CN103993911A - 综合机械化充填采煤采空区顶板动态监测仪 - Google Patents

综合机械化充填采煤采空区顶板动态监测仪 Download PDF

Info

Publication number
CN103993911A
CN103993911A CN201410217185.1A CN201410217185A CN103993911A CN 103993911 A CN103993911 A CN 103993911A CN 201410217185 A CN201410217185 A CN 201410217185A CN 103993911 A CN103993911 A CN 103993911A
Authority
CN
China
Prior art keywords
displacement meter
spring
grating
coal mining
base cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410217185.1A
Other languages
English (en)
Other versions
CN103993911B (zh
Inventor
张强
张吉雄
夏炜阳
李剑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN201410217185.1A priority Critical patent/CN103993911B/zh
Publication of CN103993911A publication Critical patent/CN103993911A/zh
Priority to AU2015263689A priority patent/AU2015263689B2/en
Priority to PCT/CN2015/078836 priority patent/WO2015176618A1/zh
Application granted granted Critical
Publication of CN103993911B publication Critical patent/CN103993911B/zh
Priority to ZA2016/04147A priority patent/ZA201604147B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere
    • E21F17/18Special adaptations of signalling or alarm devices

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Testing Or Calibration Of Command Recording Devices (AREA)
  • Length Measuring Devices By Optical Means (AREA)

Abstract

一种综合机械化充填采煤采空区顶板动态监测仪,由监测仪底座、多级伸缩杆和底盘组成。监测仪底座由底座缸体、弹簧、传输电缆、光栅位移计和导杆组成。底座缸体内设置位移计支座、保护接口、弹簧支座和量程限制板。光栅位移计含芯片。底座缸体由螺丝固定在底盘上。弹簧安置在弹簧支座的卡槽内,光栅位移计安置在位移计支座的卡槽内,导杆直接连接在光栅位移计上,导杆和光栅位移计套在弹簧内,传输电缆与芯片连接;多级伸缩杆由一级杆、二级杆和三级杆组成,一级杆安装在底座缸体内,直接接触导杆上的量程限制板。二级杆通过紧固螺栓固定在一级杆的安装槽内,三级杆和二级杆用固定螺栓固定。该装置能直接准确监测顶板动态下沉量,结构巧妙、使用方便。

Description

综合机械化充填采煤采空区顶板动态监测仪
技术领域
本发明涉及一种综合机械化充填采煤采空区顶板动态监测仪,尤其适用于充填采煤的采空区内检测顶板下沉量的工作面。
背景技术
在充填采煤中,液压支架后的夯实机构对充填物料的平均夯实力为2MPa,可以使充填物料初步达到密实。由于采空区内用固体物料密实充填,其它设备无法测量采空区密实充填物料上方顶板的下沉量。而充填采煤采空区的顶板下沉量对上覆岩层破坏规律和地表下沉情况有直接的影响,所以测量充填采空区顶板的下沉量至关重要,也是现场急待解决的问题。
发明内容
技术问题:本发明的目的是针对已有技术中存在的问题,提供一种综合机械化充填采煤采空区顶板动态变化监测仪。
技术方案:本发明的综合机械化充填采煤采空区顶板动态监测装置,包括底盘、设在底盘上的位移计支座,位移计支座上设有底座缸体,底座缸体上设有多级伸缩杆,底座缸体内设有弹簧支座和插装在弹簧支座内的光栅位移计,光栅位移计上连有导杆,导杆与光栅位移计上套装有弹簧,弹簧的底部设在弹簧支座的卡槽内,导杆上设有固定在底座缸体内的上下量程限制板,所述的光栅位移计下部设有芯片,芯片上连有穿过保护接口伸出位移计支座的传输电缆;所述芯片内的光路系统将电脉冲通过放大、整形、辨向和计数系统转换成数字信号输出,直接显示位移量;
所述的多级伸缩杆包括一级杆、二级杆和三级杆,二级杆套装在一级杆内,三级杆套装在二级杆内,分别由固定螺栓和紧固螺栓定位,一级杆套装在底座缸体内,穿过导杆,一级杆的下端面与导杆上的上量程限制板相接触;底座缸体的入口处设有密封圈;所述的三级杆上设有多个限位固定孔,二级杆上部设有与限位固定孔相配合的固定螺栓孔,并用固定螺栓固定。
所述的弹簧的外径为b mm,120≤b≤130,传输电缆的外径为15mm。
所述的底座缸体的内外径分别为b+1mm、b+11mm,一级杆的直径为b mm,光栅位移计的直径为b-17mm。
所述的光栅位移计包括标尺光栅、指示光栅、光路系统和测量系统四部分,标尺光栅相对于指示光栅移动时,形成大致按正弦规律分布的明暗相间的叠栅条纹;叠栅条纹以光栅的相对运动速度移动,并直接照射到光电元件上形成电脉冲。
所述的光栅位移计的监测频率为10min/次,最大量程为1500mm。
所述的弹簧为轻荷重弹簧,最大载荷为100kg。
所述的多个限位固定孔之间的间距为100mm。
有益效果:由于采用了上述技术方案,本发明可用于充填采煤采空区密实充填物料上方顶板下沉量的检测;整个装置掩埋于需要测量的密实充填物料中,直接接触采空区顶底板。装置主要由监测仪底座、多级伸缩杆和底盘组成,多级伸缩杆包括一级杆、二级杆和三级杆,其主要作用是将顶板下沉量传递给下方的光栅位移计。监测仪底座包括底座缸体、弹簧、传输电缆、光栅位移计和导杆,光栅位移计用于接收位移传递杆传递的顶板下沉量,并将此位移矢量转换成数字信号输出。弹簧保证不会因为位移传递杆的自重而下沉。传输电缆连接光栅位移计和数据采集工作站,将光栅位移计输出的数字信号输送给数据采集工作站。底盘可以固定综合机械化充填采煤采空区顶板动态监测仪并且保证综合机械化充填采煤采空区顶板动态监测仪不会倾倒和因为底板破碎而下沉,影响测量结果。本发明很好的解决了充填采煤采空区密实充填物料上方顶板下沉的测量问题,降低了测量难度,测量的数据准确,经实验证明了充填采煤技术的应用效果。其结构简单,成本低,应用方单,测量准确,具有广泛的推广性。
附图说明
图1是本发明的最大量程整体结构外形示意图;
图2是本发明的最大量程纵截面结构示意图;
图3是本发明的最小量程整体外形结构示意图;
图4是本发明的最小量程纵截面结构示意图;
图5是本发明的二级位移传递杆纵截面结构示意图;
图6是本发明的一级位移传递杆纵截面结构示意图;
图7是本发明监测底座纵截面结构示意图;
图8是本发明底盘俯视结构图;
图中:1-限位固定孔,2-固定螺栓,3-安装空槽,4-一级杆,5-底座缸体,6-弹簧,7-导杆,8-弹簧支座,9-位移计支座,10-底盘固定螺栓,11-保护接口,12-底盘,13-传输电缆,14-芯片,15一光栅位移计,16-下量程限制板,17-上量程限制板,18-密封圈,19-紧固螺栓,20-二级杆,21-三级杆。
具体实施方式
下面结合附图对本发明的一个实施例作进一步的描述:
图1所示,本发明的综合机械化充填采煤采空区顶板动态监测仪,主要由监测组件和多级伸缩杆构成;监测组件包括底盘12、设在底盘12上的位移计支座9,位移计支座9上设有底座缸体5,底座缸体5上设有多级伸缩杆,底座缸体5内设有弹簧支座8和插装在弹簧支座8内的光栅位移计15,所述的光栅位移计15包括标尺光栅、指示光栅、光路系统和测量系统四部分,标尺光栅相对于指示光栅移动时,形成大致按正弦规律分布的明暗相间的叠栅条纹;叠栅条纹以光栅的相对运动速度移动,并直接照射到光电元件上形成电脉冲。光栅位移计15上连有导杆7,导杆7与光栅位移计15上套装有弹簧6,所述的弹簧6的外径为b mm,120≤b≤130,传输电缆的外径为15mm;弹簧6为轻荷重弹簧,最大载荷为100kg。弹簧6的底部设在弹簧支座8的卡槽内,导杆7上设有固定在底座缸体5内的上量程限制板17和下量程限制板16,下量程限制板16位于光栅位移计15的上部,上量程限制板17位于导杆7的项部;所述的光栅位移计15下部设有芯片14,芯片14上连有穿过保护接口11伸出位移计支座9的传输电缆13;所述芯片14内的光路系统将电脉冲通过放大、整形、辨向和计数系统转换成数字信号输出,直接显示位移量,所述的底座缸体5的内外径分别为b+1mm、b+11mm,一级杆4的直径为b mm,光栅位移计15的直径为b-17mm;所述的光栅位移计15的监测频率为10min/次,最大量程为1500mm。
所述的多级伸缩杆包括一级杆4、二级杆20和三级杆21,二级杆20套装在一级杆4内,三级杆21套装在二级杆20内,分别由固定螺栓2和紧固螺栓19定位,一级杆4套装在底座缸体5内,一级杆4的下端面与导杆7上的上量程限制板17相接触;底座缸体5的入口处设有密封圈18;所述的三级杆21上设有多个限位固定孔1,多个限位固定孔1之间的间距为100mm。二级杆20上部设有与限位固定孔1相配合的固定螺栓孔,并用固定螺栓固定。
综合机械化充填采煤采空区顶板动态监测仪包括监测仪底座、位移传递杆和底盘12组成。监测仪底座由底座缸体5、弹簧6、传输电缆13、光栅位移计15和导杆7组成。底座缸体5从下到上依次设置位移计支座9、保护接口11、弹簧支座8和量程限制板16。光栅位移计15,光栅位移计15和光栅位移计15内的芯片14。弹簧6安置在弹簧支座8的卡槽内,光栅位移计15安置在位移计支座9的卡槽内,导杆7直接连接在光栅位移计15上,导杆7与光栅位移计15均套在弹簧6的内部,传输电缆13穿过保护接口11与光栅位移计15里面的芯片14连接。综合机械化充填采煤采空区顶板动态监测仪出厂时,检测仪底座内各组成部分已安装完毕,监测仪底座和一级杆4通过密封圈18相连,同时密封圈18起到固定一级杆4的作用。将综合机械化充填采煤采空区顶板动态监测仪的各个结构从下至上依次安装在需要检测的顶板下方,数据传输电缆13与预留在巷道内的数据收集工作站相连。安装时需保证综合机械化充填采煤采空区顶板动态监测仪竖直,并与顶底板接触,再用充填物料将综合机械化充填采煤采空区顶板动态监测仪掩埋,防止监测设备倾倒。设备安装完成后,当顶板下沉时,通过三级杆21、二级杆20、一级杆4和导杆7将下沉位移传至光栅位移计15。经过光栅位移计15内的标尺光栅、指示光栅、光路系统和测量系统处理,将下沉位移将转变为数字信号通过传输电缆13传输至数据收集工作站,通过对数据收集工作站内的数据的分析来监测顶板的下沉。
安装综合机械化充填采煤采空区顶板动态监测仪时只要保证设备不倾倒且与采空区顶底板接触良好,就可以直接、准确、直观的测出充填物料密实采空区顶板的下沉量,并数字化显示。

Claims (7)

1.一种综合机械化充填采煤采空区顶板动态监测仪,其特征在于:它包括底盘(12)、设在底盘(12)上的位移计支座(9),位移计支座(9)上设有底座缸体(5),底座缸体(5)上设有多级伸缩杆,底座缸体(5)内设有弹簧支座(8)和插装在弹簧支座(8)内的光栅位移计(15),光栅位移计(15)上连有导杆(7),导杆(7)与光栅位移计(15)上套装有弹簧(6),弹簧(6)的底部设在弹簧支座(8)的卡槽内,导杆(7)上设有固定在底座缸体(5)内的上下量程限制板(17、16),所述的光栅位移计(15)下部设有芯片(14),芯片(14)上连有穿过保护接口(11)伸出位移计支座(9)的传输电缆(13);所述芯片(14)内的光路系统将电脉冲通过放大、整形、辨向和计数系统转换成数字信号输出,直接显示位移量;
所述的多级伸缩杆包括一级杆(4)、二级杆(20)和三级杆(21),二级杆(20)套装在一级杆(4)内,三级杆(21)套装在二级杆(20)内,分别由固定螺栓(2)和紧固螺栓(19)固定,一级杆(4)套装在底座缸体(5)内,一级杆(4)的下端面与导杆(7)上的上量程限制板(17)相接触;底座缸体(5)的入口处设有密封圈(18);所述的三级杆(21)上设有多个限位固定孔(1),二级杆(20)上部设有与限位固定孔(1)相配合的固定螺栓孔,并用固定螺栓(2)固定。
2.根据权利要求1所述的综合机械化充填采煤采空区顶板动态监测仪,其特征在于:所述的弹簧(6)的外径为b mm,120≤b≤130,传输电缆(13)的外径为15mm。
3.根据权利要求1所述的综合机械化充填采煤采空区顶板动态监测仪,其特征在于:所述的底座缸体(5)的内外径分别为b+1mm、b+11mm,一级杆(4)的直径为b mm,光栅位移计(15)的直径为b-17mm。
4.根据权利要求1所述的综合机械化充填采煤采空区顶板动态监测仪,其特征在于:所述的光栅位移计(15)包括标尺光栅、指示光栅、光路系统和测量系统四部分,标尺光栅相对于指示光栅移动时,形成大致按正弦规律分布的明暗相间的叠栅条纹;叠栅条纹以光栅的相对运动速度移动,并直接照射到光电元件上形成电脉冲。
5.根据权利要求1或4所述的综合机械化充填采煤采空区顶板动态监测仪,其特征在于:所述的光栅位移计(15)的监测频率为10min/次,最大量程为1500mm。
6.根据权利要求1所述的综合机械化充填采煤采空区顶板动态监测仪,其特征在于:所述的弹簧(6)为轻荷重弹簧,最大载荷为100kg。
7.根据权利要求1所述的综合机械化充填采煤采空区顶板动态监测仪,其特征在于:所述的多个限位固定孔(1)之间的间距为100mm。
CN201410217185.1A 2014-05-21 2014-05-21 综合机械化充填采煤采空区顶板动态监测仪 Expired - Fee Related CN103993911B (zh)

Priority Applications (4)

Application Number Priority Date Filing Date Title
CN201410217185.1A CN103993911B (zh) 2014-05-21 2014-05-21 综合机械化充填采煤采空区顶板动态监测仪
AU2015263689A AU2015263689B2 (en) 2014-05-21 2015-05-13 Dynamic state monitor of roof for filling coal mining goaf in a comprehensive and mechanized way
PCT/CN2015/078836 WO2015176618A1 (zh) 2014-05-21 2015-05-13 综合机械化充填采煤采空区顶板动态监测仪
ZA2016/04147A ZA201604147B (en) 2014-05-21 2016-06-20 Dynamic state monitor of roof for filling coal mining goaf in a comprehensive and mechanized way

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410217185.1A CN103993911B (zh) 2014-05-21 2014-05-21 综合机械化充填采煤采空区顶板动态监测仪

Publications (2)

Publication Number Publication Date
CN103993911A true CN103993911A (zh) 2014-08-20
CN103993911B CN103993911B (zh) 2016-01-06

Family

ID=51308218

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410217185.1A Expired - Fee Related CN103993911B (zh) 2014-05-21 2014-05-21 综合机械化充填采煤采空区顶板动态监测仪

Country Status (4)

Country Link
CN (1) CN103993911B (zh)
AU (1) AU2015263689B2 (zh)
WO (1) WO2015176618A1 (zh)
ZA (1) ZA201604147B (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015176618A1 (zh) * 2014-05-21 2015-11-26 张强 综合机械化充填采煤采空区顶板动态监测仪
CN105298542A (zh) * 2015-11-18 2016-02-03 中国神华能源股份有限公司 一种用于监测综采工作面顶板的方法及系统
CN105466390A (zh) * 2015-12-01 2016-04-06 中国矿业大学 综合机械化固体充填采煤顶板提前下沉量监测方法
CN106323188A (zh) * 2016-11-03 2017-01-11 江苏中矿立兴能源科技有限公司 一种机械式恒阻单体支柱形变监测装置
CN107328385A (zh) * 2017-08-15 2017-11-07 山东科技大学 采空区顶底板变形与充填体应力监测一体化装置及方法
CN106908033B (zh) * 2017-04-11 2022-10-11 山东科技大学 一种采空区顶板多点位移同步测量装置及其测量方法

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1105954A (en) * 1964-05-19 1968-03-13 Coal Industry Patents Ltd Roof convergence measuring device
DE3337607A1 (de) * 1983-10-15 1985-05-09 Bergwerksverband Gmbh, 4300 Essen Verfahren zur gefahrensfrueherkennung bei gebirgsschlaggefaehrdung und vorrichtung zur durchfuehrung des verfahrens
CN2054829U (zh) * 1989-09-20 1990-03-21 煤炭科学研究总院北京开采研究所 矿用顶板下沉监测警报仪
CN1877263A (zh) * 2006-06-30 2006-12-13 哈尔滨工业大学 光纤光栅位移压力一体化传感器
CN101526351A (zh) * 2008-03-04 2009-09-09 安里千 杆式岩层位移监测仪及系统
CN102174900A (zh) * 2011-03-08 2011-09-07 太原理工大学 一种基于预紧力的顶板位移监测装置
CN202451218U (zh) * 2011-11-13 2012-09-26 山东科大中天电子有限公司 煤矿用岩石应力应变监测仪
CN103528530A (zh) * 2013-10-25 2014-01-22 中国矿业大学 一种矿用光纤光栅顶板离层监测装置及监测方法

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1255197A (en) * 1969-03-14 1971-12-01 Coal Industry Patents Ltd Packing debris in mines
CN102654062A (zh) * 2012-06-05 2012-09-05 中国矿业大学 一种综合机械化充填开采采空区顶板动态监测方法
CN103267601B (zh) * 2013-05-07 2014-10-08 山东科技大学 采空区覆岩运动稳定性监测系统及稳定性监测判别方法
CN103291300B (zh) * 2013-05-20 2014-12-03 中国矿业大学 综合机械化固体充填采煤直接顶动态监测仪安装方法
CN103528731B (zh) * 2013-10-25 2015-10-21 中国矿业大学 一种基于光纤光栅传感的煤矿膏体充填在线监测系统
CN103993911B (zh) * 2014-05-21 2016-01-06 中国矿业大学 综合机械化充填采煤采空区顶板动态监测仪

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1105954A (en) * 1964-05-19 1968-03-13 Coal Industry Patents Ltd Roof convergence measuring device
DE3337607A1 (de) * 1983-10-15 1985-05-09 Bergwerksverband Gmbh, 4300 Essen Verfahren zur gefahrensfrueherkennung bei gebirgsschlaggefaehrdung und vorrichtung zur durchfuehrung des verfahrens
CN2054829U (zh) * 1989-09-20 1990-03-21 煤炭科学研究总院北京开采研究所 矿用顶板下沉监测警报仪
CN1877263A (zh) * 2006-06-30 2006-12-13 哈尔滨工业大学 光纤光栅位移压力一体化传感器
CN101526351A (zh) * 2008-03-04 2009-09-09 安里千 杆式岩层位移监测仪及系统
CN102174900A (zh) * 2011-03-08 2011-09-07 太原理工大学 一种基于预紧力的顶板位移监测装置
CN202451218U (zh) * 2011-11-13 2012-09-26 山东科大中天电子有限公司 煤矿用岩石应力应变监测仪
CN103528530A (zh) * 2013-10-25 2014-01-22 中国矿业大学 一种矿用光纤光栅顶板离层监测装置及监测方法

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015176618A1 (zh) * 2014-05-21 2015-11-26 张强 综合机械化充填采煤采空区顶板动态监测仪
AU2015263689B2 (en) * 2014-05-21 2016-06-09 China University Of Mining And Technology Dynamic state monitor of roof for filling coal mining goaf in a comprehensive and mechanized way
CN105298542A (zh) * 2015-11-18 2016-02-03 中国神华能源股份有限公司 一种用于监测综采工作面顶板的方法及系统
CN105466390A (zh) * 2015-12-01 2016-04-06 中国矿业大学 综合机械化固体充填采煤顶板提前下沉量监测方法
CN105466390B (zh) * 2015-12-01 2017-12-01 中国矿业大学 综合机械化固体充填采煤顶板提前下沉量监测方法
CN106323188A (zh) * 2016-11-03 2017-01-11 江苏中矿立兴能源科技有限公司 一种机械式恒阻单体支柱形变监测装置
CN106908033B (zh) * 2017-04-11 2022-10-11 山东科技大学 一种采空区顶板多点位移同步测量装置及其测量方法
CN107328385A (zh) * 2017-08-15 2017-11-07 山东科技大学 采空区顶底板变形与充填体应力监测一体化装置及方法

Also Published As

Publication number Publication date
ZA201604147B (en) 2018-07-25
AU2015263689B2 (en) 2016-06-09
WO2015176618A1 (zh) 2015-11-26
CN103993911B (zh) 2016-01-06
AU2015263689A1 (en) 2016-02-18

Similar Documents

Publication Publication Date Title
CN103993911B (zh) 综合机械化充填采煤采空区顶板动态监测仪
CN106546366B (zh) 一种伞型深孔三向应力及位移综合测试装置
CN207351422U (zh) 一种高度测量装置
CN104061902A (zh) 复合式地下深部灾害监测装置
CN204007961U (zh) 沿空留巷膏体填充体在线监测系统
CN101614823A (zh) 通道式放射性测控系统的现场检测装置及检测方法
CN203164406U (zh) 基于gtem室的超高频传感器灵敏度测试装置
CN204719001U (zh) 建筑工程质量检测仪
CN202915989U (zh) 光敏阵列遮光式固体颗粒料位传感器
CN109186444A (zh) 一种衡器秤台限位距离的检测装置及检测方法
CN210374975U (zh) 楼板厚度检测装置
CN108590766B (zh) 一种煤矿采空区上覆弯曲下沉带岩层沉陷监测系统
CN214582965U (zh) 一种快速测量圆孔直径的装置
CN203673074U (zh) β表面污染位置分辨探测器
CN202563100U (zh) 超前地质预报装置
CN209243791U (zh) 一种基坑施工参数检测装置
CN204758081U (zh) 高温除尘灰储存装置
CN104743445B (zh) 基于连通管和姿态的塔吊安全性能检测装置及其分析方法
CN103698798B (zh) β表面污染位置分辨测量方法
CN206618461U (zh) 一种矿用移动式淋水检测装置
CN207067025U (zh) 一种输煤皮带在线煤质分析系统
CN206876703U (zh) 一种水泥浆水灰比检测装置
CN204436478U (zh) 识别顶板冒顶隐患的测量装置
CN207863000U (zh) 一种用于检测支盘桩成孔质量的装置
CN204727476U (zh) 一种电动葫芦下滑量检测仪

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Zhang Qiang

Inventor after: Zhang Jixiong

Inventor after: Sun Qiang

Inventor after: Li Baiyi

Inventor after: Yin Wei

Inventor after: Li Jian

Inventor before: Zhang Qiang

Inventor before: Zhang Jixiong

Inventor before: Xia Weiyang

Inventor before: Li Jian

COR Change of bibliographic data
CB03 Change of inventor or designer information

Inventor after: Zhang Qiang

Inventor after: Zhang Jixiong

Inventor after: Sun Qiang

Inventor after: Li Baiyi

Inventor after: Yin Wei

Inventor after: Li Jian

Inventor before: Zhang Qiang

Inventor before: Zhang Jixiong

Inventor before: Xia Weiyang

Inventor before: Li Jian

COR Change of bibliographic data
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20140820

Assignee: XUZHOU ZHONAN SCIENCE&TECHNOLOGY Co.,Ltd.

Assignor: CHINA University OF MINING AND TECHNOLOGY

Contract record no.: 2016320000117

Denomination of invention: Roof dynamic state monitor for comprehensive mechanization filling coal mining goaf

Granted publication date: 20160106

License type: Exclusive License

Record date: 20160311

LICC Enforcement, change and cancellation of record of contracts on the licence for exploitation of a patent or utility model
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160106

CF01 Termination of patent right due to non-payment of annual fee