind of blockage-clearing device and its application method of prevention and treatment inclined chute blocking
CN203877257U (en) Rectangular conical metal stock bin unblocking device
CN206927269U (en) A kind of Pneumatic block clearing device for being used to avoiding, eliminating inclined chute blocking
CN101654177B (en) Device for eliminating blocking stocks from reinforced concrete ore bin and using method thereof
CN207191965U (en) The high flat four outlets armored concrete feed bin blockage-clearing device of cylinder
CN205009063U (en) Preceding formula water sand blasting machine that mixes
CN205042815U (en) Pulsed highly -compressed air cleaning device that jets
CN102000644A (en) Steel plate pretreatment production line
CN201472921U (en) Equipment for clearing shed material blocked in pneumatic scatter-type reinforced concrete ore bin
CN105215001B (en) Adhere to the pulse jet method for cleaning of dust debris under adverse circumstances
CN104385150A (en) Flow-controllable continuous sandblasting machine
CN102580955B (en) Multipoint loosening and dredging device utilizing compressed air
CN203921709U (en) The blockage-clearing device of V flute profile disjunctor ferro-concrete feed bin
CN104029945B (en) The blockage-clearing device of cylinder flat shape armored concrete feed bin
CN203877256U (en) Blockage removal device for cylindrical flat-bottom reinforced concrete bin
CN102530439B (en) Blockage bridging removal machine for ore bin
CN204380450U (en) A kind of thermal power plant defeated coal auto spraying dust arrester
CN207596103U (en) A kind of three feeding-distribution devices
CN202449449U (en) Powder transfer tank assembly and powder truck
CN202704478U (en) Water spraying and dust extracting device and coal conveying device using thereof
CN207191966U (en) Big barrel dliameter cylindrical reinforced concrete feed bin blockage-clearing device
CN103212223A (en) Concentrate dehydrating technology and device
CN104384038A (en) Spraying device
CN204173619U (en) A kind of grab bucket discharge system with suppressing dust with dry mist device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
CB02 Change of applicant information

Address after: 243000 Anhui city of Ma'anshan Province Economic and Technological Development Zone No. 9 Ranlu Zhu

Applicant after: MAANSHAN TIANGONG TECHNOLOGY CO., LTD.

Address before: 243000 Anhui city of Ma'anshan Province Economic and Technological Development Zone No. 9 Ranlu Zhu

Applicant before: Maanshan Heavenly Technology Co., Ltd.

COR Change of bibliographic data
GR01 Patent grant