CN104179126B - Municipal overhead anti-collision wall construction method - Google Patents

Municipal overhead anti-collision wall construction method Download PDF

Info

Publication number
CN104179126B
CN104179126B CN201410438765.3A CN201410438765A CN104179126B CN 104179126 B CN104179126 B CN 104179126B CN 201410438765 A CN201410438765 A CN 201410438765A CN 104179126 B CN104179126 B CN 104179126B
Authority
CN
China
Prior art keywords
construction
workbench
workshop section
operating platform
collision wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410438765.3A
Other languages
Chinese (zh)
Other versions
CN104179126A (en
Inventor
张迪
诸伟麟
崔玉兵
梁海峰
龙凤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai No 7 Construction Co Ltd
Original Assignee
Shanghai No 7 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai No 7 Construction Co Ltd filed Critical Shanghai No 7 Construction Co Ltd
Priority to CN201410438765.3A priority Critical patent/CN104179126B/en
Publication of CN104179126A publication Critical patent/CN104179126A/en
Application granted granted Critical
Publication of CN104179126B publication Critical patent/CN104179126B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)
  • Forklifts And Lifting Vehicles (AREA)

Abstract

The invention discloses a municipal overhead anti-collision wall construction method and belongs to the technical field of municipal overhead construction. The municipal overhead anti-collision wall construction method is used for solving the problem that the municipal overhead anti-collision wall is low in construction efficiency and safety. Municipal overhead anti-collision wall construction equipment comprises a mobile platform which is arranged on the municipal viaduct floor, a workbench which is arranged on one side of the municipal viaduct floor and an electric hoist; the bottom of the mobile platform is provided with mobile wheels; the workbench comprises a supporting platform and a guard rail; the workbench is connected with the mobile platform through a connecting support; the electric hoist is fixedly arranged on the connecting support and above the workbench. The municipal overhead anti-collision wall construction equipment increases the construction safety and improves the construction efficiency. The municipal overhead anti-collision wall construction method can be widely applied to construction of complex sites such as a high municipal viaduct floor or a place with a river channel under the viaduct floor and underground important pipelines, is high in construction efficiency and saves costs.

