CN105569692A - Trolley for welding tunnel waterproof board hanging cloth - Google Patents

Trolley for welding tunnel waterproof board hanging cloth Download PDF

Info

Publication number
CN105569692A
CN105569692A CN201610078258.2A CN201610078258A CN105569692A CN 105569692 A CN105569692 A CN 105569692A CN 201610078258 A CN201610078258 A CN 201610078258A CN 105569692 A CN105569692 A CN 105569692A
Authority
CN
China
Prior art keywords
runway
door frame
chassis
trolley
overhang
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610078258.2A
Other languages
Chinese (zh)
Inventor
黄高飞
程朝亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610078258.2A priority Critical patent/CN105569692A/en
Publication of CN105569692A publication Critical patent/CN105569692A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/40Devices or apparatus specially adapted for handling or placing units of linings or supporting units for tunnels or galleries
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating
    • E21D11/383Waterproofing; Heat insulating; Soundproofing; Electric insulating by applying waterproof flexible sheets; Means for fixing the sheets to the tunnel or cavity wall

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The invention provides a trolley for welding tunnel waterproof board hanging cloth. Gantries of the trolley are provided with pulleys and hoisting equipment, automation of laying of the waterproof cloth is achieved through the hoisting equipment, and in addition, when steel bars are bound in a tunnel, the trolley can be further used as a construction bench; each gantry (1) is arranged on a base plate (14), traveling wheels (2) are arranged below the base plate (14), and a translation oil cylinder (8) is arranged above each gantry (1); a stretching and contracting platform (10) is arranged at the outer side of each gantry (1), stairs (13) are arranged on each stretching and contracting platform (10), vent pipes (12) are arranged in each gantry (1), the base plate (14) is provided with two or more sets of gantries (1), and the gantries (1) are connected through shearing force frames (9); a hoisting assembly (11) is arranged on a hoisting door beam (4). By means of the trolley, automation of laying of the tunnel waterproof cloth is achieved, construction difficulty is lowered, meanwhile, the steel bars can be hoisted, requirements of other similar types of construction work can be met, potential safety hazards are effectively lowered, and construction progress is guaranteed.

