CN203921709U - The blockage-clearing device of V flute profile disjunctor ferro-concrete feed bin - Google Patents

The blockage-clearing device of V flute profile disjunctor ferro-concrete feed bin Download PDF

Info

Publication number
CN203921709U
CN203921709U CN201420294140.XU CN201420294140U CN203921709U CN 203921709 U CN203921709 U CN 203921709U CN 201420294140 U CN201420294140 U CN 201420294140U CN 203921709 U CN203921709 U CN 203921709U
Authority
CN
China
Prior art keywords
pipeline
feed bin
help
bin
storage tank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201420294140.XU
Other languages
Chinese (zh)
Inventor
李群辉
邹忠良
王一鸣
童子月
杨书春
李长胜
琚会生
沈臻
陈飞
郝其昌
刘广才
王亮
叶琴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MAANSHAN HEAVENLY TECHNOLOGY Co Ltd
Original Assignee
MAANSHAN HEAVENLY TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MAANSHAN HEAVENLY TECHNOLOGY Co Ltd filed Critical MAANSHAN HEAVENLY TECHNOLOGY Co Ltd
Priority to CN201420294140.XU priority Critical patent/CN203921709U/en
Application granted granted Critical
Publication of CN203921709U publication Critical patent/CN203921709U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Landscapes

  • Air Transport Of Granular Materials (AREA)

Abstract

The utility model is a kind of blockage-clearing device of V flute profile disjunctor ferro-concrete feed bin, belong to the process unit of ore dressing, it is characterized in that: the blockage-clearing device of this feed bin is mainly by air compressor, storage tank I, storage tank II, left distribution box with protectors, right distribution box with protectors, the gentle power flow-aiding device of electric cabinet, strength control setup composition, on a V-shaped left side for each feed bin, the gentle force control device of strength flow-aiding device is all installed respectively on the lateral surface of right both sides bin wall accordingly, this strength flow-aiding device is mainly by always helping stream pipeline, pneumatic ball valve, ecp actr I, the main stream pipeline that helps, support stream pipeline, help flow point pipeline, ecp actr II, Pneumatic butterfly valve and help flow nozzle composition, this strength control setup is mainly by overhead control pipeline, main control pipeline, source of the gas three linked piece, bi-bit bi-pass normally closed solenoid valve, compression indicator II and a pilot piping composition, easy to use, safe and reliable, reduce workman's operation intensity, improve the efficiency of mineral processing production.

Description

The blockage-clearing device of V flute profile disjunctor ferro-concrete feed bin
Technical field
The utility model belongs to ore-dressing technique device, especially belongs to a kind of blockage-clearing device of ferro-concrete feed bin.
Background technology
The ore dressing plant in current all kinds of mines, is all provided with the storage warehouse (being designated hereinafter simply as feed bin) of mineral aggregate (ore), for regulating production procedure, distributing the selected path of mineral aggregate or regulate into ore dressing amount and balanced ore dressing process.The pattern of feed bin, can be divided into square conical hopper storehouse, V flute profile disjunctor storehouse and cylinder flat-bottom bin etc.After mineral aggregate puts in storage, due to the difference of the physical factors such as water ratio, lumpiness and the surface texture of mineral aggregate, cause that mineral aggregate increases with the friction force between bulkhead, mineral aggregate can not lean on the gravity of self to overcome friction drag, cause mineral aggregate can not certainly slip out feed bin, often cause the sticky wall of mineral aggregate to stop up.Again because the water ratio of mineral aggregate is higher and granularity is very thin, in unit volume, the face area sum of mineral aggregate particle is very large, thereby binding force increases formation arcuation scaffold, on feed bin internal perisporium, there is material stock and can not discharge outside feed bin by deadweight overcome friction, in the time that material stock is slight, in feed bin, form well shape scaffold, in the time that material stock is serious, mineral aggregate can not flow and form obstruction in feed bin, lose the function of feed bin completely, the feed bin Method of blockage removal of current use is: workman is lowered in feed bin, hand-held iron rod is disclosed material, or blow dredging up with dynamite, but in time, has personal injury and feed bin to damage to occur, there is potential safety hazard.
For the scaffold that solves feed bin stops up, Chinese patent: ZL 2,009 1 0144875.8, discloses a kind of square cone infundibulate reinforced concrete ore storage bin and has removed equipment and the using method thereof of stopping up scaffold.Its technical scheme of taking is: on the bulkhead of the interior cone of warehouse, add multilayer strength and help stream airduct, be provided with the different strength of injection direction and help flow nozzle to jet in feed bin on airduct; Also in funnel bin, four corner angle are laid steel plate simultaneously, add pneumatic vibration hammer at steel plate rear portion, and rapping steel plate is discharged outside feed bin the material in feed bin.Although this scheme is stopped up scaffold to the removing of square cone infundibulate reinforced concrete feed bin and can be played a role, but there is following point: to the block clearing of V flute profile disjunctor reinforced concrete feed bin, this scheme is just inapplicable, be mainly because: V flute profile feed bin inside does not have four corner angle, cannot install pneumatic vibration hammer additional, it is to help stream airduct in the installing of the inside of feed bin in addition, when mounted, must bring down stocks to install, thereby impact production, meanwhile, help stream airduct to be arranged on the inside of feed bin, not only serious wear, also hinders the downslide of mineral aggregate in feed bin simultaneously; In addition, Chinese patent ZL2009 2 0187426.7 and ZL2009 2 0187425.2 are for square cone infundibulate reinforced concrete ore storage bin, also inapplicable to the block clearing of V flute profile feed bin.
Summary of the invention
The purpose of this utility model is the blockage-clearing device that proposes a kind of V flute profile disjunctor ferro-concrete feed bin ,not only rational in infrastructure, safe and reliable, and easy for installation, help stream pipeline to be arranged on feed bin outside, need not bring down stocks, be easy to Maintenance and Repair, and the pipeline of having avoided inner installing is easy to wear, hinder the drawback that mineral aggregate glides, and reduces workman's operation intensity, improves the efficiency of mineral processing production.
The purpose of this utility model is achieved like this: a kind of blockage-clearing device (being called for short the blockage-clearing device of feed bin) of V flute profile disjunctor ferro-concrete feed bin, comprise each V flute profile feed bin of the ferro-concrete of disjunctor, the discharge bucket that inversed taper platform shape is set in the bottom of this feed bin (below arranged on left and right sides bin wall) arranges belt transporter below each discharge bucket, it is characterized in that: the blockage-clearing device of this V flute profile disjunctor ferro-concrete feed bin is mainly made up of air compressor, storage tank I (controlling the storage tank of use), storage tank II (helping the storage tank of stream use), left distribution box with protectors, right distribution box with protectors, the gentle power flow-aiding device of electric cabinet, strength control setup, corresponding air compressor and storage tank I, the storage tank II of installing on the ground of the outside left of the feed bin of each V flute profile of the ferro-concrete of disjunctor, at air compressor highcalm the anger on the delivery conduit of body manual ball valve I is first installed, storage tank I is installed on the delivery conduit on manual ball valve I delivery port in parallel successively, storage tank II, and between delivery conduit in admission port and the manual ball valve I of storage tank II, minimal pressure hold-off valve is installed, and the pressure of this minimal pressure hold-off valve is adjusted to 0.4MPa, its objective is that the minimal pressure that ensures storage tank I is not less than 0.4MPa, when intake pressure exceedes after 0.4MPa, could be to helping air feed in the storage tank II that flows use, simultaneously, manual ball valve II is installed on the air extractor duct pipeline of storage tank I and on the air extractor duct pipeline of manual ball valve II, strength control setup is installed, on the air extractor duct pipeline of storage tank II, manual ball valve III is installed, and on the air extractor duct pipeline of manual ball valve III, boiler check valve is installed, on the air extractor duct pipeline of boiler check valve, strength flow-aiding device is installed, in addition, on the factory building wall of the outside left of the feed bin of each V flute profile of the ferro-concrete of disjunctor with the corresponding electric cabinet and the left distribution box with protectors being connected with electric cabinet installed of support, right distribution box with protectors,
On a V-shaped left side for described each feed bin, the described gentle force control device of strength flow-aiding device and structure are all installed respectively accordingly identical on the lateral surface of right both sides bin wall, now with the left side of feed bin one of therein, the strength flow-aiding device of installing on the lateral surface of right side bin wall, strength control setup is that example is described further, described strength flow-aiding device is mainly by always helping stream pipeline, pneumatic ball valve, ecp actr I, the main stream pipeline that helps, support stream pipeline, help flow point pipeline, ecp actr II, Pneumatic butterfly valve and help flow nozzle composition, on the air extractor duct of described boiler check valve, install and always help stream pipeline and always help stream pipeline to be divided in opposite directions two sections this with triplate line, the described stream pipeline that always helps has two sections of outlet pipes, on this always helps two sections of outlet pipes of stream pipeline, with threeway, each master is installed in parallel successively respectively and helps stream pipeline, and each master of a side helps on the lateral surface of bin wall in the corresponding left side that leads to each feed bin of stream pipeline, and each master of an other side helps on the lateral surface of bin wall on the corresponding right side that leads to each feed bin of stream pipeline, this always helps stream pipeline and the main stream pipeline that helps to be all fixedly mounted on accordingly on the lateral surface of bin wall with support, help on stream pipeline the pneumatic ball valve with ecp actr I is all first installed each master, this pneumatic ball valve is as the switch that helps gas, then flow setting pressure table I (helping flowing pressure table) on pipeline this main helping, and then install and support stream pipeline successively in parallel with threeway respectively this main helping on stream pipeline, and can on stream pipeline, with threeway, four rows be installed in parallel successively respectively and support stream pipeline this main helping, Pneumatic butterfly valve with ecp actr II is all installed on pipeline respectively supporting stream, described ecp actr I, ecp actr II is used respectively wire connection corresponding with electric cabinet, pass through electric cabinet, control automatically controlled pneumatic ball valve and connect the gas source that helps, by the automatically controlled Pneumatic butterfly valve of electric cabinet control, can be to each flow nozzle air feed that helps, help stream block clearing, (illustrate: the electric apparatus of the blockage-clearing device of this feed bin is intended applying for a patent in addition, so be not further described in this patent) all install and help flow point pipeline at the air extractor duct of described each Pneumatic butterfly valve, and help on flow point pipeline and install and help flow nozzle successively in parallel with hose coupling at this, and can on flow point pipeline, install successively in parallel six with hose coupling and help flow nozzle respectively helping, this hose coupling can be rubber hose connection, the described equal correspondence of flow point pipeline that respectively helps is fixedly mounted on a V-shaped left side for feed bin, on the lateral surface of right side bin wall, simultaneously, on a V-shaped left side for feed bin, in a row respectively on the bin wall on right side, arow is offered mounting hole, and make adjacent two to arrange or the two each mounting hole mutual dislocation that are listed as, and can be on a V-shaped left side for feed bin, on the bin wall on right side, offer respectively six mounting holes of four rows and every row, make each mounting hole corresponding position that respectively helps flow nozzle that is positioned at respectively simultaneously, to respectively help flow nozzle from mounting hole, to stretch into the inwall of feed bin, and the spout that makes respectively to help flow nozzle all down, can in the inner chamber of feed bin, correspondence be positioned at a left side, on the inwall of the bin wall on right side, four rows are installed respectively alternately and six of every rows help flow nozzle, then by a left side, each mounting hole on the bin wall on right side all seals,
Described strength control setup is mainly by overhead control pipeline, main control pipeline, source of the gas three linked piece, bi-bit bi-pass normally closed solenoid valve, compression indicator II (i.e. control compression indicator) and a pilot piping composition, on the air extractor duct of described manual ball valve II, overhead control pipeline is installed and this overhead control pipeline is divided into in opposite directions two sections with triplate line, described overhead control pipeline has two sections of outlet pipes, on two sections of outlet pipes of this overhead control pipeline, with threeway, each main control pipeline is installed in parallel successively respectively, and on the lateral surface of the bin wall in the corresponding left side that leads to each feed bin of each main control pipeline of a side, and on the lateral surface of the bin wall on the corresponding right side that leads to each feed bin of each main control pipeline of an other side, this overhead control pipeline and main control pipeline are all fixedly mounted on the lateral surface of bin wall accordingly with support, source of the gas three linked piece is all first installed in each main control pipeline, bi-bit bi-pass normally closed solenoid valve and compression indicator II (i.e. control compression indicator) are then installed in this main control pipeline, and then with threeway, a pilot piping is installed in parallel successively respectively in this main control pipeline, and can in this main control pipeline, with threeway, five rows be installed in parallel successively respectively and prop up pilot piping, wire connection corresponding with electric cabinet for described bi-bit bi-pass normally closed solenoid valve, by electric cabinet control bi-bit bi-pass normally closed solenoid valve, as the switch of controlling source of the gas, each described pilot piping respectively with the corresponding connection of ecp actr II on ecp actr I and each Pneumatic butterfly valve on pneumatic ball valve, this each pilot piping is all fixedly mounted on a left side for each feed bin accordingly, on the lateral surface of the bin wall on right side.
In the time that the blockage-clearing device of this feed bin is normally worked, air compressor is in open state, when storage tank I, when air pressure in storage tank II tank all arrives 0.7MPa, this air compressing function auto-stop, when storage tank I, air pressure in storage tank II tank is during lower than 0.4MPa, air compressor again can Auto Power On, make strength control setup, air pressure in strength flow-aiding device is all not less than 0.4MPa, in the time that feed bin needs block clearing, by manual ball valve I, manual ball valve II, manual ball valve III is all in open mode, operating personal switches on power, the now green light on electric cabinet panel, A.C. voltmeter can demonstrate alternating-current voltage/AC voltage numerical value (AC220V), DC voltmeter can demonstrate voltage value (DC24V). and then operating personal is twisted the switch of pneumatic ball valve and bi-bit bi-pass normally closed solenoid valve, make bi-bit bi-pass normally closed solenoid valve obtain electric and open control source of the gas, ecp actr I is opened pneumatic ball valve (opening the gas source that helps) under the effect of air pressure, then press the control button of the ecp actr II on electric cabinet panel, under the effect of air pressure, open each Pneumatic butterfly valve, high pressure gas enter and help flow point pipeline, high pressure gas You Fen six tunnels again, help in the inner chamber that flow nozzle enters feed bin through six, high pressure gas are along a left side, the inside face Jet with downward flow direction of right bin wall forms high pressure draft, reduce the lower slip resistance of mineral aggregate, stop up thereby realize removing, but the gassing time of each high pressure draft does not exceed 3 seconds, and the interval time of adjacent twice air blowing was greater than for 3 seconds, while exceeding 3 seconds because of the gassing time of each high pressure draft, high pressure gas fails to be convened for lack of a quorum mineral aggregate is blown out to hole, just waste the energy, simultaneously, in the process of stopping up in the removing of blowing, mineral aggregate in feed bin is fallen on belt transporter through discharge bucket, now belt transporter must be in operative condition, and after block clearing completes, answer PTO Power Take Off, wait for next block clearing, easy to use, safe and reliable, be easy to Maintenance and Repair, reduce workman's operation intensity, improve the efficiency of mineral processing production.
The blockage-clearing device of the V flute profile disjunctor ferro-concrete feed bin that the utility model proposes, not only rational in infrastructure, safe and reliable, and easy for installation, need not bring down stocks, be easy to Maintenance and Repair, avoid the pipeline of inner installing easy to wear, hindered the drawback that mineral aggregate glides, reduce workman's operation intensity, improved the efficiency of mineral processing production.
The blockage-clearing device of V flute profile disjunctor ferro-concrete feed bin the utility model being proposed below in conjunction with drawings and Examples is described further.
Brief description of the drawings
Fig. 1 is the gas circuit principle schematic diagram of the blockage-clearing device of the V flute profile disjunctor ferro-concrete feed bin that proposes of the utility model.
Fig. 2 is the main cross-sectional schematic of the blockage-clearing device of the V flute profile disjunctor ferro-concrete feed bin that proposes of the utility model while installing.
Fig. 3 is that schematic diagram is looked on the left side of the blockage-clearing device of the V flute profile disjunctor ferro-concrete feed bin that proposes of the utility model while installing.
In Fig. 1-Fig. 3:
1, air compressor 2, manual ball valve I 3, storage tank I 4, manual ball valve II 5, minimal pressure hold-off valve 6, storage tank II 7, manual ball valve III 8, boiler check valve 9, left distribution box with protectors 10, right distribution box with protectors 11, electric cabinet 12, compression indicator I 13, pneumatic ball valve 14, overhead control pipeline 15, always help stream pipeline 16, ecp actr I 17, source of the gas three linked piece 18, ecp actr II 19, Pneumatic butterfly valve 20, bi-bit bi-pass normally closed solenoid valve 21, compression indicator II 22, help flow nozzle 23, main control pipeline 23-1, prop up pilot piping 24, the main stream pipeline 24-1 that helps, support stream pipeline 25, help flow point pipeline 26, bin wall 27, discharge bucket 28, feed bin 29, belt transporter.
detailed description of the invention
From Fig. 1-Fig. 3, can find out: a kind of blockage-clearing device (being called for short the blockage-clearing device of feed bin) of V flute profile disjunctor ferro-concrete feed bin, comprise the feed bin 28 of each V flute profile of the ferro-concrete of disjunctor, in the bottom of this feed bin 28, (below the bin wall 26 of arranged on left and right sides) arranges the discharge bucket 27 of inversed taper platform shape, and belt transporter 29 is set below each discharge bucket 27, it is characterized in that: the blockage-clearing device of this V flute profile disjunctor ferro-concrete feed bin is mainly by air compressor 1, storage tank I 3(controls the storage tank of use), storage tank II 6(helps the storage tank of stream use), left distribution box with protectors 9, right distribution box with protectors 10, the gentle power flow-aiding device of electric cabinet 11, strength control setup composition, on the ground of the outside left of the feed bin 28 of each V flute profile of the ferro-concrete of disjunctor, air compressor 1 and storage tank I 3 are installed, storage tank II 6, on air compressor 1 delivery conduit, manual ball valve I 2 is installed, then storage tank I 3 is installed successively in parallel on the delivery conduit of manual ball valve I 2 delivery ports, storage tank II 6, and between the admission port of storage tank II 6 and the delivery conduit of manual ball valve I 2, minimal pressure hold-off valve 5 is installed, and the pressure of this minimal pressure hold-off valve 5 is adjusted to 0.4MPa, its objective is that the minimal pressure that ensures storage tank I 3 is not less than 0.4MPa, when intake pressure exceedes after 0.4MPa, could be to the interior air feed of storage tank II 6 that helps stream use, simultaneously, manual ball valve II 4 is installed on the air extractor duct pipeline of storage tank I 3 and on the air extractor duct pipeline of manual ball valve II 4, strength control setup is installed, on the air extractor duct pipeline of storage tank II 6, manual ball valve III 7 is installed, and on the air extractor duct pipeline of manual ball valve III 7, boiler check valve 8 is installed, on the air extractor duct pipeline of boiler check valve 8, strength flow-aiding device is installed, in addition, on the factory building wall of the outside left of the feed bin 28 of each V flute profile of the ferro-concrete of disjunctor with the corresponding electric cabinet 11 and the left distribution box with protectors 9 being connected with electric cabinet 11 installed of support, right distribution box with protectors 10,
On the lateral surface of the bin wall 26 of the V-shaped arranged on left and right sides of described each feed bin 28, the described gentle force control device of strength flow-aiding device is all installed respectively accordingly, the strength flow-aiding device installed on the lateral surface of the bin wall 26 of the existing left and right side taking feed bin 28 one of therein, strength control setup are described further as example.Described strength flow-aiding device is mainly by always helping stream pipeline 15, pneumatic ball valve 13, ecp actr I 16, the main stream pipeline 24 that helps, support stream pipeline 24-1, help flow point pipeline 25, ecp actr II 18, Pneumatic butterfly valve 19 and help flow nozzle 22 to form, on the air extractor duct of described boiler check valve 8, install and always help stream pipeline 15 and always help stream pipeline 15 to be divided in opposite directions two sections this with triplate line, the described stream pipeline 15 that always helps has two sections of outlet pipes, this always help stream pipeline 15 two sections of outlet pipes on respectively with threeway install successively in parallel each master help stream pipeline 24, and each master of a side helps on the lateral surface of bin wall 26 in the stream pipeline 24 corresponding left sides that lead to each feed bin 28, and each master of an other side helps on the lateral surface of the stream pipeline 24 corresponding right side bin walls 26 that lead to each feed bin 28, this always helps stream pipeline 15 and the main stream pipeline 24 that helps to be all fixedly mounted on accordingly on the lateral surface of bin wall 26 with support, help on stream pipeline 24 pneumatic ball valve 13 with ecp actr I 16 is all first installed each master, this pneumatic ball valve 13 is as the gas source switch that helps gas, then help setting pressure table I 12(on stream pipeline 24 to help flowing pressure table this master), and then install successively in parallel and support stream pipeline 24-1 with threeway respectively this main helping on stream pipeline 24, and can on stream pipeline 24, with threeway, four rows be installed in parallel successively respectively and support stream pipeline 24-1 this main helping, Pneumatic butterfly valve 19 with ecp actr II 18 is all installed respectively supporting on stream pipeline 24-1, described ecp actr I 16, ecp actr II 18 is used respectively wire connection corresponding with electric cabinet 11, by electric cabinet 11, control automatically controlled pneumatic ball valve 13 and connect the gas source that helps, control automatically controlled Pneumatic butterfly valve 19 by electric cabinet 11, can be to each flow nozzle 22 air feed that help, help the clear resistance of stream, all install and help flow point pipeline 25 at the air extractor duct of described each Pneumatic butterfly valve 19, and help on flow point pipeline 25 and install and help flow nozzle 22 successively in parallel with hose coupling at this, and can on flow point pipeline 25, install successively in parallel six with hose coupling and help flow nozzle 22 respectively helping, this hose coupling can be rubber hose connection, the described equal correspondence of flow point pipeline 25 that respectively helps is fixedly mounted on a V-shaped left side for feed bin 28, on the lateral surface of the bin wall 26 on right side, simultaneously, on a V-shaped left side for feed bin 28, in a row respectively on the bin wall 26 on right side, arow is offered mounting hole, and make adjacent two to arrange or the two each mounting hole mutual dislocation that are listed as, and can be on a V-shaped left side for feed bin 28, on the bin wall 26 on right side, offer respectively six mounting holes of four rows and every row, and make each mounting hole corresponding position that respectively helps flow nozzle 22 that is positioned at respectively, to respectively help flow nozzle 22 from mounting hole, to stretch into respectively on the internal chamber wall of feed bin 28, and the spout that makes respectively to help flow nozzle 22 all down, can in the inner chamber of feed bin 28, correspondence be positioned at a left side, on the inwall of the bin wall 26 on right side, four rows are installed respectively alternately and six of every rows help flow nozzle 22, then by a left side, each mounting hole on the bin wall 26 on right side all seals,
Described strength control setup is mainly by overhead control pipeline 14, main control pipeline 23, source of the gas three linked piece 17, bi-bit bi-pass normally closed solenoid valve 20, compression indicator II 21(controls the compression indicator of use) and a pilot piping 23-1 composition, on the air extractor duct of described manual ball valve II 4, overhead control pipeline 14 is installed and this overhead control pipeline 14 is divided into in opposite directions two sections with triplate line, described overhead control pipeline 14 has two sections of outlet pipes, on two sections of outlet pipes of this overhead control pipeline 14, with threeway, each main control pipeline 23 is installed in parallel successively respectively, and on the lateral surface of the bin wall 26 in each main control pipeline 23 corresponding left sides that lead to each feed bin 28 of a side, and on the lateral surface of the bin wall 26 on each main control pipeline 23 corresponding right sides that lead to each feed bin 28 of an other side, this overhead control pipeline 14 and main control pipeline 23 are all fixedly mounted on the lateral surface of bin wall 26 with support, source of the gas three linked piece 17 is all first installed in each main control pipeline 23, bi-bit bi-pass normally closed solenoid valve 20 and compression indicator II 21(are then installed in this main control pipeline 23 controls with compression indicator), and then with threeway, a pilot piping 23-1 is installed in parallel successively respectively in this main control pipeline 23, and can in this main control pipeline 23, with threeway, five rows be installed in parallel successively respectively and prop up pilot piping 23-1, described bi-bit bi-pass normally closed solenoid valve 20 use wire connection corresponding with electric cabinet 11, control bi-bit bi-pass normally closed solenoid valve 20 by electric cabinet 11, as the switch of controlling source of the gas, each described pilot piping 23-1 respectively with ecp actr II 18 corresponding connections on ecp actr I 16 and each Pneumatic butterfly valve 19 on pneumatic ball valve 13, this each pilot piping 23-1 is all fixedly mounted on a left side for each feed bin 28 accordingly, on the lateral surface of the bin wall 26 on right side.
In the time that the blockage-clearing device of this feed bin is normally worked, air compressor 1 is in open state, when storage tank I 3, when air pressure in storage tank II 6 tanks all arrives 0.7MPa, this air compressor 1 energy auto-stop, when storage tank I 3, air pressure in storage tank II 6 tanks is during lower than 0.4MPa, air compressor 1 again can Auto Power On, make strength control setup, air pressure in strength flow-aiding device is not less than 0.4MPa, in the time that feed bin 28 needs block clearing, by manual ball valve I 2, manual ball valve II 4, manual ball valve III 7 is all in open mode, operating personal switches on power, the now green light on electric cabinet 11 panels, A.C. voltmeter can demonstrate alternating-current voltage/AC voltage numerical value (AC220V), DC voltmeter can demonstrate voltage value (DC24V). and then operating personal is twisted the switch of pneumatic ball valve 13 and bi-bit bi-pass normally closed solenoid valve 20, make bi-bit bi-pass normally closed solenoid valve 20 electric and open control source of the gas, ecp actr I 16 is opened pneumatic ball valve 13(and has been opened the gas source that helps under the effect of air pressure), then press row's button of the ecp actr II 18 on electric cabinet 11 panels, under the effect of air pressure, open each Pneumatic butterfly valve 19, high pressure gas enter and help flow point pipeline 25, high pressure gas You Fen six tunnels again, help in the inner chamber that flow nozzle 22 enters feed bin 28 through six, high pressure gas are along a left side, the inside face Jet with downward flow direction of right bin wall forms high pressure draft, reduce the lower slip resistance of mineral aggregate, stop up thereby realize removing, but the gassing time of each high pressure draft does not exceed 3 seconds, and the interval time of adjacent twice air blowing was greater than for 3 seconds, while exceeding 3 seconds because of the gassing time of each high pressure draft, high pressure gas fails to be convened for lack of a quorum mineral aggregate is blown out to hole, just waste the energy, simultaneously, in the process of stopping up in the removing of blowing, mineral aggregate in feed bin 28 is fallen on belt transporter 29 through discharge bucket 27, now belt transporter 29 must be in operative condition, and after block clearing completes, answer PTO Power Take Off, wait for next block clearing, easy to use, safe and reliable, be easy to Maintenance and Repair, reduce workman's operation intensity, improve the efficiency of mineral processing production.

Claims (7)

1. the blockage-clearing device of a V flute profile disjunctor ferro-concrete feed bin, comprise the feed bin (28) of each V flute profile of the ferro-concrete of disjunctor, the discharge bucket (27) that inversed taper platform shape is set in the below of the bin wall (26) of arranged on left and right sides in the bottom of this feed bin (28), arranges belt transporter (29) in the below of each discharge bucket (27), it is characterized in that: the blockage-clearing device of this V flute profile disjunctor ferro-concrete feed bin is mainly by air compressor (1), storage tank I (3) is controlled the storage tank of use, storage tank II (6) helps the storage tank of stream use, left distribution box with protectors (9), right distribution box with protectors (10), the gentle power flow-aiding device of electric cabinet (11), strength control setup composition, on the ground of the outside left of the feed bin (28) of each V flute profile of the ferro-concrete of disjunctor, air compressor (1) and storage tank I (3) are installed, storage tank II (6), manual ball valve I (2) is installed on the delivery conduit of air compressor (1), storage tank I (3) is then installed successively in parallel on the delivery conduit of manual ball valve I (2) delivery port, storage tank II (6), and between the admission port of storage tank II (6) and the delivery conduit of manual ball valve I (2), minimal pressure hold-off valve (5) is installed, and the pressure of this minimal pressure hold-off valve (5) is adjusted to 0.4MPa, simultaneously, manual ball valve II (4) is installed on the air extractor duct pipeline of storage tank I (3) and on the air extractor duct pipeline of manual ball valve II (4), strength control setup is installed, manual ball valve III (7) is installed on the air extractor duct pipeline of storage tank II (6), and boiler check valve (8) is installed on the air extractor duct pipeline of manual ball valve III (7), on the air extractor duct pipeline of boiler check valve (8), strength flow-aiding device is installed, in addition, on the factory building wall of the outside left of the feed bin (28) of each V flute profile of the ferro-concrete of disjunctor with corresponding electric cabinet (11) and the left distribution box with protectors (9) being connected with electric cabinet (11) installed of support, right distribution box with protectors (10),
On a V-shaped left side for described each feed bin (28), the described gentle force control device of strength flow-aiding device is all installed respectively on the lateral surface of the bin wall (26) of right both sides accordingly, described strength flow-aiding device is mainly by always helping stream pipeline (15), pneumatic ball valve (13), ecp actr I (16), the main stream pipeline (24) that helps, support stream pipeline (24-1), help flow point pipeline (25), ecp actr II (18), Pneumatic butterfly valve (19) and help flow nozzle (22) composition, on the air extractor duct of described boiler check valve (8), install and always help stream pipeline (15) and always help stream pipeline (15) to be divided in opposite directions two sections this with triplate line, the described stream pipeline (15) that always helps has two sections of outlet pipes, this always help stream pipeline (15) two sections of outlet pipes on respectively with threeway install successively in parallel each master help stream pipeline (24), and each master of a side helps on the lateral surface of bin wall (26) in the corresponding left side that leads to each feed bin (28) of stream pipeline (24), and each master of an other side helps on the lateral surface of bin wall (26) on the corresponding right side that leads to each feed bin (28) of stream pipeline (24), this always helps stream pipeline (15) and the main stream pipeline (24) that helps to be all fixedly mounted on accordingly on the lateral surface of bin wall (26) with support, help on stream pipeline (24) pneumatic ball valve (13) with ecp actr I (16) is all first installed each master, then help flowing pressure table in this main upper setting pressure table I (12) of stream pipeline (24) that helps, and then install successively and support stream pipeline (24-1) in parallel with threeway respectively this main helping on stream pipeline (24), Pneumatic butterfly valve (19) with ecp actr II (18) is all installed respectively supporting on stream pipeline (24-1), described ecp actr I (16), ecp actr II (18) is used respectively wire and the corresponding connection of electric cabinet (11), all install and help flow point pipeline (25) at the air extractor duct of described each Pneumatic butterfly valve (19), and help flow point pipeline (25) above to install and help flow nozzle (22) successively in parallel with hose coupling at this, the described equal correspondence of flow point pipeline (25) that respectively helps is fixedly mounted on a V-shaped left side for feed bin (28), on the lateral surface of the bin wall (26) on right side, simultaneously, on a V-shaped left side for feed bin (28), the bin wall (26) on right side is upper respectively in a row, arow is offered mounting hole, and make adjacent two to arrange or the two each mounting hole mutual dislocation that are listed as, and make each mounting hole respectively correspondence be positioned at the position that respectively helps flow nozzle (22), to respectively help flow nozzle (22) from mounting hole, to stretch into respectively on the internal chamber wall of feed bin (28), and the spout that makes respectively to help (22) under flow nozzle all down, then by a left side, each mounting hole on the bin wall (26) on right side all seals,
Described strength control setup is mainly by overhead control pipeline (14), main control pipeline (23), source of the gas three linked piece (17), bi-bit bi-pass normally closed solenoid valve (20), compression indicator II (21) is controlled compression indicator and pilot piping (23-1) composition of use, on the air extractor duct of described manual ball valve II (4), overhead control pipeline (14) is installed and this overhead control pipeline (14) is divided into in opposite directions two sections with triplate line, described overhead control pipeline (14) has two sections of outlet pipes, on two sections of outlet pipes of this overhead control pipeline (14), with threeway, each main control pipeline (23) is installed in parallel successively respectively, and on the lateral surface of the bin wall (26) in the corresponding left side that leads to each feed bin (28) of each main control pipeline (23) of a side, and on the lateral surface of the bin wall (26) on the corresponding right side that leads to each feed bin (28) of each main control pipeline (23) of an other side, this overhead control pipeline (14) and main control pipeline (23) are all fixedly mounted on the lateral surface of bin wall (26) accordingly with support, source of the gas three linked piece (17) is all first installed in each main control pipeline (23), then at upper bi-bit bi-pass normally closed solenoid valve (20) and compression indicator II (21) the i.e. control compression indicator installed of this main control pipeline (23), and then with threeway, a pilot piping (23-1) is installed in parallel successively respectively in this main control pipeline (23), described wire and the corresponding connection of electric cabinet (11) for bi-bit bi-pass normally closed solenoid valve (20), described each pilot piping (23-1) respectively with the corresponding connection of ecp actr II (18) on ecp actr I (16) and each Pneumatic butterfly valve (19) on pneumatic ball valve (13), this each pilot piping (23-1) is all fixedly mounted on a left side for each feed bin (28) accordingly, on the lateral surface of the bin wall (26) on right side.
2. the blockage-clearing device of V flute profile disjunctor ferro-concrete feed bin according to claim 1, is characterized in that on stream pipeline (24), with threeway, four rows being installed in parallel successively respectively and supporting stream pipeline (24-1) this main helping.
3. the blockage-clearing device of V flute profile disjunctor ferro-concrete feed bin according to claim 1, is characterized in that above installing successively in parallel six with hose coupling helps flow nozzle (22) respectively helping flow point pipeline (25).
4. the blockage-clearing device of V flute profile disjunctor ferro-concrete feed bin according to claim 1, is characterized in that this hose coupling is rubber hose connection.
5. the blockage-clearing device of V flute profile disjunctor ferro-concrete feed bin according to claim 1, is characterized in that offering respectively four rows and six mounting holes of every row on the bin wall (26) of the V-shaped left and right side of feed bin (28).
6. the blockage-clearing device of V flute profile disjunctor ferro-concrete feed bin according to claim 1, is characterized in that in the inner chamber of feed bin (28), on the inwall of the corresponding bin wall (26) that is positioned at left and right side, four rows to be installed respectively alternately and six of every rows help flow nozzle (22).
7. the blockage-clearing device of V flute profile disjunctor ferro-concrete feed bin according to claim 1, is characterized in that in this main control pipeline (23), with threeway, five rows being installed in parallel successively respectively props up pilot piping (23-1).
CN201420294140.XU 2014-06-04 2014-06-04 The blockage-clearing device of V flute profile disjunctor ferro-concrete feed bin Withdrawn - After Issue CN203921709U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420294140.XU CN203921709U (en) 2014-06-04 2014-06-04 The blockage-clearing device of V flute profile disjunctor ferro-concrete feed bin

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420294140.XU CN203921709U (en) 2014-06-04 2014-06-04 The blockage-clearing device of V flute profile disjunctor ferro-concrete feed bin

Publications (1)

Publication Number Publication Date
CN203921709U true CN203921709U (en) 2014-11-05

Family

ID=51817567

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420294140.XU Withdrawn - After Issue CN203921709U (en) 2014-06-04 2014-06-04 The blockage-clearing device of V flute profile disjunctor ferro-concrete feed bin

Country Status (1)

Country Link
CN (1) CN203921709U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104029946A (en) * 2014-06-04 2014-09-10 马鞍山市天工科技有限公司 Unblocking device for V groove-shaped integrated reinforced concrete feed bins
CN109516006A (en) * 2018-11-16 2019-03-26 马鞍山钢铁股份有限公司 One plant feed bin blockage-clearing device and its application method
CN111232453A (en) * 2020-03-19 2020-06-05 马鞍山市天工科技股份有限公司 Intelligent flame-proof blockage removing device for spherical coal storage bin

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104029946A (en) * 2014-06-04 2014-09-10 马鞍山市天工科技有限公司 Unblocking device for V groove-shaped integrated reinforced concrete feed bins
CN104029946B (en) * 2014-06-04 2016-08-24 马鞍山市天工科技股份有限公司 The blockage-clearing device of V flute profile disjunctor armored concrete feed bin
CN109516006A (en) * 2018-11-16 2019-03-26 马鞍山钢铁股份有限公司 One plant feed bin blockage-clearing device and its application method
CN111232453A (en) * 2020-03-19 2020-06-05 马鞍山市天工科技股份有限公司 Intelligent flame-proof blockage removing device for spherical coal storage bin

Similar Documents

Publication Publication Date Title
CN104029947B (en) Square cone-shaped metal feed bin block clearing equipment and using method
CN101654177B (en) Device for eliminating blocking stocks from reinforced concrete ore bin and using method thereof
CN107416471B (en) A kind of blockage-clearing device and its application method of prevention and treatment inclined chute blocking
CN206927269U (en) A kind of Pneumatic block clearing device for being used to avoiding, eliminating inclined chute blocking
CN207191965U (en) The high flat four outlets armored concrete feed bin blockage-clearing device of cylinder
CN203921709U (en) The blockage-clearing device of V flute profile disjunctor ferro-concrete feed bin
CN105215001B (en) Adhere to the pulse jet method for cleaning of dust debris under adverse circumstances
CN109516006A (en) One plant feed bin blockage-clearing device and its application method
CN203877257U (en) Rectangular conical metal stock bin unblocking device
CN201472921U (en) Equipment for clearing shed material blocked in pneumatic scatter-type reinforced concrete ore bin
CN103420052A (en) Program-controlled coal feeding device for raw coal bunker
CN104029945B (en) The blockage-clearing device of cylinder flat shape armored concrete feed bin
CN203877256U (en) Blockage removal device for cylindrical flat-bottom reinforced concrete bin
CN104907940A (en) Sand-spraying dust-removing equipment
CN102580955B (en) Multipoint loosening and dredging device utilizing compressed air
CN204711834U (en) A kind of sandblasting cleaner
CN104029946A (en) Unblocking device for V groove-shaped integrated reinforced concrete feed bins
CN203450637U (en) Program-controlled coal feeding device for raw coal bunker
CN102530439B (en) Blockage bridging removal machine for ore bin
CN208963787U (en) A kind of solid feeding device
CN205477722U (en) Novel colliery dust fall system
CN205098027U (en) Shotcrete tank car
CN213975413U (en) Wear-resisting anti-blocking device for cement kiln mixing bunker
CN103711119A (en) Drilled-pile mud pneumatic anti-settling circulatory system and application method thereof
US1843460A (en) Hopper feed

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20141105

Effective date of abandoning: 20160824

C25 Abandonment of patent right or utility model to avoid double patenting