CN211499700U - Construction protection handling frame - Google Patents

Construction protection handling frame Download PDF

Info

Publication number
CN211499700U
CN211499700U CN201922049818.3U CN201922049818U CN211499700U CN 211499700 U CN211499700 U CN 211499700U CN 201922049818 U CN201922049818 U CN 201922049818U CN 211499700 U CN211499700 U CN 211499700U
Authority
CN
China
Prior art keywords
fixed pulley
construction protection
handling frame
support body
cage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922049818.3U
Other languages
Chinese (zh)
Inventor
程捷
王向前
王益民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Urban And Rural Xinrui Construction Co ltd
Beijing Urban and Rural Construction Group Co Ltd
Original Assignee
Beijing Urban And Rural Xinrui Construction Co ltd
Beijing Urban and Rural Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Urban And Rural Xinrui Construction Co ltd, Beijing Urban and Rural Construction Group Co Ltd filed Critical Beijing Urban And Rural Xinrui Construction Co ltd
Priority to CN201922049818.3U priority Critical patent/CN211499700U/en
Application granted granted Critical
Publication of CN211499700U publication Critical patent/CN211499700U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a construction protection handling frame, hang the cage support body including at least two, adjacent two hang and be equipped with the running-board between the cage support body, it includes a plurality of longitudinal rods to hang the cage support body, the longitudinal rod all extends along vertical direction, adjacent two be equipped with a plurality of transverse bars between the longitudinal rod, the both ends of transverse bar respectively with adjacent two longitudinal rod fixed connection, the both ends of running-board respectively with the connection can be dismantled to at least two transverse bars of hanging the cage support body. The utility model discloses a construction protection handling frame is through setting up running-board and fixed pulley support on hanging cage support body upper portion to make construction protection handling frame can hang hoisting device and make things convenient for constructor construction, can strengthen the protection to constructor through the rail guard on the running-board, and then reach and both conveniently hang hoisting device, make things convenient for constructor to follow the construction of hanging cage support body again, improve work efficiency's purpose.

Description

Construction protection handling frame
Technical Field
The utility model relates to a cage technical field is hung in safety protection, particularly, relates to a construction protection handling frame.
Background
Need adopt aerial working safeguard procedures usually in the construction, often use operation platform such as cage, cat ladder that steel bar welding formed, and operation platform such as cage, cat ladder are single in function to present, only supply constructor to climb, and the efficiency of construction is lower.
SUMMERY OF THE UTILITY MODEL
To the above-mentioned technical problem among the correlation technique, the utility model provides a construction protection handling frame can overcome prior art's the aforesaid not enough.
In order to achieve the technical purpose, the technical scheme of the utility model is realized as follows:
the utility model provides a construction protection handling frame, includes two at least string cage support bodies, adjacent two hang and be equipped with the running-board between the cage support body, it includes a plurality of longitudinal rods to hang the cage support body, longitudinal rod all extends along vertical direction, adjacent two be equipped with a plurality of transverse bars between the longitudinal rod, the both ends of transverse bar respectively with adjacent two longitudinal rod fixed connection, the both ends of running-board respectively with the connection can be dismantled to two at least transverse rods of hanging the cage support body.
Further, at least one hang the fixed pulley support fixed connection that the upper portion and the level of cage support body set up, the fixed pulley support passes hang the cage support body, the fixed pulley support with transverse bar fixed connection, the one end of fixed pulley support is equipped with the through-hole.
Furthermore, the middle part of the transverse rod connected with the fixed pulley bracket is fixedly connected with one end of the connecting rod, and the other end of the connecting rod is fixedly connected with the other transverse rod above the fixed pulley bracket.
Furthermore, the end of the fixed pulley support, which is provided with the through hole, is fixedly connected with one end of the diagonal draw bar, and the other end of the diagonal draw bar is fixedly connected with the middle part of the transverse rod above the fixed pulley support.
Furthermore, one end of the fixed pulley support provided with the through hole is provided with a first fixed pulley, and a second fixed pulley is arranged on the transverse rod adjacent to the lower portion of the other end of the fixed pulley support.
Furthermore, two ends of a rope penetrating through the first fixed pulley and the second fixed pulley are respectively connected with the multifunctional hoisting machine and the lifting hook.
Furthermore, grooves are formed in two ends of the bottom of the pedal plate, the inner walls of the grooves are attached to the outer walls of the transverse rods, and guard rails are arranged on two sides of the top of the pedal plate respectively.
Furthermore, the bottom end of the longitudinal rod is provided with a universal wheel.
The utility model has the advantages that: the utility model discloses a construction protection handling frame is through setting up running-board and fixed pulley support on hanging cage support body upper portion to make construction protection handling frame can hang hoisting device and make things convenient for constructor construction, can strengthen the protection to constructor through the rail guard on the running-board, and then reach and both conveniently hang hoisting device, make things convenient for constructor to follow the construction of hanging cage support body again, improve work efficiency's purpose.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required to be used in the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic structural view of a construction protection handling frame according to an embodiment of the present invention;
fig. 2 is a schematic structural view of a cage hanging body according to an embodiment of the present invention;
fig. 3 is a schematic structural view of a foot pedal according to an embodiment of the present invention;
in the figure: 1. the multifunctional lifting device comprises a cage hanging body, 2 parts of a pedal, 3 parts of a longitudinal rod, 4 parts of a transverse rod, 5 parts of a fixed pulley support, 6 parts of a connecting rod, 7 parts of a fixed pulley I, 8 parts of a fixed pulley II, 9 parts of a multifunctional lifting machine, 10 parts of a lifting hook, 11 parts of a universal wheel, 12 parts of a groove, 13 parts of a diagonal draw bar, 14 parts of a protective guard.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art all belong to the protection scope of the present invention.
As shown in fig. 1-3, according to the embodiment of the utility model provides a construction protection handling frame, hang cage support body 1 including at least two, adjacent two hang and be equipped with running-board 2 between the cage support body 1, it includes a plurality of longitudinal rods 3 to hang cage support body 1, longitudinal rods 3 all extends along vertical direction, adjacent two be equipped with a plurality of transverse bars 4 between the longitudinal rods 3, the both ends of transverse bars 4 respectively with adjacent two 3 fixed connection of longitudinal rods, the both ends of running-board 2 respectively with the connection can be dismantled to at least two transverse rods 4 of hanging cage support body 1.
The hanging cage frame body 1 adopts tool type standard joints, and is connected by adopting butt-joint pieces according to the height of the building masonry.
At least one hang cage support body 1's upper portion and the fixed pulley support 5 fixed connection of level setting, fixed pulley support 5 passes hang cage support body 1, fixed pulley support 5 with 4 fixed connection of transverse bar, the one end of fixed pulley support 5 is equipped with the through-hole. The middle part of the transverse rod 4 connected with the fixed pulley bracket 5 is fixedly connected with one end of the connecting rod 6, and the other end of the connecting rod 6 is fixedly connected with the other transverse rod 4 above the fixed pulley bracket 5. The one end that is equipped with the through-hole of fixed pulley support 5 and the one end fixed connection of oblique pull rod 13, the other end of oblique pull rod 13 with the middle part fixed connection of transverse bar 4 above fixed pulley support 5.
One end of the fixed pulley support 5, which is provided with the through hole, is provided with a first fixed pulley 7, and a second fixed pulley 8 is arranged on the transverse rod 4 adjacent to the lower portion of the other end of the fixed pulley support 5. Two ends of a rope penetrating through the first fixed pulley 7 and the second fixed pulley 8 are respectively connected with a multifunctional hoisting machine 9 and a lifting hook 10.
Grooves 12 are formed in two ends of the bottom of the pedal plate 2, the inner walls of the grooves 12 are attached to the outer wall of the transverse rod 4, the position of the pedal plate 2 can be adjusted according to the height requirement, and protective guards 14 are arranged on two sides of the top of the pedal plate 2 respectively, so that protection of constructors can be enhanced.
The bottom of longitudinal rod 3 is equipped with lockable universal wheel 11, can conveniently remove construction protection handling frame on ground.
The utility model discloses a construction protection handling frame can be used as the roof and plasters whitewash furred ceiling construction platform, also can be used as the scaffold frame of building partition wall, wall body and plastering and whitewash or hanging stone material wall futilely, makes things convenient for constructor cat ladder from top to bottom and transfers goods from top to bottom.
When the multifunctional lifting machine is used specifically, the construction protection operating frame is moved to a target position, the pedal plate 2 is placed to a proper height, a constructor can construct along the construction protection operating frame, and the first fixed pulley 7 and the second fixed pulley 8 are connected with the multifunctional lifting machine 9 and the lifting hook 10 through ropes and used for transporting materials.
To sum up, with the help of the above technical scheme of the utility model, the utility model discloses a construction protection handling frame sets up running-board and fixed pulley support through hanging cage support body upper portion to make construction protection handling frame can hang hoisting device and make things convenient for constructor construction, can strengthen the protection to constructor through the rail guard on the running-board, and then reach and both conveniently hang hoisting device, make things convenient for constructor along hanging cage support body construction again, improve work efficiency's purpose.
The above description is only a preferred embodiment of the present invention, and should not be taken as limiting the invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (8)

1. The utility model provides a construction protection handling frame, its characterized in that includes two at least string cage support bodies (1), adjacent two hang and be equipped with running-board (2) between cage support body (1), it includes a plurality of longitudinal rod (3) to hang cage support body (1), longitudinal rod (3) all extend along vertical direction, adjacent two be equipped with a plurality of transverse rod (4) between longitudinal rod (3), the both ends of transverse rod (4) respectively with adjacent two longitudinal rod (3) fixed connection, the both ends of running-board (2) respectively with the connection can be dismantled in transverse rod (4) of two at least string cage support bodies (1).
2. The construction protection handling frame according to claim 1, characterized in that the upper portion of at least one of the cage hanging frame bodies (1) is fixedly connected with a horizontally arranged fixed pulley support (5), the fixed pulley support (5) penetrates through the cage hanging frame body (1), the fixed pulley support (5) is fixedly connected with the transverse rod (4), and one end of the fixed pulley support (5) is provided with a through hole.
3. The construction protection handling frame according to claim 2, characterized in that the middle of the transversal bar (4) connecting the fixed sheave bracket (5) is fixedly connected with one end of a connecting bar (6), and the other end of the connecting bar (6) is fixedly connected with another transversal bar (4) above the fixed sheave bracket (5).
4. The construction protection handling frame of claim 2, wherein the end of the fixed pulley support (5) provided with the through hole is fixedly connected with one end of a diagonal draw bar (13), and the other end of the diagonal draw bar (13) is fixedly connected with the middle part of the transverse bar (4) above the fixed pulley support (5).
5. The construction protection handling frame according to claim 2, wherein one end of the fixed pulley bracket (5) provided with the through hole is provided with a first fixed pulley (7), and the other end of the fixed pulley bracket (5) is provided with a second fixed pulley (8) on the adjacent transverse rod (4) below the other end.
6. The construction protection handling frame of claim 5, wherein two ends of a rope passing through the first fixed pulley (7) and the second fixed pulley (8) are respectively connected with a multifunctional hoisting machine (9) and a lifting hook (10).
7. The construction protection operating frame according to claim 1, wherein grooves (12) are formed in two ends of the bottom of the pedal (2), inner walls of the grooves (12) are attached to outer walls of the transverse rods (4), and protective guards (14) are respectively arranged on two sides of the top of the pedal (2).
8. Construction protection handling frame according to claim 1, characterized in that the bottom end of the longitudinal bars (3) is provided with universal wheels (11).
CN201922049818.3U 2019-11-25 2019-11-25 Construction protection handling frame Expired - Fee Related CN211499700U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922049818.3U CN211499700U (en) 2019-11-25 2019-11-25 Construction protection handling frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922049818.3U CN211499700U (en) 2019-11-25 2019-11-25 Construction protection handling frame

Publications (1)

Publication Number Publication Date
CN211499700U true CN211499700U (en) 2020-09-15

Family

ID=72411222

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922049818.3U Expired - Fee Related CN211499700U (en) 2019-11-25 2019-11-25 Construction protection handling frame

Country Status (1)

Country Link
CN (1) CN211499700U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115059277A (en) * 2022-06-22 2022-09-16 明阳智慧能源集团股份公司 Composite material layering device in wind power field and manufacturing and using method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115059277A (en) * 2022-06-22 2022-09-16 明阳智慧能源集团股份公司 Composite material layering device in wind power field and manufacturing and using method thereof

Similar Documents

Publication Publication Date Title
CN204112696U (en) For the electric hoist elevator shaft platform of main building construction
CN105569692A (en) Trolley for welding tunnel waterproof board hanging cloth
CN106400691A (en) Integrated construction process for anti-collision wall formwork
CN206233546U (en) A kind of elevator hoistways workbench
CN211499700U (en) Construction protection handling frame
CN106013774A (en) Slip-form flexible platform device suitable for assigning
CN205822747U (en) Architectural engineering scaffold
CN205330690U (en) Cloth welding platform truck is hung to tunnel water proofing board
CN105986663B (en) Elevator tooling hoistable platform
CN211499699U (en) Ladder-climbing type operation rack for hanging cage
CN209353734U (en) For installing the double-track device of curtain wall
CN209384619U (en) A kind of hanging basket device that can be walked safely on foundation pit reinforced concrete
CN203257106U (en) Multifunctional power-driven walking type walking system
CN211369454U (en) Scaffold for building engineering
CN209924409U (en) Wall-attached self-climbing electric lifting platform
CN212766686U (en) Cantilever type scaffold
CN204059908U (en) Hydraulic climbing device for discharging
CN205382718U (en) Sparse passway for escaping of steel platform die carrier system
CN211257761U (en) Lifting type elevator shaft operating platform
CN208980193U (en) The curtain wall hanging apparatus of anticollision
CN106703390A (en) Scaffolding mechanism capable of guiding rails
CN205476450U (en) A light -duty automatic lifting die carrier of concave formula for surpassing construction of high rise elevator well vertical structure
KR100777370B1 (en) Glass panel construction apparatus of building
CN204081429U (en) Overhead welding and hoisted in position job platform
CN205242982U (en) Platform is used in construction of building outer wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200915

CF01 Termination of patent right due to non-payment of annual fee