CN103243932A - Structure for detaching inner climbing tower crane through roof crane and construction method thereof - Google Patents

Structure for detaching inner climbing tower crane through roof crane and construction method thereof Download PDF

Info

Publication number
CN103243932A
CN103243932A CN2012100238595A CN201210023859A CN103243932A CN 103243932 A CN103243932 A CN 103243932A CN 2012100238595 A CN2012100238595 A CN 2012100238595A CN 201210023859 A CN201210023859 A CN 201210023859A CN 103243932 A CN103243932 A CN 103243932A
Authority
CN
China
Prior art keywords
roofing
crane
tower crane
climbing tower
tons
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012100238595A
Other languages
Chinese (zh)
Inventor
蒙智峰
张均
纪绪潮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI PANGYUAN MACHINERY RENTAL CO Ltd
Original Assignee
SHANGHAI PANGYUAN MACHINERY RENTAL CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI PANGYUAN MACHINERY RENTAL CO Ltd filed Critical SHANGHAI PANGYUAN MACHINERY RENTAL CO Ltd
Priority to CN2012100238595A priority Critical patent/CN103243932A/en
Publication of CN103243932A publication Critical patent/CN103243932A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a structure for detaching an inner climbing tower crane through a roof crane and a construction method thereof. The roof crane is arranged at a roof position of a building, the construction method for detaching the inner climbing tower crane through the roof crane is simple and safe, and jointing of the roof crane and the building is convenient and practical. The roof crane is designed to be detached conveniently, components of the roof crane are as small and light as possible, and installing, detaching and transportation are convenient. Compared with a traditional inner climbing tower detaching method (detaching a large-tonnage tower crane through a small-tonnage tower crane), cost for detaching the inner climbing tower crane through the roof crane is greatly reduced.

Description

A kind of roofing hangs dismounting internal-climbing tower crane structure and job practices thereof
Technical field
The present invention relates to the technical field of building operations, a kind of roofing hangs dismounting internal-climbing tower crane structure, particularly its mechanical connecting structure specifically.
Background technology
In building operations, when installing the location, pillar crane do not consider the tower crane dismounting, the result treats just to find when architecture construction finishes that this equipment can't normally fall joint and remove, perhaps outer attached interior dress (is positioned in the middle of the building, but carrying out liter the joint attached wall like that according to outer attached pillar crane raises) pillar crane also be normally to remove when building operations finishes, face the problems referred to above during the climbing tower crane dismounting equally.
Summary of the invention
The object of the present invention is to provide a kind of roofing to hang dismounting internal-climbing tower crane structure, designed and be hung in the roof with roofing and remove tower crane pillar crane and vertical transport to ground, hang the dismounting step by step that dismounting large-tonnage roofing hangs with little tonnage roofing, the little tonnage roofing of Chai Chuing hangs artificial dismounting by the method for dismounting of construction elevator vertical transport to ground at last, has overcome the shortcoming and defect that exists in the existing construction technology.
To achieve these goals, technical scheme of the present invention is: a kind of roofing hangs dismounting internal-climbing tower crane structure, and it comprises building, is provided with internal-climbing tower crane in the building, it is characterized in that: described roof of buildings place is provided with the roofing hoisting machine.
A kind of roofing hangs the job practices of dismounting internal-climbing tower crane structure: it is characterized in that: described job practices is for removing internal-climbing tower crane with 20 tons of roofing hoisting machines earlier, remove 20 tons of roofing hoisting machines with 10 tons of roofing hoisting machines of a side again, then remove 10 tons of roofing hoisting machines with 6 tons of roofing hoisting machines, last 6 tons of roofing hoisting machines by artificial dismounting after, be transported to ground through construction elevator.
The invention discloses a kind of roofing and hang dismounting internal-climbing tower crane structure, hang with roofing that to remove the inside-climbing tower crane job practices simple and safe, roofing hangs and connects convenient feasiblely with building, and it is convenient to have considered when roofing hangs design to remove, parts are small and light as far as possible, are convenient to assembling and disassembling and transportation.With respect to traditional internal-climbing tower crane method for dismounting (removing the large-tonnage pillar crane with little tonnage pillar crane), hang dismounting inside-climbing tower crane cost with roofing and significantly reduce.
Description of drawings
Fig. 1 is structural representation of the present invention.
Fig. 2 is the present invention's first construction state diagram.
Fig. 3 is the present invention's second construction state diagram.
The specific embodiment
With reference to the accompanying drawings, the present invention further is described.
The present invention hangs dismounting internal-climbing tower crane structure for a kind of roofing, and it comprises building 1, is provided with internal-climbing tower crane 2 in the building 1, and it is different from prior art and is: roofing 3 places of described building 1 are provided with roofing hoisting machine 4.
In the specific implementation, roofing 3 places of described building 1 are provided with two roofing hoisting machines 4, and wherein the tonnage of a roofing hoisting machine 4 is less than another roofing hoisting machine 4.
In the specific implementation, described roofing hoisting machine 4 is fixed in roofing 3 places by built-in fitting 5.
The technical program has designed and has been hung in the roof with roofing and removes tower crane pillar crane and vertical transport to ground, hang with little tonnage roofing and remove the dismounting step by step that the large-tonnage roofing hangs, the little tonnage roofing of Chai Chuing hangs artificial dismounting by the method for dismounting of construction elevator vertical transport to ground at last.
During with this method construction, roofing hangs the weight of the component that will consider split equipment in the location can be in the lifting performance scope that roofing hangs, to consider simultaneously the parts that are removed smoothly vertical transport to ground, roofing hangs the power building that acts on the building and can bear safely, perhaps through bearing safely after simple the reinforcing.Roofing hangs with building and generally is welded to connect by four built-in fittings, and it is relatively big that roofing hangs the basis, and the support reaction that acts on the building is smaller.Generally be that the large-tonnage roofing hangs the roofing that little tonnage is installed and hangs during operation, and hang dismounting large-tonnage roofing with the roofing of little tonnage and hang.As Fig. 1, Fig. 2 and shown in Figure 3 be earlier with 20 tons of roofing hoisting machines, 4 dismounting internal-climbing tower cranes 2, remove 20 tons of roofing hoisting machines 4 with 10 tons of roofing hoisting machines 4 of a side again, then remove 10 tons of roofing hoisting machines 4 with 6 tons of roofing hoisting machines 4, last 6 tons of roofing hoisting machines 4 by artificial dismounting after, be transported to ground through construction elevator.
Applicant company roofing hangs and becomes series of products at present: 20 tons, 16 tons, 10 tons, 6 tons, 2 tons 5 kinds of specifications are arranged, and along with the continuous development of corporate business, the increasing of difficulty of construction, the range of application that roofing hangs also enlarges gradually, and specification can be more complete.
Above content be in conjunction with concrete preferred embodiment to further describing that the present invention does, can not assert that the present invention is concrete to implement to be confined to above-mentioned these explanations.For the general technical staff of the technical field of the invention, without departing from the inventive concept of the premise, can also make some simple deduction or replace, all should be considered as belonging to protection scope of the present invention.

Claims (4)

1. a roofing hangs dismounting internal-climbing tower crane structure, and it comprises building (1), is provided with internal-climbing tower crane (2) in the building (1), it is characterized in that: the roofing (3) of described building (1) locates to be provided with roofing hoisting machine (4).
2. a kind of roofing according to claim 1 hangs dismounting internal-climbing tower crane structure, it is characterized in that: the roofing (3) of described building (1) locates to be provided with two roofing hoisting machines (4), and wherein the tonnage of a roofing hoisting machine (4) is less than another roofing hoisting machine (4).
3. a kind of roofing according to claim 1 hangs dismounting internal-climbing tower crane structure, and it is characterized in that: described roofing hoisting machine (4) is fixed in roofing (3) by built-in fitting (5) to be located.
4. a roofing hangs the job practices of dismantling internal-climbing tower crane: it is characterized in that: described job practices is for removing internal-climbing tower crane (2) with 20 tons of roofing hoisting machines (4) earlier, use 10 tons of roofing hoisting machines (4) of a side to remove 20 tons of roofing hoisting machines (4) again, then remove 10 tons of roofing hoisting machines (4) with 6 tons of roofing hoisting machines (4), last 6 tons of roofing hoisting machines (4) by artificial dismounting after, be transported to ground through construction elevator.
CN2012100238595A 2012-02-03 2012-02-03 Structure for detaching inner climbing tower crane through roof crane and construction method thereof Pending CN103243932A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012100238595A CN103243932A (en) 2012-02-03 2012-02-03 Structure for detaching inner climbing tower crane through roof crane and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012100238595A CN103243932A (en) 2012-02-03 2012-02-03 Structure for detaching inner climbing tower crane through roof crane and construction method thereof

Publications (1)

Publication Number Publication Date
CN103243932A true CN103243932A (en) 2013-08-14

Family

ID=48923780

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012100238595A Pending CN103243932A (en) 2012-02-03 2012-02-03 Structure for detaching inner climbing tower crane through roof crane and construction method thereof

Country Status (1)

Country Link
CN (1) CN103243932A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104153598A (en) * 2014-08-06 2014-11-19 刘建国 Self-lifting detachment method for structures with chimneys
CN104627787A (en) * 2015-01-12 2015-05-20 中兴建设有限公司 Basement roof support-free elevator installation method
CN106276631A (en) * 2016-09-30 2017-01-04 庄爱军 A kind of roofing device for hoisting and crane and the method for dismounting of crane arm
CN108147296A (en) * 2017-12-27 2018-06-12 中建四局第五建筑工程有限公司 A kind of restoration methods of high-altitude fracture tower crane
CN113023591A (en) * 2021-03-01 2021-06-25 中铁建工集团有限公司 Large-scale circular construction method for small-dismantling of flat-arm type internal-climbing tower crane
CN113175239A (en) * 2021-04-25 2021-07-27 温州亿润建设有限公司 High-rise building demolishs device
CN114229715A (en) * 2021-12-09 2022-03-25 中国建筑第八工程局有限公司 Method for dismantling internal climbing tower crane of landscape tower of small-diameter super high-rise building
CN116002542A (en) * 2022-12-30 2023-04-25 中韬华胜工程科技有限公司 Dismantling process and dismantling system for construction site of tower crane structure

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2262023Y (en) * 1996-05-30 1997-09-10 成都海泰实业开发公司 Crane for disassembling inner climbing tower crane top room
JPH09310512A (en) * 1996-05-23 1997-12-02 Penta Ocean Constr Co Ltd Demolition method for temporary roof
CN101402436A (en) * 2008-11-10 2009-04-08 重庆大学 Method and apparatus for disassembling cargo boom of climbing tower crane
JP2010265727A (en) * 2009-05-18 2010-11-25 Shimizu Corp Building demolition method using floor climbing type tower crane
CN202530775U (en) * 2012-02-03 2012-11-14 上海庞源机械租赁股份有限公司 Structure for dismounting inner climbing tower crane by using roof crane

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09310512A (en) * 1996-05-23 1997-12-02 Penta Ocean Constr Co Ltd Demolition method for temporary roof
CN2262023Y (en) * 1996-05-30 1997-09-10 成都海泰实业开发公司 Crane for disassembling inner climbing tower crane top room
CN101402436A (en) * 2008-11-10 2009-04-08 重庆大学 Method and apparatus for disassembling cargo boom of climbing tower crane
JP2010265727A (en) * 2009-05-18 2010-11-25 Shimizu Corp Building demolition method using floor climbing type tower crane
CN202530775U (en) * 2012-02-03 2012-11-14 上海庞源机械租赁股份有限公司 Structure for dismounting inner climbing tower crane by using roof crane

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
卜天富等: "《超高层内爬塔式起重机特殊拆装技术》", 《建筑机械化》, no. 2, 18 August 2011 (2011-08-18), pages 41 - 43 *
王伟等: "《188m高空内爬塔式起重机拆卸关键技术》", 《建筑机械化》, no. 2, 18 August 2011 (2011-08-18), pages 37 - 40 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104153598A (en) * 2014-08-06 2014-11-19 刘建国 Self-lifting detachment method for structures with chimneys
CN104627787A (en) * 2015-01-12 2015-05-20 中兴建设有限公司 Basement roof support-free elevator installation method
CN106276631A (en) * 2016-09-30 2017-01-04 庄爱军 A kind of roofing device for hoisting and crane and the method for dismounting of crane arm
CN108147296A (en) * 2017-12-27 2018-06-12 中建四局第五建筑工程有限公司 A kind of restoration methods of high-altitude fracture tower crane
CN108147296B (en) * 2017-12-27 2019-08-27 中建四局第五建筑工程有限公司 A kind of restoration methods of high-altitude fracture tower crane
CN113023591A (en) * 2021-03-01 2021-06-25 中铁建工集团有限公司 Large-scale circular construction method for small-dismantling of flat-arm type internal-climbing tower crane
CN113175239A (en) * 2021-04-25 2021-07-27 温州亿润建设有限公司 High-rise building demolishs device
CN114229715A (en) * 2021-12-09 2022-03-25 中国建筑第八工程局有限公司 Method for dismantling internal climbing tower crane of landscape tower of small-diameter super high-rise building
CN116002542A (en) * 2022-12-30 2023-04-25 中韬华胜工程科技有限公司 Dismantling process and dismantling system for construction site of tower crane structure

Similar Documents

Publication Publication Date Title
CN103243932A (en) Structure for detaching inner climbing tower crane through roof crane and construction method thereof
CN101672011B (en) Steel tube arch rib vertical lifting method
CN102659029B (en) Combined type movable hanger
CN202530775U (en) Structure for dismounting inner climbing tower crane by using roof crane
CN102493666A (en) High-altitude translation installation and construction method for super-large super-heavy member
CN205241086U (en) Template hoist and mount and ann gun carriage of disassembling and using
CN200971610Y (en) Guide lifting platform device for chimney
CN201901515U (en) Special lifting device for ship cabin cleaning machinery
CN201770429U (en) Portal type framework used for hoisting and slipping
CN204401995U (en) Encorbelment support system in a kind of center of installing for dome structure
CN103470057B (en) A kind of high-altitude component hoisting construction method
CN106049896A (en) Dismantling method for resisting impact load in high-altitude overhanging steel-structure-platform dismantling process
CN202729645U (en) Tower crane with elevator
CN203437842U (en) Pipeline welding platform
CN205857675U (en) Collapsible material platform on construction scaffold
CN202718385U (en) Jack-raising formwork mechanism
CN102733612B (en) Mounting method of electric hoist orbit
CN204040442U (en) Integral lifting type elevator shaft operating platform
CN203924652U (en) The operation platform of periphery shear wall between a kind of precast stair
CN202017347U (en) Externally-hung discharging platform device
CN102900023B (en) A kind of combined type working platform
CN203924659U (en) Hanging frame type construction platform device
CN207276043U (en) A kind of large component lifts positioning auxiliary device
CN202645112U (en) Mounting operation platform for 100m high-steel chimney
CN205153507U (en) Silo lateral wall high altitude vestibule erection device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20130814

RJ01 Rejection of invention patent application after publication