Description

The construction method of the overhead anti-collision wall of municipal administration
Technical field
The present invention relates to municipal overhead road, the construction method of more particularly, to a kind of municipal overhead anti-collision wall.
Background technology
Nowadays, urban congestion phenomenon is more and more prominent, for alleviating urban traffic pressure it is ensured that citizen go on a journey safely, municipal administration Overhead arise at the historic moment.When construction is overhead, generally require to arrange anti-collision wall in municipal overhead bridge floor both sides, to avoid vehicle to take off Have an accident from road.It is all generally using first installation inner template, exterior sheathing and end template, after installation, form a die cavity, Then packing material in this die cavity, template of finally dismantling forms protecting wall.In conventional art, the construction of municipal overhead anti-collision wall During be artificial operation entirely, the construction tool being adopted is mainly console scaffold or hangs rope ladder etc..Workmen is front State and high aerial installation and removal template is carried out on construction tool, there is potential safety hazard, workmen, easily from high falling, causes Security incident.Therefore, anti-collision wall construction, labor intensive, low construction efficiency are carried out using the method for overall process artificial construction, go back There is potential safety hazard.
Therefore, how to provide a kind of efficiency of construction high, the construction method of the overhead anti-collision wall of safe and reliable municipal administration becomes this Skilled person's technical problem urgently to be resolved hurrily.
Content of the invention
It is an object of the invention to provide a kind of construction method of municipal overhead anti-collision wall, overhead to solve existing municipal administration The problem that anti-collision wall construction efficiency is low, safety is not high.
To achieve these goals, the technical scheme is that
The construction method of the overhead anti-collision wall of municipal administration, comprises the steps:
Step one: construction equipment, template assembly and the construction material of municipal overhead anti-collision wall, wherein, described city are provided The construction equipment of the overhead anti-collision wall of political affairs includes the mobile station being arranged on described municipal overhead bridge floor, and the bottom of described mobile station sets There is movable pulley;And it is located at the workbench of described municipal overhead bridge floor side, described workbench includes supporting table and guard rail, institute State workbench to be connected with described mobile station by a connecting bracket;Operation with described municipal overhead bridge floor detachable connection is put down Platform, described operating platform is located above workbench;Electric block, described electric block is fixedly installed in described connecting bracket, And it is located at the top of described workbench;
Step 2: using described electric block, described template assembly and construction material are lifted into described workbench, rely on Described workbench, builds, at a construction workshop section, the operating platform being fixedly connected with described municipal overhead bridge floor;
Step 3: rely on the operating platform in described step 2 to complete the construction of anti-collision wall at this construction workshop section;
Step 4;Described workbench is relied on to remove operating platform and template assembly in described step 2, mobile described shifting Dynamic platform drives described workbench to enter another construction workshop section;
Step 5: rely on described workbench, build in another construction workshop section and be fixedly connected with described municipal overhead bridge floor Another operating platform;
Step 6: using described electric block, construction material is lifted on another operating platform, relies on another operation flat Platform completes the construction of anti-collision wall at another construction workshop section;
Step 7: repeating said steps four are to described step 6, until complete described municipal overhead bridge floor both sides anti-collision wall Construction.
Present invention also offers the construction method of another municipal overhead anti-collision wall, comprise the steps:
Step one: construction equipment, template assembly one, template assembly two and the construction material of municipal overhead anti-collision wall are provided Material, wherein, the construction equipment of described municipal overhead anti-collision wall includes the mobile station being arranged on described municipal overhead bridge floor, described The bottom of mobile station is provided with movable pulley;And it is located at the workbench of described municipal overhead bridge floor side, described workbench includes Support platform and guard rail, described workbench is connected with described mobile station by a connecting bracket;Removable with described municipal overhead bridge floor Unload the operating platform of formula connection, described operating platform is located above workbench;Electric block, described electric block is fixedly installed on In described connecting bracket, and it is located at the top of described workbench;
Step 2: using described electric block, described template assembly one and construction material are lifted into described workbench, according to Hold in the palm described workbench, build, at the first construction workshop section, the first operating platform being fixedly connected with described municipal overhead bridge floor;
Step 3: rely on described first operating platform to carry out the construction of anti-collision wall at the first construction workshop section;Move institute simultaneously Stating mobile station drives described workbench to enter the second construction workshop section;
Step 4: rely on described workbench, build at the described second construction workshop section and fix with described municipal overhead bridge floor The second operating platform connecting, completes the construction of anti-collision wall at the first construction workshop section simultaneously;
Step 5: using described electric block, described template assembly two and construction material are lifted into described second operation flat On platform, described second operating platform is relied on to carry out the construction of anti-collision wall at the second construction workshop section;Meanwhile, mobile described mobile station band Dynamic described workbench enters the first construction workshop section, relies on described workbench to remove described first operating platform and template assembly one, And the described mobile station of movement drives described workbench to enter the 3rd construction workshop section;
Step 6: rely on described workbench, build in the described 3rd construction workshop section fixing even with described municipal overhead bridge floor The 3rd operating platform connecing, completes the construction of anti-collision wall at the second construction workshop section simultaneously;
Step 7: using described electric block, construction material is lifted on described 3rd operating platform, relies on described the Three operating platforms carry out the construction of anti-collision wall at the 3rd construction workshop section;Move described mobile station drives described workbench to enter simultaneously Described second construction workshop section, relies on described workbench to remove described second operating platform and template assembly two, mobile described movement Platform drives described workbench to enter the 4th construction workshop section;
Step 8: rely on described workbench, build in the described 4th construction workshop section fixing even with described municipal overhead bridge floor The 4th operating platform connecing, completes the construction of anti-collision wall at the 3rd construction workshop section simultaneously;
Step 9: using described electric block, construction material is lifted on described 4th operating platform, relies on described the Four operating platforms carry out the construction that the 4th construction workshop section locates anti-collision wall, rely on described workbench remove described 3rd operating platform with Template assembly one, the described mobile station of movement drives described workbench to enter the 5th construction workshop section;
Step 10: rely on described workbench, build in the described 5th construction workshop section fixing even with described municipal overhead bridge floor The 5th operating platform connecing, completes the construction of anti-collision wall at the 4th construction workshop section simultaneously;
Step 11: repeating said steps five are to described step 10, until complete described municipal overhead bridge floor both sides anticollision The construction of wall.
The present invention compared with prior art, has the advantage that and beneficial effect:
1st, the construction equipment of the overhead anti-collision wall of the municipal administration of the present invention, including the mobile station being arranged on municipal overhead bridge floor, The bottom of mobile station is provided with movable pulley;Positioned at the workbench of municipal overhead bridge floor side, workbench includes supporting table and guard rail, Workbench is connected with mobile station by a connecting bracket;Electric block, electric block is fixedly installed in connecting bracket, and is located at The top of workbench.By carrying out operating platform installation on moveable workbench, operating platform is fixedly installed on municipal administration On overhead bridge floor, workmen need not be suspended in half do-nothing operation, and compared with traditional construction scaffolding, working security is higher.And And, workbench and operating platform each work independently, when workmen carries out the construction of anti-collision wall in operating platform, workbench The installation of other operating platforms or the transport of template assembly and other construction materials can be carried out, improve efficiency of construction. During movable workbench, do not interfere with operating platform, further increase workmen and carry out anti-collision wall construction on the operational platform Safety.
2nd, the construction method of the overhead anti-collision wall of the municipal administration of the present invention, the first step provides the construction of municipal overhead anti-collision wall to set Standby, template assembly and construction material;Template assembly and construction material are lifted into workbench using electric block by second step, according to Support workbench, builds, at a construction workshop section, the operating platform being fixedly connected with municipal overhead bridge floor;3rd step relies on aforementioned behaviour Complete the construction of anti-collision wall at this construction workshop section as platform;4th step relies on workbench to remove aforementioned operation platform and template group Part, mobile mobile station drives workbench to enter another construction workshop section;5th step rely on workbench, another construction workshop section build with Another operating platform that the overhead bridge floor of municipal administration is fixedly connected;Construction material is lifted into another operation using electric block by the 6th step On platform, another operating platform is relied on to complete the construction of anti-collision wall at another construction workshop section;7th step repeats the 4th step to the 6th Step, until complete the construction of municipal overhead bridge floor both sides anti-collision wall.The construction method of the present invention, is widely portable to municipal administration overhead Floor elevation is higher or bridge floor under have the construction of the complex sites such as important pipeline for river course and underground.With respect to traditional profit For being constructed with the scaffold that ground is set up, improve working security and efficiency of construction.Additionally, movable form group Part and operating platform, save engineering cost.
Brief description
The construction method of the overhead anti-collision wall of municipal administration of the present invention is given by below example and accompanying drawing.
Fig. 1 is the construction equipment structural representation of the overhead anti-collision wall of one embodiment of the invention municipal administration;
Fig. 2 is the top view of Fig. 1;
Fig. 3 is the left view of Fig. 1.
Specific embodiment
Construction method work below in conjunction with the overhead anti-collision wall of municipal administration to the present invention for the drawings and specific embodiments is detailed further Describe in detail bright.According to following explanation and claims, advantages and features of the invention will become apparent from.It should be noted that, accompanying drawing is equal In the form of very simplification and all using non-accurately ratio, only in order to conveniently, lucidly to aid in illustrating the embodiment of the present invention Purpose.
Describe the construction equipment of the overhead anti-collision wall of municipal administration of the present invention in conjunction with Fig. 1 to Fig. 3 in detail.
As shown in figure 1, the construction equipment of municipal overhead anti-collision wall, including the mobile station being arranged on municipal overhead bridge floor 1 2, the bottom of mobile station 2 is provided with movable pulley 21;Positioned at the workbench 3 of municipal overhead bridge floor 1 side, workbench 3 includes supporting table 31 and guard rail 32, workbench 3 is connected with mobile station 2 by a connecting bracket 4;Electric block 5, electric block 5 is fixedly installed In connecting bracket 4, and it is located at the top of workbench 3.
With continued reference to Fig. 1, specifically, during construction, mobile station 2 is located on municipal overhead bridge floor 1, by controlling mobile station 2 movement is controlling the movement of workbench 3.The bottom of mobile station 2 is provided with movable pulley 21.Of course, it is possible to select in each movement One motor (not shown) is arranged on wheel 21, starts motor, drive movable pulley 21 mobile;Can also select by people Work promotes mobile station 2 mobile.Workbench 3 is mainly used in the lifting of the installation, dismounting and template, material of operating platform 6.Construction Operating platform 6 scene is built, and operating platform 6 is fixedly connected with municipal overhead bridge floor 1, and is located at the upper of workbench 3 Side.After relying on workbench 3 to be fixedly connected the operating platform 6 of a construction workshop section with the side of municipal overhead bridge floor 1, constructor Member can rely on this operating platform 6 to carry out template assembly installation, concrete construction.Specifically it is contemplated that operation is flat Platform 6 is closer with the horizontal range of municipal overhead bridge floor 1, and workmen directly can stride into operation from municipal overhead bridge floor 1 On platform 6.Complete Deng concreting, and after concrete strength reaches construction requirement, form removal assembly, now need to pass through Control mobile station 2 to move to workbench 3 at operating platform 6, the template assembly of dismounting is moved to the next one by workbench 3 and waits to apply The construction workshop section of work, and rely on workbench 3 that operating platform 6 is fixedly installed on the overhead bridge floor of municipal administration 1 of this section.
That is, each construction workshop section will carry out operating platform installation, template assembly install, concreting with And template assembly dismounting operation.Certainly, operating platform is installed and template assembly dismantlement work all relies on workbench to complete. And template assembly is installed, concreting and template assembly dismounting are required to rely on operating platform.And when a construction workshop section Construction terminate after, operating platform can be removed, and the operating platform after removing is moved to other and not construct workshop section installing, Then this operating platform is relied on to carry out the anti-collision wall construction of this construction section.So alternately construct, set up using ground with traditional Scaffold construction compare, improve efficiency of construction.And, manually carry out anti-collision wall construction support is to be fixedly installed in municipal administration Operating platform on overhead bridge floor, be widely portable to that municipal overhead floor elevation is higher or bridge floor under be river course and underground There is the construction site construction that important pipeline etc. is complicated.The scaffold set up with respect to traditional ground, the municipal administration of the present invention is overhead The construction equipment of anti-collision wall is safer.
With continued reference to Fig. 1, in order to keep balance and the stability of mobile station 2, connecting bracket 4 and workbench 3, it is additionally provided with Balancing weight 7, balancing weight 7 is located at mobile station 2 one end away from workbench 3.In order to control the advance of mobile station 2, retrogressing and quiet Only motionless, brake block (not shown) is additionally provided with movable pulley 21.
With continued reference to Fig. 1, connecting bracket 4 includes transverse slat 41, the first side plate 42, the second side plate 43 and the 3rd side plate 44, the One end of side plate 42 is connected with one end of transverse slat 41, and the other end of the first side plate 42 is connected with workbench 3;Second side plate 43 One end is fixedly connected with transverse slat 41 stage casing, and the other end of the second side plate 43 is connected near one end of workbench 3 with mobile station 2;The One end of three side plates 44 is fixedly connected with the other end of transverse slat 41, and the other end of the 3rd side plate 44 and mobile station 2 are away from workbench 3 One end connect.
With continued reference to Fig. 1, the first side plate 42 connects as one transverse slat 41 and workbench 3 it is ensured that transverse slat 41 is with movement The movement of platform 2 and synchronizing moving, the workbench 3 also synchronizing moving being connected with transverse slat 41.Second side plate 43 and the 3rd side plate 44 The two ends of mobile station 2 are coupled together with transverse slat 41, thus by controlling the movement of mobile station 2 come the movement with motion plate 41.
With continued reference to Fig. 1, in order to strengthen the connectivity robustness between the first side plate 42, the second side plate 43 and transverse slat 41, the Side plate 42 is equipped with reinforcing brace 45 with the junction of transverse slat 41, the second side plate 43 with the junction of transverse slat 41.
Especially, with reference to Fig. 3, the upper and lower workbench of workmen 3 and operating platform 6 for convenience, in workbench and horizontal stroke It is additionally provided with cat ladder 8, cat ladder 8 is arranged on the first side plate 42 between plate 41.Water due to the first side plate 42 and municipal overhead bridge floor 1 Flat close together, workmen directly can go on cat ladder 8 from municipal overhead bridge floor 1, then enters workbench 3 by cat ladder 8 Carry out the installation of operating platform 6.
Specifically, with continued reference to Fig. 1, the construction equipment of the overhead anti-collision wall of municipal administration of the present embodiment is additionally provided with main control electricity Case 9 and hand held switch (not shown), start hand held switch input operation request, and main control electronic box 9 just enters row operation, Corresponding control target sends instruction backward, realizes corresponding operation.Hand held switch is provided with mobile station 2 control button, control Steady movement on municipal overhead bridge floor 1 for the mobile station 2 processed.Electric block 5 control button is additionally provided with hand held switch, controls electricity The advance of walking dolly, retrogressing on dynamic calabash 5;Control rise, the decline of suspension hook, thus realizing the lifting of template assembly.Certainly, When carrying out lifting construction, need manually to control moving forward and backward of mobile station 2 according to condition of construction, adjust operating position, will Template assembly mounts on electric block 5.And the operation of electric block 5 is to be controlled by the workman on workbench 3.Such control Process processed, achieves automated job substantially, improves the work efficiency of lifting, reduces labor intensity, saves manpower This.Certainly according to practice of construction situation it is also possible to select to weld a support on transverse slat 41, bottle gouard moved by hands is arranged on support To realize the lifting of template assembly and construction material.
Below with continued reference to the construction method of the overhead anti-collision wall of Fig. 1 to Fig. 3 detailed description present invention municipal administration:
The construction method of the overhead anti-collision wall 10 of municipal administration, specifically includes following steps:
Step one: construction equipment, template assembly (not shown) and the construction material of municipal overhead anti-collision wall 10 are provided Material (not shown);
Step 2: using electric block 5, template assembly and construction material are lifted into workbench 3, rely on workbench 3, Build, at one construction workshop section, the operating platform 6 being fixedly connected with municipal overhead bridge floor 1;
Step 3: rely on the construction completing anti-collision wall 10 at this construction workshop section at the operating platform 6 in step 2;
Step 4: rely on workbench 3 to remove operating platform 6 and template assembly in step 2, mobile mobile station 2 band is started building Station 3 enters another construction workshop section;
Step 5: rely on workbench 3, build, in another construction workshop section, another behaviour being fixedly connected with municipal overhead bridge floor 1 Make platform (not shown);
Step 6: using electric block 5, construction material is lifted on another operating platform, relies on another operating platform complete Become the construction of anti-collision wall at another construction workshop section;
Step 7: repeat step four to step 6, until completing the construction of municipal overhead bridge floor 1 both sides anti-collision wall.
In order to improve efficiency of construction further, in another embodiment of the invention, the construction party of municipal overhead anti-collision wall Method, comprises the steps:
Step one: construction equipment, template assembly one, template assembly two and the construction of described municipal overhead anti-collision wall are provided Material;
Step 2: using electric block, template assembly one and construction material are lifted into workbench, rely on workbench, the Build, at one construction workshop section, the first operating platform being fixedly connected with municipal overhead bridge floor;
Step 3: rely on the first operating platform to carry out the construction of anti-collision wall at the first construction workshop section;Move mobile station simultaneously Workbench is driven to enter the second construction workshop section;
Step 4: rely on workbench, build the second behaviour being fixedly connected with municipal overhead bridge floor at the second construction workshop section Make platform, complete the construction of anti-collision wall at the first construction workshop section simultaneously;
Step 5: using electric block, template assembly two and construction material are lifted on the second operating platform, rely on the Two operating platforms carry out the construction of anti-collision wall at the second construction workshop section;Meanwhile, mobile mobile station drives workbench to enter first and applies Work workshop section, relies on workbench to remove the first operating platform and template assembly one, and mobile mobile station drives workbench to enter the 3rd Construction workshop section;
Step 6: rely on workbench, build, in the 3rd construction workshop section, the 3rd operation being fixedly connected with municipal overhead bridge floor Platform, completes the construction of anti-collision wall at the second construction workshop section simultaneously;
Step 7: using electric block, construction material is lifted on the 3rd operating platform, relies on the 3rd operating platform to enter The construction of anti-collision wall at row the 3rd construction workshop section;Move mobile station drives workbench to enter the second construction workshop section simultaneously, relies on work Station removes the second operating platform and template assembly two, and mobile mobile station drives workbench to enter the 4th construction workshop section;
Step 8: rely on workbench, build, in the 4th construction workshop section, the 4th operation being fixedly connected with municipal overhead bridge floor Platform, completes the construction of anti-collision wall at the 3rd construction workshop section simultaneously;
Step 9: using electric block, construction material is lifted on the 4th operating platform, relies on the 4th operating platform to enter At row the 4th construction workshop section, the construction of anti-collision wall, relies on workbench to remove the 3rd operating platform and template assembly one, mobile Platform drives workbench to enter the 5th construction workshop section;
Step 10: rely on workbench, build, in the 5th construction workshop section, the 5th operation being fixedly connected with municipal overhead bridge floor Platform, completes the construction of anti-collision wall at the 4th construction workshop section simultaneously;
Step 11: repeat step five to step 10, until completing the construction of municipal overhead bridge floor both sides anti-collision wall.
Especially, the situation of job site can be made full use of, the construction of municipal overhead anti-collision wall is divided into multiple constructions Workshop section is carried out, and relies on moveable workbench, is respectively mounted operating platform in multiple construction workshop sections simultaneously.In each installation Operating platform on, arrange at least one workmen to carry out template assembly installation, concreting and template assembly respectively Dismantlement work.
Specifically, when the workmen of a construction workshop section carries out anti-collision wall construction on the first operating platform, another The workmen of construction workshop section can rely on workbench to carry out the installation of the second operating platform, then rearrange workmen and exist Carry out anti-collision wall construction on this second operating platform.At this point it is possible to mobile work platform is to the 3rd construction workshop section, and rely on workbench 3rd operating platform is installed, meanwhile, arranges workmen to carry out the 3rd construction workshop section anti-collision wall construction.
That is, multiple construction workshop sections are constructed simultaneously, mobile station drives workbench alternately to commute each operation Between platform.Every one construction workshop section to be onstructed, relies on workbench to carry out operating platform installation first, then relies on this behaviour Carry out the construction of anti-collision wall as platform.Operating platform at every installation one is it is possible to mobile work platform goes to next work of constructing Section, carries out another operating platform installation.If now there being construction workshop section to need form removal assembly, mobile work platform is applied to this Work workshop section, carries out the dismounting of this construction workshop section template assembly, and relies on workbench to pass through the lifting devices such as electric block by template Assembly is lifted on the operating platform of construction workshop section needing installation form.So, the workmen of a construction workshop section Carry out concreting on the operational platform, the workmen of another construction workshop section carries out template assembly peace on the operational platform Dress, the installation that also workmen of a construction workshop section relies on workbench to carry out this construction workshop section operating platform.Existing in construction , it is ensured that at least two very in the case that the lifting device such as workbench and electric block is not as vacant or idle as possible To being that more than three construction workshop sections are constructed simultaneously, in these workshop sections that construct, or carry out operating platform installation, or flat in operation Carry out template assembly installation on platform, or carry out concreting on the operational platform, or rely on workbench form removal assembly with And the circulation construction of operating platform.
Certainly, during practice of construction, can select first constructs completes the anti-collision wall of municipal overhead bridge floor side, then adopts Complete the anti-collision wall of municipal overhead bridge floor opposite side with same construction method, until complete entirely municipal overhead bridge floor both sides preventing Hit the construction of wall.Can also select first to complete the anti-collision wall of the bridge floor both sides of a construction section, then complete the adjacent next one to apply The anti-collision wall of the bridge floor both sides of workshop section, progressively forward impelling successively, until complete whole municipal overhead bridge floor both sides anti-collision wall Construction.
In sum, the construction equipment of the overhead anti-collision wall of the municipal administration of the present invention, including being arranged on municipal overhead bridge floor Mobile station, the bottom of mobile station is provided with movable pulley;And be located at municipal overhead bridge floor side workbench, workbench include support Platform and guard rail, workbench is connected with mobile station by a connecting bracket;Electric block, electric block is fixedly installed on connection On frame, and it is located at the top of workbench.Carry out operating platform installation by relying on mobile station to drive on the workbench of lower movement, will Operating platform is fixedly installed on municipal overhead bridge floor, and workmen need not be suspended in half do-nothing operation, with traditional construction scaffolding Compare, working security is higher.And, workbench and operating platform each work independently, when workmen enters in operating platform During the construction of row anti-collision wall, workbench can carry out installation or template assembly and other construction materials of other operating platforms Transport, improve efficiency of construction.During movable workbench, do not interfere with operating platform, further increase workmen in behaviour Make the safety of anti-collision wall construction is carried out on platform.The construction method of the overhead anti-collision wall of municipal administration of the present invention, is widely portable to The overhead floor elevation of municipal administration is higher or bridge floor under have the construction of the complex sites such as important pipeline for river course and underground.Additionally, Constructed using multiple construction workshop sections, for traditional scaffold set up using ground is constructed, improve Working security and efficiency of construction, shorten the duration.Additionally, movable form assembly and operating platform, save engineering This.Additionally, electric block lifting reduces labor intensity, save human cost.
Foregoing description is only the description to present pre-ferred embodiments, not any restriction to the scope of the invention.Ability Any change that the technical staff in domain does according to the disclosure above content, modification, belong to scope of the claims.

Claims (2)

1. the construction method of municipal overhead anti-collision wall is it is characterised in that comprise the steps:
Step one: provide construction equipment, template assembly and the construction material of municipal overhead anti-collision wall, wherein, described municipal administration is high The construction equipment of frame anti-collision wall includes the mobile station being arranged on described municipal overhead bridge floor, and the bottom of described mobile station is provided with shifting Driving wheel;And it is located at the workbench of described municipal overhead bridge floor side, described workbench includes supporting table and guard rail, described work Station is connected with described mobile station by a connecting bracket;With the operating platform of described municipal overhead bridge floor detachable connection, Described operating platform is located above workbench;Electric block, described electric block is fixedly installed in described connecting bracket, and position Top in described workbench;
Step 2: using described electric block, described template assembly and construction material are lifted into described workbench, rely on described Workbench, builds, at a construction workshop section, the operating platform being fixedly connected with described municipal overhead bridge floor;
Step 3: rely on the operating platform in described step 2 to complete the construction of anti-collision wall at this construction workshop section;
Step 4;Described workbench is relied on to remove operating platform and template assembly in described step 2, mobile described mobile station Described workbench is driven to enter another construction workshop section;
Step 5: rely on described workbench, build in another construction workshop section another with what described municipal overhead bridge floor was fixedly connected Operating platform;
Step 6: using described electric block, construction material is lifted on another operating platform, relies on another operating platform complete Become the construction of anti-collision wall at another construction workshop section;
Step 7: repeating said steps four to described step 6, until completing applying of described municipal overhead bridge floor both sides anti-collision wall Work.
2. the construction method of municipal overhead anti-collision wall is it is characterised in that comprise the steps:
Step one: construction equipment, template assembly one, template assembly two and the construction material of municipal overhead anti-collision wall are provided, its In, the construction equipment of described municipal overhead anti-collision wall includes the mobile station being arranged on described municipal overhead bridge floor, described movement The bottom of platform is provided with movable pulley;And it is located at the workbench of described municipal overhead bridge floor side, described workbench includes supporting table And guard rail, described workbench is connected with described mobile station by a connecting bracket;Detachable with described municipal overhead bridge floor The operating platform connecting, described operating platform is located above workbench;Electric block, described electric block is fixedly installed on described In connecting bracket, and it is located at the top of described workbench;
Step 2: using described electric block, described template assembly one and construction material are lifted into described workbench, rely on institute State workbench, build, at the first construction workshop section, the first operating platform being fixedly connected with described municipal overhead bridge floor;
Step 3: rely on described first operating platform to carry out the construction of anti-collision wall at the first construction workshop section;Move described shifting simultaneously Dynamic platform drives described workbench to enter the second construction workshop section;
Step 4: rely on described workbench, build at the described second construction workshop section and be fixedly connected with described municipal overhead bridge floor The second operating platform, complete the construction of anti-collision wall at the first construction workshop section simultaneously;
Step 5: described template assembly two and construction material are lifted into described second operating platform using described electric block On, rely on described second operating platform to carry out the construction of anti-collision wall at the second construction workshop section;Meanwhile, the described mobile station of movement drives Described workbench enters the first construction workshop section, relies on described workbench to remove described first operating platform and template assembly one, and The described mobile station of movement drives described workbench to enter the 3rd construction workshop section;
Step 6: rely on described workbench, build in the described 3rd construction workshop section and be fixedly connected with described municipal overhead bridge floor 3rd operating platform, completes the construction of anti-collision wall at the second construction workshop section simultaneously;
Step 7: using described electric block, construction material is lifted on described 3rd operating platform, relies on described 3rd behaviour Carry out the construction of anti-collision wall at the 3rd construction workshop section as platform;Move described mobile station drives described workbench entrance described simultaneously Second construction workshop section, relies on described workbench to remove described second operating platform and template assembly two, mobile described mobile station band Dynamic described workbench enters the 4th construction workshop section;
Step 8: rely on described workbench, build in the described 4th construction workshop section and be fixedly connected with described municipal overhead bridge floor 4th operating platform, completes the construction of anti-collision wall at the 3rd construction workshop section simultaneously;
Step 9: using described electric block, construction material is lifted on described 4th operating platform, relies on described 4th behaviour Carry out the construction of anti-collision wall at the 4th construction workshop section as platform, rely on described workbench to remove described 3rd operating platform and template Assembly one, the described mobile station of movement drives described workbench to enter the 5th construction workshop section;
Step 10: rely on described workbench, build in the described 5th construction workshop section and be fixedly connected with described municipal overhead bridge floor 5th operating platform, completes the construction of anti-collision wall at the 4th construction workshop section simultaneously;
Step 11: repeating said steps five to described step 10, until completing described municipal overhead bridge floor both sides anti-collision wall Construction.
CN201410438765.3A 2014-08-29 2014-08-29 Municipal overhead anti-collision wall construction method Active CN104179126B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410438765.3A CN104179126B (en) 2014-08-29 2014-08-29 Municipal overhead anti-collision wall construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410438765.3A CN104179126B (en) 2014-08-29 2014-08-29 Municipal overhead anti-collision wall construction method

Publications (2)

Publication Number Publication Date
CN104179126A CN104179126A (en) 2014-12-03
CN104179126B true CN104179126B (en) 2017-01-25

Family

ID=51960446

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410438765.3A Active CN104179126B (en) 2014-08-29 2014-08-29 Municipal overhead anti-collision wall construction method

Country Status (1)

Country Link
CN (1) CN104179126B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110438904A (en) * 2019-08-15 2019-11-12 中国五冶集团有限公司 A kind of device and method for installing anticollision wall form
CN112962463B (en) * 2021-02-08 2023-07-21 湖北三峡路桥工程有限公司 Construction equipment of municipal administration overhead road and bridge anticollision wall

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101967799A (en) * 2010-11-16 2011-02-09 中铁二十四局集团有限公司 Light-weight truss cradle
CN102021888A (en) * 2010-10-26 2011-04-20 肇庆南桂钢模板有限公司 Equipment for constructing bump walls on roads and bridges
CN201896292U (en) * 2010-12-21 2011-07-13 中铁二十四局集团有限公司 Movable type trolley with electricity prevention plate
CN102817320A (en) * 2012-04-27 2012-12-12 中铁大桥局集团第五工程有限公司 Concrete wall guard template construction trolley
CN202688893U (en) * 2012-08-03 2013-01-23 哈尔滨职业技术学院 Road and bridge crash-proof wall template
CN103233424A (en) * 2013-04-19 2013-08-07 济南城建集团有限公司 Hanging-basket-method support-free anti-collision wall construction method, construction hanging basket and template for construction
CN204174535U (en) * 2014-08-29 2015-02-25 上海建工七建集团有限公司 The construction equipment of the overhead anti-collision wall of municipal administration

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3950800B2 (en) * 2003-01-31 2007-08-01 京阪電気鉄道株式会社 Suspension scaffold

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102021888A (en) * 2010-10-26 2011-04-20 肇庆南桂钢模板有限公司 Equipment for constructing bump walls on roads and bridges
CN101967799A (en) * 2010-11-16 2011-02-09 中铁二十四局集团有限公司 Light-weight truss cradle
CN201896292U (en) * 2010-12-21 2011-07-13 中铁二十四局集团有限公司 Movable type trolley with electricity prevention plate
CN102817320A (en) * 2012-04-27 2012-12-12 中铁大桥局集团第五工程有限公司 Concrete wall guard template construction trolley
CN202688893U (en) * 2012-08-03 2013-01-23 哈尔滨职业技术学院 Road and bridge crash-proof wall template
CN103233424A (en) * 2013-04-19 2013-08-07 济南城建集团有限公司 Hanging-basket-method support-free anti-collision wall construction method, construction hanging basket and template for construction
CN204174535U (en) * 2014-08-29 2015-02-25 上海建工七建集团有限公司 The construction equipment of the overhead anti-collision wall of municipal administration

Also Published As

Publication number Publication date
CN104179126A (en) 2014-12-03

Similar Documents

Publication Publication Date Title
CN107338727B (en) Integrally-disassembled and assembled anti-collision wall template and walking type rail hanging and moving system thereof
CN106348188B (en) The manufacture method of planer-type building-construction lifting device
CN102251483B (en) Construction method for hoisting concrete-filled steel tube lattice bridge pier through self-lifting attached crane
CN103726421B (en) Height and span adjustable track paver for metro construction
CN104528500A (en) Double-platform scaffold-free elevator installation method
CN203834373U (en) Lifting movement mold carriage trolley for box culvert side wall formwork
CN105569692A (en) Trolley for welding tunnel waterproof board hanging cloth
CN103912128B (en) The construction method of high-altitude disjunctor steel truss
CN104179126B (en) Municipal overhead anti-collision wall construction method
CN203531377U (en) Lifting mould base for building
JP2010242308A (en) Method for demolishing high-rise building of concrete slab structure, and concrete slab demolition equipment
CN203795311U (en) Multi-leg high pier and slip form construction device
CN205558915U (en) Portable operation device
JP2014047479A (en) Method for lifting demolishing heavy machine to building to be demolished
CN204174535U (en) The construction equipment of the overhead anti-collision wall of municipal administration
JP5356091B2 (en) Crane girder exchanging method and crane girder exchanging apparatus
CN102733612B (en) Mounting method of electric hoist orbit
CN103669219B (en) Many limbs height pier is with sliding construction equipment
CN110904853B (en) Construction method for automatic lifting operation platform for mounting high-speed railway pier body lifting rail
JP2014084199A (en) Method for installing overhead crane
CN203654707U (en) Detachable gantry installation frame
CN202689494U (en) Elevator shaft template support
CN204676431U (en) Highway crash wall construction formwork installation carriage
CN206088904U (en) Guide tracked lift of guide rail detachable
CN104860212A (en) Micro crane

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant