CN103942417A - 覆冰导线脱冰跳跃仿真测试方法 - Google Patents
覆冰导线脱冰跳跃仿真测试方法 Download PDFInfo
- Publication number
- CN103942417A CN103942417A CN201410132356.0A CN201410132356A CN103942417A CN 103942417 A CN103942417 A CN 103942417A CN 201410132356 A CN201410132356 A CN 201410132356A CN 103942417 A CN103942417 A CN 103942417A
- Authority
- CN
- China
- Prior art keywords
- wire
- stress
- ice
- meteorological condition
- sigma
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01N—INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
- G01N3/00—Investigating strength properties of solid materials by application of mechanical stress
- G01N3/08—Investigating strength properties of solid materials by application of mechanical stress by applying steady tensile or compressive forces
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G7/00—Overhead installations of electric lines or cables
- H02G7/16—Devices for removing snow or ice from lines or cables
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01B—MEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS
- G01B21/00—Measuring arrangements or details thereof, where the measuring technique is not covered by the other groups of this subclass, unspecified or not relevant
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01M—TESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
- G01M5/00—Investigating the elasticity of structures, e.g. deflection of bridges or air-craft wings
- G01M5/0025—Investigating the elasticity of structures, e.g. deflection of bridges or air-craft wings of elongated objects, e.g. pipes, masts, towers or railways
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01N—INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
- G01N29/00—Investigating or analysing materials by the use of ultrasonic, sonic or infrasonic waves; Visualisation of the interior of objects by transmitting ultrasonic or sonic waves through the object
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- General Health & Medical Sciences (AREA)
- Chemical & Material Sciences (AREA)
- Analytical Chemistry (AREA)
- Biochemistry (AREA)
- Life Sciences & Earth Sciences (AREA)
- Health & Medical Sciences (AREA)
- Immunology (AREA)
- Pathology (AREA)
- Engineering & Computer Science (AREA)
- Aviation & Aerospace Engineering (AREA)
- Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
- Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
本发明公开了一种覆冰导线脱冰跳跃仿真测试方法,包括以下步骤:(1)将给定的典型气象条件下的导线应力设定为导线允许的最大使用应力,利用导线应力状态方程获得导线在测试气象条件下的应力;(2)根据步骤(1)得到的导线应力与载荷,利用导线悬链线方程得到导线的位移初始状态;(3)根据位移初始状态,利用导线动力学方程,获得各个待测时刻下导线当前测试档中各点的位移和张力状态。该方法能够可靠地测算出给定气象条件下导线脱冰跳跃每一离散时刻的位移和张力状态。
Description
技术领域
本发明涉及高压输电线路设计和测试,特别是涉及一种覆冰导线脱冰跳跃仿真测试方法。
背景技术
架空输电线路长期运行在大气环境中受到风、覆冰等非人力因素的干扰。我国是覆冰最严重的国家,线路冰害事故发生的概率居于世界前列。覆冰对输电线路正常运行的三大危害之一在于不均匀覆冰或不同期脱冰产生的张力差,电气上可能导致相间短路跳闸、闪络,机械上对绝缘子串、杆塔形成较大的不平衡张力损坏绝缘子甚至引起杆塔倒塌,直接威胁电力系统的安全运行。另外随着西部大开发中水电资源建设规模的空前扩大,超长距离的超、特高压输电要穿越高寒、高湿、重覆冰及高海拔地区,输电线路覆冰灾害问题将更加突出,其中覆冰导线脱冰跳跃问题就是需要深入开展研究的内容之一。随着我国特高压电网的蓬勃发展,导线截面积增大,分裂数增多,导线脱冰跳跃问题的研究需要更加深入的研究。
导线脱冰跳跃过程主要包括三个过程:(1)导线覆冰过程;(2)导线在一定的温度、风荷载、外力等条件下覆冰脱落,导线跳跃;(3)长时间的振荡过程后导线达到新的应力、弧垂状态。目前国内外对输电线路导线脱冰跳跃问题的研究主要采用实验和数值模拟的方法。模拟试验因其成本昂贵、结论可拓展性不强而掣肘,数值仿真方面,Jamaleddine,Mcclure等人通过有限元软件ADINA对导线进行了多个脱冰跳跃工况的数值仿真;Kalman采用有限元数值方法,研究不同档距、脉冲荷载、脱冰工况下地线位移、拉力等响应,并研究了一种除冰方法对地线的影响;Roshan Fekr等人以单导线输电线路为对象,研究了覆冰厚度、脱冰位置等因素对脱冰跳跃过程的影响。国内也有一些学者展开仿真测试研究。总的来说,由于实际线路参数的复杂性,如导线机械参数、档距组合、高差、绝缘子串长、导线的动力阻尼等因素均会对导线的脱冰跳跃过程产生显著影响,因此计算机模型很难准确模拟线路的实际情况,同时仿真结果的准确性也没有得 到试验的验证。目前线路设计对脱冰跳跃的考虑,一般根据经验公式进行校核计算。运行经验表明,经验公式对于线路防脱冰跳跃的设计具有一定的指导意义。但经验公式本身没有给出适用范围,并且对影响导线脱冰跳跃的诸多因素没有考虑完全,因而还有其不尽完善之处。总之,目前国内外对导线脱冰跳跃问题的研究还很不成熟,针对其的仿真测试研究很有必要。
发明内容
本发明的主要目的在于提供一种覆冰导线脱冰跳跃仿真测试方法,能够可靠地测算出给定气象条件下导线脱冰跳跃离散时刻的位移和张力状态。
为实现上述目的,本发明采用以下技术方案:
一种覆冰导线脱冰跳跃仿真测试方法,包括以下步骤:
(1)将给定的典型气象条件组合下的导线应力中最大值(σI)设定为导线允许的最大使用应力,利用以下的导线应力状态方程式获得导线在测试气象条件下的应力(σII),
其中,下标I代表典型气象条件,下标II代表测试气象条件,σI为导线档距中央允许的最大应力,σII为测试气象条件下的导线档距中央应力,E为导线的综合弹性系数,α为温度膨胀系数,tI为典型气象条件下的温度,tII为测试气象条件下的温度,γI为典型气象条件下的架空导线的比载,γII为测试气象条件下的架空导线的比载,其中q为单位长度导线所承受的载荷,A为导线的截面积,L为耐张段的代表档距;
(2)根据步骤(1)得到的导线应力与载荷,利用以下导线悬链线方程得到导线的位移初始状态,
其中z为当前测试档中各点沿线路方向的已知横坐标,y是各点待测算的纵坐标,z0,y0为常参数,
各点x坐标在静态时一致且给定,
其中σ0为导线最低点应力,σ0与导线档距中央应力σII的关系满足: β为高差角,H为两悬挂点间的高差,右侧高于左侧时为正值;l为耐张段的各档档距;
(3)根据位移初始状态,利用以下导线动力学方程,获得各个待测时刻下导线当前测试档中各点的位移和张力状态,
其中M、FC、T、P分别为质量矩阵、阻尼矩阵、张力矩阵、外力矩阵,质量矩阵M为对角阵;其中C为阻尼系数;T=KX,其中K为与相邻节点的x,y,z坐标相关的刚度矩阵,表征为相邻两点的动态张力与其形变量之比;X为位移,为速度,为加速度。X,均为三维矢量,包含x,y,z三个方向。
优选地,步骤(1)中,从已知的多组典型气象条件中选取出一组典型气象条件作为所述给定的典型气象条件,该组典型气象条件是在所述多组典型气象条件中使导线应力最接近导线允许的最大应力的那组典型气象条件。
优选地,步骤(1)中,导线的代表档距L通过下式计算:
其中li0为n档导线中各档的档距,i0=1,2…,n。
优选地,步骤(1)中,载荷q通过下式计算:
其中W为导线自身质量,G为重力加速度长度,ρ为空气密度,b为覆冰厚度,d为导线外径,v为风速。
优选地,步骤(3)中,采用基于中心差分的显式直接积分算法测算所述位移和张力状态,因此速度和加速度矢量为:
其中Δt为计算步长,Δt≤2/ωn,其中ωn是系统最高阶固有振动频率。
本发明的有益技术效果:
按照本发明的导线脱冰跳跃仿真测算方法,利用给定气象条件与典型气象条件的组合,得到静态时导线初始张力和导线初始位移后,能够准确可靠地预测出动态时每一离散时刻下导线的位移、张力状态直至达到设定时间。利用本发明的测算方法所得到的动态过程中导线的位移、张力状态,能够有效地分析出脱冰量、覆冰厚度、档距大小、档数、导线悬挂点高差、不均匀脱冰方式等因素对输电线路脱冰跳跃高度和纵向不平衡张力的影响规律。
附图说明
图1a、1b为架空输电导线连续档3自由度模型示意图;
图2为本发明的导线脱冰跳跃仿真测算方法实施例的流程图;
图3为本发明的方法实施例所测的导线跳跃位移曲线与试验模拟下导线跳跃位移曲线的比较图。
具体实施方式
以下结合附图对本发明的实施例作详细说明。应该强调的是,下述说明仅仅是示例性的,而不是为了限制本发明的范围及其应用。
图1a、1b所示为待仿真测试的架空输电导线连续档3自由度模型。
如图2所示,根据本发明的实施例,导线脱冰跳跃仿真测算方法包含静态处理与动态处理两个过程,静态处理过程为动态处理过程提供测算的初始值(即t<0之前导线已达到状态),即导线在跳跃前的初始状态,动态处理利用初始状态测算出待测离散时刻下导线各点的位移、张力状态。
一、导线静态处理过程
静态处理获得给定气象条件、线路参数下导线的悬挂状态(如每点弧垂)和应力状态。静态处理包括:利用预先测好的给定气象条件的静态载荷、导线应力等参数,测算测试气象条件下的导线应力,并根据载荷与应力测算导线初始位移(z-y关系,x一致且给定)。
(1)测算导线静态应力
在给定的典型气象条件I和测试气象条件II下的应力满足如下的状态方程式:
其中:σI为导线允许的最大应力(档距中央),σII为测试气象条件下的导线应力,E为导线的综合弹性系数,α为温度膨胀系数,t为温度,L为耐张段代表档距,其可由式计算出,li0为导线各档档距,γ为架空导线的比载(即单位长度导线所承受的载荷与导线截面积的比值), 其中q为导线单位长度承受载荷,A为导线截面积。参数下标I和II表示该参数是分别对应典型气象条件I和测试气象条件II下的参数。
档距,指相邻两悬挂点之间垂直于荷载方向的投影距离。
架空输电线路导线张力弧垂的设计目标是,尽可能采用较大的应力以获得较小的导线弧垂,并保证在所允许出现的各种气象条件组合下,导线的最大应力均不超过允许的最大导线应力。
优选地,对于给定多组的典型气象条件组合,导线应力的确定过程是:先比较多组典型气象条件组合下导线应力的大小,使导线应力在典型气象条件组合中的最大值达到导线允许的最大使用应力,即在此状态下安装导线使之张紧,以最大值对应那一组典型气象条件为给定的典型气象条件,并以此利用式(1)的状态方程式求出导线在其余气象条件下的应力值。
导线自架设之日起受到自身重力、覆冰、风等载荷作用,构成了q(或γ)。导线静态载荷q优选的测算方式如下表:q=P,
表1导线静态载荷
(2)测算导线的初始位移状态
导线最低点应力σ0与导线档距中央应力σII的关系满足:β为高差角。
架空输电导线由于悬挂点间距离很大,导线材料的刚性对导线几何形状的影响很小,因此一般将导线假定为一根处处铰接的柔软链条,即“悬链线”假定。根据该假定的导线静态悬挂方程(即导线的悬链线方程)为:
其中z为当前测试档中各点的已知横坐标(沿线路方向),y是各点待计算的纵坐标,z0,y0为常参数,
其中
(式3)
其中,H为两悬挂点间的高差,右侧高于左侧时为正值。
二.导线动态处理过程
测算离散时刻下导线的位移、张力状态的导线动力学方程为:
其中M、FC、T、P分别为质量矩阵、阻尼矩阵、张力矩阵、外力矩阵。X为位移,为速度,为加速度。采取节点单元质量集中的假定,质量矩阵M为对角阵;其中C为阻尼系数,可按工程经验选取;T=KX,其中K为刚度矩阵,由相邻两点的动态张力与其形变量确定,形变则可据前文对导线位移的计算确定,含x,y,z三个方向。
导线脱冰跳跃属于强非线性动力过程,优选地,采用基于中心差分的显式直接积分算法,该方法中速度和加速度矢量为:
中心差分显式算法是条件收敛算法,步长满足:
Δt≤2/ωn (式7)
其中ωn是系统最高阶固有振动频率。
导线脱冰跳跃计算模型
通常的导线动力分析模型,一般仅考虑孤立档的情况,并认为运动单元仅在XY垂直平面内做2自由度的平动。这种类型的模型在小档距、小振幅运动中,精度可以基本满足要求,但在多档导线,及导线沿Z轴方向有明显摆动的情况下,误差较大,因此并不能满足连续档导线不均匀脱冰的情况。为了对架空输电导线的脱冰过程的运动状态进行模拟测算,建立以 下的架空输电导线多档集中质量的动力模型。
将导线分成若干导线单元段,导线的质量集中在导线的节点上,质点间连接为没有质量的弹性元件,即以张力连接,不考虑其弯曲和扭转的刚度,各质点可以空间(X,Y,Z)内平动(3自由度),考虑到导线在运行环境中所可能承受的一系列外力,如分布于整个导线长度的载荷:自重载荷、覆冰载荷、风载荷等,悬挂点绝缘子串的拉力等。对各节点单元列写其动态方程即(式4),由于质点间的弹性连接导致张力矩阵T为非对角阵(相邻点间不为0)。
测算实例
以档距235m的孤立档,15mm覆冰,100%脱冰情况下仿真测算与实验模拟下的导线跳跃幅度变化曲线见图3,图中的实曲线表示仿真测算曲线,虚曲线表示模拟实验曲线。
从图3可以看出,孤立档100%脱冰情况下导线跳跃幅度的数字仿真曲线与试验曲线基本吻合。完全模拟孤立档试验工况,孤立档各种工况下导线跳跃幅度仿真计算结果和试验结果比较如表。
表2仿真计算和试验模拟下导线跳跃幅度比较
(注:表中)
比较测算结果和模拟试验结果可以看出,孤立档情况下采用相同测算条件和模拟工况的条件下,导线跳跃幅度的测算结果与模拟试验结果基本相符(误差均在10%以内)。
以上内容是结合具体的优选实施方式对本发明所作的进一步详细说明,不能认定本发明的具体实施只局限于这些说明。对于本发明所属技术领域的普通技术人员来说,在不脱离本发明构思的前提下,还可以做出若干简单推演或替换,都应当视为属于本发明的保护范围。
Claims (5)
1.一种覆冰导线脱冰跳跃仿真测试方法,其特征在于,包括以下步骤:
(1)将给定的典型气象条件组合下的导线应力中最大值(σI)设定为导线允许的最大使用应力,利用以下的导线应力状态方程式获得导线在测试气象条件下的应力(σII),
其中,下标I代表典型气象条件,下标II代表测试气象条件,σI为导线档距中央允许的最大应力,σII为测试气象条件下的导线档距中央应力,E为导线的综合弹性系数,α为温度膨胀系数,tI为典型气象条件下的温度,tII为测试气象条件下的温度,γI为典型气象条件下的架空导线的比载,γII为测试气象条件下的架空导线的比载,其中q为单位长度导线所承受的载荷,A为导线的截面积,L为耐张段的代表档距;
(2)根据步骤(1)得到的导线应力与载荷,利用以下导线悬链线方程得到导线的位移初始状态,
其中z为当前测试档中各点沿线路方向的已知横坐标,y是各点待测算的纵坐标,z0,y0为常参数,
各点x坐标在静态时一致且给定,
其中σ0为导线最低点应力,σ0与导线档距中央应力σII的关系满足:β为高差角,H为两悬挂点间的高差,右侧高于左侧时为正值;l为耐张段的各档档距;
(3)根据位移初始状态,利用以下导线动力学方程,获得各个待测时刻下导线当前测试档中各点的位移和张力状态,
其中M、FC、T、P分别为质量矩阵、阻尼矩阵、张力矩阵、外力矩阵,质量矩阵M为对角阵;其中C为阻尼系数;T=KX,其中K为与相邻节点的x,y,z坐标相关的刚度矩阵,表征为相邻两点的动态张力与其形变量之比;X为位移,为速度,为加速度。X,均为三维矢量,包含x,y,z三个方向。
2.如权利要求1所述的覆冰导线脱冰跳跃仿真测试方法,其特征在于,步骤(1)中,从已知的多组典型气象条件中选取出一组典型气象条件作为所述给定的典型气象条件,该组典型气象条件是在所述多组典型气象条件中使导线应力最接近导线允许的最大应力的那组典型气象条件。
3.如权利要求1所述的覆冰导线脱冰跳跃仿真测试方法,其特征在于,步骤(1)中,导线的代表档距L通过下式计算:
其中li0为n档导线中各档的档距,i0=1,2…,n。
4.如权利要求1至3任一项所述的覆冰导线脱冰跳跃仿真测试方法,其特征在于,步骤(1)中,载荷q通过下式计算:
其中W为导线自身质量,G为重力加速度,ρ为空气密度,b为覆冰厚度,d为导线外径,v为风速。
5.如权利要求1至4任一项所述的覆冰导线脱冰跳跃仿真测试方法,其特征在于,步骤(3)中,采用基于中心差分的显式直接积分算法测算所述位移和张力状态,因此速度和加速度矢量为:
其中Δt为计算步长,Δt≤2/ωn,其中ωn是系统最高阶固有振动频率。
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410132356.0A CN103942417B (zh) | 2014-04-01 | 2014-04-01 | 覆冰导线脱冰跳跃仿真测试方法 |
PCT/CN2014/076685 WO2015149411A1 (zh) | 2014-04-01 | 2014-04-30 | 覆冰导线脱冰跳跃仿真测试方法 |
US15/281,580 US20170016809A1 (en) | 2014-04-01 | 2016-09-30 | Iced conductor sleet jump simulation testing method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410132356.0A CN103942417B (zh) | 2014-04-01 | 2014-04-01 | 覆冰导线脱冰跳跃仿真测试方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103942417A true CN103942417A (zh) | 2014-07-23 |
CN103942417B CN103942417B (zh) | 2017-01-04 |
Family
ID=51190085
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410132356.0A Active CN103942417B (zh) | 2014-04-01 | 2014-04-01 | 覆冰导线脱冰跳跃仿真测试方法 |
Country Status (3)
Country | Link |
---|---|
US (1) | US20170016809A1 (zh) |
CN (1) | CN103942417B (zh) |
WO (1) | WO2015149411A1 (zh) |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104166802A (zh) * | 2014-08-18 | 2014-11-26 | 国家电网公司 | 一种连续档输电线路脱冰跳跃高度的确定方法 |
CN104504610A (zh) * | 2014-12-08 | 2015-04-08 | 云南电力试验研究院(集团)有限公司电力研究院 | 一种覆冰输电线路应力计算方法 |
CN107292021A (zh) * | 2017-06-20 | 2017-10-24 | 南京理工大学 | 一种基于有限质点法的覆冰输电线路不均匀脱冰模拟分析方法 |
CN108090263A (zh) * | 2017-12-05 | 2018-05-29 | 国网新疆电力有限公司电力科学研究院 | 输电线脱冰振动缩尺试验气动阻尼的验证方法 |
CN108760206A (zh) * | 2018-06-27 | 2018-11-06 | 南京理工大学 | 一种输电线路诱发脱冰振动模拟实验方法 |
CN110059384A (zh) * | 2019-04-09 | 2019-07-26 | 同济大学 | 基于生成式对抗网络模拟人群跳跃荷载的方法 |
CN110968935A (zh) * | 2019-10-28 | 2020-04-07 | 国网新疆电力有限公司电力科学研究院 | 一种任意高差覆冰输电线路脱冰最大跳跃高度的算法 |
CN112036115A (zh) * | 2020-09-16 | 2020-12-04 | 国网江西省电力有限公司电力科学研究院 | 一种覆冰导线舞动仿真测试方法 |
CN113390456A (zh) * | 2021-05-23 | 2021-09-14 | 浙江大学 | 一种输电导线任意脱冰形式模拟装置及动力响应监测系统 |
CN116929452A (zh) * | 2023-07-26 | 2023-10-24 | 东北电力大学 | 用于无悬垂串复合横担导线滑移的实验模拟装置及方法 |
CN117633405A (zh) * | 2023-11-30 | 2024-03-01 | 西南交通大学 | 一种孤立档非均匀覆冰导线脱冰跳跃高度计算方法 |
Families Citing this family (27)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107908806B (zh) * | 2017-07-17 | 2021-03-05 | 国网浙江省电力公司湖州供电公司 | 一种输电线路单档导线张力变化模拟计算方法及模拟试验装置 |
CN107782527A (zh) * | 2017-11-14 | 2018-03-09 | 国网新疆电力有限公司电力科学研究院 | 输电线路导线风洞试验组装式模拟系统 |
CN108984861B (zh) * | 2018-06-27 | 2022-10-21 | 南京理工大学 | 一种融冰环境下的输电线路诱发脱冰动态响应分析方法 |
CN109033574B (zh) * | 2018-07-10 | 2023-06-06 | 西安工程大学 | 考虑运行温度变化的输电导线模态分析方法 |
CN109635440B (zh) * | 2018-12-13 | 2023-06-27 | 国家电网公司西北分部 | 一种架空输电线路覆冰闪络跳闸概率计算方法 |
CN110427638B (zh) * | 2019-06-06 | 2022-12-06 | 国网湖南省电力有限公司 | 输电线路覆冰受力的初始找形分析方法及系统 |
CN110378066B (zh) * | 2019-07-29 | 2023-06-09 | 贵州电网有限责任公司 | 一种耐张塔输电线路覆冰厚度计算方法 |
CN110619156B (zh) * | 2019-08-30 | 2022-12-23 | 长沙理工大学 | 一种高精度油气悬架动态特性数学模型建模方法 |
CN111125612B (zh) * | 2019-11-06 | 2024-03-12 | 国网安徽省电力有限公司 | 一种架空导线覆冰舞动幅值的计算方法 |
CN111737862B (zh) * | 2020-06-11 | 2023-08-29 | 国网山西省电力公司经济技术研究院 | 基于静力平衡的多跨架空输电线覆冰找形计算方法 |
CN111737863B (zh) * | 2020-06-11 | 2023-08-29 | 国网山西省电力公司经济技术研究院 | 基于能量法的多跨架空输电线覆冰找形计算方法 |
CN112231922B (zh) * | 2020-10-23 | 2023-07-07 | 云南恒安电力工程有限公司 | 一种用于电线脱冰跳跃的防治输电线路冰灾的方法 |
CN112288190B (zh) * | 2020-11-19 | 2024-04-02 | 国网湖南省电力有限公司 | 大范围电网线路冰害跳闸预测方法、系统及存储介质 |
CN112508453A (zh) * | 2020-12-22 | 2021-03-16 | 安徽康能电气有限公司 | 一种基于国网芯的智慧线路多元感知方法及系统 |
CN113108743B (zh) * | 2021-03-04 | 2023-02-24 | 南方电网科学研究院有限责任公司 | 耐张塔导地线的覆冰厚度监测方法、装置、设备及介质 |
CN113128062B (zh) * | 2021-04-26 | 2022-05-24 | 中国电建集团福建省电力勘测设计院有限公司 | 低温微风振动下小档距应力放松系数计算方法 |
CN113221375B (zh) * | 2021-05-31 | 2023-08-04 | 山东建筑大学 | 一种考虑线路覆冰与绝缘子闪络的电力系统仿真方法 |
CN113591342B (zh) * | 2021-06-28 | 2024-02-27 | 国网天津市电力公司电力科学研究院 | 10kV架空绝缘线路舞动特性分析方法 |
CN113686287B (zh) * | 2021-07-27 | 2023-07-21 | 南方电网科学研究院有限责任公司 | 基于悬垂杆塔绝缘子串偏斜角的覆冰厚度测量方法及系统 |
CN114013685B (zh) * | 2021-11-15 | 2023-09-08 | 中国航发沈阳发动机研究所 | 一种航空发动机核心机试验加温加压程序设计方法 |
CN114417643B (zh) * | 2022-03-29 | 2022-07-01 | 陕西万迪信息科技有限公司 | 一种配电网中电杆材料选择方法及装置 |
CN114689005B (zh) * | 2022-05-06 | 2022-10-04 | 中国南方电网有限责任公司超高压输电公司贵阳局 | 一种不均匀覆冰工况下的覆冰监测方法 |
CN115130285B (zh) * | 2022-06-14 | 2024-03-01 | 西北工业大学 | 一种双侧激励异步打击下电脉冲除冰模拟方法 |
CN115357965B (zh) * | 2022-06-27 | 2023-10-27 | 中建三局第一建设工程有限责任公司 | 自锚式悬索桥及其成桥线形确定方法 |
CN115112068A (zh) * | 2022-07-13 | 2022-09-27 | 国网四川省电力公司电力科学研究院 | 基于时间序列迭代的输电线路覆冰厚度估计方法及装置 |
CN115325983A (zh) * | 2022-08-04 | 2022-11-11 | 冰音科技(重庆)有限责任公司 | 一种基于积冰器的输电线路冰情定位方法 |
CN116559614A (zh) * | 2022-09-15 | 2023-08-08 | 国网湖北省电力有限公司荆门供电公司 | 一种电网线路架覆冰抗拉模拟处理系统 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101478133A (zh) * | 2009-01-23 | 2009-07-08 | 湖南省电力勘测设计院 | 输电线覆冰跳跃模拟试验方法 |
CN102609574A (zh) * | 2012-01-19 | 2012-07-25 | 武汉大学 | 架空输电导线舞动及防舞设计的虚拟现实仿真平台系统 |
CN103514319A (zh) * | 2012-05-31 | 2014-01-15 | 山东电力集团公司青岛供电公司 | 一种线路舞动的运行模拟方法 |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7310948B2 (en) * | 2002-10-09 | 2007-12-25 | Manucheher Shirmohamadi | De-icer for suspended overhead lines |
US7516051B2 (en) * | 2006-05-19 | 2009-04-07 | 3M Innovative Properties Company | Overhead power transmission line conductor selection |
US7687710B2 (en) * | 2006-12-28 | 2010-03-30 | 3M Innovative Properties Company | Overhead electrical power transmission line |
CN201438104U (zh) * | 2009-03-26 | 2010-04-14 | 中国南方电网有限责任公司电网技术研究中心 | 架空输电线路导线覆冰实时监测系统 |
US8965698B2 (en) * | 2010-12-29 | 2015-02-24 | Nexans | Real time thermal line ratings for overhead transmission line |
CN102507123B (zh) * | 2011-09-29 | 2015-03-25 | 中国电力科学研究院 | 一种输电线路覆冰导线断线试验方法 |
CN102589618B (zh) * | 2012-02-21 | 2014-10-29 | 华北电力大学 | 一种电网输电线路覆冰状态的智能监测方法 |
-
2014
- 2014-04-01 CN CN201410132356.0A patent/CN103942417B/zh active Active
- 2014-04-30 WO PCT/CN2014/076685 patent/WO2015149411A1/zh active Application Filing
-
2016
- 2016-09-30 US US15/281,580 patent/US20170016809A1/en not_active Abandoned
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101478133A (zh) * | 2009-01-23 | 2009-07-08 | 湖南省电力勘测设计院 | 输电线覆冰跳跃模拟试验方法 |
CN102609574A (zh) * | 2012-01-19 | 2012-07-25 | 武汉大学 | 架空输电导线舞动及防舞设计的虚拟现实仿真平台系统 |
CN103514319A (zh) * | 2012-05-31 | 2014-01-15 | 山东电力集团公司青岛供电公司 | 一种线路舞动的运行模拟方法 |
Non-Patent Citations (2)
Title |
---|
M. ROSHAN FEKR ,G. MCCLURE: "Numerical modelling of the dynamic response of ice-shedding on electrical transmission lines", 《ATMOSPHERIC RESEARCH》 * |
孟晓波,王黎明 等: "特高压输电线路导线脱冰跳跃动态特性", 《清华大学学报(自然科学版)》 * |
Cited By (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104166802B (zh) * | 2014-08-18 | 2017-11-21 | 国家电网公司 | 一种连续档输电线路脱冰跳跃高度的确定方法 |
CN104166802A (zh) * | 2014-08-18 | 2014-11-26 | 国家电网公司 | 一种连续档输电线路脱冰跳跃高度的确定方法 |
CN104504610A (zh) * | 2014-12-08 | 2015-04-08 | 云南电力试验研究院(集团)有限公司电力研究院 | 一种覆冰输电线路应力计算方法 |
CN107292021B (zh) * | 2017-06-20 | 2020-07-31 | 南京理工大学 | 一种基于有限质点法的覆冰输电线路不均匀脱冰模拟分析方法 |
CN107292021A (zh) * | 2017-06-20 | 2017-10-24 | 南京理工大学 | 一种基于有限质点法的覆冰输电线路不均匀脱冰模拟分析方法 |
CN108090263A (zh) * | 2017-12-05 | 2018-05-29 | 国网新疆电力有限公司电力科学研究院 | 输电线脱冰振动缩尺试验气动阻尼的验证方法 |
CN108090263B (zh) * | 2017-12-05 | 2021-08-24 | 国网新疆电力有限公司电力科学研究院 | 输电线脱冰振动缩尺试验气动阻尼的验证方法 |
CN108760206A (zh) * | 2018-06-27 | 2018-11-06 | 南京理工大学 | 一种输电线路诱发脱冰振动模拟实验方法 |
CN110059384A (zh) * | 2019-04-09 | 2019-07-26 | 同济大学 | 基于生成式对抗网络模拟人群跳跃荷载的方法 |
CN110059384B (zh) * | 2019-04-09 | 2023-01-06 | 同济大学 | 基于生成式对抗网络模拟人群跳跃荷载的方法 |
CN110968935A (zh) * | 2019-10-28 | 2020-04-07 | 国网新疆电力有限公司电力科学研究院 | 一种任意高差覆冰输电线路脱冰最大跳跃高度的算法 |
CN110968935B (zh) * | 2019-10-28 | 2022-09-06 | 国网新疆电力有限公司电力科学研究院 | 一种任意高差覆冰输电线路脱冰最大跳跃高度的算法 |
CN112036115A (zh) * | 2020-09-16 | 2020-12-04 | 国网江西省电力有限公司电力科学研究院 | 一种覆冰导线舞动仿真测试方法 |
CN113390456A (zh) * | 2021-05-23 | 2021-09-14 | 浙江大学 | 一种输电导线任意脱冰形式模拟装置及动力响应监测系统 |
CN113390456B (zh) * | 2021-05-23 | 2022-12-02 | 浙江大学 | 一种输电导线任意脱冰形式模拟装置及动力响应监测系统 |
CN116929452A (zh) * | 2023-07-26 | 2023-10-24 | 东北电力大学 | 用于无悬垂串复合横担导线滑移的实验模拟装置及方法 |
CN116929452B (zh) * | 2023-07-26 | 2024-03-08 | 东北电力大学 | 用于无悬垂串复合横担导线滑移的实验模拟装置及方法 |
CN117633405A (zh) * | 2023-11-30 | 2024-03-01 | 西南交通大学 | 一种孤立档非均匀覆冰导线脱冰跳跃高度计算方法 |
Also Published As
Publication number | Publication date |
---|---|
CN103942417B (zh) | 2017-01-04 |
WO2015149411A1 (zh) | 2015-10-08 |
US20170016809A1 (en) | 2017-01-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103942417B (zh) | 覆冰导线脱冰跳跃仿真测试方法 | |
CN102507123B (zh) | 一种输电线路覆冰导线断线试验方法 | |
CN101847855B (zh) | 架空输电线路铁塔抗导线舞动的方法 | |
Chen et al. | Dynamic Responses and Vibration Control of the Transmission Tower‐Line System: A State‐of‐the‐Art Review | |
Zhang et al. | Wind‐Induced Coupling Vibration Effects of High‐Voltage Transmission Tower‐Line Systems | |
Hamada et al. | The response of a guyed transmission line system to boundary layer wind | |
CN101859996B (zh) | 铁塔、导线、防舞器耦合系统铁塔抗导线舞动的方法 | |
CN111125612B (zh) | 一种架空导线覆冰舞动幅值的计算方法 | |
CN107907311A (zh) | 一种输电线路导线覆冰不平衡张力试验方法及系统 | |
CN102968554A (zh) | 基于安全裕度的杆塔覆冰灾害风险预测方法 | |
CN102983533A (zh) | 一种输电线路导/地线风荷载计算方法 | |
CN103913221A (zh) | 覆冰输电线脱冰跳跃阻尼系数测量方法 | |
CN102798509B (zh) | 高速铁路接触网风致响应风洞的试验方法 | |
Paluch et al. | Experimental and numerical assessment of EPS wind action on long span transmission line conductors | |
Gorynina et al. | Powder snow avalanche impact on hanging cables | |
Lou et al. | Wind-induced conductor response considering the nonproportionality of generalized aerodynamic damping | |
Murin et al. | Modelling and simulation of power lines made of composite structures | |
Yu et al. | Dynamic characteristics analysis of ice-adhesion transmission tower-line system under effect of wind-induced ice shedding | |
He et al. | Dynamic response analysis of asynchronous deicing of quad bundle conductor spacer system during DC ice melting | |
CN103050909B (zh) | 一种相间间隔棒安装方法及其系统 | |
Hrabovský et al. | Modeling of ice-shedding from ACSR power line | |
Zhang et al. | Research on the wind-induced dynamic response analysis method of the high-voltage transmission tower-line system under strong wind | |
Ajder | Analysis of non-uniform accreted ice in overhead power lines using SAP2000 | |
Yang et al. | Dynamic responses analysis and disaster prevention of transmission line under strong wind | |
Xiaowei et al. | Numerical simulation on wind-induced responses of steel guyed transmission tower-line coupling systems |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |