CN102359302B - Extra-high voltage large-span iron tower assembling method - Google Patents

Extra-high voltage large-span iron tower assembling method Download PDF

Info

Publication number
CN102359302B
CN102359302B CN 201110334607 CN201110334607A CN102359302B CN 102359302 B CN102359302 B CN 102359302B CN 201110334607 CN201110334607 CN 201110334607 CN 201110334607 A CN201110334607 A CN 201110334607A CN 102359302 B CN102359302 B CN 102359302B
Authority
CN
China
Prior art keywords
pole
tower
lifting
iron tower
extra
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN 201110334607
Other languages
Chinese (zh)
Other versions
CN102359302A (en
Inventor
彭世建
何明
张松华
余秋安
童庆望
邹俊
季斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Hubei Electric Power Transmission and Distribution Engineering Co Ltd
Original Assignee
State Grid Corp of China SGCC
Hubei Electric Power Transmission and Distribution Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Hubei Electric Power Transmission and Distribution Engineering Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN 201110334607 priority Critical patent/CN102359302B/en
Publication of CN102359302A publication Critical patent/CN102359302A/en
Application granted granted Critical
Publication of CN102359302B publication Critical patent/CN102359302B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The invention discloses an extra-high voltage large-span iron tower assembling method, which belongs to the technical field of electric transmission and transformation electric power circuit construction processes. The method comprises the following steps of: 1, arranging a construction site, namely arranging a ground anchor, performing pole foundation construction, and arranging main material single pieces and tower sheets of an assembled iron tower body on the ground; 2, assembling a pole, mounting a hoisting system, and hoisting iron tower legs, wherein the assembled pole is a spinning self-elevating ground pole which is provided with horizontal double arms and a hydraulic downward jacking stock; 3, lifting the pole, hoisting the iron tower body section by section, and finally hoistingiron tower cross arms one by one in a segmentation mode; and 4, mounting iron tower accessories, disassembling the pole, and finally overhauling and self-checking to finish the construction. The method has the advantages of reducing the working amount of aloft operation, along with a short construction period, a small number of hoisting times and high safety; by the method, safety risks are reduced, required aloft operation personnel is greatly reduced, and labor cost is reduced; and the method has extremely good economic and social benefits.

Description

Extra-high voltage large crossing tower method for assembling
Technical field
The present invention relates to power transmission and transformation power line construction technology, relate in particular to a kind of extra-high voltage large crossing tower method for assembling.
Background technology
The research of the upright technology of extra-high voltage iron tower group is rarely found in the prior art, because extra-high voltage large crossing tower scantling is big, lift heavy is big, it is difficult to install, difficulty has the reference part in the prior art, the difficult point of its construction is, it is very inconvenient that the arm of pole is installed and removed, and hoisting weight is big, the large-scale hoist engine of needs carry out amplitude modulation to rocking arm, so that tower spare installation in position, and lifting often, amount of high-altitude operation is big, dangerous, and the stability of Lift-on/Lift-off System is difficult to guarantee.
Summary of the invention
The objective of the invention is to solve the problem that exists in the above-mentioned background technology, that the arm that proposes a kind of pole is installed and removed is very convenient, the lifting number of times is few in the integral construction, amount of high-altitude operation is few, the extra-high voltage large crossing tower method for assembling that Lift-on/Lift-off System is stable, efficiency of construction is high.
For achieving the above object, the technical scheme of the present invention's design is as follows:
Extra-high voltage large crossing tower method for assembling comprises following steps:
1., arrange the job site: arrange earth anchor and carry out the pole foundation construction, arrange trailer system and aerodynamic field, iron tower hanging piece control rope, monitoring system, power supply, crane are set, place main material single-piece, the tower sheet of assembling iron tower body of the tower on ground;
2., the upright pole of group, tackling system is installed, lifting iron tower tower leg, institute organize upright pole be with the spin of jacking stock under horizontal both arms and the hydraulic pressure from rise a pole;
3., promote pole, and lift the iron tower body of the tower piecemeal, last segmentation lifts the iron tower cross-arm piecewise;
4., the iron tower annex is installed, remove pole, overhaul at last and self check, finish construction.
In technique scheme, step 1. in, the on-the-spot earth anchor of arranging adopts the Cast-in-place concrete mode, earth anchor and iron tower foundation construction are constructed synchronously; And bury the earth anchor draw ring underground on the basis.
In technique scheme, described trailer system is included in the steering that arranges on the pole base, disposes deflecting roller on the steering.
In technique scheme, step 2. in, the upright pole concrete grammar of group is, form the pole shaft by crane lifting pole base, standard knot, simultaneously the hydraulic lifting stock is lifted on the standard knot outside, bottom, then with crane lifting iron tower tower leg, utilizes hydraulic lifting stock top pole to connect standard knot then, lift the flat arm in both sides of pole top standard knot and pole, pull bar is installed on the pole top, utilize pull bar that the flat arm in both sides is remained on horizontal level.
In technique scheme, the flat arm concrete grammar of lifting pole is that elder generation is assembled into integral body on ground with flat arm, with crane it is hung the flat arm of pole installation site at a slow speed again.
In technique scheme, the step 2. middle tackling system of installing comprises hoist engine, dolly, suspension hook, plays Hanging roller, hoisting wirerope.
In technique scheme, step 3. middle lifting body of the tower concrete grammar is, the body of the tower of balance lifting simultaneously master material assembly on the flat arm in the both sides of pole, liftoff, synchronous lifting, in place synchronously synchronously, after the installation of body of the tower master material, with the flat arm half-twist of pole, oblique material and the horizontal material of lifting body of the tower are also installed fastening oblique material and horizontal material, progressively upwards lift the oblique material of body of the tower and horizontal material up to the lifting work of finishing whole body of the tower by this step.
The upright extra-high voltage common line iron tower of the backguy pole group tower process group of landing outside the present invention's employing center suspends, develop two flat arm spins voluntarily from rising seat ground pole, and configuration hydraulic lifting, the both sides boom adopts two hinges on base to be connected with the pole shaft, guarantee that boom can be approximately perpendicular folding up and down, therefore have arm and install and remove advantage easily; Simultaneously, arm is fully with reference to the design of the principle of tower crane and to have a hoisting weight by the processing of professional tower crane factory big, and the lifting number of times is few, reduces work high above the ground work amount, the advantage that safety is good; Iron tower body of the tower and tower leg all adopt the both arms lifting; the both sides arm is balance each other; but also bilateral arm balance lift heavy simultaneously; the stability of Lift-on/Lift-off System and efficiency of construction have been increased greatly in work progress; be equipped with advanced monitoring system, full control system install data show, report to the police, control, function such as protection, the lifting of pole, lifting, revolution, etc. all adopt video monitoring and centralized operation control; the whole process of constructing is carried out special messenger's monitoring, safe and reliable.
The present invention has satisfied the requirement of standardized construction fully, can be used for instructing the upright standardized construction of extra-high voltage large crossing tower group, for the construction of extra-high voltage experiment and demonstration engineering safety, raising work efficiency, realization environmental objective provide technical support, also for using construction of the same type to have great reference value and directive significance in domestic other extra-high voltage project from now on.
Description of drawings
Fig. 1 is the overall construction flow chart of the present invention;
Fig. 2 rises a seat ground pole schematic diagram certainly for the two flat arm spin of using in the work progress of the present invention;
Among the figure, 1, cast-in fixing bolt; 2, pole basis; 3, pole mobile jib; 4, waist hoop; 5, pivoting support; 6, boom; 7, coaster; 8, suspension hook; 9, strut; 10, pull bar; 11, luffing hoist engine; 12, pull rope; 13, deflecting roller; 14, hoist engine; 15, iron tower; 16, hydraulic lifting stock.
The specific embodiment
The present invention is described in further detail below in conjunction with drawings and Examples.
Consult shown in Figure 1, extra-high voltage large crossing tower method for assembling, it comprises following steps:
1., arrange the job site: arrange the job site: arrange earth anchor and carry out the pole foundation construction, arrange trailer system and aerodynamic field, iron tower hanging piece control rope, monitoring system, power supply, crane are set, place main material single-piece, the tower sheet of assembling iron tower body of the tower on ground; Carry out the basis simultaneously and recheck, Work tool test, formulation job instruction, technical security are told somebody what one's real intentions are, the preparation that levelling of the land, pavement recondition, transport of materials, construction temporory structure arrange;
2., the upright pole of group, tackling system is installed, lifting iron tower tower leg, institute organize upright pole be with the spin of jacking stock under horizontal both arms and the hydraulic pressure from rise a pole;
3., promote pole, and lift the iron tower body of the tower piecemeal, last segmentation lifts the iron tower cross-arm piecewise;
4., the iron tower annex is installed, remove pole, overhaul at last and self check, finish construction.
Specific embodiment
With the test to the upright technology of extra-high voltage iron tower group on the 1000kV extra-high voltage proving ground concrete technical scheme of the present invention is described.
1, arranges the job site
Arrange earth anchor: the on-the-spot earth anchor of arranging adopts the Cast-in-place concrete mode, and earth anchor and iron tower foundation construction are constructed synchronously; And bury earth anchor draw ring, the construction of convenient group tower underground on the basis.
Arrange trailer system: concentrated steering is set on the pole base.Pull rope, accent arm rope are by concentrating steering steering power field.Aerodynamic field is taked to concentrate and is monitored electric control operation, accurately with synchronously, realizes safety interlocking with safety action, prevents maloperation.
The pole system is set:
A, pole backguy: pole basis and pole Synchronization Design need not arrange backguy when generally lifting, by basis carrying moment of flexure and uncompensated load.In can adopting backguy at the diagonal angle (main material) direction arrange, to improve pole stability;
B, pole waist hoop: along with the progress, the pole that lift constantly raise, for the pressure that guarantees pole is stable, must to pole multilayer waist hoop be set according to hoisting height, waist hoop spacing is less than or equal to 30 meters, and in iron tower respective nodes position waist hoop linkage is set;
C, lifting direction pre-set: when hanging main material flat arm go to iron tower to the angular direction, flat arm goes to the lateral arrangement of circuit when erection tower body first half tower sheet and cross-arm;
The apparatus arrangement of other outfits:
A, for ease of seeing lifting situation on the tower clearly, improve safety, iron tower hanging piece control rope earth anchor, is mainly used in tower leg portion and lifts main material apart from 100m place, tower center the angular direction being arranged four groups of traction power consoles respectively; Along line and horizontal line road direction four groups of traction power consoles being set respectively, apart from 200m place, tower center, be mainly used in the lifting control that members such as sheet and cross-arm are hung on body of the tower top.
Job schedule plans such as lifting and assembling, haul should be listed in b, scene, carry out to guarantee lifting everything goes well with your work;
Traction powers such as c, outfit hoist engine, and employing is concentrated automatically controlled, special messenger's operation, special messenger's monitoring;
D, center command set arrange TV monitor system and radio communication system, and the operation of key position is monitored, commanded;
Totally 7 in the hoist engines of e, the on-the-spot size of configuration difference altogether of crossover tower, TV monitoring system 1 cover and auxiliary equipment etc. arrange enough and reliable supply power supply;
F, outfit 160kN crane auxiliary construction instrument are used for the assembling of tower sheet and adopt, and establish the special messenger and command and guard.
2, the upright pole of group, installation tackling system, lifting iron tower tower leg
The upright pole of group rises seat ground pole certainly for the spin of being with both arms and hydraulic lifting stock, and concrete structure is consulted shown in Figure 2:
Cast on the stage cast-in fixing bolt 1 cast-in-place crab-bolt formula basis on the basis as pole pedestal 2.
Be installed with pole mobile jib 3 up on pole basis 2, the bottom of pole mobile jib 3 is set with hydraulic lifting stock 16, be arranged at intervals with multilayer waist hoop 4 on the pole mobile jib 3, the top of pole mobile jib 3 is installed with the pivoting support 5 with pole mobile jib 3 concentrics, the top of pivoting support 5 is installed with two identical booms 6 that are positioned on the same horizon, on two booms 6 coaster 7 is installed respectively, all be hung with suspension hook 8 on the coaster 7, the top of pivoting support 5 is installed with strut 9, the top bilateral symmetry of strut 9 fixedly has many pull bars 10, the end of many pull bars 10 is separately fixed on two booms 6, a luffing hoist engine 11 respectively is installed on two booms 6, luffing hoist engine 11 all is connected with 12, two pull ropes 12 of pull rope and is connected with hoist engine 14 by the deflecting roller 13 that is installed in pole mobile jib 3 two bottom sides respectively.
Be safety of construction, the spacing in the multilayer waist hoop 4 between adjacent two waist hoops 4 is less than or equal to 30 meters, and lead-out wire on the waist hoop 4 is connected to iron tower 15 respective nodes positions, and the length of boom 6 is greater than 22 meters.
The upright pole concrete grammar of group is, form the pole mobile jib by crane lifting pole standard knot, simultaneously the hydraulic lifting stock is lifted on the standard knot outside, bottom, then use the hypomere of crane lifting iron tower tower leg, utilize hydraulic lifting stock top pole to connect standard knot then, lift the flat arm in both sides of pole top standard knot and pole, pull bar is installed on the pole top, utilize pull bar that the flat arm in both sides is remained on horizontal level.
Crane lifting pole and tower leg hypomere: utilize crane lifting tower leg hypomere earlier, begin lifting again after the crane position is fixing according to the needs displacement of hanging piece.The lifting swivel is with some sections in lower part of the body portion and pole jacking frame earlier during the crane lifting pole, and it is fixing that pole bottom and jacking frame are installed on the pole basis, and then lifting pole top, makes it possess the condition of own jacking.
The flat arm lifting of pole: movable ear seat, inner arm, middle arm, outer arm are assembled into one on ground.The latch nut inwardly, inside and outside arm will correctly match according to the paint mark on the arm.
Perhaps, utilize the ear of embracing on the pole cap to pull the hole, pulley is installed, the lifting arm.Movable ear seat is docked with being connected joint, and used bolt is 8.8 grades, and left and right sides arm can not exchange
Pull upright arm, with the control rope arm is outwards pulled out earlier, pull stressed arm is slowly pulled of upright wire rope then and found horizontal level.
Three yoke plates, pull bar and transition arm-tie are installed, and transition arm-tie two ends use latch φ 50 * 140, and all the other connect uses latch φ 50 * 80.Transition arm-tie length is different, and its color of paint must be identical with corresponding tie point color of paint.Hoist engine, dolly, chain, suspension hook are installed then, are played annexes such as Hanging roller, hoisting wirerope.Opposite side arm the same manner is installed.
3, promote pole, place main material single-piece, the tower sheet of assembling iron tower body of the tower on ground, and by the upright body of the tower of part lifting group, the lifting iron tower is cranked arm
Rise pole: after adopting the partly hypomere of the intact tower leg of crane lifting and pole system, utilize hydraulic lifting stock top pole, the tipping standard knot is till pole allows free height to satisfy next section of lifting tower sheet.
The body of the tower lifting: adopt bilateral equilibration lifting or one-sided lifting, make hanging piece liftoff, synchronous lifting, in place synchronously synchronously, reduce the unbalanced moment that pole bears, the unbalanced moment of pole must be controlled in 750kNm.In the lifting operation process, take the measure of dodging in advance, prevent the pole backguy and hung that member is in place an interference, must not in lifting, adjust the waist hoop.
Lifting operation takes main material single-piece to decompose lifting or the erection tower sheet mode depends on each iron leg tower weight amount, allows at pole under the prerequisite of lift heavy, will adopt tower sheet lifting mode.Behind the tower sheet installation in position, with the flat arm half-twist of pole, the lifting tower body is oblique material and the horizontal material of two sides in addition.Treat tower body four skew back materials and horizontal material installs and bolton after the hoisting sling of can loosening.
By above-mentioned lifting mode, the lifting that progressively makes progress partly lifts until body of the tower to be finished.
The lifting of cranking arm: supporting capacity and site condition according to pole determine to adopt the upper and lower split Hoisting Program of cranking arm.Can adopt both sides crank arm balance lifting or one-sided lifting mode according to the construction plant.
2 liftings are adopted in the lower bent lever lifting, and during lifting, the angle of inclination of cranking arm conforms to substantially with installation back angle, so that the installation of cranking arm; After all bolts are all installed, removed hanging pulley.
On crank arm that lifting is same adopts 2 liftings, the lifting angle should be adjusted so that installation in place.Both sides crank arm that lifting is finished and fastening bolt after, add wire rope and double hook turnbuckle in the front and back suitable for reading side of cranking arm and regulate and tighten up, and the bolt hole distance suitable for reading of cranking arm on measuring, confirm its with the cross-arm respective bolt holes apart from whether conforming to.
4, segmentation lifts the iron tower cross-arm piecewise, and the iron tower annex is installed, and removes pole, overhauls at last and self check, finishes construction
Cross-arm lifting: integral hoisting dual-side cross-arm and ground line bracket, lifting cross-arm middle part.Earlier the flat arm of pole is gone to along line direction, do not overlap with cross-arm when flat arm backspin is removed, take the opposite sequence of pole system assembles to remove then.
The present invention's pole that adopts of constructing is all-hydraulic lifting, and lifting effective operation radius is 2.4~22 meters, and the suspension centre adjustment is identical with tower crane, the lifting of pole, lifting, revolution, etc. all adopt video monitoring and centralized operation to control.The pole system adopts advanced equipment in a large number, and the safety device that tower crane possesses is all joined in this pole system entirely, comprising: snubber; Hoisting weight restriction/indicator; Dolly amplitude restriction/indicator, lifting altitude restriction/indicator, angle of revolution restriction/indicator; Hoisting moment restriction/indicator, hoisting moment difference control/indicator; Anemobiagraph, lightning protection earthing, red barrier lamp; Suspension hook and reel are prevented rope releaser, amplitude variation trolley off-axis anti-drop device; Safety control system install data show, report to the police, control, function such as protection.Four angular direction that pivoting support is following are provided with four and draw ear, be used for arranging connect in backguy, interior backguy angle over the ground is 45 °, to improve the stability of pole when the various operating mode.The whole construction course security monitoring, construction safety is reliable.
The content that this manual is not described in detail belongs to the known prior art of this area professional and technical personnel.

Claims (6)

1. extra-high voltage large crossing tower method for assembling is characterized in that comprising following steps:
1., arrange the job site: arrange earth anchor and carry out the pole foundation construction, arrange trailer system and aerodynamic field, iron tower hanging piece control rope, monitoring system, power supply, crane are set, place main material single-piece, the tower sheet of assembling iron tower body of the tower on ground;
2., the upright pole of group, the upright pole concrete grammar of group is, form the pole shaft by crane lifting pole base, standard knot, simultaneously the hydraulic lifting stock is lifted on the standard knot outside, bottom, then with crane lifting iron tower tower leg, utilize hydraulic lifting stock top pole to connect standard knot then, lift the flat arm in both sides of pole top standard knot and pole, pull bar is installed on the pole top, utilize pull bar that the flat arm in both sides is remained on horizontal level; Tackling system is installed, lifting iron tower tower leg, institute organize upright pole be with the spin of jacking stock under horizontal both arms and the hydraulic pressure from rise a pole;
3., promote pole, and lift the iron tower body of the tower piecemeal, last segmentation lifts the iron tower cross-arm piecewise;
4., the iron tower annex is installed, remove pole, overhaul at last and self check, finish construction.
2. extra-high voltage large crossing tower method for assembling according to claim 1 is characterized in that, step 1. in, the on-the-spot earth anchor of arranging adopts the Cast-in-place concrete mode, earth anchor and iron tower foundation construction are constructed synchronously; And bury the earth anchor draw ring underground on the basis.
3. extra-high voltage large crossing tower method for assembling according to claim 1 and 2 is characterized in that, described trailer system is included in the platform that turns to of ground, iron tower center setting, turns to pull rope and the deflecting roller of configuration steering power field usefulness on the platform.
4. extra-high voltage large crossing tower method for assembling according to claim 1 is characterized in that, the flat arm concrete grammar of lifting pole is that elder generation is assembled into integral body on ground with flat arm, with crane it is hung the flat arm of pole installation site at a slow speed again.
5. extra-high voltage large crossing tower method for assembling according to claim 1 is characterized in that, the step 2. middle tackling system of installing comprises hoist engine, dolly, suspension hook, plays Hanging roller, hoisting wirerope.
6. extra-high voltage large crossing tower method for assembling according to claim 1, it is characterized in that, step 3. middle lifting body of the tower concrete grammar is, the body of the tower of balance lifting simultaneously master material assembly on the flat arm in the both sides of pole, liftoff, synchronous lifting, in place synchronously synchronously, after the installation of body of the tower master material, with the flat arm half-twist of pole, oblique material and the horizontal material of lifting body of the tower are also installed fastening oblique material and horizontal material, progressively upwards lift the oblique material of body of the tower and horizontal material up to the lifting work of finishing whole body of the tower by this step.
CN 201110334607 2011-10-31 2011-10-31 Extra-high voltage large-span iron tower assembling method Active CN102359302B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110334607 CN102359302B (en) 2011-10-31 2011-10-31 Extra-high voltage large-span iron tower assembling method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110334607 CN102359302B (en) 2011-10-31 2011-10-31 Extra-high voltage large-span iron tower assembling method

Publications (2)

Publication Number Publication Date
CN102359302A CN102359302A (en) 2012-02-22
CN102359302B true CN102359302B (en) 2013-10-09

Family

ID=45584677

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110334607 Active CN102359302B (en) 2011-10-31 2011-10-31 Extra-high voltage large-span iron tower assembling method

Country Status (1)

Country Link
CN (1) CN102359302B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103924816A (en) * 2014-04-16 2014-07-16 山东送变电工程公司 Installation method for cup type iron tower of ultra-high voltage transmission line

Families Citing this family (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103924826A (en) * 2013-01-10 2014-07-16 张启富 Telescopic serial holding pole lifting telescopic arm
CN104278874A (en) * 2013-07-06 2015-01-14 湖北省电力公司黄冈供电公司 Method for assembling iron tower through high-voltage power transmission lines
CN104192469B (en) * 2014-08-29 2016-07-06 国家电网公司 A kind of electricity tower sliding conveying arrangement and using method thereof
CN104594696B (en) * 2014-12-19 2016-11-02 国家电网公司 Double embrace bar group is utilized to found 1000kV tangent suspension tower construction method
CN104878977B (en) * 2015-06-09 2017-06-09 广西建工集团第五建筑工程有限责任公司 High-rise building decorates tower modular organization installation method
CN106245986A (en) * 2016-10-11 2016-12-21 国家电网公司 The method for assembling of power network line steel tower and device
CN106972412B (en) * 2017-03-20 2019-07-26 国家电网公司 UHV transmission line lattice crossing frame
CN107227881A (en) * 2017-05-10 2017-10-03 宝鸡市银光电力机具有限责任公司 A kind of adhesion type is from lifting pole
CN107143198B (en) * 2017-05-24 2019-05-03 常熟风范电力设备股份有限公司 A method of UHV transmission steel tower is found suitable for mountain area sternness location group
CN109138583A (en) * 2018-09-27 2019-01-04 国网湖北省电力有限公司宜昌供电公司 A method of for make somebody a mere figurehead steel tower main material and efficient Forming framework sky steel tower
CN109236012B (en) * 2018-11-05 2020-08-04 中国电建集团山东电力建设第一工程有限公司 Method for hoisting power transmission line T-shaped guyed tower
CN115324416A (en) * 2022-03-14 2022-11-11 中铁一局集团电务工程有限公司 Integral hoisting construction process for iron tower
CN115354882B (en) * 2022-07-15 2023-08-22 安徽送变电工程有限公司 Method for dismantling ultra-large spanning old electric tower

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201362980Y (en) * 2008-11-25 2009-12-16 江苏省送变电公司 Steel tube holding pole
CN101649682A (en) * 2008-08-13 2010-02-17 黑龙江省送变电工程公司 Method for assembling tower by post-assembly rocker arm holding pole technology
WO2011099915A1 (en) * 2010-02-09 2011-08-18 Spektrakon Ab Method for erecting a wind turbine tower

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101649682A (en) * 2008-08-13 2010-02-17 黑龙江省送变电工程公司 Method for assembling tower by post-assembly rocker arm holding pole technology
CN201362980Y (en) * 2008-11-25 2009-12-16 江苏省送变电公司 Steel tube holding pole
WO2011099915A1 (en) * 2010-02-09 2011-08-18 Spektrakon Ab Method for erecting a wind turbine tower

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103924816A (en) * 2014-04-16 2014-07-16 山东送变电工程公司 Installation method for cup type iron tower of ultra-high voltage transmission line
CN103924816B (en) * 2014-04-16 2015-11-25 山东送变电工程公司 A kind of mounting method of UHV transmission line wine glass-shaped steel tower

Also Published As

Publication number Publication date
CN102359302A (en) 2012-02-22

Similar Documents

Publication Publication Date Title
CN102359302B (en) Extra-high voltage large-span iron tower assembling method
CN102359303B (en) Extra-high voltage common circuit iron tower assembling method
CN102213033B (en) The method of construction of wind-driven generator mixing pylon
CN102071644B (en) Lifting installation method of integral bridge arch rib
CN102267664B (en) Method for installing bridge crane using load-supporting roof beam for hoisting and usage thereof
CN202346637U (en) Holding rod of double-flat-arm spinning self-lifting seat
CN103225408A (en) Construction method for long-span net rack multiple-mast independent type integral lifting
CN105421859A (en) Electricity grid telegraph pole erecting device and construction method
CN208899886U (en) Cantilever frame platform
CN109236012B (en) Method for hoisting power transmission line T-shaped guyed tower
CN206692235U (en) A kind of steel structure dome lifts by crane erecting device
CN109138452A (en) Heavy construction bolt sphere steel pipe rack entirety fast lifting construction technology
CN104909312A (en) Electric operating vehicle
CN114873497A (en) Vertical lifting installation device and method for variable-diameter unbalanced load equipment
CN104343086A (en) Small-spatial construction method for steel anchor beam anchoring zone of cable-stayed bridge upper pylon
CN209308175U (en) A kind of factory building roof rack mounting structure
CN204727562U (en) A kind of electric power operation car
CN202899720U (en) Steel pole provided with foot treadles and used for high-tension transmission line iron tower
CN210457249U (en) Electric pole holding structure with self-jacking machine body
CN209244229U (en) A kind of pin-connected panel suspention steel platform
JPH05286694A (en) Construction method and crane for assembling external type steel tower
CN216240042U (en) Holding pole standing device
CN111706149A (en) Construction method of novel assembled holding pole
CN110359756A (en) 750kV booster stations framework installation method
CN203826824U (en) Single holding pole for replacing disconnecting link

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: STATE GRID CORPORATION OF CHINA

Effective date: 20121220

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: Yang Yuansheng 430063 Hubei province Wuhan city Wuchang District Road No. 5

Applicant after: HUBEI ELECTRIC POWER TRANSMISSION & DISTRIBUTION ENGINEERING Co.

Address before: Yang Yuansheng 430063 Hubei province Wuhan city Wuchang District Road No. 5

Applicant before: Hubei Electric Power Transmission & Distribution Engineering Co.,Ltd.

TA01 Transfer of patent application right

Effective date of registration: 20121220

Address after: Yang Yuansheng 430063 Hubei province Wuhan city Wuchang District Road No. 5

Applicant after: HUBEI ELECTRIC POWER TRANSMISSION & DISTRIBUTION ENGINEERING Co.

Applicant after: State Grid Corporation of China

Address before: Yang Yuansheng 430063 Hubei province Wuhan city Wuchang District Road No. 5

Applicant before: HUBEI ELECTRIC POWER TRANSMISSION & DISTRIBUTION ENGINEERING Co.

C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Peng Shijian

Inventor after: He Ming

Inventor after: Zhang Songhua

Inventor after: Yu Qiuan

Inventor after: Tong Qingwang

Inventor after: Zou Jun

Inventor after: Ji Bin

Inventor before: Peng Shijian

Inventor before: He Ming

Inventor before: Zhang Songhua

Inventor before: Yu Qiuan

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: PENG SHIJIAN HE MING ZHANG SONGHUA YU QIUAN TO: PENG SHIJIAN HE MING ZHANGSONGHUA YU QIUAN TONG QINGWANG ZOU JUN JI BIN

C14 Grant of patent or utility model
GR01 Patent grant