CN103896153A - Zig-zag derrick for replacing disconnecting link - Google Patents

Zig-zag derrick for replacing disconnecting link Download PDF

Info

Publication number
CN103896153A
CN103896153A CN201410158765.8A CN201410158765A CN103896153A CN 103896153 A CN103896153 A CN 103896153A CN 201410158765 A CN201410158765 A CN 201410158765A CN 103896153 A CN103896153 A CN 103896153A
Authority
CN
China
Prior art keywords
herringbone
bar
connecting plate
replacing
fixing seat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410158765.8A
Other languages
Chinese (zh)
Inventor
裴有慧
韩舒
程建国
杨俊�
杨建�
吴鹏
夏添
曹广瑞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NANJING HUAHENG POWER TRANSMISSION AND TRANSFORMATION Co Ltd
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Nanjing Power Supply Co of Jiangsu Electric Power Co
Original Assignee
NANJING HUAHENG POWER TRANSMISSION AND TRANSFORMATION Co Ltd
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Nanjing Power Supply Co of Jiangsu Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANJING HUAHENG POWER TRANSMISSION AND TRANSFORMATION Co Ltd, State Grid Corp of China SGCC, State Grid Jiangsu Electric Power Co Ltd, Nanjing Power Supply Co of Jiangsu Electric Power Co filed Critical NANJING HUAHENG POWER TRANSMISSION AND TRANSFORMATION Co Ltd
Priority to CN201410158765.8A priority Critical patent/CN103896153A/en
Publication of CN103896153A publication Critical patent/CN103896153A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Electric Cable Installation (AREA)

Abstract

本发明公开了一种用于更换刀闸的人字抱杆,所要解决的技术问题是:针对现有中原运行变电站更换刀闸施工方法中采用的抱杆存在背景技术中的缺点。采用的技术方案:包括左人字杆、右人字杆、悬吊头、左固定座和右固定座;悬吊头与左人字杆和右人字杆的上端头相连,左人字杆和右人字杆呈“人”字型;左固定座设置在左人字杆的底端,右固定座设置在右人字杆的底端;左人字杆和右人字杆均包括上立柱和下立柱;上立柱和下立柱之间为可拆卸式连接方式;悬吊头包括左连接板、右连接板和吊钩;左连接板的下端与左人字杆的顶端相连,右连接板的下端与右人字杆的顶端相连;左连接板的上端、右连接板的上端同时与吊钩相连;吊钩上设有通孔。

The invention discloses a herringbone holding pole for replacing a knife switch. The technical problem to be solved is that the holding pole used in the construction method for replacing the knife gate in the existing central plains operating substation has shortcomings in the background technology. The technical solution adopted: including the left herringbone, right herringbone, suspension head, left fixing seat and right fixing seat; the suspension head is connected with the upper ends of the left and right herringbone, and the left and the right herringbone are in the shape of a "herringbone"; the left fixing seat is set at the bottom of the left herringbone, and the right fixing seat is set at the bottom of the right herringbone; both the left and right herringbone include the upper The column and the lower column; the connection between the upper column and the lower column is detachable; the suspension head includes a left connecting plate, a right connecting plate and a hook; the lower end of the left connecting plate is connected with the top of the left herringbone, and the right The lower end of the plate is connected with the top of the right herringbone bar; the upper end of the left connecting plate and the upper end of the right connecting plate are connected with the hook at the same time; the hook is provided with a through hole.

Description

一种用于更换刀闸的人字抱杆A kind of herringbone holding rod for replacing the knife switch

技术领域technical field

本发明涉及一种用于更换刀闸的人字抱杆,尤其涉及一种用于更换或新装110KV、35KV刀闸的人字抱杆,属于起重起吊类工具配置。The invention relates to a herringbone holding rod for replacing a knife switch, in particular to a herringbone holding rod for replacing or newly installing a 110KV and 35KV knife switch, which belongs to the configuration of lifting tools.

背景技术Background technique

原运行变电站更换刀闸施工方法,220kV、110kV刀闸组,更换装新采用Ф10公分普通钢管抱杆,长6.5米,不可分段、大型车辆运输,进入运行变电站吊至2层平台,延用起吊过程,确定间隔空间满足安全距离抱杆升空,12人同时配合操作,统一指挥,3人稳至抱杆根部,4人控制风绳方向,用人工举至竖直90°,并把抱杆移至刀闸花兰架根部绑扎,风绳固定,统一配合,统一指挥1人,运输组装4人,登高作业2人,起重牵引4人,刀闸1组更换完毕,用同样的方法移至2组刀闸处,做好起吊准备。The construction method of replacing the knife switch in the original operating substation, 220kV, 110kV knife switch group, the new installation adopts a Ф10 cm ordinary steel pipe holding pole, 6.5 meters long, cannot be segmented, transported by large vehicles, enters the operating substation and lifts to the 2nd floor platform, extended Use the lifting process to ensure that the interval space satisfies the safe distance to hold the pole and lift it into the air. 12 people cooperate with the operation at the same time, and the command is unified. 3 people stabilize the root of the pole, and 4 people control the direction of the wind rope. The holding pole was moved to the root of the orchid frame of the knife gate and tied, the wind rope was fixed, unified cooperation, unified command 1 person, 4 people for transportation and assembly, 2 people for climbing operations, 4 people for lifting and traction, and the replacement of 1 group of knife gates was completed. The method is to move to the 2 sets of knife gates and prepare for lifting.

缺点:shortcoming:

1、自制加工、铁制钢管抱杆,无可靠的安全系数,起吊负载无试验,风险隐患比较大。2、整个6.5米抱杆、运输长携带不方便,必须用大型车辆运输。3、6.5米钢管抱杆在运行变电站转弯半径大、上下空间有限,对设备运行存在的安全风险较大。4、投入施工作业人员12人,人员劳动强度大,极易损伤刀闸瓷瓶,施工方法繁琐。5、施工效率低,施工过程困难多,人身安全、设备安全风险因素较多,安全技术经济指标难以控制。1. Self-made processing, iron steel pipe holding pole, no reliable safety factor, no test for lifting load, relatively high risk and hidden danger. 2. The entire 6.5-meter-long pole is inconvenient to carry and must be transported by a large vehicle. 3. The 6.5-meter steel pipe holding pole has a large turning radius and limited upper and lower space in the operating substation, which poses a greater safety risk to the operation of the equipment. 4. There are 12 people involved in the construction work. The labor intensity of the personnel is high, and it is easy to damage the knife gate porcelain vase. The construction method is cumbersome. 5. The construction efficiency is low, the construction process is difficult, there are many risk factors for personal safety and equipment safety, and the safety technical and economic indicators are difficult to control.

发明内容Contents of the invention

本发明所要解决的技术问题是:针对现有中原运行变电站更换刀闸施工方法中采用的抱杆存在背景技术中的缺点。The technical problem to be solved by the present invention is: there are shortcomings in the background technology for the poles used in the construction method of replacing the knife switch in the existing Zhongyuan operating substation.

本发明的目的是提供一种用于更换刀闸的人字抱杆。The object of the present invention is to provide a herringbone holding rod for replacing a knife switch.

本发明为解决上述技术问题所采用的技术方案如下:The technical scheme that the present invention adopts for solving the problems of the technologies described above is as follows:

一种用于更换刀闸的人字抱杆,包括左人字杆、右人字杆、悬吊头、左固定座和右固定座;悬吊头与左人字杆和右人字杆的上端头相连,左人字杆和右人字杆呈“人”字型;左固定座设置在左人字杆的底端,右固定座设置在右人字杆的底端;左人字杆与左固定座之间为活动式连接方式;所述右人字杆与右固定座之间也为活动式连接方式;A herringbone holding bar for replacing a knife switch, including a left herringbone bar, a right herringbone bar, a suspension head, a left fixing seat and a right fixing seat; The upper ends are connected, and the left herringbone and the right herringbone are in the shape of a "herringbone"; the left fixing seat is set at the bottom of the left herringbone, and the right fixing seat is set at the bottom of the right herringbone; the left herringbone It is a movable connection with the left fixed seat; it is also a movable connection between the right herringbone rod and the right fixed seat;

所述左人字杆和右人字杆均包括上立柱和下立柱;上立柱和下立柱之间为可拆卸式连接方式;The left herringbone and the right herringbone both include an upper column and a lower column; the upper column and the lower column are connected in a detachable manner;

所述悬吊头包括左连接板、右连接板和吊钩;所述左连接板的下端与左人字杆的顶端相连,所述右连接板的下端与右人字杆的顶端相连;所述左连接板的上端、右连接板的上端同时与吊钩相连;The suspension head includes a left connecting plate, a right connecting plate and a suspension hook; the lower end of the left connecting plate is connected with the top of the left herringbone bar, and the lower end of the right connecting plate is connected with the top of the right herringbone bar; The upper end of the left connecting plate and the upper end of the right connecting plate are connected with the hook at the same time;

所述吊钩上设有用连接于安装链条葫芦的通孔。The hook is provided with a through hole for connecting to a chain hoist.

本发明所述上立柱与下立柱均为伸缩杆。本发明的上立柱与下立柱采用伸缩杆是为了能更好的适用于不同高度的跟换,拓展其应用范围和重复利用率,同时便于方便携带、减小作业空间、适用范围更大。The upper column and the lower column of the present invention are telescopic rods. The upper column and the lower column of the present invention adopt telescopic rods in order to be better suitable for replacement at different heights, expand their application range and reuse rate, and at the same time be convenient to carry, reduce the working space, and have a wider application range.

本发明中所述的上立柱、下立柱均采用现有技术中的铝合金材料制成。Both the upper column and the lower column described in the present invention are made of aluminum alloy material in the prior art.

采用本发明的抱杆,更换110kV、35kV刀闸组工艺方法:Using the holding pole of the present invention, the process method of replacing 110kV and 35kV knife switch groups:

在改扩建项目工程施工,特别在运行变电站二层平台间隔、停电更换刀闸的工作,相邻两边间隔在运行,更换110kV刀闸作业,采用固定式铝合金人字抱杆,分两节对装,每节1.5米,底座0.3米,抱杆直径6.5公分,抱杆全长3.1米,抱杆总重量20公斤,顶部用螺栓连接,施工中先固定人字抱杆在110kV刀闸底脚、槽钢根部两侧用螺栓加夹具固定抱杆根部,采用3根尼龙风绳固定人字抱杆,上风侧2根,下风侧1根固定,整组拆除110kV刀闸1组,在二层平台组装新刀闸1组,整组吊装。In the construction of the reconstruction and expansion project, especially in the work of the second-floor platform interval of the operating substation and the replacement of the knife switch in a power failure, the adjacent two sides are running at intervals, and the replacement of the 110kV knife switch is performed. The fixed aluminum alloy herringbone pole is used, which is divided into two sections. Each section is 1.5 meters, the base is 0.3 meters, the diameter of the pole is 6.5 cm, the total length of the pole is 3.1 meters, the total weight of the pole is 20 kg, the top is connected by bolts, and the herringbone pole is first fixed at the foot of the 110kV knife gate during construction , Both sides of the root of the channel steel are fixed with bolts and clamps at the root of the pole, and 3 nylon wind ropes are used to fix the herringbone pole, 2 on the windward side and 1 on the downwind side. The whole group removes 1 group of 110kV knife gates, on the second floor Assemble a set of new knife gates on the platform, and hoist the whole set.

本发明与现有技术相比的优点:1、施工方法简便,节省人工、时间,抱杆体积小、重量轻,运输携带装拆方便。2、在运行变电站搬运、携带组装便捷,拆装加长、操作性强。3、安全系数≥2.5倍可控,对施工人员的安全、运行设备的安全可控、能控。4、在运行变电站特定的环境下,现场布置结合设备结构的特点,在空间狭小有限的情况下可控制,确保对人身的安全,对设备的保护安全起到了可靠的可控、能控作用。Compared with the prior art, the present invention has the following advantages: 1. The construction method is simple, labor and time are saved, the holding pole is small in size, light in weight, and convenient for transportation, carrying, assembly and disassembly. 2. It is convenient to carry, carry and assemble in the running substation, and the disassembly and assembly are lengthened, and the operability is strong. 3. The safety factor ≥ 2.5 times is controllable, which is controllable and controllable for the safety of construction personnel and the safety of operating equipment. 4. In the specific environment of the operating substation, the on-site layout combined with the characteristics of the equipment structure can be controlled in a small and limited space to ensure the safety of the person and play a reliable, controllable and controllable role in the protection and safety of the equipment.

附图说明Description of drawings

图1是本发明的结构示意图。Fig. 1 is a structural schematic diagram of the present invention.

图2是悬吊头的结构示意图。Figure 2 is a schematic structural view of the suspension head.

其中,1为上立柱,2为下立柱,3为悬吊头,3-1为左连接板,3-2为右连接板,3-3为吊钩,3-3-1为通孔,4为左固定座,5为右固定座,7为左人字杆,8为右人字杆。Among them, 1 is the upper column, 2 is the lower column, 3 is the suspension head, 3-1 is the left connecting plate, 3-2 is the right connecting plate, 3-3 is the hook, 3-3-1 is the through hole, 4 is a left fixed seat, and 5 is a right fixed seat, and 7 is a left herringbone bar, and 8 is a right herringbone bar.

具体实施方式Detailed ways

为使本发明的内容更加明显易懂,以下结合附图1-图2和具体实施方式做进一步的描述。In order to make the content of the present invention more obvious and comprehensible, further description will be made below in conjunction with accompanying drawings 1-2 and specific implementation methods.

为了使本发明的目的、技术方案及优点更加清楚明白,以下结合附图及实施例,对本发明进行进一步详细说明。应当理解,此处所描述的具体实施例仅用以解释本发明,并不用于限定本发明。In order to make the object, technical solution and advantages of the present invention clearer, the present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention.

一种用于更换刀闸的人字抱杆,包括左人字杆7、右人字杆8、悬吊头3、左固定座4和右固定座5;A herringbone holding rod for replacing a knife switch, comprising a left herringbone rod 7, a right herringbone rod 8, a suspension head 3, a left fixing seat 4 and a right fixing seat 5;

左人字杆7和右人字杆8包括上立柱1和下立柱2;The left herringbone 7 and the right herringbone 8 include an upper column 1 and a lower column 2;

悬吊头3包括左连接板3-1、右连接板3-2和吊钩3-3;Suspension head 3 comprises left connecting plate 3-1, right connecting plate 3-2 and suspension hook 3-3;

悬吊头3内的左连接板3-1的下端通过螺栓与左人字杆7的顶端相连,右连接板3-2的下端通过螺栓与右人字杆8的顶端相连;左连接板3-1的上端、右连接板3-2的上端同时通过螺栓与吊钩3-3相连;左人字杆7和右人字杆8呈“人”字型;左固定座4设置在左人字杆7的底端,右固定座5设置在右人字杆8的底端;左人字杆7与左固定座4之间为活动式连接方式;右人字杆8与右固定座5之间也为活动式连接方式;左人字杆7和右人字杆8均包括上立柱1和下立柱2;上立柱1和下立柱2之间通过螺栓相连;吊钩3-3上设有用于安装链条葫芦的通孔3-3-1。The lower end of the left connecting plate 3-1 in the suspension head 3 links to each other with the top of the left herringbone bar 7 by bolts, and the lower end of the right connecting plate 3-2 links to each other with the top of the right herringbone bar 8 by bolts; the left connecting plate 3 The upper end of -1 and the upper end of the right connecting plate 3-2 are connected to the suspension hook 3-3 through bolts simultaneously; the left herringbone bar 7 and the right herringbone bar 8 are in the shape of "herringbone"; The bottom of the character bar 7, the right fixed seat 5 is arranged on the bottom of the right herringbone bar 8; between the left herringbone bar 7 and the left fixed seat 4 is a movable connection mode; the right herringbone bar 8 and the right fixed seat 5 There is also a movable connection between them; the left herringbone bar 7 and the right herringbone bar 8 both include an upper column 1 and a lower column 2; the upper column 1 and the lower column 2 are connected by bolts; the hook 3-3 is provided with There are through holes 3-3-1 for mounting chain hoists.

采用本发明的抱杆,更换110kV刀闸组工艺方法:Using the holding pole of the present invention, the process method of replacing the 110kV knife switch group:

在改扩建项目工程施工,特别在运行变电站二层平台间隔、停电更换刀闸的工作,相邻两边间隔在运行,更换110kV刀闸作业,采用固定式铝合金人字抱杆,分两节对装,每节1.5米,底座0.3米,抱杆直径6.5公分,抱杆全长3.1米,抱杆总重量20公斤,顶部用螺栓连接,施工中先固定人字抱杆在110kV刀闸底脚、槽钢根部两侧用螺栓加夹具固定抱杆根部,采用3根尼龙风绳固定人字抱杆,上风侧2根,下风侧1根固定,整组拆除110kV刀闸1组,在二层平台组装新刀闸1组,整组吊装。In the construction of the reconstruction and expansion project, especially in the work of the second-floor platform interval of the operating substation and the replacement of the knife switch in a power failure, the adjacent two sides are running at intervals, and the replacement of the 110kV knife switch is performed. The fixed aluminum alloy herringbone pole is used, which is divided into two sections. Each section is 1.5 meters, the base is 0.3 meters, the diameter of the pole is 6.5 cm, the total length of the pole is 3.1 meters, the total weight of the pole is 20 kg, the top is connected by bolts, and the herringbone pole is first fixed at the foot of the 110kV knife gate during construction , Both sides of the root of the channel steel are fixed with bolts and clamps at the root of the pole, and 3 nylon wind ropes are used to fix the herringbone pole, 2 on the windward side and 1 on the downwind side. The whole group removes 1 group of 110kV knife gates, on the second floor Assemble a set of new knife gates on the platform, and hoist the whole set.

除上述实施例外,本发明还可以有其他实施方式。凡采用等同替换或等效变换形成的技术方案,均落在本发明要求的保护范围。In addition to the above-mentioned embodiments, the present invention can also have other implementations. All technical solutions formed by equivalent replacement or equivalent transformation fall within the scope of protection required by the present invention.

采用本发明抱杆所完成的成果:Achievements achieved by adopting the pole of the present invention:

通过近几年的努力,改扩建变电站几十座,更换220kV、110kV刀闸近百组,实践证明此方法可行、可靠,如在220kV六合变、220kV板桥变、220kV溧水变、220kV晓庄变、220kV东阳变、220kV尧化门变等等,在实践过程中得到了广泛的操作和应用,经过一系列的施工过程证明,此方法安全可控,有效的保证了人身的安全、设备的安全,提高了施工过程的机械化、半机械化程度,降低了高空作业风险率,节约了施工成本,减轻了施工人员的重复劳动及体力消耗,提高了员工的经济效益,确保了施工零事故。Through the efforts in recent years, dozens of substations have been rebuilt and expanded, and nearly a hundred sets of 220kV and 110kV knife switches have been replaced. Practice has proved that this method is feasible and reliable, such as in 220kV Liuhe Substation, 220kV Banqiao Substation, 220kV Lishui Substation, 220kV Xiaozhuang Substation Substation, 220kV Dongyang Substation, 220kV Yaohuamen Substation, etc., have been widely operated and applied in practice. After a series of construction processes, it has been proved that this method is safe and controllable, and effectively guarantees personal safety and equipment safety. Safety improves the degree of mechanization and semi-mechanization of the construction process, reduces the risk rate of high-altitude operations, saves construction costs, reduces the repetitive labor and physical exertion of construction personnel, improves the economic benefits of employees, and ensures zero accidents in construction.

本发明未涉及部分均与现有技术相同或采用现有技术加以实现。The parts not involved in the present invention are the same as the prior art or implemented by adopting the prior art.

Claims (2)

1. for changing a herringbone holding pole for disconnecting link, it is characterized in that, comprise Zuoren word bar (7), right herringbone bar (8), suspention head (3), left permanent seat (4) and right permanent seat (5); Described suspention head (3) is connected with the upper end of right herringbone bar (8) with Zuoren word bar (7), and described Zuoren word bar (7) and right herringbone bar (8) are " people " font; Left permanent seat (4) is arranged on the bottom of Zuoren word bar (7), and right permanent seat (5) is arranged on the bottom of right herringbone bar (8); Between described Zuoren word bar (7) and left permanent seat (4), it is movable connection mode; Between described right herringbone bar (8) and right permanent seat (5), it is also movable connection mode;
Described Zuoren word bar (7) and right herringbone bar (8) include upper pillar stand (1) and lower pillar stand (2); Between described upper pillar stand (1) and lower pillar stand (2), it is detachable connection mode;
Described suspention head (3) comprises left connecting panel (3-1), right connecting panel (3-2) and suspension hook (3-3); The lower end of described left connecting panel (3-1) is connected with the top of Zuoren word bar (7), and the lower end of described right connecting panel (3-2) is connected with the top of right herringbone bar (8); The upper end of the upper end of described left connecting panel (3-1), right connecting panel (3-2) is connected with suspension hook (3-3) simultaneously;
Described suspension hook (3-3) is provided with the through hole (3-3-1) for connection chain and tackle block.
2. as claimed in claim 1ly it is characterized in that for changing the herringbone holding pole of disconnecting link, described upper pillar stand (1) is expansion link with lower pillar stand (2).
CN201410158765.8A 2014-04-18 2014-04-18 Zig-zag derrick for replacing disconnecting link Pending CN103896153A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410158765.8A CN103896153A (en) 2014-04-18 2014-04-18 Zig-zag derrick for replacing disconnecting link

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410158765.8A CN103896153A (en) 2014-04-18 2014-04-18 Zig-zag derrick for replacing disconnecting link

Publications (1)

Publication Number Publication Date
CN103896153A true CN103896153A (en) 2014-07-02

Family

ID=50987790

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410158765.8A Pending CN103896153A (en) 2014-04-18 2014-04-18 Zig-zag derrick for replacing disconnecting link

Country Status (1)

Country Link
CN (1) CN103896153A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107829596A (en) * 2017-11-30 2018-03-23 浙江省送变电工程有限公司 A kind of extra-high voltage iron tower group founds multipurpose herringbone holding pole
CN108996418A (en) * 2018-08-06 2018-12-14 国网上海市电力公司 A kind of retractable multifunctional post mounting accessories
CN109138577A (en) * 2018-07-11 2019-01-04 云南电网有限责任公司曲靖供电局 Adjusting rod and herringbone holding pole

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2644666A (en) * 1951-06-27 1953-07-07 Lee S Johnson Gin pole and universal top assembly therefor
CN2039471U (en) * 1988-05-12 1989-06-14 范文林 Multi-functional combined round tube clasper
US20020095878A1 (en) * 2000-12-05 2002-07-25 Henderson Allan P. Tilt-up and telescopic support tower for large structures
CN201190443Y (en) * 2008-04-22 2009-02-04 赵国良 Embraced Bar special for tower set
CN101429827A (en) * 2008-11-28 2009-05-13 程永忠 Leaning tower self-stabilization upside-down mounting assembling apparatus and method thereof
CN201695744U (en) * 2009-12-03 2011-01-05 浙江省送变电工程公司 Pole luffing cable
CN102322173A (en) * 2011-07-04 2012-01-18 江苏省电力公司海门市供电公司 Fall-off portable holding rod
CN102644403A (en) * 2011-06-24 2012-08-22 国家电网公司直流建设分公司 Holding pole with detachable standard knots
CN202689671U (en) * 2012-04-27 2013-01-23 山西省电力公司大同供电分公司 Lifting type holding rod
CN203794469U (en) * 2014-04-18 2014-08-27 国家电网公司 Inversed-v-shaped holding pole for replacing disconnecting link

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2644666A (en) * 1951-06-27 1953-07-07 Lee S Johnson Gin pole and universal top assembly therefor
CN2039471U (en) * 1988-05-12 1989-06-14 范文林 Multi-functional combined round tube clasper
US20020095878A1 (en) * 2000-12-05 2002-07-25 Henderson Allan P. Tilt-up and telescopic support tower for large structures
CN201190443Y (en) * 2008-04-22 2009-02-04 赵国良 Embraced Bar special for tower set
CN101429827A (en) * 2008-11-28 2009-05-13 程永忠 Leaning tower self-stabilization upside-down mounting assembling apparatus and method thereof
CN201695744U (en) * 2009-12-03 2011-01-05 浙江省送变电工程公司 Pole luffing cable
CN102644403A (en) * 2011-06-24 2012-08-22 国家电网公司直流建设分公司 Holding pole with detachable standard knots
CN102322173A (en) * 2011-07-04 2012-01-18 江苏省电力公司海门市供电公司 Fall-off portable holding rod
CN202689671U (en) * 2012-04-27 2013-01-23 山西省电力公司大同供电分公司 Lifting type holding rod
CN203794469U (en) * 2014-04-18 2014-08-27 国家电网公司 Inversed-v-shaped holding pole for replacing disconnecting link

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107829596A (en) * 2017-11-30 2018-03-23 浙江省送变电工程有限公司 A kind of extra-high voltage iron tower group founds multipurpose herringbone holding pole
CN109138577A (en) * 2018-07-11 2019-01-04 云南电网有限责任公司曲靖供电局 Adjusting rod and herringbone holding pole
CN108996418A (en) * 2018-08-06 2018-12-14 国网上海市电力公司 A kind of retractable multifunctional post mounting accessories

Similar Documents

Publication Publication Date Title
CN106939707B (en) A kind of restricted clearance large-scale steel structure supporting platform from method for improving
CN102359303A (en) Extra-high voltage common circuit iron tower assembling method
CN104234200B (en) A kind of suspen-shell structure rope leverage is by ring lifting installation method
CN102251483B (en) Construction method for hoisting concrete-filled steel tube lattice bridge pier through self-lifting attached crane
CN105226560B (en) A kind of crossing frame and its construction method
CN104276514B (en) Mounting method of flooring self-balance wrapping rod
CN201323398Y (en) Small-sized electric power equipment landing gear
CN202260192U (en) Derrick mast with adjustable height
CN202544468U (en) Drawbar-type electrical steel tubular rod
CN103896153A (en) Zig-zag derrick for replacing disconnecting link
CN204625045U (en) A kind of steel structure hoisting door shaped stent formula hanging apparatus
CN201737616U (en) Double-lifting pole
CN203284126U (en) Simple composite gantry high-altitude weight hoisting device
CN203794469U (en) Inversed-v-shaped holding pole for replacing disconnecting link
CN204040598U (en) The two rocker pole of a kind of remote control hydraulic
CN204324741U (en) Load switch of transformer suspended core apparatus
CN203826824U (en) Single holding pole for replacing disconnecting link
CN203715115U (en) Supporting point structure for self-hoisting system of portal crane
CN202729645U (en) Tower crane with elevator
CN204125120U (en) Distribution insulated elevating platform
CN105366559A (en) Small hoisting machine fixed on channel steel framework
CN204384733U (en) Bus plug-in strip Lift-on/Lift-off System
CN204570396U (en) D type is the traversing door frame of beam just
CN103904575A (en) Single tower crane for replacing disconnecting links
CN203545559U (en) Electric meter box hoisting tool

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20140702