Description

A kind of anchor bar of waterproof plate in tunnels dossal welding chassis
Art
The present invention relates to tunnel water proofing cloth chassis field, particularly relate to a kind of anchor bar of waterproof plate in tunnels dossal welding chassis.
Background technology
At present, when building tunnel, in order to prevent tunnel leak, extend tunnel application life, need to establish canvas cloth on tunnel inner wall upper berth, and the general mechanization in existing tunnel is low, when laying canvas cloth, need manually to build Simple reinforced bar stand, a dead lift, to job location, has increased the weight of the consumption of workman's muscle power; Simultaneously in process of deployment, need the operation such as loader, digging machine facility to combine construction, the potential safety hazard in work progress strengthens; Very easily cause canvas cloth damaged in artificial process of deployment simultaneously, affect construction quality, during construction operation, affect other vehicles and pass through, delay construction speed.
Summary of the invention
In order to overcome the deficiencies in the prior art, a kind of anchor bar of waterproof plate in tunnels dossal welding chassis provided by the invention, that pulley is set on chassis door frame, hanging device, hanging device is utilized to realize the automation of canvas cloth laying, not only achieve the automation that canvas cloth is laid, and when bundling reinforcing bar in tunnel, builder's staging can also be used as and use; Its technical scheme is; A kind of anchor bar of waterproof plate in tunnels dossal welding chassis is by door frame 1, road wheel 2, boom hoisting 3, translation oil cylinder 8, shearing frame 9, scaling platform 10, lifting assembly 11, air chimney 12, stair 13, and chassis 14 is formed;
Described boom hoisting 3 be by overhang-door beam 4, runway 5, runway support 6, chain sprocket assembly 7 is formed;
Described rising on overhang-door beam 4 is provided with runway support 6, and runway 5 is arranged on runway support 6, and chain sprocket drive assembly 7 is arranged on runway 5 and forms boom hoisting 3;
Described door frame 1 is arranged on chassis 14, and road wheel 2 is arranged on below chassis 14, and translation oil cylinder 8 is arranged on above door frame 1; Scaling platform 10 is arranged on outside door frame 1, and stair 13 arrange on scaling platform 10, and air chimney 12 is arranged in door frame 1, described chassis 14 is at least provided with 2 groups of door frames 1, is connected between door frame 1 by shearing frame 9; Lifting assembly 11 has been arranged on overhang-door beam 4;
Described runway 5 is outer ring arc track;
Described door frame 1 is at least provided with an air chimney 12;
During use, road wheel 2 runs to job location, lifting assembly 11 slings canvas cloth or reinforcing bar, chain sprocket assembly 7 on runway 5 operates canvas cloth or reinforcing bar along runway 5, after arriving assigned address, constructor is entered on scaling platform 10 by the stair 13 on door frame 1 and starts construction operation.
Beneficial effect, a kind of anchor bar of waterproof plate in tunnels dossal welding chassis provided by the invention, achieves the automation that tunnel water proofing cloth is laid, reduce difficulty of construction, can also reinforcing bar be lifted by crane simultaneously, the needs of other construction colleague can also be met, effective reduction potential safety hazard, ensures construction speed.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the present invention is further described.
Fig. 1 is structural representation of the present invention;
Fig. 2 is lateral view of the present invention;
Fig. 3 is boom hoisting schematic diagram of the present invention;
In figure, door frame (1), road wheel (2), boom hoisting (3), plays overhang-door beam (4), runway (5), runway support (6), chain sprocket assembly (7), translation oil cylinder (8), shearing frame (9), scaling platform (10), lifting assembly (11), air chimney (12), stair (13), chassis (14).
Detailed description of the invention
Below in conjunction with accompanying drawing, the present invention is described in more detail.
Embodiment 1
As shown in the figure, a kind of anchor bar of waterproof plate in tunnels dossal welding chassis is by door frame (1), road wheel (2), boom hoisting (3), play overhang-door beam (4), runway (5), runway support (6), chain sprocket assembly (7), translation oil cylinder (8), shearing frame (9), scaling platform (10), lifting assembly (11), air chimney (12), stair (13), chassis (14) are formed;
Described boom hoisting (3) be by overhang-door beam (4), runway (5), runway support (6), chain sprocket assembly (7) form;
Described rising on overhang-door beam (4) is provided with runway support (6), runway (5) is arranged on runway support (6), and chain sprocket drive assembly (7) is arranged on runway (5) and forms boom hoisting (3);
Described door frame (1) is arranged on chassis (14), and road wheel (2) is arranged on below, chassis (14), and translation oil cylinder (8) is arranged on door frame (1) top; Scaling platform (10) is arranged on door frame (1) outside, stair (13) arrange on scaling platform (10), air chimney (12) is arranged in door frame (1), described chassis (14) is at least provided with (2) group door frame (1), is connected by shearing frame (9) between door frame (1); Lifting assembly (11) has been arranged on overhang-door beam (4);
Described runway (5) is outer ring arc track;
Described door frame (1) is at least provided with an air chimney (12).
Embodiment 2
During use, road wheel (2) runs to job location, canvas cloth or reinforcing bar are sling in lifting assembly (11), chain sprocket assembly (7) on runway (5) operates canvas cloth or reinforcing bar along runway (5), after arriving assigned address, constructor is entered on scaling platform (10) by the stair (13) on door frame (1) and starts construction operation.

Claims (4)

1. an anchor bar of waterproof plate in tunnels dossal welding chassis, by door frame (1), road wheel (2), boom hoisting (3), play overhang-door beam (4), runway (5), runway support (6), chain sprocket assembly (7), translation oil cylinder (8), shearing frame (9), scaling platform (10), lifting assembly (11), air chimney (12), stair (13), chassis (14) are formed; It is characterized in that: described boom hoisting (3) be by overhang-door beam (4), runway (5), runway support (6), chain sprocket assembly (7) form; It is characterized in that: described rising on overhang-door beam (4) is provided with runway support (6), runway (5) is arranged on runway support (6), and chain sprocket drive assembly (7) is arranged on runway (5) and forms boom hoisting (3);
Described door frame (1) is arranged on chassis (14), and road wheel (2) is arranged on below, chassis (14), and translation oil cylinder (8) is arranged on door frame (1) top; Scaling platform (10) is arranged on door frame (1) outside, stair (13) arrange on scaling platform (10), air chimney (12) is arranged in door frame (1), described chassis (14) is at least provided with (2) group door frame (1), is connected by shearing frame (9) between door frame (1); Lifting assembly (11) has been arranged on overhang-door beam (4).
2., according to a kind of anchor bar of waterproof plate in tunnels dossal welding chassis described in claim 1, it is characterized in that: described runway (5) is outer ring arc track.
3., according to a kind of anchor bar of waterproof plate in tunnels dossal welding chassis described in claim 1, it is characterized in that: described door frame (1) is at least provided with an air chimney (12).
4. according to a kind of anchor bar of waterproof plate in tunnels dossal welding chassis described in claim 1, it is characterized in that: road wheel (2) runs to job location, canvas cloth or reinforcing bar are sling in lifting assembly (11), chain sprocket assembly (7) on runway (5) operates canvas cloth or reinforcing bar along runway (5), after arriving assigned address, constructor is entered on scaling platform (10) by the stair (13) on door frame (1) and starts construction operation.
CN201610078258.2A 2016-01-29 2016-01-29 Trolley for welding tunnel waterproof board hanging cloth Pending CN105569692A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610078258.2A CN105569692A (en) 2016-01-29 2016-01-29 Trolley for welding tunnel waterproof board hanging cloth

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610078258.2A CN105569692A (en) 2016-01-29 2016-01-29 Trolley for welding tunnel waterproof board hanging cloth

Publications (1)

Publication Number Publication Date
CN105569692A true CN105569692A (en) 2016-05-11

Family

ID=55880248

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610078258.2A Pending CN105569692A (en) 2016-01-29 2016-01-29 Trolley for welding tunnel waterproof board hanging cloth

Country Status (1)

Country Link
CN (1) CN105569692A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107956488A (en) * 2017-12-27 2018-04-24 中铁工程装备集团有限公司 A kind of splash guard reinforcing bar spreads hanging platform car
CN108035747A (en) * 2017-12-19 2018-05-15 张罗悦 A kind of tunnel steel form lining trolley
CN108756960A (en) * 2018-07-30 2018-11-06 洛阳高飞桥隧机械有限公司 A kind of application method of anchor bar of waterproof plate in tunnels laying and reinforcing bar positioning lifting device
CN108843350A (en) * 2018-07-23 2018-11-20 中铁十七局集团第三工程有限公司 A kind of coiled material hangs fixed device
CN109026075A (en) * 2018-07-23 2018-12-18 中铁十七局集团第三工程有限公司 Tunnel vault and abutment wall splash guard suspension device and its method
CN113336104A (en) * 2021-06-18 2021-09-03 中交第二航务工程局有限公司 Comprehensive pipe gallery integrated light movable portal frame system

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1325212A2 (en) * 2000-10-10 2003-07-09 Robert Planinc Tunnel lining made of prefabricated reinforced concrete elements and process for its manufacturing and installing
KR101123733B1 (en) * 2011-06-22 2012-03-06 주식회사 서진기계 Concrete curing equipment for tunnel construction
CN202273689U (en) * 2011-09-25 2012-06-13 中铁十四局集团有限公司 Pave hanging device for tunnel waterproof plate
CN202768021U (en) * 2012-06-30 2013-03-06 中铁十二局集团第二工程有限公司 Waterproof board laying trolley
CN103758541A (en) * 2014-01-26 2014-04-30 中铁工程装备集团有限公司 Trolley and method for laying tunnel waterproof plate
CN104533466A (en) * 2014-11-21 2015-04-22 中铁一局集团有限公司 Multifunctional flexible traction type paving rack for waterproof board
CN205330690U (en) * 2016-01-29 2016-06-22 黄高飞 Cloth welding platform truck is hung to tunnel water proofing board

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1325212A2 (en) * 2000-10-10 2003-07-09 Robert Planinc Tunnel lining made of prefabricated reinforced concrete elements and process for its manufacturing and installing
KR101123733B1 (en) * 2011-06-22 2012-03-06 주식회사 서진기계 Concrete curing equipment for tunnel construction
CN202273689U (en) * 2011-09-25 2012-06-13 中铁十四局集团有限公司 Pave hanging device for tunnel waterproof plate
CN202768021U (en) * 2012-06-30 2013-03-06 中铁十二局集团第二工程有限公司 Waterproof board laying trolley
CN103758541A (en) * 2014-01-26 2014-04-30 中铁工程装备集团有限公司 Trolley and method for laying tunnel waterproof plate
CN104533466A (en) * 2014-11-21 2015-04-22 中铁一局集团有限公司 Multifunctional flexible traction type paving rack for waterproof board
CN205330690U (en) * 2016-01-29 2016-06-22 黄高飞 Cloth welding platform truck is hung to tunnel water proofing board

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108035747A (en) * 2017-12-19 2018-05-15 张罗悦 A kind of tunnel steel form lining trolley
CN108035747B (en) * 2017-12-19 2019-03-12 厦门雅众建设集团有限公司 A kind of tunnel steel form lining trolley
CN107956488A (en) * 2017-12-27 2018-04-24 中铁工程装备集团有限公司 A kind of splash guard reinforcing bar spreads hanging platform car
CN108843350A (en) * 2018-07-23 2018-11-20 中铁十七局集团第三工程有限公司 A kind of coiled material hangs fixed device
CN109026075A (en) * 2018-07-23 2018-12-18 中铁十七局集团第三工程有限公司 Tunnel vault and abutment wall splash guard suspension device and its method
CN109026075B (en) * 2018-07-23 2020-04-03 中铁十七局集团第三工程有限公司 Tunnel vault and side wall waterproof board hanging device and method thereof
CN108756960A (en) * 2018-07-30 2018-11-06 洛阳高飞桥隧机械有限公司 A kind of application method of anchor bar of waterproof plate in tunnels laying and reinforcing bar positioning lifting device
CN113336104A (en) * 2021-06-18 2021-09-03 中交第二航务工程局有限公司 Comprehensive pipe gallery integrated light movable portal frame system
CN113336104B (en) * 2021-06-18 2023-06-06 中交第二航务工程局有限公司 Integrated light movable door frame system of comprehensive pipe rack

Similar Documents

Publication Publication Date Title
CN105569692A (en) Trolley for welding tunnel waterproof board hanging cloth
CN103711301A (en) Construction method and device for two-track movable electric basket and lifting hoist
CN206608189U (en) The all-hydraulic integrated upright bow member dedicated trolley of constructing tunnel
CN103726421B (en) Height and span adjustable track paver for metro construction
CN205330690U (en) Cloth welding platform truck is hung to tunnel water proofing board
CN205294665U (en) Jack -up tower crane based on engineering mechanics
CN107905822A (en) A kind of large cross-section tunnel moves adjustable waterproof construction trolley
CN104973517B (en) A kind of electronic gantry platform that installs for sintering machine head device and its using method
CN103863938A (en) Safe lifting device for conveying wind tunnel test car
CN103318774B (en) Self-assembly/self-disassembly hoisting device, crane and self-assembly/self-disassembly method of hoister
CN103086276B (en) Construction method for hoisting bridge type crane in high-rise well tower type building
CN203684019U (en) Height and span adjustable track laying machine for subway construction
CN203795311U (en) Multi-leg high pier and slip form construction device
CN210312155U (en) Take climbing mechanism's RGV dolly
CN203613464U (en) Slip form construction cargo transportation device
CN109487646A (en) Shield section and platform section running track traveling process become automatically across method
CN206346500U (en) Compact simplified arm extending type straddle truck
CN105863686A (en) Invert formwork hosting traveling trolley
CN107386138B (en) Totally-enclosed sound insulation screen construction vehicle and totally-enclosed sound insulation screen installation method
CN216238175U (en) Basket traveling system is hung in construction of bridge cantilever
CN205976546U (en) Rail transport device for inclined working face
CN211813313U (en) Crawler-type lifting vehicle for coal mine
CN103669219B (en) Many limbs height pier is with sliding construction equipment
CN211499700U (en) Construction protection handling frame
CN209618693U (en) A kind of encircling type single-beam operation trolley

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160511

RJ01 Rejection of invention patent application after publication