CN104179126B - Municipal overhead anti-collision wall construction method - Google Patents
Municipal overhead anti-collision wall construction method Download PDFInfo
- Publication number
- CN104179126B CN104179126B CN201410438765.3A CN201410438765A CN104179126B CN 104179126 B CN104179126 B CN 104179126B CN 201410438765 A CN201410438765 A CN 201410438765A CN 104179126 B CN104179126 B CN 104179126B
- Authority
- CN
- China
- Prior art keywords
- construction
- workbench
- workshop section
- operating platform
- collision wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Bridges Or Land Bridges (AREA)
- Forklifts And Lifting Vehicles (AREA)
Abstract
The invention discloses a municipal overhead anti-collision wall construction method and belongs to the technical field of municipal overhead construction. The municipal overhead anti-collision wall construction method is used for solving the problem that the municipal overhead anti-collision wall is low in construction efficiency and safety. Municipal overhead anti-collision wall construction equipment comprises a mobile platform which is arranged on the municipal viaduct floor, a workbench which is arranged on one side of the municipal viaduct floor and an electric hoist; the bottom of the mobile platform is provided with mobile wheels; the workbench comprises a supporting platform and a guard rail; the workbench is connected with the mobile platform through a connecting support; the electric hoist is fixedly arranged on the connecting support and above the workbench. The municipal overhead anti-collision wall construction equipment increases the construction safety and improves the construction efficiency. The municipal overhead anti-collision wall construction method can be widely applied to construction of complex sites such as a high municipal viaduct floor or a place with a river channel under the viaduct floor and underground important pipelines, is high in construction efficiency and saves costs.
Description
Technical field
The present invention relates to municipal overhead road, the construction method of more particularly, to a kind of municipal overhead anti-collision wall.
Background technology
Nowadays, urban congestion phenomenon is more and more prominent, for alleviating urban traffic pressure it is ensured that citizen go on a journey safely, municipal administration
Overhead arise at the historic moment.When construction is overhead, generally require to arrange anti-collision wall in municipal overhead bridge floor both sides, to avoid vehicle to take off
Have an accident from road.It is all generally using first installation inner template, exterior sheathing and end template, after installation, form a die cavity,
Then packing material in this die cavity, template of finally dismantling forms protecting wall.In conventional art, the construction of municipal overhead anti-collision wall
During be artificial operation entirely, the construction tool being adopted is mainly console scaffold or hangs rope ladder etc..Workmen is front
State and high aerial installation and removal template is carried out on construction tool, there is potential safety hazard, workmen, easily from high falling, causes
Security incident.Therefore, anti-collision wall construction, labor intensive, low construction efficiency are carried out using the method for overall process artificial construction, go back
There is potential safety hazard.
Therefore, how to provide a kind of efficiency of construction high, the construction method of the overhead anti-collision wall of safe and reliable municipal administration becomes this
Skilled person's technical problem urgently to be resolved hurrily.
Content of the invention
It is an object of the invention to provide a kind of construction method of municipal overhead anti-collision wall, overhead to solve existing municipal administration
The problem that anti-collision wall construction efficiency is low, safety is not high.
To achieve these goals, the technical scheme is that
The construction method of the overhead anti-collision wall of municipal administration, comprises the steps:
Step one: construction equipment, template assembly and the construction material of municipal overhead anti-collision wall, wherein, described city are provided
The construction equipment of the overhead anti-collision wall of political affairs includes the mobile station being arranged on described municipal overhead bridge floor, and the bottom of described mobile station sets
There is movable pulley;And it is located at the workbench of described municipal overhead bridge floor side, described workbench includes supporting table and guard rail, institute
State workbench to be connected with described mobile station by a connecting bracket;Operation with described municipal overhead bridge floor detachable connection is put down
Platform, described operating platform is located above workbench;Electric block, described electric block is fixedly installed in described connecting bracket,
And it is located at the top of described workbench;
Step 2: using described electric block, described template assembly and construction material are lifted into described workbench, rely on
Described workbench, builds, at a construction workshop section, the operating platform being fixedly connected with described municipal overhead bridge floor;
Step 3: rely on the operating platform in described step 2 to complete the construction of anti-collision wall at this construction workshop section;
Step 4;Described workbench is relied on to remove operating platform and template assembly in described step 2, mobile described shifting
Dynamic platform drives described workbench to enter another construction workshop section;
Step 5: rely on described workbench, build in another construction workshop section and be fixedly connected with described municipal overhead bridge floor
Another operating platform;
Step 6: using described electric block, construction material is lifted on another operating platform, relies on another operation flat
Platform completes the construction of anti-collision wall at another construction workshop section;
Step 7: repeating said steps four are to described step 6, until complete described municipal overhead bridge floor both sides anti-collision wall
Construction.
Present invention also offers the construction method of another municipal overhead anti-collision wall, comprise the steps:
Step one: construction equipment, template assembly one, template assembly two and the construction material of municipal overhead anti-collision wall are provided
Material, wherein, the construction equipment of described municipal overhead anti-collision wall includes the mobile station being arranged on described municipal overhead bridge floor, described
The bottom of mobile station is provided with movable pulley;And it is located at the workbench of described municipal overhead bridge floor side, described workbench includes
Support platform and guard rail, described workbench is connected with described mobile station by a connecting bracket;Removable with described municipal overhead bridge floor
Unload the operating platform of formula connection, described operating platform is located above workbench;Electric block, described electric block is fixedly installed on
In described connecting bracket, and it is located at the top of described workbench;
Step 2: using described electric block, described template assembly one and construction material are lifted into described workbench, according to
Hold in the palm described workbench, build, at the first construction workshop section, the first operating platform being fixedly connected with described municipal overhead bridge floor;
Step 3: rely on described first operating platform to carry out the construction of anti-collision wall at the first construction workshop section;Move institute simultaneously
Stating mobile station drives described workbench to enter the second construction workshop section;
Step 4: rely on described workbench, build at the described second construction workshop section and fix with described municipal overhead bridge floor
The second operating platform connecting, completes the construction of anti-collision wall at the first construction workshop section simultaneously;
Step 5: using described electric block, described template assembly two and construction material are lifted into described second operation flat
On platform, described second operating platform is relied on to carry out the construction of anti-collision wall at the second construction workshop section;Meanwhile, mobile described mobile station band
Dynamic described workbench enters the first construction workshop section, relies on described workbench to remove described first operating platform and template assembly one,
And the described mobile station of movement drives described workbench to enter the 3rd construction workshop section;
Step 6: rely on described workbench, build in the described 3rd construction workshop section fixing even with described municipal overhead bridge floor
The 3rd operating platform connecing, completes the construction of anti-collision wall at the second construction workshop section simultaneously;
Step 7: using described electric block, construction material is lifted on described 3rd operating platform, relies on described the
Three operating platforms carry out the construction of anti-collision wall at the 3rd construction workshop section;Move described mobile station drives described workbench to enter simultaneously
Described second construction workshop section, relies on described workbench to remove described second operating platform and template assembly two, mobile described movement
Platform drives described workbench to enter the 4th construction workshop section;
Step 8: rely on described workbench, build in the described 4th construction workshop section fixing even with described municipal overhead bridge floor
The 4th operating platform connecing, completes the construction of anti-collision wall at the 3rd construction workshop section simultaneously;
Step 9: using described electric block, construction material is lifted on described 4th operating platform, relies on described the
Four operating platforms carry out the construction that the 4th construction workshop section locates anti-collision wall, rely on described workbench remove described 3rd operating platform with
Template assembly one, the described mobile station of movement drives described workbench to enter the 5th construction workshop section;
Step 10: rely on described workbench, build in the described 5th construction workshop section fixing even with described municipal overhead bridge floor
The 5th operating platform connecing, completes the construction of anti-collision wall at the 4th construction workshop section simultaneously;
Step 11: repeating said steps five are to described step 10, until complete described municipal overhead bridge floor both sides anticollision
The construction of wall.
The present invention compared with prior art, has the advantage that and beneficial effect:
1st, the construction equipment of the overhead anti-collision wall of the municipal administration of the present invention, including the mobile station being arranged on municipal overhead bridge floor,
The bottom of mobile station is provided with movable pulley;Positioned at the workbench of municipal overhead bridge floor side, workbench includes supporting table and guard rail,
Workbench is connected with mobile station by a connecting bracket;Electric block, electric block is fixedly installed in connecting bracket, and is located at
The top of workbench.By carrying out operating platform installation on moveable workbench, operating platform is fixedly installed on municipal administration
On overhead bridge floor, workmen need not be suspended in half do-nothing operation, and compared with traditional construction scaffolding, working security is higher.And
And, workbench and operating platform each work independently, when workmen carries out the construction of anti-collision wall in operating platform, workbench
The installation of other operating platforms or the transport of template assembly and other construction materials can be carried out, improve efficiency of construction.
During movable workbench, do not interfere with operating platform, further increase workmen and carry out anti-collision wall construction on the operational platform
Safety.
2nd, the construction method of the overhead anti-collision wall of the municipal administration of the present invention, the first step provides the construction of municipal overhead anti-collision wall to set
Standby, template assembly and construction material;Template assembly and construction material are lifted into workbench using electric block by second step, according to
Support workbench, builds, at a construction workshop section, the operating platform being fixedly connected with municipal overhead bridge floor;3rd step relies on aforementioned behaviour
Complete the construction of anti-collision wall at this construction workshop section as platform;4th step relies on workbench to remove aforementioned operation platform and template group
Part, mobile mobile station drives workbench to enter another construction workshop section;5th step rely on workbench, another construction workshop section build with
Another operating platform that the overhead bridge floor of municipal administration is fixedly connected;Construction material is lifted into another operation using electric block by the 6th step
On platform, another operating platform is relied on to complete the construction of anti-collision wall at another construction workshop section;7th step repeats the 4th step to the 6th
Step, until complete the construction of municipal overhead bridge floor both sides anti-collision wall.The construction method of the present invention, is widely portable to municipal administration overhead
Floor elevation is higher or bridge floor under have the construction of the complex sites such as important pipeline for river course and underground.With respect to traditional profit
For being constructed with the scaffold that ground is set up, improve working security and efficiency of construction.Additionally, movable form group
Part and operating platform, save engineering cost.
Brief description
The construction method of the overhead anti-collision wall of municipal administration of the present invention is given by below example and accompanying drawing.
Fig. 1 is the construction equipment structural representation of the overhead anti-collision wall of one embodiment of the invention municipal administration;
Fig. 2 is the top view of Fig. 1;
Fig. 3 is the left view of Fig. 1.
Specific embodiment
Construction method work below in conjunction with the overhead anti-collision wall of municipal administration to the present invention for the drawings and specific embodiments is detailed further
Describe in detail bright.According to following explanation and claims, advantages and features of the invention will become apparent from.It should be noted that, accompanying drawing is equal
In the form of very simplification and all using non-accurately ratio, only in order to conveniently, lucidly to aid in illustrating the embodiment of the present invention
Purpose.
Describe the construction equipment of the overhead anti-collision wall of municipal administration of the present invention in conjunction with Fig. 1 to Fig. 3 in detail.
As shown in figure 1, the construction equipment of municipal overhead anti-collision wall, including the mobile station being arranged on municipal overhead bridge floor 1
2, the bottom of mobile station 2 is provided with movable pulley 21;Positioned at the workbench 3 of municipal overhead bridge floor 1 side, workbench 3 includes supporting table
31 and guard rail 32, workbench 3 is connected with mobile station 2 by a connecting bracket 4;Electric block 5, electric block 5 is fixedly installed
In connecting bracket 4, and it is located at the top of workbench 3.
With continued reference to Fig. 1, specifically, during construction, mobile station 2 is located on municipal overhead bridge floor 1, by controlling mobile station
2 movement is controlling the movement of workbench 3.The bottom of mobile station 2 is provided with movable pulley 21.Of course, it is possible to select in each movement
One motor (not shown) is arranged on wheel 21, starts motor, drive movable pulley 21 mobile;Can also select by people
Work promotes mobile station 2 mobile.Workbench 3 is mainly used in the lifting of the installation, dismounting and template, material of operating platform 6.Construction
Operating platform 6 scene is built, and operating platform 6 is fixedly connected with municipal overhead bridge floor 1, and is located at the upper of workbench 3
Side.After relying on workbench 3 to be fixedly connected the operating platform 6 of a construction workshop section with the side of municipal overhead bridge floor 1, constructor
Member can rely on this operating platform 6 to carry out template assembly installation, concrete construction.Specifically it is contemplated that operation is flat
Platform 6 is closer with the horizontal range of municipal overhead bridge floor 1, and workmen directly can stride into operation from municipal overhead bridge floor 1
On platform 6.Complete Deng concreting, and after concrete strength reaches construction requirement, form removal assembly, now need to pass through
Control mobile station 2 to move to workbench 3 at operating platform 6, the template assembly of dismounting is moved to the next one by workbench 3 and waits to apply
The construction workshop section of work, and rely on workbench 3 that operating platform 6 is fixedly installed on the overhead bridge floor of municipal administration 1 of this section.
That is, each construction workshop section will carry out operating platform installation, template assembly install, concreting with
And template assembly dismounting operation.Certainly, operating platform is installed and template assembly dismantlement work all relies on workbench to complete.
And template assembly is installed, concreting and template assembly dismounting are required to rely on operating platform.And when a construction workshop section
Construction terminate after, operating platform can be removed, and the operating platform after removing is moved to other and not construct workshop section installing,
Then this operating platform is relied on to carry out the anti-collision wall construction of this construction section.So alternately construct, set up using ground with traditional
Scaffold construction compare, improve efficiency of construction.And, manually carry out anti-collision wall construction support is to be fixedly installed in municipal administration
Operating platform on overhead bridge floor, be widely portable to that municipal overhead floor elevation is higher or bridge floor under be river course and underground
There is the construction site construction that important pipeline etc. is complicated.The scaffold set up with respect to traditional ground, the municipal administration of the present invention is overhead
The construction equipment of anti-collision wall is safer.
With continued reference to Fig. 1, in order to keep balance and the stability of mobile station 2, connecting bracket 4 and workbench 3, it is additionally provided with
Balancing weight 7, balancing weight 7 is located at mobile station 2 one end away from workbench 3.In order to control the advance of mobile station 2, retrogressing and quiet
Only motionless, brake block (not shown) is additionally provided with movable pulley 21.
With continued reference to Fig. 1, connecting bracket 4 includes transverse slat 41, the first side plate 42, the second side plate 43 and the 3rd side plate 44, the
One end of side plate 42 is connected with one end of transverse slat 41, and the other end of the first side plate 42 is connected with workbench 3;Second side plate 43
One end is fixedly connected with transverse slat 41 stage casing, and the other end of the second side plate 43 is connected near one end of workbench 3 with mobile station 2;The
One end of three side plates 44 is fixedly connected with the other end of transverse slat 41, and the other end of the 3rd side plate 44 and mobile station 2 are away from workbench 3
One end connect.
With continued reference to Fig. 1, the first side plate 42 connects as one transverse slat 41 and workbench 3 it is ensured that transverse slat 41 is with movement
The movement of platform 2 and synchronizing moving, the workbench 3 also synchronizing moving being connected with transverse slat 41.Second side plate 43 and the 3rd side plate 44
The two ends of mobile station 2 are coupled together with transverse slat 41, thus by controlling the movement of mobile station 2 come the movement with motion plate 41.
With continued reference to Fig. 1, in order to strengthen the connectivity robustness between the first side plate 42, the second side plate 43 and transverse slat 41, the
Side plate 42 is equipped with reinforcing brace 45 with the junction of transverse slat 41, the second side plate 43 with the junction of transverse slat 41.
Especially, with reference to Fig. 3, the upper and lower workbench of workmen 3 and operating platform 6 for convenience, in workbench and horizontal stroke
It is additionally provided with cat ladder 8, cat ladder 8 is arranged on the first side plate 42 between plate 41.Water due to the first side plate 42 and municipal overhead bridge floor 1
Flat close together, workmen directly can go on cat ladder 8 from municipal overhead bridge floor 1, then enters workbench 3 by cat ladder 8
Carry out the installation of operating platform 6.
Specifically, with continued reference to Fig. 1, the construction equipment of the overhead anti-collision wall of municipal administration of the present embodiment is additionally provided with main control electricity
Case 9 and hand held switch (not shown), start hand held switch input operation request, and main control electronic box 9 just enters row operation,
Corresponding control target sends instruction backward, realizes corresponding operation.Hand held switch is provided with mobile station 2 control button, control
Steady movement on municipal overhead bridge floor 1 for the mobile station 2 processed.Electric block 5 control button is additionally provided with hand held switch, controls electricity
The advance of walking dolly, retrogressing on dynamic calabash 5;Control rise, the decline of suspension hook, thus realizing the lifting of template assembly.Certainly,
When carrying out lifting construction, need manually to control moving forward and backward of mobile station 2 according to condition of construction, adjust operating position, will
Template assembly mounts on electric block 5.And the operation of electric block 5 is to be controlled by the workman on workbench 3.Such control
Process processed, achieves automated job substantially, improves the work efficiency of lifting, reduces labor intensity, saves manpower
This.Certainly according to practice of construction situation it is also possible to select to weld a support on transverse slat 41, bottle gouard moved by hands is arranged on support
To realize the lifting of template assembly and construction material.
Below with continued reference to the construction method of the overhead anti-collision wall of Fig. 1 to Fig. 3 detailed description present invention municipal administration:
The construction method of the overhead anti-collision wall 10 of municipal administration, specifically includes following steps:
Step one: construction equipment, template assembly (not shown) and the construction material of municipal overhead anti-collision wall 10 are provided
Material (not shown);
Step 2: using electric block 5, template assembly and construction material are lifted into workbench 3, rely on workbench 3,
Build, at one construction workshop section, the operating platform 6 being fixedly connected with municipal overhead bridge floor 1;
Step 3: rely on the construction completing anti-collision wall 10 at this construction workshop section at the operating platform 6 in step 2;
Step 4: rely on workbench 3 to remove operating platform 6 and template assembly in step 2, mobile mobile station 2 band is started building
Station 3 enters another construction workshop section;
Step 5: rely on workbench 3, build, in another construction workshop section, another behaviour being fixedly connected with municipal overhead bridge floor 1
Make platform (not shown);
Step 6: using electric block 5, construction material is lifted on another operating platform, relies on another operating platform complete
Become the construction of anti-collision wall at another construction workshop section;
Step 7: repeat step four to step 6, until completing the construction of municipal overhead bridge floor 1 both sides anti-collision wall.
In order to improve efficiency of construction further, in another embodiment of the invention, the construction party of municipal overhead anti-collision wall
Method, comprises the steps:
Step one: construction equipment, template assembly one, template assembly two and the construction of described municipal overhead anti-collision wall are provided
Material;
Step 2: using electric block, template assembly one and construction material are lifted into workbench, rely on workbench, the
Build, at one construction workshop section, the first operating platform being fixedly connected with municipal overhead bridge floor;
Step 3: rely on the first operating platform to carry out the construction of anti-collision wall at the first construction workshop section;Move mobile station simultaneously
Workbench is driven to enter the second construction workshop section;
Step 4: rely on workbench, build the second behaviour being fixedly connected with municipal overhead bridge floor at the second construction workshop section
Make platform, complete the construction of anti-collision wall at the first construction workshop section simultaneously;
Step 5: using electric block, template assembly two and construction material are lifted on the second operating platform, rely on the
Two operating platforms carry out the construction of anti-collision wall at the second construction workshop section;Meanwhile, mobile mobile station drives workbench to enter first and applies
Work workshop section, relies on workbench to remove the first operating platform and template assembly one, and mobile mobile station drives workbench to enter the 3rd
Construction workshop section;
Step 6: rely on workbench, build, in the 3rd construction workshop section, the 3rd operation being fixedly connected with municipal overhead bridge floor
Platform, completes the construction of anti-collision wall at the second construction workshop section simultaneously;
Step 7: using electric block, construction material is lifted on the 3rd operating platform, relies on the 3rd operating platform to enter
The construction of anti-collision wall at row the 3rd construction workshop section;Move mobile station drives workbench to enter the second construction workshop section simultaneously, relies on work
Station removes the second operating platform and template assembly two, and mobile mobile station drives workbench to enter the 4th construction workshop section;
Step 8: rely on workbench, build, in the 4th construction workshop section, the 4th operation being fixedly connected with municipal overhead bridge floor
Platform, completes the construction of anti-collision wall at the 3rd construction workshop section simultaneously;
Step 9: using electric block, construction material is lifted on the 4th operating platform, relies on the 4th operating platform to enter
At row the 4th construction workshop section, the construction of anti-collision wall, relies on workbench to remove the 3rd operating platform and template assembly one, mobile
Platform drives workbench to enter the 5th construction workshop section;
Step 10: rely on workbench, build, in the 5th construction workshop section, the 5th operation being fixedly connected with municipal overhead bridge floor
Platform, completes the construction of anti-collision wall at the 4th construction workshop section simultaneously;
Step 11: repeat step five to step 10, until completing the construction of municipal overhead bridge floor both sides anti-collision wall.
Especially, the situation of job site can be made full use of, the construction of municipal overhead anti-collision wall is divided into multiple constructions
Workshop section is carried out, and relies on moveable workbench, is respectively mounted operating platform in multiple construction workshop sections simultaneously.In each installation
Operating platform on, arrange at least one workmen to carry out template assembly installation, concreting and template assembly respectively
Dismantlement work.
Specifically, when the workmen of a construction workshop section carries out anti-collision wall construction on the first operating platform, another
The workmen of construction workshop section can rely on workbench to carry out the installation of the second operating platform, then rearrange workmen and exist
Carry out anti-collision wall construction on this second operating platform.At this point it is possible to mobile work platform is to the 3rd construction workshop section, and rely on workbench
3rd operating platform is installed, meanwhile, arranges workmen to carry out the 3rd construction workshop section anti-collision wall construction.
That is, multiple construction workshop sections are constructed simultaneously, mobile station drives workbench alternately to commute each operation
Between platform.Every one construction workshop section to be onstructed, relies on workbench to carry out operating platform installation first, then relies on this behaviour
Carry out the construction of anti-collision wall as platform.Operating platform at every installation one is it is possible to mobile work platform goes to next work of constructing
Section, carries out another operating platform installation.If now there being construction workshop section to need form removal assembly, mobile work platform is applied to this
Work workshop section, carries out the dismounting of this construction workshop section template assembly, and relies on workbench to pass through the lifting devices such as electric block by template
Assembly is lifted on the operating platform of construction workshop section needing installation form.So, the workmen of a construction workshop section
Carry out concreting on the operational platform, the workmen of another construction workshop section carries out template assembly peace on the operational platform
Dress, the installation that also workmen of a construction workshop section relies on workbench to carry out this construction workshop section operating platform.Existing in construction
, it is ensured that at least two very in the case that the lifting device such as workbench and electric block is not as vacant or idle as possible
To being that more than three construction workshop sections are constructed simultaneously, in these workshop sections that construct, or carry out operating platform installation, or flat in operation
Carry out template assembly installation on platform, or carry out concreting on the operational platform, or rely on workbench form removal assembly with
And the circulation construction of operating platform.
Certainly, during practice of construction, can select first constructs completes the anti-collision wall of municipal overhead bridge floor side, then adopts
Complete the anti-collision wall of municipal overhead bridge floor opposite side with same construction method, until complete entirely municipal overhead bridge floor both sides preventing
Hit the construction of wall.Can also select first to complete the anti-collision wall of the bridge floor both sides of a construction section, then complete the adjacent next one to apply
The anti-collision wall of the bridge floor both sides of workshop section, progressively forward impelling successively, until complete whole municipal overhead bridge floor both sides anti-collision wall
Construction.
In sum, the construction equipment of the overhead anti-collision wall of the municipal administration of the present invention, including being arranged on municipal overhead bridge floor
Mobile station, the bottom of mobile station is provided with movable pulley;And be located at municipal overhead bridge floor side workbench, workbench include support
Platform and guard rail, workbench is connected with mobile station by a connecting bracket;Electric block, electric block is fixedly installed on connection
On frame, and it is located at the top of workbench.Carry out operating platform installation by relying on mobile station to drive on the workbench of lower movement, will
Operating platform is fixedly installed on municipal overhead bridge floor, and workmen need not be suspended in half do-nothing operation, with traditional construction scaffolding
Compare, working security is higher.And, workbench and operating platform each work independently, when workmen enters in operating platform
During the construction of row anti-collision wall, workbench can carry out installation or template assembly and other construction materials of other operating platforms
Transport, improve efficiency of construction.During movable workbench, do not interfere with operating platform, further increase workmen in behaviour
Make the safety of anti-collision wall construction is carried out on platform.The construction method of the overhead anti-collision wall of municipal administration of the present invention, is widely portable to
The overhead floor elevation of municipal administration is higher or bridge floor under have the construction of the complex sites such as important pipeline for river course and underground.Additionally,
Constructed using multiple construction workshop sections, for traditional scaffold set up using ground is constructed, improve
Working security and efficiency of construction, shorten the duration.Additionally, movable form assembly and operating platform, save engineering
This.Additionally, electric block lifting reduces labor intensity, save human cost.
Foregoing description is only the description to present pre-ferred embodiments, not any restriction to the scope of the invention.Ability
Any change that the technical staff in domain does according to the disclosure above content, modification, belong to scope of the claims.
Claims (2)
1. the construction method of municipal overhead anti-collision wall is it is characterised in that comprise the steps:
Step one: provide construction equipment, template assembly and the construction material of municipal overhead anti-collision wall, wherein, described municipal administration is high
The construction equipment of frame anti-collision wall includes the mobile station being arranged on described municipal overhead bridge floor, and the bottom of described mobile station is provided with shifting
Driving wheel;And it is located at the workbench of described municipal overhead bridge floor side, described workbench includes supporting table and guard rail, described work
Station is connected with described mobile station by a connecting bracket;With the operating platform of described municipal overhead bridge floor detachable connection,
Described operating platform is located above workbench;Electric block, described electric block is fixedly installed in described connecting bracket, and position
Top in described workbench;
Step 2: using described electric block, described template assembly and construction material are lifted into described workbench, rely on described
Workbench, builds, at a construction workshop section, the operating platform being fixedly connected with described municipal overhead bridge floor;
Step 3: rely on the operating platform in described step 2 to complete the construction of anti-collision wall at this construction workshop section;
Step 4;Described workbench is relied on to remove operating platform and template assembly in described step 2, mobile described mobile station
Described workbench is driven to enter another construction workshop section;
Step 5: rely on described workbench, build in another construction workshop section another with what described municipal overhead bridge floor was fixedly connected
Operating platform;
Step 6: using described electric block, construction material is lifted on another operating platform, relies on another operating platform complete
Become the construction of anti-collision wall at another construction workshop section;
Step 7: repeating said steps four to described step 6, until completing applying of described municipal overhead bridge floor both sides anti-collision wall
Work.
2. the construction method of municipal overhead anti-collision wall is it is characterised in that comprise the steps:
Step one: construction equipment, template assembly one, template assembly two and the construction material of municipal overhead anti-collision wall are provided, its
In, the construction equipment of described municipal overhead anti-collision wall includes the mobile station being arranged on described municipal overhead bridge floor, described movement
The bottom of platform is provided with movable pulley;And it is located at the workbench of described municipal overhead bridge floor side, described workbench includes supporting table
And guard rail, described workbench is connected with described mobile station by a connecting bracket;Detachable with described municipal overhead bridge floor
The operating platform connecting, described operating platform is located above workbench;Electric block, described electric block is fixedly installed on described
In connecting bracket, and it is located at the top of described workbench;
Step 2: using described electric block, described template assembly one and construction material are lifted into described workbench, rely on institute
State workbench, build, at the first construction workshop section, the first operating platform being fixedly connected with described municipal overhead bridge floor;
Step 3: rely on described first operating platform to carry out the construction of anti-collision wall at the first construction workshop section;Move described shifting simultaneously
Dynamic platform drives described workbench to enter the second construction workshop section;
Step 4: rely on described workbench, build at the described second construction workshop section and be fixedly connected with described municipal overhead bridge floor
The second operating platform, complete the construction of anti-collision wall at the first construction workshop section simultaneously;
Step 5: described template assembly two and construction material are lifted into described second operating platform using described electric block
On, rely on described second operating platform to carry out the construction of anti-collision wall at the second construction workshop section;Meanwhile, the described mobile station of movement drives
Described workbench enters the first construction workshop section, relies on described workbench to remove described first operating platform and template assembly one, and
The described mobile station of movement drives described workbench to enter the 3rd construction workshop section;
Step 6: rely on described workbench, build in the described 3rd construction workshop section and be fixedly connected with described municipal overhead bridge floor
3rd operating platform, completes the construction of anti-collision wall at the second construction workshop section simultaneously;
Step 7: using described electric block, construction material is lifted on described 3rd operating platform, relies on described 3rd behaviour
Carry out the construction of anti-collision wall at the 3rd construction workshop section as platform;Move described mobile station drives described workbench entrance described simultaneously
Second construction workshop section, relies on described workbench to remove described second operating platform and template assembly two, mobile described mobile station band
Dynamic described workbench enters the 4th construction workshop section;
Step 8: rely on described workbench, build in the described 4th construction workshop section and be fixedly connected with described municipal overhead bridge floor
4th operating platform, completes the construction of anti-collision wall at the 3rd construction workshop section simultaneously;
Step 9: using described electric block, construction material is lifted on described 4th operating platform, relies on described 4th behaviour
Carry out the construction of anti-collision wall at the 4th construction workshop section as platform, rely on described workbench to remove described 3rd operating platform and template
Assembly one, the described mobile station of movement drives described workbench to enter the 5th construction workshop section;
Step 10: rely on described workbench, build in the described 5th construction workshop section and be fixedly connected with described municipal overhead bridge floor
5th operating platform, completes the construction of anti-collision wall at the 4th construction workshop section simultaneously;
Step 11: repeating said steps five to described step 10, until completing described municipal overhead bridge floor both sides anti-collision wall
Construction.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410438765.3A CN104179126B (en) | 2014-08-29 | 2014-08-29 | Municipal overhead anti-collision wall construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410438765.3A CN104179126B (en) | 2014-08-29 | 2014-08-29 | Municipal overhead anti-collision wall construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104179126A CN104179126A (en) | 2014-12-03 |
CN104179126B true CN104179126B (en) | 2017-01-25 |
Family
ID=51960446
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410438765.3A Active CN104179126B (en) | 2014-08-29 | 2014-08-29 | Municipal overhead anti-collision wall construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104179126B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110438904A (en) * | 2019-08-15 | 2019-11-12 | 中国五冶集团有限公司 | A kind of device and method for installing anticollision wall form |
CN112962463B (en) * | 2021-02-08 | 2023-07-21 | 湖北三峡路桥工程有限公司 | Construction equipment of municipal administration overhead road and bridge anticollision wall |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101967799A (en) * | 2010-11-16 | 2011-02-09 | 中铁二十四局集团有限公司 | Light-weight truss cradle |
CN102021888A (en) * | 2010-10-26 | 2011-04-20 | 肇庆南桂钢模板有限公司 | Equipment for constructing bump walls on roads and bridges |
CN201896292U (en) * | 2010-12-21 | 2011-07-13 | 中铁二十四局集团有限公司 | Movable type trolley with electricity prevention plate |
CN102817320A (en) * | 2012-04-27 | 2012-12-12 | 中铁大桥局集团第五工程有限公司 | Concrete wall guard template construction trolley |
CN202688893U (en) * | 2012-08-03 | 2013-01-23 | 哈尔滨职业技术学院 | Road and bridge crash-proof wall template |
CN103233424A (en) * | 2013-04-19 | 2013-08-07 | 济南城建集团有限公司 | Hanging-basket-method support-free anti-collision wall construction method, construction hanging basket and template for construction |
CN204174535U (en) * | 2014-08-29 | 2015-02-25 | 上海建工七建集团有限公司 | The construction equipment of the overhead anti-collision wall of municipal administration |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3950800B2 (en) * | 2003-01-31 | 2007-08-01 | 京阪電気鉄道株式会社 | Suspension scaffold |
-
2014
- 2014-08-29 CN CN201410438765.3A patent/CN104179126B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102021888A (en) * | 2010-10-26 | 2011-04-20 | 肇庆南桂钢模板有限公司 | Equipment for constructing bump walls on roads and bridges |
CN101967799A (en) * | 2010-11-16 | 2011-02-09 | 中铁二十四局集团有限公司 | Light-weight truss cradle |
CN201896292U (en) * | 2010-12-21 | 2011-07-13 | 中铁二十四局集团有限公司 | Movable type trolley with electricity prevention plate |
CN102817320A (en) * | 2012-04-27 | 2012-12-12 | 中铁大桥局集团第五工程有限公司 | Concrete wall guard template construction trolley |
CN202688893U (en) * | 2012-08-03 | 2013-01-23 | 哈尔滨职业技术学院 | Road and bridge crash-proof wall template |
CN103233424A (en) * | 2013-04-19 | 2013-08-07 | 济南城建集团有限公司 | Hanging-basket-method support-free anti-collision wall construction method, construction hanging basket and template for construction |
CN204174535U (en) * | 2014-08-29 | 2015-02-25 | 上海建工七建集团有限公司 | The construction equipment of the overhead anti-collision wall of municipal administration |
Also Published As
Publication number | Publication date |
---|---|
CN104179126A (en) | 2014-12-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107338727B (en) | Integrally-disassembled and assembled anti-collision wall template and walking type rail hanging and moving system thereof | |
CN106348188B (en) | The manufacture method of planer-type building-construction lifting device | |
CN102251483B (en) | Construction method for hoisting concrete-filled steel tube lattice bridge pier through self-lifting attached crane | |
CN103726421B (en) | Height and span adjustable track paver for metro construction | |
CN104528500A (en) | Double-platform scaffold-free elevator installation method | |
CN203834373U (en) | Lifting movement mold carriage trolley for box culvert side wall formwork | |
CN105569692A (en) | Trolley for welding tunnel waterproof board hanging cloth | |
CN103912128B (en) | The construction method of high-altitude disjunctor steel truss | |
CN104179126B (en) | Municipal overhead anti-collision wall construction method | |
CN203531377U (en) | Lifting mould base for building | |
JP2010242308A (en) | Method for demolishing high-rise building of concrete slab structure, and concrete slab demolition equipment | |
CN203795311U (en) | Multi-leg high pier and slip form construction device | |
CN205558915U (en) | Portable operation device | |
JP2014047479A (en) | Method for lifting demolishing heavy machine to building to be demolished | |
CN204174535U (en) | The construction equipment of the overhead anti-collision wall of municipal administration | |
JP5356091B2 (en) | Crane girder exchanging method and crane girder exchanging apparatus | |
CN102733612B (en) | Mounting method of electric hoist orbit | |
CN103669219B (en) | Many limbs height pier is with sliding construction equipment | |
CN110904853B (en) | Construction method for automatic lifting operation platform for mounting high-speed railway pier body lifting rail | |
JP2014084199A (en) | Method for installing overhead crane | |
CN203654707U (en) | Detachable gantry installation frame | |
CN202689494U (en) | Elevator shaft template support | |
CN204676431U (en) | Highway crash wall construction formwork installation carriage | |
CN206088904U (en) | Guide tracked lift of guide rail detachable | |
CN104860212A (en) | Micro crane |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |