CN103866992B - The method of rack ceiling renovation - Google Patents

The method of rack ceiling renovation Download PDF

Info

Publication number
CN103866992B
CN103866992B CN201210552638.7A CN201210552638A CN103866992B CN 103866992 B CN103866992 B CN 103866992B CN 201210552638 A CN201210552638 A CN 201210552638A CN 103866992 B CN103866992 B CN 103866992B
Authority
CN
China
Prior art keywords
ceiling
rack
renovation
operation platform
tubing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210552638.7A
Other languages
Chinese (zh)
Other versions
CN103866992A (en
Inventor
唐文伟
杨剑豪
吴鑫磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction No 5 Group Co Ltd
Original Assignee
Shanghai Construction No 5 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction No 5 Group Co Ltd filed Critical Shanghai Construction No 5 Group Co Ltd
Priority to CN201210552638.7A priority Critical patent/CN103866992B/en
Publication of CN103866992A publication Critical patent/CN103866992A/en
Application granted granted Critical
Publication of CN103866992B publication Critical patent/CN103866992B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The invention discloses the method for rack ceiling renovation, described method, for renovating the ceiling being positioned on described rack, wherein, comprises the steps: to build dismantling operation platform along the structure of described rack, be used for removing described ceiling, carry out described ceiling and remove step; Spray the described ceiling of having removed, carry out the renovation step of described ceiling; Again build fitting operation platform, the confirmation lifting position on described fitting operation platform, reinstalls to the described ceiling having renovated on described rack. Rack ceiling renovate method provided by the invention, by the step that ceiling is removed, ceiling renovates and ceiling is installed is again provided, has realized ceiling has been renovated; And the method etc. of reinforcing maintenance rack is provided, thus effectively realize renovation, the maintenance to rack ceiling, save again construction cost and time.<!--1-->

Description

The method of rack ceiling renovation
Technical field
The present invention relates to building construction field, relate in particular to the method for rack ceiling renovation.
Background technology
Have now many buildings, for example, natatorium etc. all adopt roof to adopt the structure shape of rack ceilingFormula, this building has novel structure, and daylighting is good and be easy to the features such as maintenance, along with makingWith the growth in age, many places building slight crack, roof net on ceiling, can be inevitably there isThe various aging problems such as serious such as frame corrosion, these have all seriously affected the use of building,Cause many buildings to be abandoned or reconstruct, this has seriously strengthened cost consumption and systemApproximately the use of building.
Summary of the invention
For the problem of above-mentioned existence, the object of this invention is to provide the method for rack ceiling renovation, energyEnough effectively solution because rack ceiling long neglected and in disrepair restricts the technology that building re-uses askedTopic.
The object of the invention is to be achieved through the following technical solutions:
A method for rack ceiling renovation, described method is for renovating the ceiling being positioned on described rack, wherein, comprise the steps:
Build dismantling operation platform along the structure of described rack, for removing described ceiling, carry out instituteState ceiling and remove step;
Spray the described ceiling of having removed, carry out the renovation step of described ceiling;
Build fitting operation platform, the confirmation lifting position on described fitting operation platform, byThe described ceiling of renovation reinstalls on described rack.
The method of above-mentioned rack ceiling renovation, wherein, remove step at described ceiling and comprise:
Build a framework along described rack, described framework forms described dismantling operation platform peripheral structure;
On described framework, fixedly mount springboard, described springboard forms the operation of described dismantling operation platformStructure, constructs for constructor;
On described dismantling operation platform, described ceiling is divided into polylith top board, to described topPlate carries out after mark, and described top board block-by-block is removed from described rack.
The method of above-mentioned rack ceiling renovation, wherein, described top board is triangle top board.
The method of above-mentioned rack ceiling renovation wherein, arranges multiple on described triangle top boardPoint is connected with one end of a fastener respectively on described fulcrum, connects at the other end of described fastenerSplicing rope, for the top board that lands.
The method of above-mentioned rack ceiling renovation, wherein, in described ceiling renovation step, is carrying outBefore the described ceiling that spraying has been removed, also comprise the step of being polished in described ceiling surface。
The method of above-mentioned rack ceiling renovation, wherein, again building fitting operation platform, in instituteState in the step at confirmation on fitting operation platform lifting position, at described fitting operation platformCenter arranges hole, lifts described ceiling for hoist engine is set.
The method of above-mentioned rack ceiling renovation, wherein, is pacifying the described ceiling having renovated againBefore being filled to the step on described rack, also comprise: the step that checks and reinforce described rack.
The method of above-mentioned rack ceiling renovation, wherein, described inspection to reinforce the step of rack concreteComprise the steps:
Provide a reinforcing tubing, along axially described reinforcing tubing being divided into of described reinforcing tubingHalf tubing and second tubing;
Check described rack, distinguish rod member to be reinforced in described rack, rod member described to be reinforced is enteredRow is reinforced, and rod member to be reinforced described in polishing, at the coated one deck liner in rod member described to be reinforced surface;
Described first tubing and described second tubing merging are arranged on to described pad surfaces, reinforce fixingInstituteState first tubing and described second tubing.
Compared with prior art, the invention has the beneficial effects as follows:
Rack ceiling renovate method provided by the invention, by providing, ceiling is removed, ceiling renovation andThe step that ceiling is installed again, has realized ceiling has been renovated; And provide reinforcing to overhaulThe method of rack etc., thus effectively realize renovation, the maintenance to rack ceiling, save againConstruction cost and time.
Brief description of the drawings
Fig. 1 is the FB(flow block) of the method for rack ceiling renovation of the present invention.
Fig. 2 is the knot that the top board in an embodiment in the method for rack ceiling of the present invention renovation is removedStructure schematic diagram.
Fig. 3 is the FB(flow block) of the reinforcing rack step in the method for rack ceiling of the present invention renovation.
Fig. 4 is that the ceiling in an embodiment in the method for rack ceiling of the present invention renovation is installed againStructural representation.
Detailed description of the invention
Below in conjunction with schematic diagram and concrete operations embodiment, the invention will be further described.
In conjunction with shown in Fig. 1 to Fig. 4, the present invention shows the method for rack ceiling renovation, wherein, and shouldMethod, for renovating the ceiling being positioned on rack, wherein, comprises the steps:
Build dismantling operation platform along the structure of rack, for removing ceiling, carry out described ceiling and tear openExcept step;
Wherein, in this step, build a framework along rack, framework forms outside dismantling operation platformClosed structure; On framework, fixedly mount springboard, springboard forms the operating structure of dismantling operation platform, construct for constructor. In enforcement, first enter rack by the original passage of ascending a height of buildingRoof top, removes position at need and sets up the framework of dismantling operation platform, adopts scaffold board conductSpringboard, is fixed on these springboard two ends on framework, preferably, adopts the thick scaffold board conduct of 5cmSpringboard, then uses steel wire that springboard is bundled on framework, and when construction, constructor stand on springboardOn carry out dismantling operation.
Put up after dismantling operation platform, on dismantling operation platform, the assembled knot original according to ceilingStructure,This ceiling is divided into polylith top board, and, for the convenience of later installing again, to oftenPiece top board carries out respective markers, and top board block-by-block is removed from rack.
In one embodiment of the invention, the top board that this top board is triangular structure. In enforcement, rootAccording to original shape of this top board, this leg-of-mutton top board can be removed and taken off respectively; Preferably, this top board is cut apart again, be divided into the triangle top board of polylith fritter, use fritterTriangle top board, for convenience detach, ensure construction safety.
In addition, in the time removing every top board, can use the mode of manual demolition, particularly, threeMultiple fulcrums are set on dihedral top board, and each fulcrum is connected with one end of a fastener respectively, andAt the other end connecting rope of fastener, by decrease speed and the time realization of Artificial Control ropeThe dismounting of top board.
In a preferred embodiment of the invention, as shown in Figure 2, particularly, at the periphery of top board 1Upper selected six fulcrums, preferably, select tie point 3 between top board 1 and rack 2 and everyThe mid point 4 on limit, respectively as fulcrum, welds an iron hoop on each fulcrum, selects U-shaped buckle to doFor fastener, this U-shaped buckle and iron hoop are pinned, in order to ensure the firm of buckle, can also arrangeThe little U-shaped buckle of fixture fastening, is then fixed on one end of rope on U-shaped buckle, anotherHolding the welding root that can select to walk around on rack 2 to put to ground is fixed; Then by constructingPerson cuts respectively every top board, and this top board is upwards promoted and soared, rotation monoblock top board 1 toCorrect position is transferred to ground.
Complete after above-mentioned steps, the ceiling that spraying has been removed, carries out the renovation of ceiling;
In this step, the top board of every dismounting is sprayed to renovation, preferably, renovate at ceilingIn step, before spraying the ceiling of having removed, also comprise and polished in ceiling surfaceStep.
In one embodiment of the invention, this top board is aluminum or aluminum alloy roof plate, to this everyIn the step that top board renovates, to this top board surface adopt manual grinding Ex-all surface dirt,Other pollutant such as particle is to smooth surface, and this top board is cleaned, to be dried after,This top board is sprayed into after paint film solidifies completely and is used.
In addition, before the described ceiling having renovated is reinstalled to the step on described rack,Also comprise the step that checks and reinforce described rack.
Wherein, in one embodiment of the invention, this inspection the step of reinforcing rack specifically compriseFollowing step, as shown in Figure 3:
One reinforcing tubing is provided, preferably, selects steel pipe as reinforcing tubing, along reinforcing tubingAxleTo reinforcing tubing being divided into first tubing and second tubing;
Rack comprises many rod members, checks and determines rod member to be reinforced in rack, treats reinforcing rod member and entersRow is reinforced;
The rod member to be reinforced of polishing, at the coated one deck liner in rod member to be reinforced surface; Wherein, to rod memberSurface while polishing, preferably adopt sand paper, steel brush etc., the machinery of rod member is damaged preventingWound;
Apply one deck viscose in this pad surfaces, particularly, at this rod member surface coated structure glue, useIn pasting this liner, this liner is preferably selected PVC plastic tube;
Then first tubing and second tubing merge and are arranged on pad surfaces, fix first tubing withDescribed second tubing, preferably, selects stirrup securing member that reinforcing tubing is fixed on rack.Utilize the method for above-mentioned reinforcing rack, can effectively avoid other not need fixing rod memberCause damage.
On above-mentioned steps basis, carry out ceiling and install again, particularly, again build fitting operationPlatform, the confirmation lifting position on fitting operation platform, pacifies the ceiling having renovated againBe filled on rack.
In one embodiment of the invention, as shown in Figure 4, again building fitting operation platform 4Time, at the center of fitting operation platform 4, hole 5 is set, for being set, hoist engine 6 lifts ceiling.Particularly, this fitting operation platform 4, mainly taking scaffold board 41 as main, is laid on 1, lifting top boardIn the upper truss of position, at platform center reserving hole 5, channel-section steel is laid to prop up as hoist engine in topFrame 61.
Above specific embodiments of the invention be have been described in detail, but the present invention be not restricted toThe specific embodiment of upper description, it is just as example. To those skilled in the art,Any equivalent modifications and alternative also all among category of the present invention. Therefore, do not departing from thisEqualization conversion and the amendment under bright spirit and scope, done, all should be encompassed in model of the present inventionIn enclosing.

Claims (7)

1. a method for rack ceiling renovation, described method is used for renovating the ceiling being positioned on described rack,It is characterized in that, comprise the steps:
Build dismantling operation platform along the structure of described rack, for removing described ceiling, described in carrying outCeiling is removed step;
Spray the described ceiling of having removed, carry out the renovation step of described ceiling;
Build fitting operation platform, the confirmation lifting position on described fitting operation platform, will turn overNew described ceiling reinstalls on described rack;
Removing step at described ceiling comprises:
Build a framework along described rack, described framework forms described dismantling operation platform peripheral structure;
On described framework, fixedly mount springboard, described springboard forms the operation knot of described dismantling operation platformStructure, constructs for constructor;
On described dismantling operation platform, described ceiling is divided into polylith top board, to described top boardCarry out after mark, described top board block-by-block is removed from described rack.
2. the method for rack ceiling renovation according to claim 1, is characterized in that described top boardFor triangle top board.
3. the method for rack ceiling renovation according to claim 2, is characterized in that, described threeMultiple fulcrums are set on dihedral top board, on described fulcrum, are connected with one end of a fastener respectively, describedThe other end connecting rope of fastener, for the top board that lands.
4. the method for rack ceiling renovation according to claim 1, is characterized in that, on described topIn canopy renovation step, before spraying the described ceiling of having removed, also comprise described ceiling surfaceThe step of polishing.
5. the method for rack ceiling renovation according to claim 1, is characterized in that, is again takingBuild fitting operation platform, in the step at the confirmation lifting position on described fitting operation platform, describedThe center of fitting operation platform arranges hole, lifts described ceiling for hoist engine is set.
6. the method for rack ceiling according to claim 1 renovation, is characterized in that, byThe described ceiling of renovation also comprises: check and reinforce institute before reinstalling to the step on described rackState the step of rack.
7. the method for rack ceiling renovation according to claim 6, is characterized in that described inspectionAnd the step of reinforcing rack specifically comprises the steps:
One reinforcing tubing is provided, axially described reinforcing tubing is divided into first along described reinforcing tubingTubing and second tubing;
Check described rack, distinguish rod member to be reinforced in described rack, rod member described to be reinforced is carried outReinforce, rod member to be reinforced described in polishing, at the coated one deck liner in rod member described to be reinforced surface;
Described first tubing and described second tubing merging are arranged on to described pad surfaces, reinforce fixing instituteState first tubing and described second tubing.
CN201210552638.7A 2012-12-18 2012-12-18 The method of rack ceiling renovation Active CN103866992B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210552638.7A CN103866992B (en) 2012-12-18 2012-12-18 The method of rack ceiling renovation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210552638.7A CN103866992B (en) 2012-12-18 2012-12-18 The method of rack ceiling renovation

Publications (2)

Publication Number Publication Date
CN103866992A CN103866992A (en) 2014-06-18
CN103866992B true CN103866992B (en) 2016-05-25

Family

ID=50905971

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210552638.7A Active CN103866992B (en) 2012-12-18 2012-12-18 The method of rack ceiling renovation

Country Status (1)

Country Link
CN (1) CN103866992B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112854814B (en) * 2021-01-11 2022-06-07 周金红 House construction is with fixing a point demolish wall body device

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2279394Y (en) * 1996-02-01 1998-04-22 王作洪 Multi-function rack roof boarding
JP2004169275A (en) * 2002-11-15 2004-06-17 Sekisui Chem Co Ltd Method for remodeling building
US20100154320A1 (en) * 2008-12-23 2010-06-24 Chevron U.S.A. Inc. Composite concrete roof for an outer lng containment tank and method of making the same
CN102486051B (en) * 2010-12-06 2013-12-11 中冶天工集团有限公司 Manual demolishing method of large-area spherical net rack

Also Published As

Publication number Publication date
CN103866992A (en) 2014-06-18

Similar Documents

Publication Publication Date Title
CN106884384B (en) A kind of mountain area steel-concrete composite beam cable-stayed bridge erection crane method
CN103075025B (en) Wholly lifting construction method for asymmetric structure of huge overhang steel of high-rise building
CN104192735B (en) A kind of minor crane
CN103669900A (en) Integral reinforcement construction method for outer barrel wall of chimney
CN102877638B (en) Operating platform and operating method for constructing suspension steel structure system
CN103882990A (en) Rapid mechanical connecting device for building component and manufacturing method thereof
CN103866992B (en) The method of rack ceiling renovation
CN103243932A (en) Structure for detaching inner climbing tower crane through roof crane and construction method thereof
CN205421022U (en) Suspension bridge stiffening beam handing equipment that slides
CN102003074A (en) Construction method for indoor long-span steel connecting bridge
CN203382467U (en) Hanging operation vehicle
CN104340885A (en) Crawling crane and boom frame system thereof
CN208934422U (en) A kind of pump concrete pump line support device with bumper and absorbing shock function
CN208362905U (en) A kind of bridge concrete guardrail pours trolley
CN202000647U (en) Base device for lifting scaffold in elevator shaft
CN203437842U (en) Pipeline welding platform
CN202706495U (en) Ladder type air basket
JP6534938B2 (en) Lining plate installation and rain curing jig and lining plate installation method using the jig
CN205509388U (en) Three cascades climbing crane span structure
CN104179126B (en) Municipal overhead anti-collision wall construction method
CN108081448B (en) Production process of integrally decorated and electromechanical prefabricated GRC formwork structural column
CN209308414U (en) A kind of builder&#39;s road formula stair step punching block
CN105887701A (en) Suspension bridge superstructure demolition and replacement installation method
CN208934380U (en) A kind of Excitations for Long Span Suspension operating platform
CN208039793U (en) A kind of detachable operating platform of steel pipe truss string structure installing Cable-clamp

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant