CN107143198B - A method of UHV transmission steel tower is found suitable for mountain area sternness location group - Google Patents
A method of UHV transmission steel tower is found suitable for mountain area sternness location group Download PDFInfo
- Publication number
- CN107143198B CN107143198B CN201710373450.9A CN201710373450A CN107143198B CN 107143198 B CN107143198 B CN 107143198B CN 201710373450 A CN201710373450 A CN 201710373450A CN 107143198 B CN107143198 B CN 107143198B
- Authority
- CN
- China
- Prior art keywords
- support bar
- tower
- pole
- arm
- group
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/34—Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Electric Cable Installation (AREA)
Abstract
The invention discloses a kind of methods for founding UHV transmission steel tower suitable for mountain area sternness location group, include the following steps: (1) preparation of construction;(2) vertical tower leg lower section is organized;(3) pole group is vertical and bracing wire unfolds;(4) tower leg middle and lower sections and tower body group are vertical, pole is promoted and adjustment;(5) cross-arm and tower body attachment are lifted;(6) it removes pole: successively removing first support bar, mobile jib section and second support bar in order;(7) defect is eliminated in maintenance and self-test, completes construction.The unrestricted limitation with landform of the method for high-voltage power transmission tower of the invention, efficiently solve the difficulty that mountain area group founds strain insulator steel tower, it has the advantages that (1) meets the requirement of standardized construction, can be used for instructing the standardized construction of extra high voltage line tower erection;(2) combined pole is used, so that the unfolding of external cable is not limited by terrain at the top of pole, improves the geographical location flexibility of tower erection.
Description
Technical field
The present invention relates to power transmission and transformation power line construction technical fields, are not only restricted to draw at the top of pole more particularly to one kind
The method for assembling of the UHV transmission steel tower suitable for mountain area sternness location of line unfolding.
Background technique
Tower erection construction is important link in transmission line construction, great in constructing amount, security risk is high.For Zang Dong,
The western high mountain in river, uplift plateau equal ripple drop are big, ravines and guillies criss-cross, the special construction environment with steep cliff, steep bank, because of the bracing wire of pole top
It can not unfold, the group for usually limiting UHV transmission steel tower stands the development of work.
Supertension line tower erection itself is installed there are the boom of pole and dismounting is inconvenient, hoisting weight is big, Zong Xianggao
Big, Hoisting Position is spent far from problems such as steel tower centers.
In addition, on the one hand since the research of the vertical technique of extra-high voltage iron tower group is rarely found in the prior art;On the other hand existing
There is combined pole to be essentially the straight bar section using the connection of multiple standard components, generallys use interior suspension in tower erection construction
External cable formula pole split tower erection or inner suspended inner guy formula pole split tower erection, it is very big that the former is in height difference variation for tower position
Butte, halfway up the hill even precipitous cliff area etc. be not easy to the place of bracing wire, landing external cable over the ground horizontal plane angle it is difficult to ensure that not
Greater than 45 °, the latter is it is difficult to ensure that the stability lifted, therefore, prior art location group severe for steep cliff, steep bank etc. are stood extra-high
Pressure electric power pylon difficulty has reference place.
Summary of the invention
It is suitable for mountain area sternness location group the invention mainly solves the technical problem of providing one kind and founds UHV transmission iron
The method of tower is able to solve prior art topography the following group severe for steep cliff, steep bank etc. and founds hardly possible existing for super high voltage power line iron tower
Topic.
In order to solve the above technical problems, one technical scheme adopted by the invention is that: it provides a kind of severe suitable for mountain area
The method that location group founds UHV transmission steel tower, includes the following steps:
(1) preparation of construction: clearing up and arranges construction site, and tower material and relevant device needed for tower erection are transported to and applied
Workshop;
(2) it organizes vertical tower leg lower section: being opened according to tower leg weight, root, the group of main material length and place completion tower leg lower end is stood;
(3) pole group is vertical and bracing wire unfolds:
1. pole mobile jib section is stood up: the main material top-hung coaster for the tower leg lower section that group has been stood in step (2) utilizes lifting
Wirerope lifts by crane the mobile jib section of pole on the inside of main material;
2. first support bar is fixed: will consolidate between one end of the first support bar of pole and mobile jib section by certain angle bolt
It is fixed;
3. second support bar is fixed: one end of the second support bar of pole is connect with the main material node of tower leg lower section, it will
The other end of second support bar and the other end screw of first support bar are fixed;
4. bracing wire unfolds: one end of bracing wire being fixed on to the top of mobile jib section, then pile warp first support bar and second
The junction of strut, the other end are fixed on the junction of the tower leg lower section and ground;
(4) tower leg middle and lower sections and tower body group are vertical, pole is promoted and adjustment: using pole segmental hoisting group stand tower leg middle section and
Push up section;Tower body is lifted using pole segmentation or fragment;According to the vertical height of tower body group, is repeatedly promoted using waist hoop and adjust pole;
(5) cross-arm and tower body attachment are lifted: first placing assembling ground wire cross-arm and conducting wire cross-arm on ground, then utilizes pole
Segmental hoisting ground wire cross-arm, conducting wire cross-arm and tower body attachment;
(6) it removes pole: successively removing first support bar, mobile jib section and second support bar in order;
(7) defect is eliminated in maintenance and self-test, completes construction.
In a preferred embodiment of the present invention, in the step (3), consolidating between the first support bar and mobile jib section
Determining angle is 120~150 °.
In a preferred embodiment of the present invention, in the step (4), the pole promotes the method with adjustment are as follows: first
The connection bolt between first support bar and second support bar is opened, using waist hoop in the main material inboard lift mobile jib for having organized tower body
Section adjusts position of the second support bar on the main material node for having organized tower body, finally by first support bar and second then up
The end of support rod is bolted fixation again.
In a preferred embodiment of the present invention, in the step (5), the ground wire cross-arm and conducting wire cross-arm include leftly
Line cross-arm, right ground wire cross-arm, left conducting wire cross-arm and right conducting wire cross-arm;The left ground wire cross-arm, right ground wire cross-arm, left conducting wire cross-arm
With right conducting wire cross-arm segmental hoisting one by one.
In a preferred embodiment of the present invention, the pole includes: mobile jib section, first support bar and second support bar;
Wherein, the mobile jib section is formed by connecting by multiple standard knots, the standard knot include more supervisor and oblique cornical, the supervisor's
Both ends be nested with respectively it is cementing have an aluminium alloy anchor ear connector, the both ends of the oblique cornical, which are nested with, cementing has the connection of the first aluminium alloy
Head, the both ends of the oblique cornical are closed by the aluminium of first Aluminum alloy connector and the supervisor bottom of a upper standard knot respectively
The aluminium alloy anchor ear connector at the opposite side of golden anchor ear connector and next standard knot supervisor top is bolted;Described first
One end of strut is bolted with the aluminium alloy anchor ear connector in the mobile jib section, one end of the second support bar and transmission of electricity
The main material node of steel tower connects, fixed between the other end of the first support bar and the other end of the second support bar to connect
It connects.
In a preferred embodiment of the present invention, one end of the first support bar be nested with it is cementing have the second aluminium alloy connection
Head, the both ends of the second support bar, which are nested with, cementing has the second Aluminum alloy connector, the first support bar and second support bar
Between fixation is bolted by second Aluminum alloy connector and third Aluminum alloy connector.
In a preferred embodiment of the present invention, the mobile jib, diagonal web member, first support bar and second support bar are carbon
Fiber and the composite mixed enhancing modified resin based composites of quartz fibre.
In a preferred embodiment of the present invention, the composite mixed mass ratio of the carbon fiber and quartz fibre be 2~
3.5:1。
The beneficial effects of the present invention are: a kind of side for founding UHV transmission steel tower suitable for mountain area sternness location group of the present invention
Method is a kind of new process that tower erection is realized on the basis of using the combined pole of special construction, with unrestricted
The characteristics of with the limitation of landform, efficiently solves the difficulty that mountain area group founds strain insulator steel tower, has the advantages that
(1) requirement for meeting standardized construction can be used for instructing the standardized construction of extra high voltage line tower erection;
(2) combined pole is used, so that the unfolding of external cable is not limited by terrain at the top of pole, improves iron
The vertical geographical location flexibility of tower group;
(3) special combined pole structure is easily achieved the vertical group of pole, promotion and disassembling section.
Detailed description of the invention
Fig. 1 is that the stereochemical structure during a kind of vertical UHV transmission steel tower suitable for mountain area sternness location group of the present invention is shown
It is intended to;
Fig. 2 is the schematic top plan view that vertical steel tower is organized during group is vertical;
Fig. 3 is the structural schematic diagram of combined pole used;
The components in the drawings are labeled as follows: 1. mobile jib sections, 11. supervisors, 12. oblique cornicals, 2. first connecting rods, and 3. second
Connecting rod, 4. aluminium alloy anchor ear connectors, 5. first Aluminum alloy connectors, 6. second Aluminum alloy connectors, 7. third aluminium alloys
Connector, 8. Universal rotary turbines, 9. support links, 10. have organized electric power pylon, 13. bracing wire upper sections, 14. bracing wire lower sections, and 15.
Lifting rope, 16. hanging pieces.
Specific embodiment
The preferred embodiments of the present invention will be described in detail with reference to the accompanying drawing, so that advantages and features of the invention energy
It is easier to be readily appreciated by one skilled in the art, so as to make a clearer definition of the protection scope of the present invention.
Fig. 1 and Fig. 2 are please referred to, the embodiment of the present invention includes:
A method of UHV transmission steel tower being found suitable for mountain area sternness location group, is included the following steps:
(1) preparation of construction: clearing up and arranges construction site, and tower material and relevant device needed for tower erection are transported to and applied
Workshop.
(2) it organizes vertical tower leg lower section: being opened according to tower leg weight, root, the group of main material length and place completion tower leg lower end is stood.
(3) pole group is vertical and bracing wire unfolds:
1. pole mobile jib section is stood up: the main material top-hung coaster for the tower leg lower section that group has been stood in step (2) utilizes lifting
Wirerope lifts by crane the mobile jib section of pole on the inside of main material.
2. first support bar is fixed: by the angle between one end of the first support bar of pole and mobile jib section by 120~150 °
Degree bolt is fixed.
3. second support bar is fixed: one end of the second support bar of pole is connect with the main material node of tower leg lower section, it will
The other end of second support bar and the other end screw of first support bar are fixed;Wherein it is possible to adjust second support bar and main material
The link position of node makes pole establish back guy so as to adjust the connection angle between second support bar and first support bar
(i.e. external cable) is in suitable angular range.
4. bracing wire unfolds: one end of bracing wire being fixed on to the top of mobile jib section, then pile warp first support bar and second
The junction of strut, the other end are fixed on the junction of the tower leg lower section and ground;Bracing wire length can scale.
(4) tower leg middle and lower sections and tower body group are vertical, pole is promoted and adjustment:
Tower leg middle section and top section are stood using pole segmental hoisting group;
Tower body is lifted using pole segmentation or fragment;
According to the vertical height of tower body group, pole is repeatedly promoted and adjusted using waist hoop, every time after adjustment, makes the embedment of mobile jib section
Depth accounts for the 1/3 of mobile jib segment length, and vertical tower body has been organized in 2/3 stretching, and specific tower bar is promoted and method of adjustment are as follows:
The connection bolt between first support bar and second support bar is first opened or lays down, from up to down successively using 3
Equidistantly distributing will be lifted up in the waist hoop in mobile jib section on the inside of the main material of mobile jib Duan Congyi group tower body, adjust then up
Position of two support rods on the main material node for having organized tower body, finally by the end of first support bar and second support bar bolt again
It is connected and fixed, in addition, suitably extending the length of bracing wire, and reaches suitable external cable angle.
(5) cross-arm and tower body attachment are lifted: first placing assembling ground wire cross-arm and conducting wire cross-arm on ground, then utilizes pole
Segmental hoisting ground wire cross-arm, conducting wire cross-arm and tower body attachment;The ground wire cross-arm and conducting wire cross-arm include left ground wire cross-arm, right
Line cross-arm, left conducting wire cross-arm and right conducting wire cross-arm;The left ground wire cross-arm, right ground wire cross-arm, left conducting wire cross-arm and right conducting wire are horizontal
Carry on a shoulder pole segmental hoisting one by one.
(6) remove pole: when removing pole, first will open or lay down first support bar and mobile jib section and second support bar it
Between connection bolt, so that first support bar first be removed;Then relax bearing rope, will draw steel using the coaster in the middle part of cross-arm
Cord is fixed on mobile jib section center of gravity top, and binds big rope in the root of mobile jib section, and mobile jib section is pulled out tower using traction big rope
Body;Finally, second support bar is removed from the main material node for having organized tower body.After the completion of dismounting, each anchor should be cheated and be backfilled, dropped
The influence of low Construction on Environment.
(7) defect is eliminated in maintenance and self-test, completes construction.
Pole used in above-mentioned group of vertical UHV transmission steel tower is suspension external cable pole in combined type, comprising: mobile jib section
1, first support bar 2 and second support bar 3;Wherein, the mobile jib section 1 is formed by connecting by multiple standard knots, each standard knot packet
Include oblique cornical 12 of the supervisor 11 and 1 piece tilt distribution of 2 parallelly distribute ons between 2 parallel charges, specifically, the supervisor
11 both ends be nested with respectively it is cementing have an aluminium alloy anchor ear connector 4, the both ends of the oblique cornical 12, which are nested with, cementing has the conjunction of the first aluminium
The both ends of golden connector 5, the oblique cornical 12 pass through the first Aluminum alloy connector 5 and 11 bottom of supervisor of a upper standard knot
The aluminium alloy anchor ear connector 4 at 11 top of the opposite side of aluminium alloy anchor ear connector 4 and next standard knot supervisor is bolted, phase
The V-shaped distribution of diagonal web member 12 between adjacent two standard knots.
Aluminium alloy is fixed in addition, being also connected between mutually level two aluminium alloys anchor ear connector in mobile jib section
The support link 9 of material constitutes firm triangular structure between the support link and the supervisor and oblique cornical.
The first support bar 2 has 4, and the both ends of each first support bar 2, which are nested with, cementing has the second Aluminum alloy connector
6, one end of first support bar 2 is connected by the second Aluminum alloy connector 6 with 4 bolt of aluminium alloy anchor ear connector in mobile jib section 1
Connect, to realize the connection of first support bar Yu mobile jib section, and make angle 120 between first support bar 2 and mobile jib section 1~
150°.In addition, ipsilateral connection two is in the first support bar of 90 ° of angles in mobile jib section, the two first support bars be can connect
On the same aluminium alloy anchor ear connector, also it can connect on the different aluminium alloy anchor ear connector in upper and lower position.
The second support bar 3 has 4, and one end, which is nested with, cementing has third Aluminum alloy connector 7.Second support bar 3
One end is bolted fixation by the second Aluminum alloy connector 6 of third Aluminum alloy connector 7 and first support bar 2, and even
Place's installation Universal rotary turbine 8 is connect, to protect guy wire;The other end of second support bar 3 and the main material node of electric power pylon connect
It connects.The angle that is connected and fixed between second support bar and first support bar can be according to the company between second support bar and electric power pylon
It connects position and changes.
Above-mentioned mobile jib 11, diagonal web member 12, first support bar 2 and second support bar 3 be carbon fiber and quartz fibre with 2~
The composite mixed enhancing modified resin based composites of the ratio of 3.5:1 have light weight, and specific strength is high, and resistance to low temperature is good etc.
Feature is the excellent alternative materials of steel pipe and aluminum pipe.
The pole includes: mobile jib section, first support bar and second support bar;Wherein, the mobile jib section is by multiple standards
Section is formed by connecting, and the standard knot includes more supervisors and oblique cornical, and the both ends of the supervisor are nested with respectively cementing has aluminium alloy
Anchor ear connector, the both ends of the oblique cornical be nested with it is cementing have the first Aluminum alloy connector, the both ends of the oblique cornical lead to respectively
Cross first Aluminum alloy connector and the aluminium alloy anchor ear connector for being responsible for bottom of a upper standard knot and next standard
The aluminium alloy anchor ear connector at the opposite side supervisor top of section is bolted;On one end of the first support bar and the mobile jib section
Aluminium alloy anchor ear connector be bolted, the main material node of one end of the second support bar and electric power pylon connects, described
It is fixedly connected between the other end of first support bar and the other end of the second support bar.
One end of the first support bar, which is nested with, cementing has the second Aluminum alloy connector, two end caps of the second support bar
Set it is cementing have the second Aluminum alloy connector, between the first support bar and second support bar by second aluminium alloy connect
Head and third Aluminum alloy connector are bolted fixation.
The mobile jib, diagonal web member, first support bar and second support bar are carbon fiber and the composite mixed increasing of quartz fibre
Strong modified resin based composites.
The composite mixed mass ratio of the carbon fiber and quartz fibre is 2~3.5:1.
The above description is only an embodiment of the present invention, is not intended to limit the scope of the invention, all to utilize this hair
Equivalent structure or equivalent flow shift made by bright specification and accompanying drawing content is applied directly or indirectly in other relevant skills
Art field, is included within the scope of the present invention.
Claims (6)
1. a kind of method for founding UHV transmission steel tower suitable for mountain area sternness location group, which comprises the steps of:
(1) preparation of construction: clearing up and arranges construction site, and tower material and relevant device needed for tower erection are transported to construction field
Ground;
(2) it organizes vertical tower leg lower section: being opened according to tower leg weight, root, the group of main material length and place completion tower leg lower end is stood;
(3) pole group is vertical and bracing wire unfolds:
The pole includes: mobile jib section, first support bar and second support bar;Wherein, the mobile jib section is connected by multiple standard knots
It connects, the standard knot includes more supervisors and oblique cornical, and the both ends of the supervisor are nested with respectively cementing has aluminium alloy anchor ear
Connector, the both ends of the oblique cornical be nested with it is cementing have the first Aluminum alloy connector, the both ends of the oblique cornical pass through institute respectively
State the aluminium alloy anchor ear connector and next standard knot of the supervisor bottom of the first Aluminum alloy connector and a upper standard knot
The aluminium alloy anchor ear connector at opposite side supervisor top is bolted;Aluminium on one end of the first support bar and the mobile jib section
Alloy anchor ear connector is bolted, and one end of the second support bar and the main material node of electric power pylon connect, and described first
It is fixedly connected between the other end of support rod and the other end of the second support bar;
1. pole mobile jib section is stood up: the main material top-hung coaster for the tower leg lower section that group has been stood in step (2) utilizes lifting steel wire
It restricts and lifts by crane the mobile jib section of pole on the inside of main material;
2. first support bar is fixed: will be fixed between one end of the first support bar of pole and mobile jib section by certain angle bolt;
3. second support bar is fixed: one end of the second support bar of pole being connect with the main material node of tower leg lower section, by second
The other end of support rod and the other end bolt of first support bar are fixed;Fixed angles between the first support bar and mobile jib section
Degree is 120 ~ 150 °;
4. bracing wire unfolds: one end of bracing wire being fixed on to the top of mobile jib section, then pile warp first support bar and second support bar
Junction, the other end is fixed on the junction of the tower leg lower section and ground;
(4) upper section and tower body group are vertical in tower leg, pole is promoted and adjustment: standing tower leg middle section and top using pole segmental hoisting group
Section;Tower body is lifted using pole segmentation or fragment;According to the vertical height of tower body group, is repeatedly promoted using waist hoop and adjust pole;
(5) cross-arm and tower body attachment are lifted: first placing assembling ground wire cross-arm and conducting wire cross-arm on ground, then utilizes pole
Segmental hoisting ground wire cross-arm, conducting wire cross-arm and tower body attachment;
(6) it removes pole: successively removing first support bar, mobile jib section and second support bar in order;
(7) defect is eliminated in maintenance and self-test, completes construction.
2. the method for being suitable for mountain area sternness location group and founding UHV transmission steel tower, feature exist according to claim 1
In in the step (4), the pole promotes the method with adjustment are as follows: first opens between first support bar and second support bar
Connection bolt adjust second support bar then up using waist hoop in the main material inboard lift mobile jib section for having organized tower body
Position on the main material node of group tower body, is finally bolted fixation for the end of first support bar and second support bar again.
3. the method for being suitable for mountain area sternness location group and founding UHV transmission steel tower, feature exist according to claim 1
In in the step (5), the ground wire cross-arm and conducting wire cross-arm include left ground wire cross-arm, right ground wire cross-arm, left conducting wire cross
Load and right conducting wire cross-arm;The left ground wire cross-arm, right ground wire cross-arm, left conducting wire cross-arm and right conducting wire cross-arm are segmented one by one
Lifting.
4. the method according to claim 1 for founding UHV transmission steel tower suitable for mountain area sternness location group, feature exist
In, one end of the first support bar be nested with it is cementing have the second Aluminum alloy connector, the both ends of the second support bar are nested with glue
Have the second Aluminum alloy connector, between the first support bar and second support bar by second Aluminum alloy connector and
Third Aluminum alloy connector is bolted fixation.
5. the method according to claim 1 for founding UHV transmission steel tower suitable for mountain area sternness location group, feature exist
In the mobile jib, diagonal web member, first support bar and second support bar are that carbon fiber and the composite mixed enhancing of quartz fibre are modified
Polymer matrix composites.
6. the method according to claim 5 for founding UHV transmission steel tower suitable for mountain area sternness location group, feature exist
In the composite mixed mass ratio of the carbon fiber and quartz fibre is 2 ~ 3.5:1.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710373450.9A CN107143198B (en) | 2017-05-24 | 2017-05-24 | A method of UHV transmission steel tower is found suitable for mountain area sternness location group |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710373450.9A CN107143198B (en) | 2017-05-24 | 2017-05-24 | A method of UHV transmission steel tower is found suitable for mountain area sternness location group |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107143198A CN107143198A (en) | 2017-09-08 |
CN107143198B true CN107143198B (en) | 2019-05-03 |
Family
ID=59779139
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710373450.9A Active CN107143198B (en) | 2017-05-24 | 2017-05-24 | A method of UHV transmission steel tower is found suitable for mountain area sternness location group |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107143198B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110485792A (en) * | 2019-09-10 | 2019-11-22 | 国网山东省电力公司东营供电公司 | A kind of vertical safe construction method of iron tower of power transmission line group |
CN111395852A (en) * | 2020-03-19 | 2020-07-10 | 福州大学 | Internal suspension internal stay wire holding pole stay wire detection and inclination angle detection system based on Internet of things |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2010242429A (en) * | 2009-04-08 | 2010-10-28 | Takenaka Komuten Co Ltd | Demolition method for steel tower |
CN102359303B (en) * | 2011-10-31 | 2013-10-09 | 湖北省送变电工程公司 | Extra-high voltage common circuit iron tower assembling method |
CN102359302B (en) * | 2011-10-31 | 2013-10-09 | 湖北省送变电工程公司 | Extra-high voltage large-span iron tower assembling method |
CN103924816B (en) * | 2014-04-16 | 2015-11-25 | 山东送变电工程公司 | A kind of mounting method of UHV transmission line wine glass-shaped steel tower |
ES2558025B1 (en) * | 2014-07-30 | 2016-11-11 | Acciona Windpower, S.A. | Assembly procedure of concrete towers of decreasing section for wind turbines and associated wind turbines |
CN105003118B (en) * | 2015-07-27 | 2018-07-17 | 中国电力科学研究院 | A kind of pole for assembling power transmission tower |
CN105822132A (en) * | 2016-03-26 | 2016-08-03 | 山东华安铁塔有限公司 | Unit type assembly and erection method of extra-high-voltage power transmission iron pylon |
CN106245986A (en) * | 2016-10-11 | 2016-12-21 | 国家电网公司 | The method for assembling of power network line steel tower and device |
-
2017
- 2017-05-24 CN CN201710373450.9A patent/CN107143198B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN107143198A (en) | 2017-09-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105529648B (en) | Hydraulic pressure assembled crossing frame | |
CN204662661U (en) | The two rope truss string structure system of the two case beam of large span | |
CN102359303B (en) | Extra-high voltage common circuit iron tower assembling method | |
CN102359302B (en) | Extra-high voltage large-span iron tower assembling method | |
CN106087752B (en) | Multispan cable-carried arch bridge construction method | |
CN103526699B (en) | Method for replacing pipe bridge hanging steel ropes | |
CN205955358U (en) | Group's tower device of interior floated armful of pole of acting as go -between | |
CN202346637U (en) | Holding rod of double-flat-arm spinning self-lifting seat | |
CN102290742B (en) | Tension stringing construction technology | |
KR20160030177A (en) | Assembly and method for lifting loads | |
CN103342296B (en) | Adhering self-elevating-type tower crane for hoisting wind power equipment | |
CN107143198B (en) | A method of UHV transmission steel tower is found suitable for mountain area sternness location group | |
CN104925672A (en) | Full-hydraulic self-climbing suspended double-sided tower crane | |
CN103526688B (en) | A kind of conduit bridge suspension system | |
CN106229889A (en) | A kind of transmission line of electricity lifting device for aerial wires | |
CN102535939B (en) | Inversely assembling process for standing stay wire V-type tower | |
CN101649683A (en) | Method for hoisting power transmission iron tower by assembly holding pole technology | |
CN206785083U (en) | A kind of combined pole with high firm support performance | |
CN105822132A (en) | Unit type assembly and erection method of extra-high-voltage power transmission iron pylon | |
CN203050218U (en) | Standard knot hoisting support for jacking | |
CN206874293U (en) | Subway tunnel soft oil support device | |
CN102664377A (en) | Double-cross arm assembler for single lever and double-cross arm mounting method | |
CN110485792A (en) | A kind of vertical safe construction method of iron tower of power transmission line group | |
CN110159051A (en) | Substation framework | |
CN106495026B (en) | Construction tower crane temporarily builds attachment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |