CN107143198A - A kind of method for founding UHV transmission steel tower suitable for the severe location group in mountain area - Google Patents

A kind of method for founding UHV transmission steel tower suitable for the severe location group in mountain area Download PDF

Info

Publication number
CN107143198A
CN107143198A CN201710373450.9A CN201710373450A CN107143198A CN 107143198 A CN107143198 A CN 107143198A CN 201710373450 A CN201710373450 A CN 201710373450A CN 107143198 A CN107143198 A CN 107143198A
Authority
CN
China
Prior art keywords
support bar
tower
pole
arm
group
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710373450.9A
Other languages
Chinese (zh)
Other versions
CN107143198B (en
Inventor
赵月华
赵金元
顾小蕾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changshu Fengfan Power Equipment Co Ltd
Original Assignee
Changshu Fengfan Power Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changshu Fengfan Power Equipment Co Ltd filed Critical Changshu Fengfan Power Equipment Co Ltd
Priority to CN201710373450.9A priority Critical patent/CN107143198B/en
Publication of CN107143198A publication Critical patent/CN107143198A/en
Application granted granted Critical
Publication of CN107143198B publication Critical patent/CN107143198B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/34—Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Electric Cable Installation (AREA)

Abstract

The invention discloses a kind of method for founding UHV transmission steel tower suitable for the severe location group in mountain area, comprise the following steps:(1)Preparation of construction;(2)The vertical tower leg hypomere of group;(3)Pole group is vertical and bracing wire is unfolded;(4)Hypomere and tower body group are stood in tower leg, pole is lifted and adjustment;(5)Lift cross-arm and tower body annex;(6)Remove pole:Remove first support bar, mobile jib section and second support bar successively in order;(7)Maintenance and self-inspection, eliminate defect, complete construction.The unrestricted limitation with landform of method of the high-voltage power transmission tower of the present invention, efficiently solves the difficulty that mountain area group founds strain insulator steel tower, has the following advantages that:(1)The requirement of standardized construction is met, available for the standardized construction for instructing extra high voltage line tower erection;(2)Using combined pole so that the unfolding of external cable is not limited by terrain at the top of pole, improves the geographical position flexibility of tower erection.

Description

A kind of method for founding UHV transmission steel tower suitable for the severe location group in mountain area
Technical field
The present invention relates to power transmission and transformation power line construction technical field, more particularly to one kind is not only restricted to drawing at the top of pole The method for assembling of the UHV transmission steel tower for being applied to the severe location in mountain area of line unfolding.
Background technology
Tower erection construction is the important step in transmission line construction, and great in constructing amount, security risk is high.For Zang Dong, The western high mountain in river, uplift plateau equal ripple drop are big, ravines and guillies criss-cross, the special construction environment with steep cliff, steep bank, because of the bracing wire of pole top It can not unfold, the group of generally limitation UHV transmission steel tower stands the development of work.
It is big, longitudinal high that inconvenient, hoisting weight is installed and removed to the arm that supertension line tower erection has pole in itself Degree is big, Hoisting Position is away from problems such as steel tower centers.
In addition, on the one hand because the research of the vertical technique of extra-high voltage iron tower group is rarely found in the prior art;On the other hand it is existing There is combined pole to be essentially the straight bar section connected using multiple standard components, it is generally suspended in tower erection construction using interior External cable formula pole split tower erection or inner suspended inner guy formula pole split tower erection, the former is very big in discrepancy in elevation change for tower position Butte, halfway up the hill even precipitous cliff area etc. be not easy to the place of bracing wire, landing external cable over the ground horizontal plane angle it is difficult to ensure that not More than 45 °, the latter it is difficult to ensure that the stability of lifting, therefore, prior art stand extra-high for the severe location group such as steep cliff, steep bank Pressure electric power pylon difficulty has reference part.
The content of the invention
The present invention solves the technical problem of provide a kind of severe location group in mountain area that is applied to found UHV transmission iron The method of tower, can solve the problem that prior art founds the difficulty that super high voltage power line iron tower is present for the severe physical features the following group such as steep cliff, steep bank Topic.
In order to solve the above technical problems, one aspect of the present invention is:There is provided a kind of severe suitable for mountain area The method that location group founds UHV transmission steel tower, comprises the following steps:
(1)Preparation of construction:Clear up and arrange construction site, the tower material and relevant device needed for tower erection are transported to construction field Ground;
(2)The vertical tower leg hypomere of group:Opened according to tower leg weight, root, main material length and place complete the group of tower leg lower end and stood;
(3)Pole group is vertical and bracing wire is unfolded:
1. pole mobile jib section is stood up:In step(2)The middle group of main material top-hung coaster of tower leg hypomere that has stood, using lifting by crane steel wire Restrict and the mobile jib section of pole is lifted by crane on the inside of main material;
2. first support bar is fixed:It will be fixed between one end of the first support bar of pole and mobile jib section by certain angle bolt;
3. second support bar is fixed:One end of the second support bar of pole is connected with the main material node of tower leg hypomere, by second The other end of support bar and the other end screw of first support bar are fixed;
4. bracing wire is unfolded:One end of bracing wire is fixed on to the top of mobile jib section, then pile warp first support bar and second support bar Junction, its other end is fixed on the junction on the tower leg hypomere and ground;
(4)Hypomere and tower body group are stood in tower leg, pole is lifted and adjustment:Tower leg stage casing and top are stood using pole segmental hoisting group Section;Utilize pole segmentation or burst lifting tower body;According to the vertical height of tower body group, repeatedly lifted using waist hoop and adjust pole;
(5)Lift cross-arm and tower body annex:Assembling ground wire cross-arm and wire cross-arm first are placed on ground, is then segmented using pole Lift ground wire cross-arm, wire cross-arm and tower body annex;
(6)Remove pole:Remove first support bar, mobile jib section and second support bar successively in order;
(7)Maintenance and self-inspection, eliminate defect, complete construction.
In a preferred embodiment of the present invention, the step(3)In, consolidating between the first support bar and mobile jib section Angle is determined for 120~150 °.
In a preferred embodiment of the present invention, the step(4)In, the pole lifting is with the method adjusted:First The connecting bolt between first support bar and second support bar is opened, the main material inboard lift mobile jib of tower body is being organized using waist hoop Section, adjusts position of the second support bar on the main material node for having organized tower body, finally by first support bar and second then up Bolt connection is fixed again for the end of support bar.
In a preferred embodiment of the present invention, the step(5)In, the ground wire cross-arm and wire cross-arm are included leftly Line cross-arm, right ground wire cross-arm, left wire cross-arm and right wire cross-arm;The left ground wire cross-arm, right ground wire cross-arm, left wire cross-arm With right wire cross-arm segmental hoisting one by one.
In a preferred embodiment of the present invention, the pole includes:Mobile jib section, first support bar and second support bar; Wherein, the mobile jib section is formed by connecting by multiple standard knots, and the standard knot includes many supervisors and oblique cornical, the supervisor's Two ends be nested with respectively it is cementing have an aluminium alloy anchor ear connector, the two ends of the oblique cornical, which are nested with, cementing has the connection of the first aluminium alloy Closed respectively by the aluminium of first Aluminum alloy connector and the supervisor bottom of a upper standard knot at head, the two ends of the oblique cornical Aluminium alloy anchor ear connector bolt connection at the top of the offside supervisor of golden anchor ear connector and next standard knot;Described first One end of strut and the aluminium alloy anchor ear connector bolt connection in mobile jib section, one end of the second support bar and transmission of electricity The main material node connection of steel tower, it is fixed between the other end of the first support bar and the other end of the second support bar to connect Connect.
In a preferred embodiment of the present invention, one end of the first support bar be nested with it is cementing have the second aluminium alloy connection Head, the two ends of the second support bar, which are nested with, cementing has the second Aluminum alloy connector, the first support bar and second support bar Between fixed by second Aluminum alloy connector and 3 Al alloy connector bolt connection.
In a preferred embodiment of the present invention, the mobile jib, diagonal web member, first support bar and second support bar are carbon Fiber and the composite mixed enhancing modified resin based composites of quartz fibre.
In a preferred embodiment of the present invention, the composite mixed mass ratio of the carbon fiber and quartz fibre be 2~ 3.5:1。
The beneficial effects of the invention are as follows:A kind of side that UHV transmission steel tower is found suitable for the severe location group in mountain area of the present invention Method is to realize the new technology of tower erection on the basis of a kind of combined pole using special construction, and it has unrestricted The characteristics of limitation with landform, the difficulty that mountain area group founds strain insulator steel tower is efficiently solved, is had the following advantages that:
(1)The requirement of standardized construction is met, available for the standardized construction for instructing extra high voltage line tower erection;
(2)Using combined pole so that the unfolding of external cable is not limited by terrain at the top of pole, improves steel tower group Vertical geographical position flexibility;
(3)Special combined pole structure causes the vertical group of pole, lifting and disassembling section to be easily achieved.
Brief description of the drawings
Fig. 1 is that the stereochemical structure during a kind of vertical UHV transmission steel tower suitable for the severe location group in mountain area of the present invention is shown It is intended to;
Fig. 2 is the schematic top plan view that vertical steel tower is organized during group is stood;
Fig. 3 is the structural representation of combined pole used;
The mark of each part is as follows in accompanying drawing:1. mobile jib section, 11. supervisors, 12. oblique cornicals, 2. head rods, 3. second connections Bar, 4. aluminium alloy anchor ear connectors, 5. first Aluminum alloy connectors, 6. second Aluminum alloy connectors, the connection of 7. 3 Al alloys Head, 8. Universal rotary turbines, 9. support links, 10. have organized electric power pylon, 13. bracing wire epimeres, 14. bracing wire hypomeres, 15. liftings Rope, 16. hanging pieces.
Embodiment
Presently preferred embodiments of the present invention is described in detail below in conjunction with the accompanying drawings, so that advantages and features of the invention energy It is easier to be readily appreciated by one skilled in the art, apparent is clearly defined so as to be made to protection scope of the present invention.
Fig. 1 and Fig. 2 are referred to, the embodiment of the present invention includes:
A kind of method for founding UHV transmission steel tower suitable for the severe location group in mountain area, comprises the following steps:
(1)Preparation of construction:Clear up and arrange construction site, the tower material and relevant device needed for tower erection are transported to construction field Ground.
(2)The vertical tower leg hypomere of group:Opened according to tower leg weight, root, main material length and place complete the group of tower leg lower end and stood.
(3)Pole group is vertical and bracing wire is unfolded:
1. pole mobile jib section is stood up:In step(2)The middle group of main material top-hung coaster of tower leg hypomere that has stood, using lifting by crane steel wire Restrict and the mobile jib section of pole is lifted by crane on the inside of main material.
2. first support bar is fixed:120~150 ° of angle will be pressed between one end of the first support bar of pole and mobile jib section Degree bolt is fixed.
3. second support bar is fixed:One end of the second support bar of pole is connected with the main material node of tower leg hypomere, will The other end of second support bar and the other end screw of first support bar are fixed;Wherein it is possible to adjust second support bar and main material The link position of node, so as to adjust the connection angle between second support bar and first support bar, makes pole establish back guy (That is external cable)In suitable angular range.
4. bracing wire is unfolded:One end of bracing wire is fixed on to the top of mobile jib section, then pile warp first support bar and second The junction of strut, its other end is fixed on the junction on the tower leg hypomere and ground;Bracing wire length can be scaled.
(4)Hypomere and tower body group are stood in tower leg, pole is lifted and adjustment:
Tower leg stage casing and top section are stood using pole segmental hoisting group;
Utilize pole segmentation or burst lifting tower body;
According to the vertical height of tower body group, repeatedly lifted using waist hoop and adjust pole, every time after adjustment, make the length of embedment of mobile jib section The 1/3 of mobile jib segment length is accounted for, vertical tower body has been organized in 2/3 stretching, and specific tower bar lifting is with method of adjustment:
The connecting bolt between first support bar and second support bar is first opened or lays down, it is equidistant successively from up to down using 3 It will be lifted up from the waist hoop being distributed in mobile jib section on the inside of the main material of mobile jib Duan Congyi group tower bodies, second adjusted then up Position of the strut on the main material node for having organized tower body, finally by the end of first support bar and second support bar bolt connection again It is fixed, in addition, the suitably length of extension bracing wire, and reach suitable external cable angle.
(5)Lift cross-arm and tower body annex:Assembling ground wire cross-arm and wire cross-arm first are placed on ground, pole is then utilized Segmental hoisting ground wire cross-arm, wire cross-arm and tower body annex;The ground wire cross-arm and wire cross-arm include left ground wire cross-arm, right Line cross-arm, left wire cross-arm and right wire cross-arm;The left ground wire cross-arm, right ground wire cross-arm, left wire cross-arm and right wire are horizontal Carry on a shoulder pole segmental hoisting one by one.
(6)Remove pole:When removing pole, first will open or lay down first support bar and mobile jib section and second support bar it Between connecting bolt, so that first support bar first be removed;Then relaxed bearing rope, and steel will be drawn using the coaster in the middle part of cross-arm Cord is fixed on mobile jib section center of gravity top, and binds big rope in the root of mobile jib section, is restricted using traction is big by mobile jib section pull-out tower Body;Finally, second support bar is removed at the main material node for having organized tower body.After the completion of dismounting, each anchor hole should be backfilled, dropped The influence of low Construction on Environment.
(7)Maintenance and self-inspection, eliminate defect, complete construction.
Pole used in above-mentioned group of vertical UHV transmission steel tower is suspension external cable pole in combined type, including:Mobile jib section 1st, first support bar 2 and second support bar 3;Wherein, the mobile jib section 1 is formed by connecting by multiple standard knots, each standard knot bag Include the oblique cornical 12 of the supervisor 11 and 1 tilt distribution of 2 parallel distributions between 2 parallel charges, specifically, the supervisor 11 two ends be nested with respectively it is cementing have an aluminium alloy anchor ear connector 4, the two ends of the oblique cornical 12, which are nested with, cementing has the conjunction of the first aluminium Golden connector 5, the two ends of the oblique cornical 12 pass through the first Aluminum alloy connector 5 and the bottom of supervisor 11 of a upper standard knot The bolt connection of aluminium alloy anchor ear connector 4 at the top of offside supervisor 11 of aluminium alloy anchor ear connector 4 and next standard knot, phase The V-shaped distribution of diagonal web member 12 between adjacent two standard knots.
In addition, being also connected with being fixed with aluminium alloy between being in mutually level two aluminium alloys anchor ear connector in mobile jib section The support link 9 of material, constitutes firm triangular structure between the support link and the supervisor and oblique cornical.
The first support bar 2 has 4, and the two ends of each first support bar 2, which are nested with, cementing has the second Aluminum alloy connector 6, one end of first support bar 2 is connected by the second Aluminum alloy connector 6 with the bolt of aluminium alloy anchor ear connector 4 in mobile jib section 1 Connect, so as to realize the connection of first support bar and mobile jib section, and make the angle between first support bar 2 and mobile jib section 1 be 120~ 150°.In addition, the upper homonymy of mobile jib section connects two first support bars in 90 ° of angles, the two first support bars can be connected On same aluminium alloy anchor ear connector, it can also be connected on the different aluminium alloy anchor ear connector of upper-lower position.
The second support bar 3 has 4, and its one end, which is nested with, cementing has 3 Al alloy connector 7.Second support bar 3 One end is fixed by 3 Al alloy connector 7 and the bolt connection of the second Aluminum alloy connector 6 of first support bar 2, and even Meet place and Universal rotary turbine 8 is installed, to protect guy wire;The other end of second support bar 3 and the main material node of electric power pylon connect Connect.The angle that is connected between second support bar and first support bar can be according to the company between second support bar and electric power pylon Connect position and change.
Above-mentioned mobile jib 11, diagonal web member 12, first support bar 2 and second support bar 3 be carbon fiber and quartz fibre with 2~ 3.5:The 1 composite mixed enhancing modified resin based composites of ratio, with light weight, specific strength is high, and resistance to low temperature is good etc. Feature, is the excellent alternative materials of steel pipe and aluminum pipe.
The pole includes:Mobile jib section, first support bar and second support bar;Wherein, the mobile jib section is by multiple standards Section is formed by connecting, and the standard knot includes many supervisors and oblique cornical, and the two ends of the supervisor are nested with respectively cementing has aluminium alloy Anchor ear connector, the two ends of the oblique cornical be nested with it is cementing have the first Aluminum alloy connector, the two ends of the oblique cornical lead to respectively Cross first Aluminum alloy connector and the aluminium alloy anchor ear connector and next standard of the supervisor bottom of a upper standard knot Aluminium alloy anchor ear connector bolt connection at the top of the offside supervisor of section;On one end of the first support bar and mobile jib section Aluminium alloy anchor ear connector bolt connection, the main material node of one end of the second support bar and electric power pylon is connected, described It is fixedly connected between the other end of first support bar and the other end of the second support bar.
One end of the first support bar be nested with it is cementing have the second Aluminum alloy connector, the two ends set of the second support bar Put it is cementing have the second Aluminum alloy connector, between the first support bar and second support bar pass through second aluminium alloy connect Head and 3 Al alloy connector bolt connection are fixed.
The mobile jib, diagonal web member, first support bar and second support bar are carbon fiber and the composite mixed increasing of quartz fibre Strong modified resin based composites.
The composite mixed mass ratio of the carbon fiber and quartz fibre is 2~3.5:1.
Embodiments of the invention are the foregoing is only, are not intended to limit the scope of the invention, it is every to utilize this hair Equivalent structure or equivalent flow conversion that bright specification and accompanying drawing content are made, or directly or indirectly it is used in other related skills Art field, is included within the scope of the present invention.

Claims (8)

1. a kind of method for founding UHV transmission steel tower suitable for the severe location group in mountain area, it is characterised in that comprise the following steps:
(1)Preparation of construction:Clear up and arrange construction site, the tower material and relevant device needed for tower erection are transported to construction field Ground;
(2)The vertical tower leg hypomere of group:Opened according to tower leg weight, root, main material length and place complete the group of tower leg lower end and stood;
(3)Pole group is vertical and bracing wire is unfolded:
1. pole mobile jib section is stood up:In step(2)The middle group of main material top-hung coaster of tower leg hypomere that has stood, using lifting by crane steel wire Restrict and the mobile jib section of pole is lifted by crane on the inside of main material;
2. first support bar is fixed:It will be fixed between one end of the first support bar of pole and mobile jib section by certain angle bolt;
3. second support bar is fixed:One end of the second support bar of pole is connected with the main material node of tower leg hypomere, by second The other end of support bar and the other end screw of first support bar are fixed;
4. bracing wire is unfolded:One end of bracing wire is fixed on to the top of mobile jib section, then pile warp first support bar and second support bar Junction, its other end is fixed on the junction on the tower leg hypomere and ground;
(4)Hypomere and tower body group are stood in tower leg, pole is lifted and adjustment:Tower leg stage casing and top are stood using pole segmental hoisting group Section;Utilize pole segmentation or burst lifting tower body;According to the vertical height of tower body group, repeatedly lifted using waist hoop and adjust pole;
(5)Lift cross-arm and tower body annex:Assembling ground wire cross-arm and wire cross-arm first are placed on ground, is then segmented using pole Lift ground wire cross-arm, wire cross-arm and tower body annex;
(6)Remove pole:Remove first support bar, mobile jib section and second support bar successively in order;
(7)Maintenance and self-inspection, eliminate defect, complete construction.
2. the method according to claim 1 for founding UHV transmission steel tower suitable for the severe location group in mountain area, its feature exists In the step(3)In, the fixed angle between the first support bar and mobile jib section is 120~150 °.
3. the method according to claim 1 for founding UHV transmission steel tower suitable for the severe location group in mountain area, its feature exists In the step(4)In, the pole lifting is with the method adjusted:First open between first support bar and second support bar Connecting bolt, organizing the main material inboard lift mobile jib section of tower body using waist hoop, second support bar adjusted then up Position on the main material node of group tower body, finally by the end of first support bar and second support bar, bolt connection is fixed again.
4. the method according to claim 1 for founding UHV transmission steel tower suitable for the severe location group in mountain area, its feature exists In the step(5)In, the ground wire cross-arm and wire cross-arm include left ground wire cross-arm, right ground wire cross-arm, left wire cross-arm and Right wire cross-arm;The left ground wire cross-arm, right ground wire cross-arm, left wire cross-arm and right wire cross-arm segmental hoisting one by one.
5. it is applied to the method that the severe location group in mountain area founds UHV transmission steel tower according to any one of Claims 1-4, Characterized in that, the pole includes:Mobile jib section, first support bar and second support bar;Wherein, the mobile jib section is by multiple marks Quasi- section is formed by connecting, and the standard knot includes many supervisors and oblique cornical, and the two ends of the supervisor are nested with respectively cementing has aluminium conjunction Golden anchor ear connector, the two ends of the oblique cornical, which are nested with, cementing has the first Aluminum alloy connector, the two ends difference of the oblique cornical Pass through first Aluminum alloy connector and the aluminium alloy anchor ear connector and next mark of the supervisor bottom of a upper standard knot Aluminium alloy anchor ear connector bolt connection at the top of the offside supervisor of quasi- section;One end of the first support bar and mobile jib section On aluminium alloy anchor ear connector bolt connection, the main material node of one end of the second support bar and electric power pylon connects, institute State and be fixedly connected between the other end of first support bar and the other end of the second support bar.
6. the method according to claim 5 for founding UHV transmission steel tower suitable for the severe location group in mountain area, its feature exists In one end of, the first support bar be nested with it is cementing have the second Aluminum alloy connector, the two ends of the second support bar are nested with glue Have the second Aluminum alloy connector, between the first support bar and second support bar by second Aluminum alloy connector and 3 Al alloy connector bolt connection is fixed.
7. the method according to claim 5 for founding UHV transmission steel tower suitable for the severe location group in mountain area, its feature exists In the mobile jib, diagonal web member, first support bar and second support bar are that carbon fiber and the composite mixed enhancing of quartz fibre are modified Polymer matrix composites.
8. the method according to claim 7 for founding UHV transmission steel tower suitable for the severe location group in mountain area, its feature exists In the composite mixed mass ratio of the carbon fiber and quartz fibre is 2~3.5:1.
CN201710373450.9A 2017-05-24 2017-05-24 A method of UHV transmission steel tower is found suitable for mountain area sternness location group Active CN107143198B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710373450.9A CN107143198B (en) 2017-05-24 2017-05-24 A method of UHV transmission steel tower is found suitable for mountain area sternness location group

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710373450.9A CN107143198B (en) 2017-05-24 2017-05-24 A method of UHV transmission steel tower is found suitable for mountain area sternness location group

Publications (2)

Publication Number Publication Date
CN107143198A true CN107143198A (en) 2017-09-08
CN107143198B CN107143198B (en) 2019-05-03

Family

ID=59779139

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710373450.9A Active CN107143198B (en) 2017-05-24 2017-05-24 A method of UHV transmission steel tower is found suitable for mountain area sternness location group

Country Status (1)

Country Link
CN (1) CN107143198B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110485792A (en) * 2019-09-10 2019-11-22 国网山东省电力公司东营供电公司 A safe construction method for erection of transmission line iron towers
CN111395852A (en) * 2020-03-19 2020-07-10 福州大学 Internet of things-based inner suspension inner pull wire and pole pull wire detection and inclination detection system

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010242429A (en) * 2009-04-08 2010-10-28 Takenaka Komuten Co Ltd Demolition method for steel tower
CN102359302A (en) * 2011-10-31 2012-02-22 湖北省输变电工程公司 Extra-high voltage large-span iron tower assembling method
CN102359303A (en) * 2011-10-31 2012-02-22 湖北省输变电工程公司 Extra-high voltage common circuit iron tower assembling method
CN103924816A (en) * 2014-04-16 2014-07-16 山东送变电工程公司 Installation method for cup type iron tower of ultra-high voltage transmission line
CN105003118A (en) * 2015-07-27 2015-10-28 中国电力科学研究院 Pole for assembling power transmission towers
EP2980337A1 (en) * 2014-07-30 2016-02-03 Acciona Windpower S.a. Method for assembling diminishing section concrete towers for wind turbines and associated wind turbine
CN105822132A (en) * 2016-03-26 2016-08-03 山东华安铁塔有限公司 Unit type assembly and erection method of extra-high-voltage power transmission iron pylon
CN106245986A (en) * 2016-10-11 2016-12-21 国家电网公司 The method for assembling of power network line steel tower and device

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010242429A (en) * 2009-04-08 2010-10-28 Takenaka Komuten Co Ltd Demolition method for steel tower
CN102359302A (en) * 2011-10-31 2012-02-22 湖北省输变电工程公司 Extra-high voltage large-span iron tower assembling method
CN102359303A (en) * 2011-10-31 2012-02-22 湖北省输变电工程公司 Extra-high voltage common circuit iron tower assembling method
CN103924816A (en) * 2014-04-16 2014-07-16 山东送变电工程公司 Installation method for cup type iron tower of ultra-high voltage transmission line
EP2980337A1 (en) * 2014-07-30 2016-02-03 Acciona Windpower S.a. Method for assembling diminishing section concrete towers for wind turbines and associated wind turbine
CN105003118A (en) * 2015-07-27 2015-10-28 中国电力科学研究院 Pole for assembling power transmission towers
CN105822132A (en) * 2016-03-26 2016-08-03 山东华安铁塔有限公司 Unit type assembly and erection method of extra-high-voltage power transmission iron pylon
CN106245986A (en) * 2016-10-11 2016-12-21 国家电网公司 The method for assembling of power network line steel tower and device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110485792A (en) * 2019-09-10 2019-11-22 国网山东省电力公司东营供电公司 A safe construction method for erection of transmission line iron towers
CN111395852A (en) * 2020-03-19 2020-07-10 福州大学 Internet of things-based inner suspension inner pull wire and pole pull wire detection and inclination detection system

Also Published As

Publication number Publication date
CN107143198B (en) 2019-05-03

Similar Documents

Publication Publication Date Title
CN102359303B (en) Extra-high voltage common circuit iron tower assembling method
CN101476293B (en) Construction Method of Large Bridge Arch Rib Without Support
CN104234200B (en) A kind of suspen-shell structure rope leverage is by ring lifting installation method
CN105905815B (en) The method of work of seat ground self-balancing pole
KR20160030177A (en) Assembly and method for lifting loads
CN103547527B (en) Swivel Tower Crane
CN106087752B (en) Multispan cable-carried arch bridge construction method
CN103526699B (en) Method for replacing pipe bridge hanging steel ropes
CN208394600U (en) A kind of prefabricated part hanging device
CN102359302A (en) Extra-high voltage large-span iron tower assembling method
CN105110213A (en) Crane provided with counterweight balance mechanism adopting dead weight of hoisted object as well as crane transformation scheme
CN104594696B (en) Double embrace bar group is utilized to found 1000kV tangent suspension tower construction method
CN219499262U (en) Photovoltaic system with floating rope structure
CN103526688B (en) A kind of conduit bridge suspension system
CN120083375A (en) A bracket-free construction method for single-circle pull-down of radial multi-braced cable-supported grid structure
CN102535939B (en) Inversely assembling process for standing stay wire V-type tower
CN103342296B (en) Adhering self-elevating-type tower crane for hoisting wind power equipment
CN104925672A (en) Full-hydraulic self-climbing suspended double-sided tower crane
CN101649683A (en) Method for hoisting power transmission iron tower by assembly holding pole technology
CN107143198B (en) A method of UHV transmission steel tower is found suitable for mountain area sternness location group
CN206785083U (en) A kind of combined pole with high firm support performance
CN204150970U (en) Seat ground self-balancing pole
WO2025246464A1 (en) Pushing and hoisting device for extra-high voltage transmission tower cross beam
CN206667781U (en) Lifting device for arbitrary curved surface net rack
CN202450838U (en) Assembling type iron tower base station

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant