Structure for detaching inner climbing tower crane through roof crane and construction method thereof Download PDFInfo
- Publication number
- CN103243932A CN103243932A CN2012100238595A CN201210023859A CN103243932A CN 103243932 A CN103243932 A CN 103243932A CN 2012100238595 A CN2012100238595 A CN 2012100238595A CN 201210023859 A CN201210023859 A CN 201210023859A CN 103243932 A CN103243932 A CN 103243932A
- Authority
- CN
- China
- Prior art keywords
- roofing
- crane
- tower crane
- climbing tower
- tons
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 14
- 230000009194 climbing Effects 0.000 title abstract description 6
- 238000000034 method Methods 0.000 abstract description 5
- 208000027697 autoimmune lymphoproliferative syndrome due to CTLA4 haploinsuffiency Diseases 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000007547 defect Effects 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention discloses a structure for detaching an inner climbing tower crane through a roof crane and a construction method thereof. The roof crane is arranged at a roof position of a building, the construction method for detaching the inner climbing tower crane through the roof crane is simple and safe, and jointing of the roof crane and the building is convenient and practical. The roof crane is designed to be detached conveniently, components of the roof crane are as small and light as possible, and installing, detaching and transportation are convenient. Compared with a traditional inner climbing tower detaching method (detaching a large-tonnage tower crane through a small-tonnage tower crane), cost for detaching the inner climbing tower crane through the roof crane is greatly reduced.
Description
Technical field
The present invention relates to the technical field of building operations, a kind of roofing hangs dismounting internal-climbing tower crane structure, particularly its mechanical connecting structure specifically.
Background technology
In building operations, when installing the location, pillar crane do not consider the tower crane dismounting, the result treats just to find when architecture construction finishes that this equipment can't normally fall joint and remove, perhaps outer attached interior dress (is positioned in the middle of the building, but carrying out liter the joint attached wall like that according to outer attached pillar crane raises) pillar crane also be normally to remove when building operations finishes, face the problems referred to above during the climbing tower crane dismounting equally.
Summary of the invention
The object of the present invention is to provide a kind of roofing to hang dismounting internal-climbing tower crane structure, designed and be hung in the roof with roofing and remove tower crane pillar crane and vertical transport to ground, hang the dismounting step by step that dismounting large-tonnage roofing hangs with little tonnage roofing, the little tonnage roofing of Chai Chuing hangs artificial dismounting by the method for dismounting of construction elevator vertical transport to ground at last, has overcome the shortcoming and defect that exists in the existing construction technology.
To achieve these goals, technical scheme of the present invention is: a kind of roofing hangs dismounting internal-climbing tower crane structure, and it comprises building, is provided with internal-climbing tower crane in the building, it is characterized in that: described roof of buildings place is provided with the roofing hoisting machine.
A kind of roofing hangs the job practices of dismounting internal-climbing tower crane structure: it is characterized in that: described job practices is for removing internal-climbing tower crane with 20 tons of roofing hoisting machines earlier, remove 20 tons of roofing hoisting machines with 10 tons of roofing hoisting machines of a side again, then remove 10 tons of roofing hoisting machines with 6 tons of roofing hoisting machines, last 6 tons of roofing hoisting machines by artificial dismounting after, be transported to ground through construction elevator.
The invention discloses a kind of roofing and hang dismounting internal-climbing tower crane structure, hang with roofing that to remove the inside-climbing tower crane job practices simple and safe, roofing hangs and connects convenient feasiblely with building, and it is convenient to have considered when roofing hangs design to remove, parts are small and light as far as possible, are convenient to assembling and disassembling and transportation.With respect to traditional internal-climbing tower crane method for dismounting (removing the large-tonnage pillar crane with little tonnage pillar crane), hang dismounting inside-climbing tower crane cost with roofing and significantly reduce.
Description of drawings
Fig. 1 is structural representation of the present invention.
Fig. 2 is the present invention's first construction state diagram.
Fig. 3 is the present invention's second construction state diagram.
The specific embodiment
With reference to the accompanying drawings, the present invention further is described.
The present invention hangs dismounting internal-climbing tower crane structure for a kind of roofing, and it comprises building 1, is provided with internal-climbing tower crane 2 in the building 1, and it is different from prior art and is: roofing 3 places of described building 1 are provided with roofing hoisting machine 4.
In the specific implementation, roofing 3 places of described building 1 are provided with two roofing hoisting machines 4, and wherein the tonnage of a roofing hoisting machine 4 is less than another roofing hoisting machine 4.
In the specific implementation, described roofing hoisting machine 4 is fixed in roofing 3 places by built-in fitting 5.
The technical program has designed and has been hung in the roof with roofing and removes tower crane pillar crane and vertical transport to ground, hang with little tonnage roofing and remove the dismounting step by step that the large-tonnage roofing hangs, the little tonnage roofing of Chai Chuing hangs artificial dismounting by the method for dismounting of construction elevator vertical transport to ground at last.
During with this method construction, roofing hangs the weight of the component that will consider split equipment in the location can be in the lifting performance scope that roofing hangs, to consider simultaneously the parts that are removed smoothly vertical transport to ground, roofing hangs the power building that acts on the building and can bear safely, perhaps through bearing safely after simple the reinforcing.Roofing hangs with building and generally is welded to connect by four built-in fittings, and it is relatively big that roofing hangs the basis, and the support reaction that acts on the building is smaller.Generally be that the large-tonnage roofing hangs the roofing that little tonnage is installed and hangs during operation, and hang dismounting large-tonnage roofing with the roofing of little tonnage and hang.As Fig. 1, Fig. 2 and shown in Figure 3 be earlier with 20 tons of roofing hoisting machines, 4 dismounting internal-climbing tower cranes 2, remove 20 tons of roofing hoisting machines 4 with 10 tons of roofing hoisting machines 4 of a side again, then remove 10 tons of roofing hoisting machines 4 with 6 tons of roofing hoisting machines 4, last 6 tons of roofing hoisting machines 4 by artificial dismounting after, be transported to ground through construction elevator.
Applicant company roofing hangs and becomes series of products at present: 20 tons, 16 tons, 10 tons, 6 tons, 2 tons 5 kinds of specifications are arranged, and along with the continuous development of corporate business, the increasing of difficulty of construction, the range of application that roofing hangs also enlarges gradually, and specification can be more complete.
Above content be in conjunction with concrete preferred embodiment to further describing that the present invention does, can not assert that the present invention is concrete to implement to be confined to above-mentioned these explanations.For the general technical staff of the technical field of the invention, without departing from the inventive concept of the premise, can also make some simple deduction or replace, all should be considered as belonging to protection scope of the present invention.
Claims (4)
1. a roofing hangs dismounting internal-climbing tower crane structure, and it comprises building (1), is provided with internal-climbing tower crane (2) in the building (1), it is characterized in that: the roofing (3) of described building (1) locates to be provided with roofing hoisting machine (4).
2. a kind of roofing according to claim 1 hangs dismounting internal-climbing tower crane structure, it is characterized in that: the roofing (3) of described building (1) locates to be provided with two roofing hoisting machines (4), and wherein the tonnage of a roofing hoisting machine (4) is less than another roofing hoisting machine (4).
3. a kind of roofing according to claim 1 hangs dismounting internal-climbing tower crane structure, and it is characterized in that: described roofing hoisting machine (4) is fixed in roofing (3) by built-in fitting (5) to be located.
4. a roofing hangs the job practices of dismantling internal-climbing tower crane: it is characterized in that: described job practices is for removing internal-climbing tower crane (2) with 20 tons of roofing hoisting machines (4) earlier, use 10 tons of roofing hoisting machines (4) of a side to remove 20 tons of roofing hoisting machines (4) again, then remove 10 tons of roofing hoisting machines (4) with 6 tons of roofing hoisting machines (4), last 6 tons of roofing hoisting machines (4) by artificial dismounting after, be transported to ground through construction elevator.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012100238595A CN103243932A (en) | 2012-02-03 | 2012-02-03 | Structure for detaching inner climbing tower crane through roof crane and construction method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012100238595A CN103243932A (en) | 2012-02-03 | 2012-02-03 | Structure for detaching inner climbing tower crane through roof crane and construction method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103243932A true CN103243932A (en) | 2013-08-14 |
Family
ID=48923780
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012100238595A Pending CN103243932A (en) | 2012-02-03 | 2012-02-03 | Structure for detaching inner climbing tower crane through roof crane and construction method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103243932A (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104153598A (en) * | 2014-08-06 | 2014-11-19 | 刘建国 | Self-lifting detachment method for structures with chimneys |
CN104627787A (en) * | 2015-01-12 | 2015-05-20 | 中兴建设有限公司 | Basement roof support-free elevator installation method |
CN106276631A (en) * | 2016-09-30 | 2017-01-04 | 庄爱军 | A kind of roofing device for hoisting and crane and the method for dismounting of crane arm |
CN108147296A (en) * | 2017-12-27 | 2018-06-12 | 中建四局第五建筑工程有限公司 | A kind of restoration methods of high-altitude fracture tower crane |
CN113023591A (en) * | 2021-03-01 | 2021-06-25 | 中铁建工集团有限公司 | Large-scale circular construction method for small-dismantling of flat-arm type internal-climbing tower crane |
CN113175239A (en) * | 2021-04-25 | 2021-07-27 | 温州亿润建设有限公司 | High-rise building demolishs device |
CN114229715A (en) * | 2021-12-09 | 2022-03-25 | 中国建筑第八工程局有限公司 | Method for dismantling internal climbing tower crane of landscape tower of small-diameter super high-rise building |
CN116002542A (en) * | 2022-12-30 | 2023-04-25 | 中韬华胜工程科技有限公司 | Dismantling process and dismantling system for construction site of tower crane structure |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2262023Y (en) * | 1996-05-30 | 1997-09-10 | 成都海泰实业开发公司 | Crane for disassembling inner climbing tower crane top room |
JPH09310512A (en) * | 1996-05-23 | 1997-12-02 | Penta Ocean Constr Co Ltd | Demolition method for temporary roof |
CN101402436A (en) * | 2008-11-10 | 2009-04-08 | 重庆大学 | Method and apparatus for disassembling cargo boom of climbing tower crane |
JP2010265727A (en) * | 2009-05-18 | 2010-11-25 | Shimizu Corp | Building demolition method using floor climbing type tower crane |
CN202530775U (en) * | 2012-02-03 | 2012-11-14 | 上海庞源机械租赁股份有限公司 | Structure for dismounting inner climbing tower crane by using roof crane |
-
2012
- 2012-02-03 CN CN2012100238595A patent/CN103243932A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09310512A (en) * | 1996-05-23 | 1997-12-02 | Penta Ocean Constr Co Ltd | Demolition method for temporary roof |
CN2262023Y (en) * | 1996-05-30 | 1997-09-10 | 成都海泰实业开发公司 | Crane for disassembling inner climbing tower crane top room |
CN101402436A (en) * | 2008-11-10 | 2009-04-08 | 重庆大学 | Method and apparatus for disassembling cargo boom of climbing tower crane |
JP2010265727A (en) * | 2009-05-18 | 2010-11-25 | Shimizu Corp | Building demolition method using floor climbing type tower crane |
CN202530775U (en) * | 2012-02-03 | 2012-11-14 | 上海庞源机械租赁股份有限公司 | Structure for dismounting inner climbing tower crane by using roof crane |
Non-Patent Citations (2)
Title |
---|
卜天富等: "《超高层内爬塔式起重机特殊拆装技术》", 《建筑机械化》, no. 2, 18 August 2011 (2011-08-18), pages 41 - 43 * |
王伟等: "《188m高空内爬塔式起重机拆卸关键技术》", 《建筑机械化》, no. 2, 18 August 2011 (2011-08-18), pages 37 - 40 * |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104153598A (en) * | 2014-08-06 | 2014-11-19 | 刘建国 | Self-lifting detachment method for structures with chimneys |
CN104627787A (en) * | 2015-01-12 | 2015-05-20 | 中兴建设有限公司 | Basement roof support-free elevator installation method |
CN106276631A (en) * | 2016-09-30 | 2017-01-04 | 庄爱军 | A kind of roofing device for hoisting and crane and the method for dismounting of crane arm |
CN108147296A (en) * | 2017-12-27 | 2018-06-12 | 中建四局第五建筑工程有限公司 | A kind of restoration methods of high-altitude fracture tower crane |
CN108147296B (en) * | 2017-12-27 | 2019-08-27 | 中建四局第五建筑工程有限公司 | A kind of restoration methods of high-altitude fracture tower crane |
CN113023591A (en) * | 2021-03-01 | 2021-06-25 | 中铁建工集团有限公司 | Large-scale circular construction method for small-dismantling of flat-arm type internal-climbing tower crane |
CN113175239A (en) * | 2021-04-25 | 2021-07-27 | 温州亿润建设有限公司 | High-rise building demolishs device |
CN114229715A (en) * | 2021-12-09 | 2022-03-25 | 中国建筑第八工程局有限公司 | Method for dismantling internal climbing tower crane of landscape tower of small-diameter super high-rise building |
CN116002542A (en) * | 2022-12-30 | 2023-04-25 | 中韬华胜工程科技有限公司 | Dismantling process and dismantling system for construction site of tower crane structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103243932A (en) | Structure for detaching inner climbing tower crane through roof crane and construction method thereof | |
CN101672011B (en) | Steel tube arch rib vertical lifting method | |
CN102659029B (en) | Combined type movable hanger | |
CN202530775U (en) | Structure for dismounting inner climbing tower crane by using roof crane | |
CN102493666A (en) | High-altitude translation installation and construction method for super-large super-heavy member | |
CN205241086U (en) | Template hoist and mount and ann gun carriage of disassembling and using | |
CN200971610Y (en) | Guide lifting platform device for chimney | |
CN201901515U (en) | Special lifting device for ship cabin cleaning machinery | |
CN201770429U (en) | Portal type framework used for hoisting and slipping | |
CN204401995U (en) | Encorbelment support system in a kind of center of installing for dome structure | |
CN103470057B (en) | A kind of high-altitude component hoisting construction method | |
CN106049896A (en) | Dismantling method for resisting impact load in high-altitude overhanging steel-structure-platform dismantling process | |
CN202729645U (en) | Tower crane with elevator | |
CN203437842U (en) | Pipeline welding platform | |
CN205857675U (en) | Collapsible material platform on construction scaffold | |
CN202718385U (en) | Jack-raising formwork mechanism | |
CN102733612B (en) | Mounting method of electric hoist orbit | |
CN204040442U (en) | Integral lifting type elevator shaft operating platform | |
CN203924652U (en) | The operation platform of periphery shear wall between a kind of precast stair | |
CN202017347U (en) | Externally-hung discharging platform device | |
CN102900023B (en) | A kind of combined type working platform | |
CN203924659U (en) | Hanging frame type construction platform device | |
CN207276043U (en) | A kind of large component lifts positioning auxiliary device | |
CN202645112U (en) | Mounting operation platform for 100m high-steel chimney | |
CN205153507U (en) | Silo lateral wall high altitude vestibule erection device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20130814 |
|
RJ01 | Rejection of invention patent application after publication |