CN103904575A - Single tower crane for replacing disconnecting links - Google Patents

Single tower crane for replacing disconnecting links Download PDF

Info

Publication number
CN103904575A
CN103904575A CN201410158783.6A CN201410158783A CN103904575A CN 103904575 A CN103904575 A CN 103904575A CN 201410158783 A CN201410158783 A CN 201410158783A CN 103904575 A CN103904575 A CN 103904575A
Authority
CN
China
Prior art keywords
tower crane
stand column
pillar stand
disconnecting link
replacing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410158783.6A
Other languages
Chinese (zh)
Inventor
韩舒
裴有慧
程建国
孙忠超
吴俊杰
董立珂
梅晓东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NANJING HUAHENG POWER TRANSMISSION AND TRANSFORMATION Co Ltd
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Nanjing Power Supply Co of Jiangsu Electric Power Co
Original Assignee
NANJING HUAHENG POWER TRANSMISSION AND TRANSFORMATION Co Ltd
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Nanjing Power Supply Co of Jiangsu Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANJING HUAHENG POWER TRANSMISSION AND TRANSFORMATION Co Ltd, State Grid Corp of China SGCC, State Grid Jiangsu Electric Power Co Ltd, Nanjing Power Supply Co of Jiangsu Electric Power Co filed Critical NANJING HUAHENG POWER TRANSMISSION AND TRANSFORMATION Co Ltd
Priority to CN201410158783.6A priority Critical patent/CN103904575A/en
Publication of CN103904575A publication Critical patent/CN103904575A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The invention discloses a single tower crane for replacing disconnecting links. The single tower crane aims to solve the problem that a tower crane used in the existing operation transformer substation disconnecting link replacing method has defects in the prior art. The single tower crane for replacing the disconnecting links comprises an upper stand column, a lower stand column, a lifting head and a fixing seat, the upper stand column and the lower stand column are detachably connected, the lifting head is arranged at the top end of the upper stand column, the fixing seat is arranged at the bottom end of the lower stand column, and a lifting lug is arranged on the lifting head. The single tower crane has the advantages that a construction method is simple and saves labor and time, and the tower crane is small in size, low in weight, and convenient to transport, carry, assemble and disassemble; the tower crane is convenient to transport, carry and assemble in an operation transformer substation, and the tower crane can be assembled, disassembled and lengthened and is high in operability; the safety coefficient is no less than 2.5 times that of the prior art and is controllable, and safety of construction staff and safety of operation devices are controllable.

Description

A kind of for changing the single pole of disconnecting link
Technical field
The present invention relates to a kind ofly for changing the single pole of disconnecting link, relate in particular to a kind ofly for changing or the single pole of new clothes 220KV, 110KV disconnecting link, belong to lifting lifting class tool configuration.
Background technology
Former operation transformer station changes disconnecting link construction method, 220kV, 110kV disconnecting link group, 10 centimeters of common steel tube poles of the new Ф of employing more change the outfit, long 6.5 meters, can not segmentation, oversize vehicle transportation, enter operation transformer station and winch to 2 layers of platform, adopt lifting process, determine that clearance space meets the lift-off of safe distance pole, 12 people are compounding practice simultaneously, unified command, 3 people are surely to pole root, 4 people control wind rope direction, with extremely vertical 90 ° of artificial acts, and pole is moved to disconnecting link spend the colligation of blue frame root, wind rope is fixed, unified cooperation, assume unified command of 1 people, transportation assembling 4 people, ascend operation 2 people, 4 people are drawn in lifting, 1 group of replacing of disconnecting link is complete, use the same method and move to 2 groups of disconnecting link places, carrying out lifting prepares.
Shortcoming:
1, oneself making, iron steel tube holding pole, without reliable coefficient of safety, lifting loads is without test, and risk hidden danger is larger.2, whole 6.5 meters of poles, transportation length are carried inconvenience, must transport with oversize vehicle.3,6.5 meters of steel tube holding poles are at large, the upper and lower limited space of operation transformer station radius of turn, and the security risk that operation exists to equipment is larger.4, drop into construction operation personnel 12 people, personnel labor intensity is large, very easily damages disconnecting link porcelain vase, and construction method is loaded down with trivial details.5, efficiency of construction is low, and work progress difficulty is many, and personal safety, device security risk factors are more, and safe practice economic index is difficult to control.
Summary of the invention
Technical problem to be solved by this invention is: change for existing environment Central Plains operation transformer station the pole adopting in disconnecting link construction method and have the shortcoming in background technology.
The object of this invention is to provide a kind of for changing the single pole of disconnecting link.
The present invention is as follows for solving the problems of the technologies described above adopted technical scheme:
For changing a single pole for disconnecting link, comprise upper pillar stand, lower pillar stand, suspention head and holder; Between described upper pillar stand and lower pillar stand, be detachable connected mode, suspention head is arranged on the top of upper pillar stand, and holder is arranged on the bottom of lower pillar stand; Described suspention head is provided with hanger.
Upper pillar stand described in the present invention, lower pillar stand all adopt aluminum alloy materials of the prior art to make.
The top of suspention head of the present invention is provided with the cable loop that is no less than two; Described cable loop is symmetrical arranged.The object that the present invention arranges cable loop on the top of suspention head is, makes fixing more firm of pole of the present invention.
Upper pillar stand of the present invention and lower pillar stand are expansion link.Upper pillar stand of the present invention and lower pillar stand adopt expansion link be for can better be applicable to differing heights with changing, expand its range of application and recycling rate of waterused, be convenient to be convenient for carrying simultaneously, reduce working space, the scope of application is larger.
Holder of the present invention is arranged on lower pillar stand bottom, and holder both sides earrings adopts U-shaped ring to be reliably connected with equipment supporter root, to fix.
Adopt pole of the present invention, change 220kV disconnecting link group process:
In Reconstruction Project engineering construction, change especially the work of disconnecting link in operation transformer substrate two-layer platform interval, power failure, interval, adjacent both sides, in operation, is changed 220kV disconnecting link construction operation, is adopted single combination, new aluminum alloy tubular type pole.0.5 centimeter of pole wall thickness, 8 centimeters of pole diameters, point two joints are to dress, and 2.5 meters, every joint, separately adds 0.5 meter of base, 0.5 meter, top cap, 6 meters of total lengths, 20 kilograms of pole total weights.Work progress 1 people commander, 2 people's work high above the ground, 4 people transport assembling, and transportation porcelain vase assembling, be bolted on holder on two-layer platform, adopts after reeving cable loop and be fixed on two-layer platform, adopts chain block lifting.
The present invention's advantage compared with prior art: 1, construction method is easy, saves artificial, time, and pole volume is little, lightweight, and it is convenient that mounting or dismounting are carried in transportation.2, in operation transformer station carrying, to carry assembling convenient, dismounting lengthening, strong operability.3, coefficient of safety >=2.5 are times controlled, and the safety to workmen, the safety of operational outfit is controlled, can control.4, under the specific environment of operation transformer station, the feature of site layout project bonding apparatus structure can be controlled in the situation that narrow space is limited, guarantees personal safety, and the protection of equipment has been played safely to reliable controlled, energy control effect.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention.
Fig. 2 is the structural representation of suspention head.
Wherein, 1 is upper pillar stand, and 2 is lower pillar stand, and 3 is suspention head, and 4 is holder, and 5 is hanger, and 6 is cable loop, and 7 is rope.
Embodiment
For content of the present invention is become apparent more, be further described below in conjunction with accompanying drawing 1-Fig. 2 and embodiment.
In order to make object of the present invention, technical scheme and advantage clearer, below in conjunction with drawings and Examples, the present invention is further elaborated.Should be appreciated that specific embodiment described herein, only in order to explain the present invention, is not intended to limit the present invention.
For changing a single pole for disconnecting link, comprise upper pillar stand 1, lower pillar stand 2, suspention 3 and holder 4;
Between upper pillar stand 1 and lower pillar stand 2, adopt bolt to be connected, suspention 3 is arranged on the top of upper pillar stand 1 by bolt, and holder 4 is arranged on the bottom of lower pillar stand 2 by bolt; Hanger 5 is weldingly fixed in suspention 3 and for hanging chain block, disconnecting link is changed.The top of suspention 3 is provided with the cable loop 6 of four; Four cable loop 6 are symmetrical arranged.
Adopt pole of the present invention, change 220kV disconnecting link group process:
In Reconstruction Project engineering construction, change especially the work of disconnecting link in operation transformer substrate two-layer platform interval, power failure, interval, adjacent both sides, in operation, is changed 220kV disconnecting link construction operation, is adopted single combination, new aluminum alloy tubular type pole.0.5 centimeter of pole wall thickness, 8 centimeters of pole diameters, point two joints are to dress, and 2.5 meters, every joint, separately adds 0.5 meter of base, 0.5 meter, top cap, 6 meters of total lengths, 20 kilograms of pole total weights.Work progress 1 people commander, 2 people's work high above the ground, 4 people transport assembling, and transportation porcelain vase assembling, be bolted on holder 4 on two-layer platform, adopts rope 7 to be fixed on two-layer platform through after cable loop 6, adopts chain block lifting.
In addition to the implementation, the present invention can also have other execution modes.All employings are equal to the technical scheme of replacement or equivalent transformation formation, all drop on the protection range of requirement of the present invention.
The achievement that adopts pole of the present invention to complete:
By effort in recent years, tens, reorganization and expansion transformer station, change 220kV, nearly hundred groups of 110kV disconnecting links, facts have proved that the method is feasible, reliably, as become in the 220kV six directions, 220kV slab bridge becomes, 220kV Lishui becomes, 220kV Xiao Zhuan becomes, 220kV Dongyang becomes, 220kV Yaoization becomes etc., in practice process, obtain operating widely and applying, prove through a series of work progress, the method safety is controlled, effectively guarantee personal safety, the safety of equipment, improve the mechanization of work progress, semi-mechanization degree, reduce work high above the ground relative risk, save construction cost, workmen's the duplication of labour and physical demands are alleviated, improve employee's economic benefit, guarantee construction zero accident.
Part that the present invention does not relate to all same as the prior art or employing prior art is realized.

Claims (3)

1. for changing a single pole for disconnecting link, it is characterized in that, comprise upper pillar stand (1), lower pillar stand (2), suspention head (3) and holder (4); Between described upper pillar stand (1) and lower pillar stand (2), be detachable connected mode, suspention head (3) is arranged on the top of upper pillar stand (1), and holder (4) is arranged on the bottom of lower pillar stand (2); Described suspention head (3) is provided with hanger (5).
2. as claimed in claim 1ly it is characterized in that for changing the single pole of disconnecting link, the top of described suspention head (3) is provided with the cable loop (6) that is no less than two; Described cable loop (6) is symmetrical arranged.
3. as claimed in claim 1ly it is characterized in that for changing the single pole of disconnecting link, described upper pillar stand (1) is expansion link with lower pillar stand (2).
CN201410158783.6A 2014-04-18 2014-04-18 Single tower crane for replacing disconnecting links Pending CN103904575A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410158783.6A CN103904575A (en) 2014-04-18 2014-04-18 Single tower crane for replacing disconnecting links

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410158783.6A CN103904575A (en) 2014-04-18 2014-04-18 Single tower crane for replacing disconnecting links

Publications (1)

Publication Number Publication Date
CN103904575A true CN103904575A (en) 2014-07-02

Family

ID=50995779

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410158783.6A Pending CN103904575A (en) 2014-04-18 2014-04-18 Single tower crane for replacing disconnecting links

Country Status (1)

Country Link
CN (1) CN103904575A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110697590A (en) * 2019-11-13 2020-01-17 国网上海市电力公司 Wire lifting device for electrified pole erection removal and ground potential pole erection removal method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04364310A (en) * 1991-06-11 1992-12-16 Mitsubishi Electric Corp Lifter for truck-type machine
CN201392998Y (en) * 2009-01-06 2010-01-27 哈尔滨电业局 Isolating switch maintaining pole
CN201512370U (en) * 2009-09-10 2010-06-23 上海市电力公司超高压输变电公司 Switch blade hoisting frame
CN201584699U (en) * 2009-12-09 2010-09-15 河南省电力公司安阳供电公司 Combined hanger for replacing power pillar porcelain insulator
CN202260192U (en) * 2011-10-18 2012-05-30 安徽省电力公司滁州供电公司 Derrick mast with adjustable height
CN203826824U (en) * 2014-04-18 2014-09-10 国家电网公司 Single holding pole for replacing disconnecting link

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04364310A (en) * 1991-06-11 1992-12-16 Mitsubishi Electric Corp Lifter for truck-type machine
CN201392998Y (en) * 2009-01-06 2010-01-27 哈尔滨电业局 Isolating switch maintaining pole
CN201512370U (en) * 2009-09-10 2010-06-23 上海市电力公司超高压输变电公司 Switch blade hoisting frame
CN201584699U (en) * 2009-12-09 2010-09-15 河南省电力公司安阳供电公司 Combined hanger for replacing power pillar porcelain insulator
CN202260192U (en) * 2011-10-18 2012-05-30 安徽省电力公司滁州供电公司 Derrick mast with adjustable height
CN203826824U (en) * 2014-04-18 2014-09-10 国家电网公司 Single holding pole for replacing disconnecting link

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110697590A (en) * 2019-11-13 2020-01-17 国网上海市电力公司 Wire lifting device for electrified pole erection removal and ground potential pole erection removal method
CN110697590B (en) * 2019-11-13 2024-05-07 国网上海市电力公司 Wire lifting device for electrified vertical removing pole and ground potential vertical removing method

Similar Documents

Publication Publication Date Title
CN102359302B (en) Extra-high voltage large-span iron tower assembling method
CN102864936B (en) Combination lifting construction method for large-scale high hollow building roof of steel structure
CN101537976B (en) Dual-tower-mast giant self-lifting crane and following-carrying lifting method thereof
CN102251483B (en) Construction method for hoisting concrete-filled steel tube lattice bridge pier through self-lifting attached crane
CN106939707A (en) A kind of restricted clearance large-scale steel structure supporting platform from method for improving
CN106012852B (en) Support integrally falls frame construction method
CN201376848Y (en) Large-scale double-tower automatic-elevation hoisting equipment
CN203654702U (en) Operating platform for construction of reinforced concrete chimney
CN201458583U (en) Liftable and detachable lifting platform
CN105464456A (en) Method and lifting sling for assembling extra-high voltage transmission iron tower through helicopter
CN204873484U (en) Road bridge hoist
CN203826824U (en) Single holding pole for replacing disconnecting link
CN103896153A (en) Zig-zag derrick for replacing disconnecting link
CN103904575A (en) Single tower crane for replacing disconnecting links
CN203800449U (en) Overhaul platform of equipment on transformer station pillar
CN203755173U (en) Formwork device used for hydraulic climbing of bridge high pier
CN203794469U (en) Inversed-v-shaped holding pole for replacing disconnecting link
CN202550348U (en) Folding multifunctional overhauling frame for overhauling isolating switch
CN206220460U (en) For the operating platform of tower
CN205724585U (en) Multi-function overhaul platform
CN202729645U (en) Tower crane with elevator
CN202602133U (en) Multifunctional portable climbing pole
CN205637619U (en) No post steel construction pipe truss hanging device of underground big space of large -span superelevation
CN210237035U (en) Telescopic movable operation platform in heat absorption tower
CN209510211U (en) Heavy caliber long-distance oil & gas pipeline construction special-purpose ladder

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140702