CN205637619U - No post steel construction pipe truss hanging device of underground big space of large -span superelevation - Google Patents

No post steel construction pipe truss hanging device of underground big space of large -span superelevation Download PDF

Info

Publication number
CN205637619U
CN205637619U CN201620284931.3U CN201620284931U CN205637619U CN 205637619 U CN205637619 U CN 205637619U CN 201620284931 U CN201620284931 U CN 201620284931U CN 205637619 U CN205637619 U CN 205637619U
Authority
CN
China
Prior art keywords
cantilever
superelevation
truss
span
underground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620284931.3U
Other languages
Chinese (zh)
Inventor
郭颖
周建峰
李永红
窦卫
赵天宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Sixth Engineering Division Co Ltd
Third Construction Engineering Co Ltd of China Construction Sixth Engineering Division Co Ltd
Original Assignee
China Construction Sixth Engineering Division Co Ltd
Third Construction Engineering Co Ltd of China Construction Sixth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Engineering Division Co Ltd, Third Construction Engineering Co Ltd of China Construction Sixth Engineering Division Co Ltd filed Critical China Construction Sixth Engineering Division Co Ltd
Priority to CN201620284931.3U priority Critical patent/CN205637619U/en
Application granted granted Critical
Publication of CN205637619U publication Critical patent/CN205637619U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a no post steel construction pipe truss hanging device of underground big space of large -span superelevation, two hoisting support including bilateral symmetry, hoisting support fixes forever structurally what correspond with the truss tip, hoisting support is equipped with the branch and puts cantilever and guy rope in its both sides, the end of cantilever is located the top of pipe truss main part the end of cantilever is equipped with rings be connected with electric block on the rings. The utility model discloses a two cantilever type hoisting support of bilateral symmetry to connect electric block on hoisting support, utilize gantry crane's construction principle, realized that fixed point vertical lift article reach the function in the regulation height, can satisfy the needs that the big space of the secret large -span no post steel construction pipe truss main part of superelevation is suspended in midair. And the utility model discloses can use by the recirculation, can reduce construction cost.

Description

Underground large span large space superelevation is without post steel-structure tube truss suspension apparatus
Technical field
This utility model relates to a kind of suspension apparatus, and particularly a kind of underground large span large space superelevation is without post steel-structure tube purlin Frame suspension apparatus.
Background technology
Along with socioeconomic development, deluxe hotel and high-grade office building are increasing, as five-star star hotel both Want client to move in comfortable, also to have a series of auxiliary facility to meet commercial affairs needs simultaneously, banquet hall mainly undertake dinner party, The functions such as meeting, wedding displaying.Its function just requires that the necessary spatial extent in banquet hall is big, and floor height clear height wants height, opens Between big, without beam column.Xoncrete structure cannot meet floor height clear height and span.Seamless steel pipe truss is from heavy and light, and span is big, This problem can be solved.But this truss-like structure is used for aboveground space structure, the underground space is by the many beam columns of underground structure The impact of system, seldom applies, more without relevant Project case reference.
Certain engineering structure located underground bears two layers of central area, length 36 meters, width 27 meters, clear height 8 meters, uses 15 Pin is seamless square tube truss, every truss structure length 27 meters, high 1.7 meters, weigh 9.5 tons, belong to underground large span large space superelevation The truss of steel-structure tube without post, is limited by basement structure, and overall truss cannot transport directly to scene, and on-the-spot tower crane without List truss structure is directly lifted in place by method, does not the most possess the condition stopping hanging device, therefore crane cannot lift around foundation ditch. It is thus desirable to use stagewise large-span truss, being embedded on permanent structure by truss end, main part is at the construction field (site) Welding, and then need to solve the lifting problem of tubular truss main part.
Summary of the invention
This utility model provide for solving technical problem present in known technology a kind of underground large span large space superelevation without Post steel-structure tube truss suspension apparatus, this device is capable of underground large span large space superelevation without post steel-structure tube truss master The suspention of body.
This utility model is adopted the technical scheme that by solving technical problem present in known technology: one underground greatly across Degree large space superelevation is without post steel-structure tube truss suspension apparatus, and including symmetrical two hoisting brackets, described lifting is propped up Frame is fixed on the permanent structure corresponding with truss end, and described hoisting bracket is provided with the cantilever and guy split in its both sides Rope, the end of described cantilever is positioned at the top of tubular truss main body, and the end at described cantilever is provided with suspension ring, at described suspension ring Upper connection has electric block.
The main body of described hoisting bracket uses tripod, and the bottom of described tripod is fixed on pre-embedded steel slab, described pre-buried Steel plate is anchored in permanent structure.
Described tripod uses I-steel to be welded.
This utility model has the advantage that with good effect: use symmetrical two cantilevered hoisting brackets, and Connect electric block on hoisting bracket, utilize the Construction Principle of gantry crane, it is achieved that fixed point vertical lift article reach Function in specified altitude, it is possible to meet the needs that underground large span large space superelevation is suspended in midair without post steel-structure tube truss main body. And this utility model can use with repetitive cycling, it is possible to reduce construction cost.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is hoisting bracket structural representation of the present utility model;
Fig. 3 is tripod of the present utility model and pre-embedded steel slab connection diagram.
In figure: 1, cable wind rope;2, hoisting bracket;3, cantilever;4, suspension ring;5, truss end;6, permanent structure; 7, pre-embedded steel slab;8, tubular truss main body.
Detailed description of the invention
For summary of the invention of the present utility model, feature and effect can be further appreciated that, hereby enumerate following example, and coordinate Accompanying drawing describes in detail as follows:
Referring to Fig. 1~Fig. 3, a kind of underground large span large space superelevation is without post steel-structure tube truss suspension apparatus, including a left side Two hoisting brackets 2 of right symmetry, described hoisting bracket 2 is fixed on the permanent structure 6 corresponding with truss end 5, institute Stating hoisting bracket 2 and be provided with the cantilever 3 and cable wind rope 1 split in its both sides, the end of described cantilever 3 is positioned at tubular truss main body The top of 8, the end at described cantilever 3 is provided with suspension ring 4, and connecting on described suspension ring 4 has electric block.
In the present embodiment, the main body of described hoisting bracket 2 uses tripod, and the bottom of described tripod is fixed in pre-buried On steel plate 7, described pre-embedded steel slab 7 is anchored in permanent structure 6.Said structure is simple, reliable and stable.Described triangle Frame uses I-steel to be welded.
Although preferred embodiment of the present utility model being described above in conjunction with accompanying drawing, but this utility model not office Being limited to above-mentioned detailed description of the invention, above-mentioned detailed description of the invention is only schematically, is not restrictive, this The those of ordinary skill in field, under enlightenment of the present utility model, is being protected without departing from this utility model objective and claim In the case of the scope protected, it is also possible to make a lot of form, within these belong to protection domain of the present utility model.

Claims (3)

1. a underground large span large space superelevation is without post steel-structure tube truss suspension apparatus, it is characterized in that, including symmetrical two hoisting brackets, described hoisting bracket is fixed on the permanent structure corresponding with truss end, described hoisting bracket is provided with the cantilever and cable wind rope split in its both sides, the end of described cantilever is positioned at the top of tubular truss main body, and the end at described cantilever is provided with suspension ring, and connecting on described suspension ring has electric block.
Underground the most according to claim 1 large span large space superelevation is without post steel-structure tube truss suspension apparatus, it is characterized in that, the main body of described hoisting bracket uses tripod, and the bottom of described tripod is fixed on pre-embedded steel slab, and described pre-embedded steel slab is anchored in permanent structure.
Underground the most according to claim 2 large span large space superelevation is without post steel-structure tube truss suspension apparatus, it is characterised in that described tripod uses I-steel to be welded.
CN201620284931.3U 2016-04-07 2016-04-07 No post steel construction pipe truss hanging device of underground big space of large -span superelevation Expired - Fee Related CN205637619U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620284931.3U CN205637619U (en) 2016-04-07 2016-04-07 No post steel construction pipe truss hanging device of underground big space of large -span superelevation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620284931.3U CN205637619U (en) 2016-04-07 2016-04-07 No post steel construction pipe truss hanging device of underground big space of large -span superelevation

Publications (1)

Publication Number Publication Date
CN205637619U true CN205637619U (en) 2016-10-12

Family

ID=57067390

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620284931.3U Expired - Fee Related CN205637619U (en) 2016-04-07 2016-04-07 No post steel construction pipe truss hanging device of underground big space of large -span superelevation

Country Status (1)

Country Link
CN (1) CN205637619U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108343251A (en) * 2018-05-08 2018-07-31 中冶建工集团有限公司 A kind of continuance lifting method without bearing large space Steel Truss Beam
CN108412206A (en) * 2018-03-28 2018-08-17 中大建设股份有限公司 The construction method of truss operating platform suitable for large space construction

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108412206A (en) * 2018-03-28 2018-08-17 中大建设股份有限公司 The construction method of truss operating platform suitable for large space construction
CN108343251A (en) * 2018-05-08 2018-07-31 中冶建工集团有限公司 A kind of continuance lifting method without bearing large space Steel Truss Beam

Similar Documents

Publication Publication Date Title
CN102864936B (en) Combination lifting construction method for large-scale high hollow building roof of steel structure
CN202658909U (en) Steel column positioning rack based on reverse-building method
CN106703416B (en) Steel roof truss dead man hanging method in small space
CN110130652A (en) Large complicated composite structure steel worm-gearing construction method for lifting whole
CN103603504B (en) The dynamo-electric heavy caliber standpipe of super highrise building is with the method for main body progress lifting construction
CN108560719A (en) The support installation method of super large span double-layer Bidirectional hanging rope structure
CN206692235U (en) A kind of steel structure dome lifts by crane erecting device
CN205637619U (en) No post steel construction pipe truss hanging device of underground big space of large -span superelevation
CN109138452A (en) Heavy construction bolt sphere steel pipe rack entirety fast lifting construction technology
CN102535939B (en) Inversely assembling process for standing stay wire V-type tower
CN106759909B (en) Bearing structure system and its construction method are hung up under one kind
CN105822066B (en) Underground large span large space superelevation is without post steel-structure tube truss construction engineering method
CN208071235U (en) A kind of bearing and lifting system of steel truss frame integral hoisting
CN103821136A (en) Suspended single row scaffold and construction method thereof
CN204126297U (en) A kind of temporary support of steel truss roof
CN104264781B (en) Latticed cylinder Steel Shell and construction method thereof
CN105464215A (en) Reverse construction method construction method of hanging structure incapable of being provided with vertical temporary support
CN207142689U (en) Implement the device of lifting using curtain wall embedded part
CN206447498U (en) Large Tube truss Steel Structure purlin lifting gin pole
CN105350698A (en) Large-span dome installation construction method
CN205575534U (en) Lattice formula groined type support body lifting means
CN205367540U (en) Prevent tower crane of empting
CN211312514U (en) Movable ground anchor device for mounting conical section of steel structure cooling tower
CN104627849A (en) Hoisting equipment and hoisting method for hoisting inner courtyard pipeline
CN204826727U (en) Reinforcing bar processing protection canopy that can dismantle, has enough to meet need

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161012

Termination date: 20200407