CN105569692A - Trolley for welding tunnel waterproof board hanging cloth - Google Patents
Trolley for welding tunnel waterproof board hanging cloth Download PDFInfo
- Publication number
- CN105569692A CN105569692A CN201610078258.2A CN201610078258A CN105569692A CN 105569692 A CN105569692 A CN 105569692A CN 201610078258 A CN201610078258 A CN 201610078258A CN 105569692 A CN105569692 A CN 105569692A
- Authority
- CN
- China
- Prior art keywords
- runway
- door frame
- chassis
- trolley
- overhang
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000004744 fabric Substances 0.000 title claims abstract description 17
- 238000003466 welding Methods 0.000 title claims abstract description 12
- 238000010276 construction Methods 0.000 claims abstract description 14
- 238000010008 shearing Methods 0.000 claims abstract description 8
- 230000003014 reinforcing Effects 0.000 claims description 8
- 230000000630 rising Effects 0.000 claims description 3
- 229910000831 Steel Inorganic materials 0.000 abstract 2
- 239000010959 steel Substances 0.000 abstract 2
- 238000000034 method Methods 0.000 description 2
- 238000004078 waterproofing Methods 0.000 description 2
- 210000003205 Muscles Anatomy 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/38—Waterproofing; Heat insulating; Soundproofing; Electric insulating
- E21D11/383—Waterproofing; Heat insulating; Soundproofing; Electric insulating by applying waterproof flexible sheets; Means for fixing the sheets to the tunnel or cavity wall
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/40—Devices or apparatus specially adapted for handling or placing units of linings or supporting units for tunnels or galleries
Abstract
The invention provides a trolley for welding tunnel waterproof board hanging cloth. Gantries of the trolley are provided with pulleys and hoisting equipment, automation of laying of the waterproof cloth is achieved through the hoisting equipment, and in addition, when steel bars are bound in a tunnel, the trolley can be further used as a construction bench; each gantry (1) is arranged on a base plate (14), traveling wheels (2) are arranged below the base plate (14), and a translation oil cylinder (8) is arranged above each gantry (1); a stretching and contracting platform (10) is arranged at the outer side of each gantry (1), stairs (13) are arranged on each stretching and contracting platform (10), vent pipes (12) are arranged in each gantry (1), the base plate (14) is provided with two or more sets of gantries (1), and the gantries (1) are connected through shearing force frames (9); a hoisting assembly (11) is arranged on a hoisting door beam (4). By means of the trolley, automation of laying of the tunnel waterproof cloth is achieved, construction difficulty is lowered, meanwhile, the steel bars can be hoisted, requirements of other similar types of construction work can be met, potential safety hazards are effectively lowered, and construction progress is guaranteed.
Description
Art
The present invention relates to tunnel water proofing cloth chassis field, particularly relate to a kind of anchor bar of waterproof plate in tunnels dossal welding chassis.
Background technology
At present, when building tunnel, in order to prevent tunnel leak, extend tunnel application life, need to establish canvas cloth on tunnel inner wall upper berth, and the general mechanization in existing tunnel is low, when laying canvas cloth, need manually to build Simple reinforced bar stand, a dead lift, to job location, has increased the weight of the consumption of workman's muscle power; Simultaneously in process of deployment, need the operation such as loader, digging machine facility to combine construction, the potential safety hazard in work progress strengthens; Very easily cause canvas cloth damaged in artificial process of deployment simultaneously, affect construction quality, during construction operation, affect other vehicles and pass through, delay construction speed.
Summary of the invention
In order to overcome the deficiencies in the prior art, a kind of anchor bar of waterproof plate in tunnels dossal welding chassis provided by the invention, that pulley is set on chassis door frame, hanging device, hanging device is utilized to realize the automation of canvas cloth laying, not only achieve the automation that canvas cloth is laid, and when bundling reinforcing bar in tunnel, builder's staging can also be used as and use; Its technical scheme is; A kind of anchor bar of waterproof plate in tunnels dossal welding chassis is by door frame 1, road wheel 2, boom hoisting 3, translation oil cylinder 8, shearing frame 9, scaling platform 10, lifting assembly 11, air chimney 12, stair 13, and chassis 14 is formed;
Described boom hoisting 3 be by overhang-door beam 4, runway 5, runway support 6, chain sprocket assembly 7 is formed;
Described rising on overhang-door beam 4 is provided with runway support 6, and runway 5 is arranged on runway support 6, and chain sprocket drive assembly 7 is arranged on runway 5 and forms boom hoisting 3;
Described door frame 1 is arranged on chassis 14, and road wheel 2 is arranged on below chassis 14, and translation oil cylinder 8 is arranged on above door frame 1; Scaling platform 10 is arranged on outside door frame 1, and stair 13 arrange on scaling platform 10, and air chimney 12 is arranged in door frame 1, described chassis 14 is at least provided with 2 groups of door frames 1, is connected between door frame 1 by shearing frame 9; Lifting assembly 11 has been arranged on overhang-door beam 4;
Described runway 5 is outer ring arc track;
Described door frame 1 is at least provided with an air chimney 12;
During use, road wheel 2 runs to job location, lifting assembly 11 slings canvas cloth or reinforcing bar, chain sprocket assembly 7 on runway 5 operates canvas cloth or reinforcing bar along runway 5, after arriving assigned address, constructor is entered on scaling platform 10 by the stair 13 on door frame 1 and starts construction operation.
Beneficial effect, a kind of anchor bar of waterproof plate in tunnels dossal welding chassis provided by the invention, achieves the automation that tunnel water proofing cloth is laid, reduce difficulty of construction, can also reinforcing bar be lifted by crane simultaneously, the needs of other construction colleague can also be met, effective reduction potential safety hazard, ensures construction speed.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the present invention is further described.
Fig. 1 is structural representation of the present invention;
Fig. 2 is lateral view of the present invention;
Fig. 3 is boom hoisting schematic diagram of the present invention;
In figure, door frame (1), road wheel (2), boom hoisting (3), plays overhang-door beam (4), runway (5), runway support (6), chain sprocket assembly (7), translation oil cylinder (8), shearing frame (9), scaling platform (10), lifting assembly (11), air chimney (12), stair (13), chassis (14).
Detailed description of the invention
Below in conjunction with accompanying drawing, the present invention is described in more detail.
Embodiment 1
As shown in the figure, a kind of anchor bar of waterproof plate in tunnels dossal welding chassis is by door frame (1), road wheel (2), boom hoisting (3), play overhang-door beam (4), runway (5), runway support (6), chain sprocket assembly (7), translation oil cylinder (8), shearing frame (9), scaling platform (10), lifting assembly (11), air chimney (12), stair (13), chassis (14) are formed;
Described boom hoisting (3) be by overhang-door beam (4), runway (5), runway support (6), chain sprocket assembly (7) form;
Described rising on overhang-door beam (4) is provided with runway support (6), runway (5) is arranged on runway support (6), and chain sprocket drive assembly (7) is arranged on runway (5) and forms boom hoisting (3);
Described door frame (1) is arranged on chassis (14), and road wheel (2) is arranged on below, chassis (14), and translation oil cylinder (8) is arranged on door frame (1) top; Scaling platform (10) is arranged on door frame (1) outside, stair (13) arrange on scaling platform (10), air chimney (12) is arranged in door frame (1), described chassis (14) is at least provided with (2) group door frame (1), is connected by shearing frame (9) between door frame (1); Lifting assembly (11) has been arranged on overhang-door beam (4);
Described runway (5) is outer ring arc track;
Described door frame (1) is at least provided with an air chimney (12).
Embodiment 2
During use, road wheel (2) runs to job location, canvas cloth or reinforcing bar are sling in lifting assembly (11), chain sprocket assembly (7) on runway (5) operates canvas cloth or reinforcing bar along runway (5), after arriving assigned address, constructor is entered on scaling platform (10) by the stair (13) on door frame (1) and starts construction operation.
Claims (4)
1. an anchor bar of waterproof plate in tunnels dossal welding chassis, by door frame (1), road wheel (2), boom hoisting (3), play overhang-door beam (4), runway (5), runway support (6), chain sprocket assembly (7), translation oil cylinder (8), shearing frame (9), scaling platform (10), lifting assembly (11), air chimney (12), stair (13), chassis (14) are formed; It is characterized in that: described boom hoisting (3) be by overhang-door beam (4), runway (5), runway support (6), chain sprocket assembly (7) form; It is characterized in that: described rising on overhang-door beam (4) is provided with runway support (6), runway (5) is arranged on runway support (6), and chain sprocket drive assembly (7) is arranged on runway (5) and forms boom hoisting (3);
Described door frame (1) is arranged on chassis (14), and road wheel (2) is arranged on below, chassis (14), and translation oil cylinder (8) is arranged on door frame (1) top; Scaling platform (10) is arranged on door frame (1) outside, stair (13) arrange on scaling platform (10), air chimney (12) is arranged in door frame (1), described chassis (14) is at least provided with (2) group door frame (1), is connected by shearing frame (9) between door frame (1); Lifting assembly (11) has been arranged on overhang-door beam (4).
2., according to a kind of anchor bar of waterproof plate in tunnels dossal welding chassis described in claim 1, it is characterized in that: described runway (5) is outer ring arc track.
3., according to a kind of anchor bar of waterproof plate in tunnels dossal welding chassis described in claim 1, it is characterized in that: described door frame (1) is at least provided with an air chimney (12).
4. according to a kind of anchor bar of waterproof plate in tunnels dossal welding chassis described in claim 1, it is characterized in that: road wheel (2) runs to job location, canvas cloth or reinforcing bar are sling in lifting assembly (11), chain sprocket assembly (7) on runway (5) operates canvas cloth or reinforcing bar along runway (5), after arriving assigned address, constructor is entered on scaling platform (10) by the stair (13) on door frame (1) and starts construction operation.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610078258.2A CN105569692A (en) | 2016-01-29 | 2016-01-29 | Trolley for welding tunnel waterproof board hanging cloth |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610078258.2A CN105569692A (en) | 2016-01-29 | 2016-01-29 | Trolley for welding tunnel waterproof board hanging cloth |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105569692A true CN105569692A (en) | 2016-05-11 |
Family
ID=55880248
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610078258.2A Pending CN105569692A (en) | 2016-01-29 | 2016-01-29 | Trolley for welding tunnel waterproof board hanging cloth |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105569692A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108035747A (en) * | 2017-12-19 | 2018-05-15 | 张罗悦 | A kind of tunnel steel form lining trolley |
CN109026075A (en) * | 2018-07-23 | 2018-12-18 | 中铁十七局集团第三工程有限公司 | Tunnel vault and abutment wall splash guard suspension device and its method |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1325212A2 (en) * | 2000-10-10 | 2003-07-09 | Robert Planinc | Tunnel lining made of prefabricated reinforced concrete elements and process for its manufacturing and installing |
KR101123733B1 (en) * | 2011-06-22 | 2012-03-06 | 주식회사 서진기계 | Concrete curing equipment for tunnel construction |
CN202273689U (en) * | 2011-09-25 | 2012-06-13 | 中铁十四局集团有限公司 | Pave hanging device for tunnel waterproof plate |
CN202768021U (en) * | 2012-06-30 | 2013-03-06 | 中铁十二局集团第二工程有限公司 | Waterproof board laying trolley |
CN103758541A (en) * | 2014-01-26 | 2014-04-30 | 中铁工程装备集团有限公司 | Trolley and method for laying tunnel waterproof plate |
CN104533466A (en) * | 2014-11-21 | 2015-04-22 | 中铁一局集团有限公司 | Multifunctional flexible traction type paving rack for waterproof board |
CN205330690U (en) * | 2016-01-29 | 2016-06-22 | 黄高飞 | Cloth welding platform truck is hung to tunnel water proofing board |
-
2016
- 2016-01-29 CN CN201610078258.2A patent/CN105569692A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1325212A2 (en) * | 2000-10-10 | 2003-07-09 | Robert Planinc | Tunnel lining made of prefabricated reinforced concrete elements and process for its manufacturing and installing |
KR101123733B1 (en) * | 2011-06-22 | 2012-03-06 | 주식회사 서진기계 | Concrete curing equipment for tunnel construction |
CN202273689U (en) * | 2011-09-25 | 2012-06-13 | 中铁十四局集团有限公司 | Pave hanging device for tunnel waterproof plate |
CN202768021U (en) * | 2012-06-30 | 2013-03-06 | 中铁十二局集团第二工程有限公司 | Waterproof board laying trolley |
CN103758541A (en) * | 2014-01-26 | 2014-04-30 | 中铁工程装备集团有限公司 | Trolley and method for laying tunnel waterproof plate |
CN104533466A (en) * | 2014-11-21 | 2015-04-22 | 中铁一局集团有限公司 | Multifunctional flexible traction type paving rack for waterproof board |
CN205330690U (en) * | 2016-01-29 | 2016-06-22 | 黄高飞 | Cloth welding platform truck is hung to tunnel water proofing board |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108035747A (en) * | 2017-12-19 | 2018-05-15 | 张罗悦 | A kind of tunnel steel form lining trolley |
CN108035747B (en) * | 2017-12-19 | 2019-03-12 | 厦门雅众建设集团有限公司 | A kind of tunnel steel form lining trolley |
CN109026075A (en) * | 2018-07-23 | 2018-12-18 | 中铁十七局集团第三工程有限公司 | Tunnel vault and abutment wall splash guard suspension device and its method |
CN109026075B (en) * | 2018-07-23 | 2020-04-03 | 中铁十七局集团第三工程有限公司 | Tunnel vault and side wall waterproof board hanging device and method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103711301A (en) | Construction method and device for two-track movable electric basket and lifting hoist | |
CN103726421B (en) | Height and span adjustable track paver for metro construction | |
CN205294665U (en) | Jack -up tower crane based on engineering mechanics | |
CN205330690U (en) | Cloth welding platform truck is hung to tunnel water proofing board | |
CN104973517B (en) | A kind of electronic gantry platform that installs for sintering machine head device and its using method | |
CN105569692A (en) | Trolley for welding tunnel waterproof board hanging cloth | |
CN203684019U (en) | Height and span adjustable track laying machine for subway construction | |
CN203795311U (en) | Multi-leg high pier and slip form construction device | |
CN103318774B (en) | Self-assembly/self-disassembly hoisting device, crane and self-assembly/self-disassembly method of hoister | |
CN103086276B (en) | Construction method for hoisting bridge type crane in high-rise well tower type building | |
CN107905822A (en) | A kind of large cross-section tunnel moves adjustable waterproof construction trolley | |
CN105863686A (en) | Invert formwork hosting traveling trolley | |
CN206608189U (en) | The all-hydraulic integrated upright bow member dedicated trolley of constructing tunnel | |
CN205241086U (en) | Template hoist and mount and ann gun carriage of disassembling and using | |
CN103863938A (en) | Safe lifting device for conveying wind tunnel test car | |
CN211813313U (en) | Crawler-type lifting vehicle for coal mine | |
CN210312155U (en) | Take climbing mechanism's RGV dolly | |
CN203613464U (en) | Slip form construction cargo transportation device | |
CN109487646A (en) | Shield section and platform section running track traveling process become automatically across method | |
CN106437174A (en) | Rail conveying device used for inclined working plane and construction method of rail conveying device | |
CN206088904U (en) | Guide tracked lift of guide rail detachable | |
CN202913360U (en) | Bridge floor rotary hoisting device | |
CN107386138B (en) | Totally-enclosed sound insulation screen construction vehicle and totally-enclosed sound insulation screen installation method | |
CN205603179U (en) | Prevent electric power engineering work platform that falls | |
CN103669219B (en) | Many limbs height pier is with sliding construction equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160511 |
|
RJ01 | Rejection of invention patent application after publication |