CN107143198B - A method of UHV transmission steel tower is found suitable for mountain area sternness location group - Google Patents

A method of UHV transmission steel tower is found suitable for mountain area sternness location group Download PDF

Info

Publication number
CN107143198B
CN107143198B CN201710373450.9A CN201710373450A CN107143198B CN 107143198 B CN107143198 B CN 107143198B CN 201710373450 A CN201710373450 A CN 201710373450A CN 107143198 B CN107143198 B CN 107143198B
Authority
CN
China
Prior art keywords
support bar
tower
pole
arm
group
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710373450.9A
Other languages
Chinese (zh)
Other versions
CN107143198A (en
Inventor
赵月华
赵金元
顾小蕾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changshu Fengfan Power Equipment Co Ltd
Original Assignee
Changshu Fengfan Power Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changshu Fengfan Power Equipment Co Ltd filed Critical Changshu Fengfan Power Equipment Co Ltd
Priority to CN201710373450.9A priority Critical patent/CN107143198B/en
Publication of CN107143198A publication Critical patent/CN107143198A/en
Application granted granted Critical
Publication of CN107143198B publication Critical patent/CN107143198B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/34Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Electric Cable Installation (AREA)

Abstract

The invention discloses a kind of methods for founding UHV transmission steel tower suitable for mountain area sternness location group, include the following steps: (1) preparation of construction;(2) vertical tower leg lower section is organized;(3) pole group is vertical and bracing wire unfolds;(4) tower leg middle and lower sections and tower body group are vertical, pole is promoted and adjustment;(5) cross-arm and tower body attachment are lifted;(6) it removes pole: successively removing first support bar, mobile jib section and second support bar in order;(7) defect is eliminated in maintenance and self-test, completes construction.The unrestricted limitation with landform of the method for high-voltage power transmission tower of the invention, efficiently solve the difficulty that mountain area group founds strain insulator steel tower, it has the advantages that (1) meets the requirement of standardized construction, can be used for instructing the standardized construction of extra high voltage line tower erection;(2) combined pole is used, so that the unfolding of external cable is not limited by terrain at the top of pole, improves the geographical location flexibility of tower erection.

Description

A method of UHV transmission steel tower is found suitable for mountain area sternness location group
Technical field
The present invention relates to power transmission and transformation power line construction technical fields, are not only restricted to draw at the top of pole more particularly to one kind The method for assembling of the UHV transmission steel tower suitable for mountain area sternness location of line unfolding.
Background technique
Tower erection construction is important link in transmission line construction, great in constructing amount, security risk is high.For Zang Dong, The western high mountain in river, uplift plateau equal ripple drop are big, ravines and guillies criss-cross, the special construction environment with steep cliff, steep bank, because of the bracing wire of pole top It can not unfold, the group for usually limiting UHV transmission steel tower stands the development of work.
Supertension line tower erection itself is installed there are the boom of pole and dismounting is inconvenient, hoisting weight is big, Zong Xianggao Big, Hoisting Position is spent far from problems such as steel tower centers.
In addition, on the one hand since the research of the vertical technique of extra-high voltage iron tower group is rarely found in the prior art;On the other hand existing There is combined pole to be essentially the straight bar section using the connection of multiple standard components, generallys use interior suspension in tower erection construction External cable formula pole split tower erection or inner suspended inner guy formula pole split tower erection, it is very big that the former is in height difference variation for tower position Butte, halfway up the hill even precipitous cliff area etc. be not easy to the place of bracing wire, landing external cable over the ground horizontal plane angle it is difficult to ensure that not Greater than 45 °, the latter is it is difficult to ensure that the stability lifted, therefore, prior art location group severe for steep cliff, steep bank etc. are stood extra-high Pressure electric power pylon difficulty has reference place.
Summary of the invention
It is suitable for mountain area sternness location group the invention mainly solves the technical problem of providing one kind and founds UHV transmission iron The method of tower is able to solve prior art topography the following group severe for steep cliff, steep bank etc. and founds hardly possible existing for super high voltage power line iron tower Topic.
In order to solve the above technical problems, one technical scheme adopted by the invention is that: it provides a kind of severe suitable for mountain area The method that location group founds UHV transmission steel tower, includes the following steps:
(1) preparation of construction: clearing up and arranges construction site, and tower material and relevant device needed for tower erection are transported to and applied Workshop;
(2) it organizes vertical tower leg lower section: being opened according to tower leg weight, root, the group of main material length and place completion tower leg lower end is stood;
(3) pole group is vertical and bracing wire unfolds:
1. pole mobile jib section is stood up: the main material top-hung coaster for the tower leg lower section that group has been stood in step (2) utilizes lifting Wirerope lifts by crane the mobile jib section of pole on the inside of main material;
2. first support bar is fixed: will consolidate between one end of the first support bar of pole and mobile jib section by certain angle bolt It is fixed;
3. second support bar is fixed: one end of the second support bar of pole is connect with the main material node of tower leg lower section, it will The other end of second support bar and the other end screw of first support bar are fixed;
4. bracing wire unfolds: one end of bracing wire being fixed on to the top of mobile jib section, then pile warp first support bar and second The junction of strut, the other end are fixed on the junction of the tower leg lower section and ground;
(4) tower leg middle and lower sections and tower body group are vertical, pole is promoted and adjustment: using pole segmental hoisting group stand tower leg middle section and Push up section;Tower body is lifted using pole segmentation or fragment;According to the vertical height of tower body group, is repeatedly promoted using waist hoop and adjust pole;
(5) cross-arm and tower body attachment are lifted: first placing assembling ground wire cross-arm and conducting wire cross-arm on ground, then utilizes pole Segmental hoisting ground wire cross-arm, conducting wire cross-arm and tower body attachment;
(6) it removes pole: successively removing first support bar, mobile jib section and second support bar in order;
(7) defect is eliminated in maintenance and self-test, completes construction.
In a preferred embodiment of the present invention, in the step (3), consolidating between the first support bar and mobile jib section Determining angle is 120~150 °.
In a preferred embodiment of the present invention, in the step (4), the pole promotes the method with adjustment are as follows: first The connection bolt between first support bar and second support bar is opened, using waist hoop in the main material inboard lift mobile jib for having organized tower body Section adjusts position of the second support bar on the main material node for having organized tower body, finally by first support bar and second then up The end of support rod is bolted fixation again.
In a preferred embodiment of the present invention, in the step (5), the ground wire cross-arm and conducting wire cross-arm include leftly Line cross-arm, right ground wire cross-arm, left conducting wire cross-arm and right conducting wire cross-arm;The left ground wire cross-arm, right ground wire cross-arm, left conducting wire cross-arm With right conducting wire cross-arm segmental hoisting one by one.
In a preferred embodiment of the present invention, the pole includes: mobile jib section, first support bar and second support bar; Wherein, the mobile jib section is formed by connecting by multiple standard knots, the standard knot include more supervisor and oblique cornical, the supervisor's Both ends be nested with respectively it is cementing have an aluminium alloy anchor ear connector, the both ends of the oblique cornical, which are nested with, cementing has the connection of the first aluminium alloy Head, the both ends of the oblique cornical are closed by the aluminium of first Aluminum alloy connector and the supervisor bottom of a upper standard knot respectively The aluminium alloy anchor ear connector at the opposite side of golden anchor ear connector and next standard knot supervisor top is bolted;Described first One end of strut is bolted with the aluminium alloy anchor ear connector in the mobile jib section, one end of the second support bar and transmission of electricity The main material node of steel tower connects, fixed between the other end of the first support bar and the other end of the second support bar to connect It connects.
In a preferred embodiment of the present invention, one end of the first support bar be nested with it is cementing have the second aluminium alloy connection Head, the both ends of the second support bar, which are nested with, cementing has the second Aluminum alloy connector, the first support bar and second support bar Between fixation is bolted by second Aluminum alloy connector and third Aluminum alloy connector.
In a preferred embodiment of the present invention, the mobile jib, diagonal web member, first support bar and second support bar are carbon Fiber and the composite mixed enhancing modified resin based composites of quartz fibre.
In a preferred embodiment of the present invention, the composite mixed mass ratio of the carbon fiber and quartz fibre be 2~ 3.5:1。
The beneficial effects of the present invention are: a kind of side for founding UHV transmission steel tower suitable for mountain area sternness location group of the present invention Method is a kind of new process that tower erection is realized on the basis of using the combined pole of special construction, with unrestricted The characteristics of with the limitation of landform, efficiently solves the difficulty that mountain area group founds strain insulator steel tower, has the advantages that
(1) requirement for meeting standardized construction can be used for instructing the standardized construction of extra high voltage line tower erection;
(2) combined pole is used, so that the unfolding of external cable is not limited by terrain at the top of pole, improves iron The vertical geographical location flexibility of tower group;
(3) special combined pole structure is easily achieved the vertical group of pole, promotion and disassembling section.
Detailed description of the invention
Fig. 1 is that the stereochemical structure during a kind of vertical UHV transmission steel tower suitable for mountain area sternness location group of the present invention is shown It is intended to;
Fig. 2 is the schematic top plan view that vertical steel tower is organized during group is vertical;
Fig. 3 is the structural schematic diagram of combined pole used;
The components in the drawings are labeled as follows: 1. mobile jib sections, 11. supervisors, 12. oblique cornicals, 2. first connecting rods, and 3. second Connecting rod, 4. aluminium alloy anchor ear connectors, 5. first Aluminum alloy connectors, 6. second Aluminum alloy connectors, 7. third aluminium alloys Connector, 8. Universal rotary turbines, 9. support links, 10. have organized electric power pylon, 13. bracing wire upper sections, 14. bracing wire lower sections, and 15. Lifting rope, 16. hanging pieces.
Specific embodiment
The preferred embodiments of the present invention will be described in detail with reference to the accompanying drawing, so that advantages and features of the invention energy It is easier to be readily appreciated by one skilled in the art, so as to make a clearer definition of the protection scope of the present invention.
Fig. 1 and Fig. 2 are please referred to, the embodiment of the present invention includes:
A method of UHV transmission steel tower being found suitable for mountain area sternness location group, is included the following steps:
(1) preparation of construction: clearing up and arranges construction site, and tower material and relevant device needed for tower erection are transported to and applied Workshop.
(2) it organizes vertical tower leg lower section: being opened according to tower leg weight, root, the group of main material length and place completion tower leg lower end is stood.
(3) pole group is vertical and bracing wire unfolds:
1. pole mobile jib section is stood up: the main material top-hung coaster for the tower leg lower section that group has been stood in step (2) utilizes lifting Wirerope lifts by crane the mobile jib section of pole on the inside of main material.
2. first support bar is fixed: by the angle between one end of the first support bar of pole and mobile jib section by 120~150 ° Degree bolt is fixed.
3. second support bar is fixed: one end of the second support bar of pole is connect with the main material node of tower leg lower section, it will The other end of second support bar and the other end screw of first support bar are fixed;Wherein it is possible to adjust second support bar and main material The link position of node makes pole establish back guy so as to adjust the connection angle between second support bar and first support bar (i.e. external cable) is in suitable angular range.
4. bracing wire unfolds: one end of bracing wire being fixed on to the top of mobile jib section, then pile warp first support bar and second The junction of strut, the other end are fixed on the junction of the tower leg lower section and ground;Bracing wire length can scale.
(4) tower leg middle and lower sections and tower body group are vertical, pole is promoted and adjustment:
Tower leg middle section and top section are stood using pole segmental hoisting group;
Tower body is lifted using pole segmentation or fragment;
According to the vertical height of tower body group, pole is repeatedly promoted and adjusted using waist hoop, every time after adjustment, makes the embedment of mobile jib section Depth accounts for the 1/3 of mobile jib segment length, and vertical tower body has been organized in 2/3 stretching, and specific tower bar is promoted and method of adjustment are as follows:
The connection bolt between first support bar and second support bar is first opened or lays down, from up to down successively using 3 Equidistantly distributing will be lifted up in the waist hoop in mobile jib section on the inside of the main material of mobile jib Duan Congyi group tower body, adjust then up Position of two support rods on the main material node for having organized tower body, finally by the end of first support bar and second support bar bolt again It is connected and fixed, in addition, suitably extending the length of bracing wire, and reaches suitable external cable angle.
(5) cross-arm and tower body attachment are lifted: first placing assembling ground wire cross-arm and conducting wire cross-arm on ground, then utilizes pole Segmental hoisting ground wire cross-arm, conducting wire cross-arm and tower body attachment;The ground wire cross-arm and conducting wire cross-arm include left ground wire cross-arm, right Line cross-arm, left conducting wire cross-arm and right conducting wire cross-arm;The left ground wire cross-arm, right ground wire cross-arm, left conducting wire cross-arm and right conducting wire are horizontal Carry on a shoulder pole segmental hoisting one by one.
(6) remove pole: when removing pole, first will open or lay down first support bar and mobile jib section and second support bar it Between connection bolt, so that first support bar first be removed;Then relax bearing rope, will draw steel using the coaster in the middle part of cross-arm Cord is fixed on mobile jib section center of gravity top, and binds big rope in the root of mobile jib section, and mobile jib section is pulled out tower using traction big rope Body;Finally, second support bar is removed from the main material node for having organized tower body.After the completion of dismounting, each anchor should be cheated and be backfilled, dropped The influence of low Construction on Environment.
(7) defect is eliminated in maintenance and self-test, completes construction.
Pole used in above-mentioned group of vertical UHV transmission steel tower is suspension external cable pole in combined type, comprising: mobile jib section 1, first support bar 2 and second support bar 3;Wherein, the mobile jib section 1 is formed by connecting by multiple standard knots, each standard knot packet Include oblique cornical 12 of the supervisor 11 and 1 piece tilt distribution of 2 parallelly distribute ons between 2 parallel charges, specifically, the supervisor 11 both ends be nested with respectively it is cementing have an aluminium alloy anchor ear connector 4, the both ends of the oblique cornical 12, which are nested with, cementing has the conjunction of the first aluminium The both ends of golden connector 5, the oblique cornical 12 pass through the first Aluminum alloy connector 5 and 11 bottom of supervisor of a upper standard knot The aluminium alloy anchor ear connector 4 at 11 top of the opposite side of aluminium alloy anchor ear connector 4 and next standard knot supervisor is bolted, phase The V-shaped distribution of diagonal web member 12 between adjacent two standard knots.
Aluminium alloy is fixed in addition, being also connected between mutually level two aluminium alloys anchor ear connector in mobile jib section The support link 9 of material constitutes firm triangular structure between the support link and the supervisor and oblique cornical.
The first support bar 2 has 4, and the both ends of each first support bar 2, which are nested with, cementing has the second Aluminum alloy connector 6, one end of first support bar 2 is connected by the second Aluminum alloy connector 6 with 4 bolt of aluminium alloy anchor ear connector in mobile jib section 1 Connect, to realize the connection of first support bar Yu mobile jib section, and make angle 120 between first support bar 2 and mobile jib section 1~ 150°.In addition, ipsilateral connection two is in the first support bar of 90 ° of angles in mobile jib section, the two first support bars be can connect On the same aluminium alloy anchor ear connector, also it can connect on the different aluminium alloy anchor ear connector in upper and lower position.
The second support bar 3 has 4, and one end, which is nested with, cementing has third Aluminum alloy connector 7.Second support bar 3 One end is bolted fixation by the second Aluminum alloy connector 6 of third Aluminum alloy connector 7 and first support bar 2, and even Place's installation Universal rotary turbine 8 is connect, to protect guy wire;The other end of second support bar 3 and the main material node of electric power pylon connect It connects.The angle that is connected and fixed between second support bar and first support bar can be according to the company between second support bar and electric power pylon It connects position and changes.
Above-mentioned mobile jib 11, diagonal web member 12, first support bar 2 and second support bar 3 be carbon fiber and quartz fibre with 2~ The composite mixed enhancing modified resin based composites of the ratio of 3.5:1 have light weight, and specific strength is high, and resistance to low temperature is good etc. Feature is the excellent alternative materials of steel pipe and aluminum pipe.
The pole includes: mobile jib section, first support bar and second support bar;Wherein, the mobile jib section is by multiple standards Section is formed by connecting, and the standard knot includes more supervisors and oblique cornical, and the both ends of the supervisor are nested with respectively cementing has aluminium alloy Anchor ear connector, the both ends of the oblique cornical be nested with it is cementing have the first Aluminum alloy connector, the both ends of the oblique cornical lead to respectively Cross first Aluminum alloy connector and the aluminium alloy anchor ear connector for being responsible for bottom of a upper standard knot and next standard The aluminium alloy anchor ear connector at the opposite side supervisor top of section is bolted;On one end of the first support bar and the mobile jib section Aluminium alloy anchor ear connector be bolted, the main material node of one end of the second support bar and electric power pylon connects, described It is fixedly connected between the other end of first support bar and the other end of the second support bar.
One end of the first support bar, which is nested with, cementing has the second Aluminum alloy connector, two end caps of the second support bar Set it is cementing have the second Aluminum alloy connector, between the first support bar and second support bar by second aluminium alloy connect Head and third Aluminum alloy connector are bolted fixation.
The mobile jib, diagonal web member, first support bar and second support bar are carbon fiber and the composite mixed increasing of quartz fibre Strong modified resin based composites.
The composite mixed mass ratio of the carbon fiber and quartz fibre is 2~3.5:1.
The above description is only an embodiment of the present invention, is not intended to limit the scope of the invention, all to utilize this hair Equivalent structure or equivalent flow shift made by bright specification and accompanying drawing content is applied directly or indirectly in other relevant skills Art field, is included within the scope of the present invention.

Claims (6)

1. a kind of method for founding UHV transmission steel tower suitable for mountain area sternness location group, which comprises the steps of:
(1) preparation of construction: clearing up and arranges construction site, and tower material and relevant device needed for tower erection are transported to construction field Ground;
(2) it organizes vertical tower leg lower section: being opened according to tower leg weight, root, the group of main material length and place completion tower leg lower end is stood;
(3) pole group is vertical and bracing wire unfolds:
The pole includes: mobile jib section, first support bar and second support bar;Wherein, the mobile jib section is connected by multiple standard knots It connects, the standard knot includes more supervisors and oblique cornical, and the both ends of the supervisor are nested with respectively cementing has aluminium alloy anchor ear Connector, the both ends of the oblique cornical be nested with it is cementing have the first Aluminum alloy connector, the both ends of the oblique cornical pass through institute respectively State the aluminium alloy anchor ear connector and next standard knot of the supervisor bottom of the first Aluminum alloy connector and a upper standard knot The aluminium alloy anchor ear connector at opposite side supervisor top is bolted;Aluminium on one end of the first support bar and the mobile jib section Alloy anchor ear connector is bolted, and one end of the second support bar and the main material node of electric power pylon connect, and described first It is fixedly connected between the other end of support rod and the other end of the second support bar;
1. pole mobile jib section is stood up: the main material top-hung coaster for the tower leg lower section that group has been stood in step (2) utilizes lifting steel wire It restricts and lifts by crane the mobile jib section of pole on the inside of main material;
2. first support bar is fixed: will be fixed between one end of the first support bar of pole and mobile jib section by certain angle bolt;
3. second support bar is fixed: one end of the second support bar of pole being connect with the main material node of tower leg lower section, by second The other end of support rod and the other end bolt of first support bar are fixed;Fixed angles between the first support bar and mobile jib section Degree is 120 ~ 150 °;
4. bracing wire unfolds: one end of bracing wire being fixed on to the top of mobile jib section, then pile warp first support bar and second support bar Junction, the other end is fixed on the junction of the tower leg lower section and ground;
(4) upper section and tower body group are vertical in tower leg, pole is promoted and adjustment: standing tower leg middle section and top using pole segmental hoisting group Section;Tower body is lifted using pole segmentation or fragment;According to the vertical height of tower body group, is repeatedly promoted using waist hoop and adjust pole;
(5) cross-arm and tower body attachment are lifted: first placing assembling ground wire cross-arm and conducting wire cross-arm on ground, then utilizes pole Segmental hoisting ground wire cross-arm, conducting wire cross-arm and tower body attachment;
(6) it removes pole: successively removing first support bar, mobile jib section and second support bar in order;
(7) defect is eliminated in maintenance and self-test, completes construction.
2. the method for being suitable for mountain area sternness location group and founding UHV transmission steel tower, feature exist according to claim 1 In in the step (4), the pole promotes the method with adjustment are as follows: first opens between first support bar and second support bar Connection bolt adjust second support bar then up using waist hoop in the main material inboard lift mobile jib section for having organized tower body Position on the main material node of group tower body, is finally bolted fixation for the end of first support bar and second support bar again.
3. the method for being suitable for mountain area sternness location group and founding UHV transmission steel tower, feature exist according to claim 1 In in the step (5), the ground wire cross-arm and conducting wire cross-arm include left ground wire cross-arm, right ground wire cross-arm, left conducting wire cross Load and right conducting wire cross-arm;The left ground wire cross-arm, right ground wire cross-arm, left conducting wire cross-arm and right conducting wire cross-arm are segmented one by one Lifting.
4. the method according to claim 1 for founding UHV transmission steel tower suitable for mountain area sternness location group, feature exist In, one end of the first support bar be nested with it is cementing have the second Aluminum alloy connector, the both ends of the second support bar are nested with glue Have the second Aluminum alloy connector, between the first support bar and second support bar by second Aluminum alloy connector and Third Aluminum alloy connector is bolted fixation.
5. the method according to claim 1 for founding UHV transmission steel tower suitable for mountain area sternness location group, feature exist In the mobile jib, diagonal web member, first support bar and second support bar are that carbon fiber and the composite mixed enhancing of quartz fibre are modified Polymer matrix composites.
6. the method according to claim 5 for founding UHV transmission steel tower suitable for mountain area sternness location group, feature exist In the composite mixed mass ratio of the carbon fiber and quartz fibre is 2 ~ 3.5:1.
CN201710373450.9A 2017-05-24 2017-05-24 A method of UHV transmission steel tower is found suitable for mountain area sternness location group Active CN107143198B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710373450.9A CN107143198B (en) 2017-05-24 2017-05-24 A method of UHV transmission steel tower is found suitable for mountain area sternness location group

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710373450.9A CN107143198B (en) 2017-05-24 2017-05-24 A method of UHV transmission steel tower is found suitable for mountain area sternness location group

Publications (2)

Publication Number Publication Date
CN107143198A CN107143198A (en) 2017-09-08
CN107143198B true CN107143198B (en) 2019-05-03

Family

ID=59779139

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710373450.9A Active CN107143198B (en) 2017-05-24 2017-05-24 A method of UHV transmission steel tower is found suitable for mountain area sternness location group

Country Status (1)

Country Link
CN (1) CN107143198B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110485792A (en) * 2019-09-10 2019-11-22 国网山东省电力公司东营供电公司 A kind of vertical safe construction method of iron tower of power transmission line group
CN111395852A (en) * 2020-03-19 2020-07-10 福州大学 Internal suspension internal stay wire holding pole stay wire detection and inclination angle detection system based on Internet of things

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010242429A (en) * 2009-04-08 2010-10-28 Takenaka Komuten Co Ltd Demolition method for steel tower
CN102359303B (en) * 2011-10-31 2013-10-09 湖北省送变电工程公司 Extra-high voltage common circuit iron tower assembling method
CN102359302B (en) * 2011-10-31 2013-10-09 湖北省送变电工程公司 Extra-high voltage large-span iron tower assembling method
CN103924816B (en) * 2014-04-16 2015-11-25 山东送变电工程公司 A kind of mounting method of UHV transmission line wine glass-shaped steel tower
ES2558025B1 (en) * 2014-07-30 2016-11-11 Acciona Windpower, S.A. Assembly procedure of concrete towers of decreasing section for wind turbines and associated wind turbines
CN105003118B (en) * 2015-07-27 2018-07-17 中国电力科学研究院 A kind of pole for assembling power transmission tower
CN105822132A (en) * 2016-03-26 2016-08-03 山东华安铁塔有限公司 Unit type assembly and erection method of extra-high-voltage power transmission iron pylon
CN106245986A (en) * 2016-10-11 2016-12-21 国家电网公司 The method for assembling of power network line steel tower and device

Also Published As

Publication number Publication date
CN107143198A (en) 2017-09-08

Similar Documents

Publication Publication Date Title
CN105529648B (en) Hydraulic pressure assembled crossing frame
CN204662661U (en) The two rope truss string structure system of the two case beam of large span
CN102359303B (en) Extra-high voltage common circuit iron tower assembling method
CN102359302B (en) Extra-high voltage large-span iron tower assembling method
CN106087752B (en) Multispan cable-carried arch bridge construction method
CN103526699B (en) Method for replacing pipe bridge hanging steel ropes
CN205955358U (en) Group's tower device of interior floated armful of pole of acting as go -between
CN202346637U (en) Holding rod of double-flat-arm spinning self-lifting seat
CN102290742B (en) Tension stringing construction technology
KR20160030177A (en) Assembly and method for lifting loads
CN103342296B (en) Adhering self-elevating-type tower crane for hoisting wind power equipment
CN107143198B (en) A method of UHV transmission steel tower is found suitable for mountain area sternness location group
CN104925672A (en) Full-hydraulic self-climbing suspended double-sided tower crane
CN103526688B (en) A kind of conduit bridge suspension system
CN106229889A (en) A kind of transmission line of electricity lifting device for aerial wires
CN102535939B (en) Inversely assembling process for standing stay wire V-type tower
CN101649683A (en) Method for hoisting power transmission iron tower by assembly holding pole technology
CN206785083U (en) A kind of combined pole with high firm support performance
CN105822132A (en) Unit type assembly and erection method of extra-high-voltage power transmission iron pylon
CN203050218U (en) Standard knot hoisting support for jacking
CN206874293U (en) Subway tunnel soft oil support device
CN102664377A (en) Double-cross arm assembler for single lever and double-cross arm mounting method
CN110485792A (en) A kind of vertical safe construction method of iron tower of power transmission line group
CN110159051A (en) Substation framework
CN106495026B (en) Construction tower crane temporarily builds attachment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant