CN108756960A - A kind of application method of anchor bar of waterproof plate in tunnels laying and reinforcing bar positioning lifting device - Google Patents

A kind of application method of anchor bar of waterproof plate in tunnels laying and reinforcing bar positioning lifting device Download PDF

Info

Publication number
CN108756960A
CN108756960A CN201810854180.8A CN201810854180A CN108756960A CN 108756960 A CN108756960 A CN 108756960A CN 201810854180 A CN201810854180 A CN 201810854180A CN 108756960 A CN108756960 A CN 108756960A
Authority
CN
China
Prior art keywords
reinforcing bar
door frame
bar
trolley
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810854180.8A
Other languages
Chinese (zh)
Inventor
黄高飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Luoyang Fly Bridge Machinery Co Ltd
Original Assignee
Luoyang Fly Bridge Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Luoyang Fly Bridge Machinery Co Ltd filed Critical Luoyang Fly Bridge Machinery Co Ltd
Priority to CN201810854180.8A priority Critical patent/CN108756960A/en
Publication of CN108756960A publication Critical patent/CN108756960A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/40Devices or apparatus specially adapted for handling or placing units of linings or supporting units for tunnels or galleries
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating
    • E21D11/381Setting apparatus or devices

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

A kind of application method of anchor bar of waterproof plate in tunnels laying and reinforcing bar positioning lifting device,Steel bar hanger correspondence is fixed first between the rotation hanger of a pair of of dossal trolley,Then the reinforcing bar placed on ground is passed through to the reinforced steel bar perforation of reinforcing bar carding by root,Then again by reinforcing bar fixation corresponding with the steel holding holes in reinforcing bar fixing card,Start drive car at this time,Drive car drives dossal trolley to be moved along trolley track,Steel bar hanger movement is driven while dossal trolley moves,Steel bar hanger drives reinforced steel bar ring frame body to be moved,When dossal trolley is moved to the other side of door frame from the side of door frame,Complete the laying work of splash guard reinforcing bar,After the laying work for completing splash guard reinforcing bar,It only needs the Steel bar hanger between the rotation hanger of a pair of of dossal trolley being replaced with splash guard,The laying work of splash guard can be completed,The splash guard reinforcing bar and dossal that the present invention is laid with are smooth,It improves and is laid with splash guard reinforcing bar operating efficiency.

Description

A kind of application method of anchor bar of waterproof plate in tunnels laying and reinforcing bar positioning lifting device
Technical field
The present invention relates to tunnel special mechanical equipment field, especially a kind of anchor bar of waterproof plate in tunnels is laid with and reinforcing bar positioning is promoted The application method of device.
Background technology
Currently, during constructing tunnel, the tunnel constructed using composite lining, in order to ensure Tunnel Second Lining Supporting quality needs to be laid with splash guard first and splash guard reinforcing bar carries out carrying out water-proofing treatment to tunnel, so before secondary lining Uniform gunite concrete carries out support reinforcement on splash guard reinforcing bar afterwards, utilizes the strong feature of concrete anti-compression performance, Yi Jifang The characteristics of water slab muscle pull resistance, increase the integer support intensity in tunnel, splash guard reinforcing bar needs before gunite concrete Horizontal and vertical whole is connected as an entirety on splash guard reinforcing bar, just can ensure that the pull resistance of splash guard reinforcing bar, waterproof slab Muscle, due to being influenced by tunnel height, can not carry out manual work, need in tunnel platform when carrying out horizontal and vertical and connection Job platform is built on vehicle temporarily to construct, here it is the main method of current composite lining tunnel construction, use is this When method is constructed, needs to build a large amount of simple platform, manually carries out operation, not only waste a large amount of production time, And cause the labor intensity of worker big, the problems such as danger coefficient is high, when being manually laid with splash guard reinforcing bar, inevitably There are certain errors, therefore how to solve composite lining tunnel construction and need largely to build simple platform, and how to solve Certainly splash guard and splash guard reinforcing bar are laid with uneven, the problem of influencing tunnel integral strength, become insoluble for a long time Technical barrier.
In view of the foregoing, a kind of application method of anchor bar of waterproof plate in tunnels laying and reinforcing bar positioning lifting device is now developed.
Invention content
Purpose of the invention is to overcome the shortcomings in the prior art, solves to need to build a large amount of letter when constructing tunnel Easy platform causes the labor intensity of worker big, the high problem of danger coefficient, and solves splash guard and the laying of splash guard reinforcing bar not Uniformly, the problem of influencing tunnel integral strength, provides a kind of user of anchor bar of waterproof plate in tunnels laying and reinforcing bar positioning lifting device Method, the configuration of the present invention is simple, the splash guard reinforcing bar and dossal of laying are smooth, greatly improve and are laid with splash guard reinforcing bar operation effect Rate.
The present invention to achieve the goals above, adopts the following technical scheme that:A kind of anchor bar of waterproof plate in tunnels is laid with and reinforcing bar positioning The application method of lifting device, the anchor bar of waterproof plate in tunnels be laid with and reinforcing bar position lifting device, be by:Door frame, Tong Liang, bottom Beam, upper frame, walking mechanism, track, trolley track, dossal trolley, drive car, steel wire rope, traction wheel, directive wheel, behaviour Make platform, reinforcing bar locating wheel, carding fixed frame, reinforcing bar carding, Steel bar hanger, reinforcing bar fixing card, connecting rod to constitute;Tunnel is anti- Water plate reinforcement trolley at least three door frames of setting, the portal frame that door frame is constituted for two root posts top setting beam welding, three A door frame is followed successively by front door frame, middle door frame, rear door frame from front to back;The column bottom of three door frame both sides is respectively provided with bottom girder, and three Logical beam is welded in top, middle part, the lower part of a door frame both sides, is arranged upper frame above the crossbeam of front door frame and middle door frame, door frame and Upper frame collectively forms the frame of anchor bar of waterproof plate in tunnels reinforcement trolley;Walking mechanism is respectively provided on the column of front door frame and rear door frame, row It walks and track is set below the wheel of mechanism, the anchor bar of waterproof plate in tunnels reinforcement trolley frame is moved by walking mechanism before and after track Driving mechanism dynamic, that the periphery setting splash guard of anchor bar of waterproof plate in tunnels reinforcement trolley frame is laid with and reinforcing bar positioning is promoted;
The splash guard is laid with and the structure of the driving mechanism of reinforcing bar positioning promotion is:The top of front door frame and middle door frame and The trolley track of a pair of of arc of external setting of both sides, the company of being respectively set between a pair of of trolley track and front door frame and middle door frame Bar is symmetrical arranged two dossal trolleies on the slideway of a pair of of trolley track, Steel bar hanger is arranged between two dossal trolleies;It is a pair of Traction wheel is uniformly distributed on trolley track, the traction wheel on a pair of of trolley track is arranged symmetrically, the cross of front door frame and middle door frame It is symmetrical arranged two drive cars above beam, driving wheel, front door is respectively set on the output shaft of two drive cars Symmetrical directive wheel on the frame body of frame and middle door frame, on the driving wheel, front door frame and middle door frame frame body on drive car Directive wheel, winding setting steel wire rope respectively on the traction wheel on a pair of of trolley track, a pair of of steel wire rope is set as cyclic annular, a pair of Both ends of the end of steel wire rope respectively with two dossal trolleies are correspondingly connected with, and the paving that reinforcing bar is positioned, promoted is arranged in Steel bar hanger If mechanism;
The reinforcing bar positions, the structure of the laying mechanism of promotion is:It is symmetrically set on front door frame and the logical beam of middle door frame both sides Operating platform is set, reinforcing bar locating wheel is arranged in the one side edge of operating platform;Longitudinal reinforcing bar is uniformly distributed in Steel bar hanger to fix Block, reserved steel bar mounting hole in reinforcing bar fixing card, reinforcing bar is set in steel holding holes;The bottom surface of the bottom girder of front door frame and middle door frame Upper setting carding fixed frame is uniformly distributed longitudinal reinforcing bar carding in the frame of carding fixed frame, and reinforcing bar carding is Cylinder hollow pipe, reserved steel bar perforation on reinforcing bar carding, reinforced steel bar perforation corresponds to steel holding holes and is arranged, on the crossbeam of upper frame Two pairs of mandrils are vertically arranged between trolley track, the top of two pairs of mandrils is respectively provided with reinforcing bar locating wheel;
When reinforcing bar laying construction, Steel bar hanger correspondence is fixed first between the rotation hanger of a pair of of dossal trolley, Then the reinforcing bar placed on ground is passed through to the reinforced steel bar perforation of reinforcing bar carding by root, it then again will be on reinforcing bar and reinforcing bar fixing card Steel holding holes correspond to and fix, start drive car at this time, drive cricoid steel wire rope to move by drive car It is dynamic.
While drive car drives cricoid steel wire rope movement, steel wire rope is driven by traction wheel and directive wheel and is hung Cloth trolley is moved along trolley track, and Steel bar hanger movement, reinforcing bar are moved by rotating suspension armband while dossal trolley moves When lifting appliance moving, reinforced steel bar ring frame body is driven to be moved, reinforcing bar passes through the steel of operating platform one side edge in the process of moving Muscle locating wheel dredges reinforcing bar, while can play the role of mitigating reinforcing bar resistance when the rotation of reinforcing bar locating wheel, works as dossal When trolley is moved to the other side of door frame from the side of door frame, the laying work of splash guard reinforcing bar is completed.
After the laying work for completing splash guard reinforcing bar, operating personnel station carries out binding binding in operating platform;It is laid with waterproof When plate, it is only necessary to the Steel bar hanger between the rotation hanger of a pair of of dossal trolley are replaced with splash guard, then repeat above-mentioned step The rapid laying work that splash guard can be completed drives tunnel after one section of engineering construction in tunnel finishes by walking mechanism Road lining trolley frame marches to next section of job location along track, then repeats the above steps and constructs.
The beneficial effects of the invention are as follows:The configuration of the present invention is simple, strong operability, the splash guard reinforcing bar and dossal of laying are flat It is whole, it is easy to use, it greatly improves and is laid with splash guard reinforcing bar operating efficiency, reduce cost of labor, reduce the labour of worker Intensity improves splash guard reinforcing bar laying quality, is appropriate for promoting the use of.
Description of the drawings
The invention will be further described below in conjunction with the accompanying drawings:
Fig. 1 is general assembly structural schematic diagram;
Fig. 2 is the side structure schematic view of Fig. 1;
In Fig. 1,2:Door frame 1, logical beam 1.1, bottom girder 1.2, upper frame 2, walking mechanism 3, track 4, trolley track 5, dossal are small Vehicle 6, drive car 7, steel wire rope 71, traction wheel 8, directive wheel 81, operating platform 9, reinforcing bar locating wheel 10, carding are fixed Frame 11, reinforcing bar carding 12, Steel bar hanger 13, reinforcing bar fixing card 14, connecting rod 15.
Specific implementation mode
With reference to embodiment, invention is further described in detail with specific implementation mode:
Embodiment 1
At least three door frames 1 are arranged in anchor bar of waterproof plate in tunnels reinforcement trolley, and door frame 1 is that beam welding structure is arranged in two root posts top At portal frame, three door frames 1 are followed successively by front door frame, middle door frame, rear door frame from front to back;The column of three 1 both sides of door frame Bottom is respectively provided with bottom girder 1.2, and logical beam 1.1 is welded in top, middle part, the lower part of three 1 both sides of door frame, front door frame and middle door frame Upper frame 2 is set above crossbeam, and door frame 1 and upper frame 2 collectively form the frame of anchor bar of waterproof plate in tunnels reinforcement trolley;Front door frame and rear door frame Column on be respectively provided with walking mechanism 3, track 4, the anchor bar of waterproof plate in tunnels reinforcement trolley frame are set below the wheel of walking mechanism 3 Frame is moved forward and backward by walking mechanism 3 along track 4, and the periphery setting splash guard of anchor bar of waterproof plate in tunnels reinforcement trolley frame is laid with and steel The driving mechanism that muscle positioning is promoted;
The splash guard is laid with and the structure of the driving mechanism of reinforcing bar positioning promotion is:The top of front door frame and middle door frame and The trolley track 5 of a pair of of arc of external setting of both sides, the company of being respectively set between a pair of of trolley track 5 and front door frame and middle door frame Bar 15 is symmetrical arranged two dossal trolleies 6 on the slideway of a pair of of trolley track 5, Steel bar hanger is arranged between two dossal trolleies 6 13;Traction wheel 8 is uniformly distributed on a pair of of trolley track 5, the traction wheel 8 on a pair of of trolley track 5 be it is arranged symmetrically, front door frame and It is symmetrical arranged two drive cars 7 above the crossbeam of middle door frame, is respectively set on the output shaft of two drive cars 7 Symmetrical directive wheel 81 on the frame body of driving wheel, front door frame and middle door frame, driving wheel, front door frame on drive car 7 Setting steel wire rope 71 is wound respectively on the directive wheel 81 on middle door frame frame body, the traction wheel 8 on a pair of of trolley track 5, it is a pair of Steel wire rope 71 is set as cyclic annular, and the both ends of the end of a pair of of steel wire rope 71 respectively with two dossal trolleies 6 are correspondingly connected with, and reinforcing bar is hung The laying mechanism that setting reinforcing bar is positioned, promoted on tool 13;
The reinforcing bar positions, the structure of the laying mechanism of promotion is:It is symmetrical on front door frame and the logical beam 1.1 of middle door frame both sides Operating platform 9, the one side edge setting reinforcing bar locating wheel 10 of operating platform 9 are set;It is uniformly distributed in Steel bar hanger 13 longitudinal Reinforcing bar is arranged in steel holding holes in reinforcing bar fixing card 14, reserved steel bar mounting hole in reinforcing bar fixing card 14;Front door frame and middle door frame Bottom girder 1.2 bottom surface on setting carding fixed frame 11, be uniformly distributed longitudinal reinforcing bar in the frame of carding fixed frame 11 Carding 12, reinforcing bar carding 12 are cylinder hollow pipe, and reserved steel bar perforation, reinforced steel bar perforation correspond to steel on reinforcing bar carding 12 Muscle mounting hole is arranged, and two pairs of mandrils is vertically arranged between trolley track 5 on the crossbeam of upper frame 2, the top of two pairs of mandrils is all provided with Set reinforcing bar locating wheel 10;
When reinforcing bar laying construction, Steel bar hanger 13 is corresponded to first between the rotation hanger of a pair of of dossal trolley 6 and is fixed It is good, then the reinforcing bar placed on ground by root is passed through to the reinforced steel bar perforation of reinforcing bar carding 12, then again consolidate reinforcing bar and reinforcing bar Surely the steel holding holes on card 14, which correspond to, fixes, and starts drive car 7 at this time, ring-type is driven by drive car 7 Steel wire rope 71 move.
While drive car 7 drives cricoid steel wire rope 71 to move, steel wire rope 71 passes through traction wheel 8 and directive wheel 81 drive dossal trolleies 6 are moved along trolley track 5, are moved reinforcing bar by rotating suspension armband while dossal trolley 6 moves and are hung 13 movement of tool, when Steel bar hanger 13 moves, drives reinforced steel bar ring frame body to be moved, and reinforcing bar is flat by operating in the process of moving The reinforcing bar locating wheel 10 of platform one side edge dredges reinforcing bar, while can play mitigation reinforcing bar when the rotation of reinforcing bar locating wheel 10 The effect of resistance completes the laying of splash guard reinforcing bar when dossal trolley 6 is moved to the other side of door frame 1 from the side of door frame 1 Work.
After the laying work for completing splash guard reinforcing bar, operating personnel station carries out binding binding in operating platform 9;It is laid with waterproof When plate, it is only necessary to the Steel bar hanger 13 between the rotation hanger of a pair of of dossal trolley 6 are replaced with splash guard, then repeated above-mentioned The laying work of splash guard can be completed in step, after one section of engineering construction in tunnel finishes, is driven by walking mechanism 3 Tunnel lining trolley frame marches to next section of job location along track 4, then repeats the above steps and constructs.

Claims (3)

1. a kind of anchor bar of waterproof plate in tunnels is laid with and the application method of reinforcing bar positioning lifting device, the anchor bar of waterproof plate in tunnels is laid with and steel Muscle positions lifting device, is by door frame (1), logical beam (1.1), bottom girder (1.2), upper frame (2), walking mechanism (3), track (4), small Track road (5), dossal trolley (6), drive car (7), steel wire rope (71), traction wheel (8), directive wheel (81), operation are flat Platform (9), reinforcing bar locating wheel (10), carding fixed frame (11), reinforcing bar carding (12), Steel bar hanger (13), reinforcing bar fixing card (14), connecting rod (15) is constituted;It is characterized in that:At least three door frames (1) are arranged in anchor bar of waterproof plate in tunnels reinforcement trolley, and door frame (1) is The portal frame that beam welding is constituted is arranged in two root posts top, and three door frames (1) are followed successively by front door frame, middle door from front to back Frame, rear door frame;The column bottom of three door frame (1) both sides is respectively provided with bottom girder (1.2), the top of three door frame (1) both sides, in Logical beam (1.1) is welded in portion, lower part, and the crossbeam top setting upper frame (2) of front door frame and middle door frame, door frame (1) and upper frame (2) are altogether With the frame for constituting anchor bar of waterproof plate in tunnels reinforcement trolley;Walking mechanism (3), vehicle with walking machine are respectively provided on the column of front door frame and rear door frame Setting track (4) below the wheel of structure (3), the anchor bar of waterproof plate in tunnels reinforcement trolley frame is by walking mechanism (3) along track (4) It is moved forward and backward, the driving mechanism that the periphery setting splash guard of anchor bar of waterproof plate in tunnels reinforcement trolley frame is laid with and reinforcing bar positioning is promoted;
The splash guard is laid with and the structure of the driving mechanism of reinforcing bar positioning promotion is:The top and both sides of front door frame and middle door frame A pair of of arc of external setting trolley track (5), the company of being respectively set between a pair of of trolley track (5) and front door frame and middle door frame Bar (15) is symmetrical arranged two dossal trolleies (6) on the slideway of a pair of of trolley track (5), is arranged between two dossal trolleies (6) Steel bar hanger (13);Traction wheel (8), the traction wheel (8) on a pair of of trolley track (5) are uniformly distributed on a pair of of trolley track (5) It is arranged symmetrically, two drive cars (7), two trolley driving dresses is symmetrical arranged above the crossbeam of front door frame and middle door frame It sets and driving wheel is respectively set on the output shaft of (7), symmetrical directive wheel (81) on the frame body of front door frame and middle door frame, trolley drives Driving wheel, front door frame on dynamic device (7) and the directive wheel (81) on middle door frame frame body, the traction on a pair of of trolley track (5) It takes turns and winds setting steel wire rope (71) on (8) respectively, a pair of of steel wire rope (71) is set as cyclic annular, the end point of a pair of of steel wire rope (71) Both ends not with two dossal trolleies (6) are correspondingly connected with, and the laying mechanism that reinforcing bar is positioned, promoted is arranged in Steel bar hanger (13);
The reinforcing bar positions, the structure of the laying mechanism of promotion is:It is symmetrically set on front door frame and the logical beam (1.1) of middle door frame both sides Set operating platform (9), the one side edge setting reinforcing bar locating wheel (10) of operating platform (9);Steel bar hanger is uniformly distributed on (13) Reinforcing bar is arranged in steel holding holes in longitudinal reinforcing bar fixing card (14), reserved steel bar mounting hole in reinforcing bar fixing card (14);Front door Carding fixed frame (11) is set on the bottom surface of the bottom girder (1.2) of frame and middle door frame, in the frame of carding fixed frame (11) The longitudinal reinforcing bar carding (12) of even distribution, reinforcing bar carding (12) are cylinder hollow pipe, are reserved on reinforcing bar carding (12) Reinforced steel bar perforation, reinforced steel bar perforation correspond to steel holding holes setting, are vertically arranged between trolley track (5) on the crossbeam of upper frame (2) The top of two pairs of mandrils, two pairs of mandrils is respectively provided with reinforcing bar locating wheel (10);
When reinforcing bar laying construction, by the corresponding fixation of Steel bar hanger (13) first between the rotation hanger of a pair of of dossal trolley (6) It is good, then the reinforcing bar placed on ground is passed through to the reinforced steel bar perforation of reinforcing bar carding (12) by root, then again by reinforcing bar and reinforcing bar Steel holding holes in fixing card (14), which correspond to, to be fixed, and is started drive car (7) at this time, is passed through drive car (7) Drive cricoid steel wire rope (71) mobile.
2. a kind of anchor bar of waterproof plate in tunnels according to claim 1 is laid with and the application method of reinforcing bar positioning lifting device, special Sign is:While drive car (7) drives cricoid steel wire rope (71) mobile, steel wire rope (71) passes through traction wheel (8) Dossal trolley (6) is driven to be moved along trolley track (5) with directive wheel (81), dossal trolley (6) passes through rotation while mobile It turns linked to armband and moves Steel bar hanger (13) movement, when Steel bar hanger (13) is mobile, drive reinforced steel bar ring frame body to be moved, reinforcing bar is moving Reinforcing bar is dredged by the reinforcing bar locating wheel (10) of operating platform one side edge in dynamic process, while reinforcing bar locating wheel (10) can play the role of mitigating reinforcing bar resistance when rotating, when dossal trolley (6) is moved to door frame from the side of door frame (1) (1) when the other side, the laying work of splash guard reinforcing bar is completed.
3. a kind of anchor bar of waterproof plate in tunnels according to claim 1 is laid with and the application method of reinforcing bar positioning lifting device, special Sign is:After the laying work for completing splash guard reinforcing bar, operating personnel station carries out binding binding in operating platform (9);It is laid with anti- When water plate, it is only necessary to the Steel bar hanger (13) between the rotation hanger of a pair of of dossal trolley (6) are replaced with splash guard, then weighed The laying work that splash guard can be completed in multiple above-mentioned steps passes through vehicle with walking machine after one section of engineering construction in tunnel finishes Structure (3) drives tunnel lining trolley frame to march to next section of job location along track (4), then repeats the above steps and is applied Work.
CN201810854180.8A 2018-07-30 2018-07-30 A kind of application method of anchor bar of waterproof plate in tunnels laying and reinforcing bar positioning lifting device Pending CN108756960A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810854180.8A CN108756960A (en) 2018-07-30 2018-07-30 A kind of application method of anchor bar of waterproof plate in tunnels laying and reinforcing bar positioning lifting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810854180.8A CN108756960A (en) 2018-07-30 2018-07-30 A kind of application method of anchor bar of waterproof plate in tunnels laying and reinforcing bar positioning lifting device

Publications (1)

Publication Number Publication Date
CN108756960A true CN108756960A (en) 2018-11-06

Family

ID=63971940

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810854180.8A Pending CN108756960A (en) 2018-07-30 2018-07-30 A kind of application method of anchor bar of waterproof plate in tunnels laying and reinforcing bar positioning lifting device

Country Status (1)

Country Link
CN (1) CN108756960A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109736859A (en) * 2019-02-28 2019-05-10 庆云汉诚隧道工程机械有限公司 A kind of self-propelled multifunctional constructing tunnel car body, trolley and construction method
CN112943315A (en) * 2021-01-28 2021-06-11 常州畅韵工程材料有限公司 Low-vibration waterproof board auxiliary laying construction device for high-speed rail tunnel

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104533466A (en) * 2014-11-21 2015-04-22 中铁一局集团有限公司 Multifunctional flexible traction type paving rack for waterproof board
CN105129602A (en) * 2015-09-24 2015-12-09 中铁四局集团第二工程有限公司 Sling capable of integrally lifting long and large-diameter vertical steel bars
CN105422143A (en) * 2015-12-25 2016-03-23 德阳思远重工有限公司 Intelligent trolley for tunnel construction
CN105569692A (en) * 2016-01-29 2016-05-11 黄高飞 Trolley for welding tunnel waterproof board hanging cloth
CN205823303U (en) * 2016-07-25 2016-12-21 中车建设工程有限公司 The Multifunctional bench that a kind of tunnel special lining cutting reinforcement installation and splash guard are laid
CN205977243U (en) * 2016-08-01 2017-02-22 湖南五新隧道智能装备股份有限公司 A platform truck for tunnel water proofing board is laid and reinforcement
CN106988770A (en) * 2017-05-19 2017-07-28 龚岗 Geotextiles waterproof cloth and two lined steel muscle are plated in integrated bogie hearth
CN107100651A (en) * 2017-05-13 2017-08-29 山东佳信机械设备有限公司 A kind of tunnel-liner is seamlessly connected reinforcing bar positioning, splash guard laying chassis
CN107956488A (en) * 2017-12-27 2018-04-24 中铁工程装备集团有限公司 A kind of splash guard reinforcing bar spreads hanging platform car
CN208564592U (en) * 2018-07-30 2019-03-01 洛阳高飞桥隧机械有限公司 A kind of anchor bar of waterproof plate in tunnels is laid with and reinforcing bar positions lifting device

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104533466A (en) * 2014-11-21 2015-04-22 中铁一局集团有限公司 Multifunctional flexible traction type paving rack for waterproof board
CN105129602A (en) * 2015-09-24 2015-12-09 中铁四局集团第二工程有限公司 Sling capable of integrally lifting long and large-diameter vertical steel bars
CN105422143A (en) * 2015-12-25 2016-03-23 德阳思远重工有限公司 Intelligent trolley for tunnel construction
CN105569692A (en) * 2016-01-29 2016-05-11 黄高飞 Trolley for welding tunnel waterproof board hanging cloth
CN205823303U (en) * 2016-07-25 2016-12-21 中车建设工程有限公司 The Multifunctional bench that a kind of tunnel special lining cutting reinforcement installation and splash guard are laid
CN205977243U (en) * 2016-08-01 2017-02-22 湖南五新隧道智能装备股份有限公司 A platform truck for tunnel water proofing board is laid and reinforcement
CN107100651A (en) * 2017-05-13 2017-08-29 山东佳信机械设备有限公司 A kind of tunnel-liner is seamlessly connected reinforcing bar positioning, splash guard laying chassis
CN106988770A (en) * 2017-05-19 2017-07-28 龚岗 Geotextiles waterproof cloth and two lined steel muscle are plated in integrated bogie hearth
CN107956488A (en) * 2017-12-27 2018-04-24 中铁工程装备集团有限公司 A kind of splash guard reinforcing bar spreads hanging platform car
CN208564592U (en) * 2018-07-30 2019-03-01 洛阳高飞桥隧机械有限公司 A kind of anchor bar of waterproof plate in tunnels is laid with and reinforcing bar positions lifting device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109736859A (en) * 2019-02-28 2019-05-10 庆云汉诚隧道工程机械有限公司 A kind of self-propelled multifunctional constructing tunnel car body, trolley and construction method
CN109736859B (en) * 2019-02-28 2020-04-17 庆云汉诚隧道工程机械有限公司 Self-propelled multifunctional tunnel construction vehicle body, trolley and construction method
CN112943315A (en) * 2021-01-28 2021-06-11 常州畅韵工程材料有限公司 Low-vibration waterproof board auxiliary laying construction device for high-speed rail tunnel
CN112943315B (en) * 2021-01-28 2022-02-08 常州畅韵工程材料有限公司 Low-vibration waterproof board auxiliary laying construction device for high-speed rail tunnel

Similar Documents

Publication Publication Date Title
CN102042021A (en) Automatically walking stepped mobile trestle
CN202560245U (en) Multifunctional trolley with freely retractable arms
CN104612061B (en) A kind of suspension open type hanging basket device and construction method thereof
CN107584650A (en) Using the bridge prefabrication devices and methods therefor of self-propelled continuous productive process
CN102913259B (en) Steel arch assembling machine of tunnel vault for repairing damages of existing railway tunnel
CN104533460B (en) Support replacement formula formwork jumbo and the construction method of underpass concreting
CN110424277A (en) PC beam bridge Wavelike steel webplate hanging apparatus and construction method with low gantry crane
CN111550270B (en) Ultra-large self-propelled tunnel multifunctional operation platform and tunnel steel bar waterproof board construction method
CN113123800B (en) Construction method of starting base of large-diameter shield tunnel steel structure
CN108756960A (en) A kind of application method of anchor bar of waterproof plate in tunnels laying and reinforcing bar positioning lifting device
CN202926344U (en) Tunnel vault steel arch frame mounting machine for existing railway tunnel disease repairing
CN204851287U (en) Big section moving as a whole formula formwork support
CN208564592U (en) A kind of anchor bar of waterproof plate in tunnels is laid with and reinforcing bar positions lifting device
CN109706918B (en) Reinforcing cage orifice forming device for hoisting limited space and construction method thereof
CN213510645U (en) PBA secretly digs platform truck support template system that station side span was just propped up and is encircleed
CN206215824U (en) Filling pile cage of reinforcement processing unit (plant)
CN202117689U (en) Light-duty trolley which is matched with shield station-passing for structure formwork
CN114561873B (en) Bridge high pier construction method
CN214741382U (en) Tunnel preliminary bracing well pilot tunnel bow member grudging post device
CN205135656U (en) Modular two lining platform trucks of multipurpose
CN201963311U (en) Automatic-marching type movable scaffoldbridge
CN210105880U (en) Alternate hydraulic lifting template ditch cable trough trolley device
CN214196341U (en) Self-propelled hydraulic inverted arch trolley
CN210370694U (en) Tunnel secondary lining template trolley
CN202300422U (en) Open type tunnel boring machine (TBM) full cross section synchronous lining building trolley for hydraulic tunnel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination