CN211369454U - Scaffold for building engineering - Google Patents

Scaffold for building engineering Download PDF

Info

Publication number
CN211369454U
CN211369454U CN201921800406.2U CN201921800406U CN211369454U CN 211369454 U CN211369454 U CN 211369454U CN 201921800406 U CN201921800406 U CN 201921800406U CN 211369454 U CN211369454 U CN 211369454U
Authority
CN
China
Prior art keywords
scaffold
steel frame
building engineering
fixedly connected
sides
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921800406.2U
Other languages
Chinese (zh)
Inventor
桑桂湘
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201921800406.2U priority Critical patent/CN211369454U/en
Application granted granted Critical
Publication of CN211369454U publication Critical patent/CN211369454U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model discloses a scaffold frame for building engineering belongs to building engineering technical field. A scaffold for building engineering comprises a workbench supporting steel frame, wherein a workbench is lapped on the top of the workbench supporting steel frame, steel frame connecting clamps are fixedly connected to two sides of the workbench, a longitudinal steel frame is fixedly mounted in each steel frame connecting clamp, a cavity is formed in each workbench, and grooves are formed in two sides of each cavity; the utility model discloses a suspender, driving shaft, elevating platform and material transport vehicle's cooperation is used, and the constructor accessible is placed instrument or material on material transport vehicle, then makes the driving shaft operate to can drive the elevating platform and go up and down, the constructor of being convenient for takes to placing instrument or material on the transport vehicle, and operation process is simple convenient, labour saving and time saving, need not constructor and climb down from the scaffold and take it, avoids the emergence of potential safety hazard.

Description

Scaffold for building engineering
Technical Field
The utility model relates to a building engineering technical field especially relates to a scaffold frame for building engineering.
Background
At present, the scaffold refers to various supports which are erected for workers to operate and solve vertical and horizontal transportation on a construction site, and a general term of the building industry refers to a place which is used on an outer wall, interior decoration or high-rise floor height and cannot be directly constructed on a construction site, and the scaffold is made of materials which are usually used for up-down operation of constructors or enclosure of a peripheral safety net, high-altitude installation components and the like: bamboo, wood, steel pipes or synthetic materials, and scaffolds are also used as templates in some projects, and are also widely used in advertising, municipal, traffic roads and bridges, mines, and other departments.
When using the scaffold to carry out construction operation, need carry some instruments or material sometimes and place and carry out construction operation at the scaffold, nevertheless the table surface is long-pending limited to be convenient for constructor to place material or instrument on the workstation, if come and go to take, not only waste time has certain potential safety hazard to constructor moreover.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the problem that the workstation area is limited among the prior art, and the constructor of being not convenient for places material or instrument on the workstation, and the scaffold frame for building engineering who proposes.
In order to achieve the above purpose, the utility model adopts the following technical scheme: the utility model provides a scaffold frame for building engineering, includes that the workstation supports the steelframe, the top overlap joint that the workstation supported the steelframe has the workstation, the equal fixedly connected with steelframe link clamp in both sides of workstation, the inside fixed mounting of steelframe link clamp has vertical steelframe, the cavity has been seted up to the inside of workstation, the recess has all been seted up to the inside both sides of cavity, the inside of recess is provided with the driving shaft, the suspender has been cup jointed to the surface of driving shaft, the other end of suspender is tied and is hung one side at the elevating platform, the inside of elevating platform is provided with the material transport vechicle.
Preferably, the inside fixedly connected with material protection spacing of cavity, the elevating platform sets up the inside at material protection spacing.
Preferably, the longitudinal steel frame is fixedly connected with the transverse steel frame through the steel frame connecting clamp, and the transverse steel frame is fixedly connected with the reinforcing rod through the steel frame connecting clamp.
Preferably, the crawling ladders are fixedly mounted on two sides of the longitudinal steel frame, a movable panel is hinged to one side of the top of the material protection limiting frame, and handles are fixedly connected to the movable panel and the front face of the material transport vehicle.
Preferably, guard rails are arranged on two sides of the top of the workbench, and hand grips are fixedly connected to two sides of each guard rail.
Preferably, one side of the inside of the groove is provided with a motor, the driving shaft is fixedly connected to the output end of the motor, the bottom of the material transport vehicle is provided with a pulley, and the pulley is arranged inside the limiting groove.
Compared with the prior art, the utility model provides a scaffold frame for building engineering possesses following beneficial effect:
1. the utility model discloses, use through suspender, driving shaft, elevating platform and material transport vehicle's cooperation, the constructor accessible is placed instrument or material on material transport vehicle, then makes the driving shaft operate to can drive the elevating platform and go up and down, the constructor of being convenient for takes to instrument or material of placing on the transport vehicle, and operation process is simple convenient, labour saving and time saving, need not constructor and climb down from the scaffold and take it, avoids the emergence of potential safety hazard.
2. The utility model discloses, through the setting of spacing and elevating platform of material protection, carry out the in-process that goes up and down when the elevating platform in the spacing frame of material protection, spacing frame of material protection can play spacing effect to it, thereby avoid the elevating platform to take place to incline and lead to inside material or instrument to drop out, support the steelframe through the workstation, a workbench, horizontal steelframe, vertical steelframe, the cooperation of anchor strut and steelframe joint clamp is used, not only can make constructor build this scaffold frame fast, and joint strength is high, the holistic steadiness of this scaffold frame has been improved.
The part that does not relate to in the device all is the same with prior art or can adopt prior art to realize, the utility model discloses the constructor of being convenient for takes instrument or material placed on the transport vechicle, and operation process is simple convenient, labour saving and time saving, need not that the constructor is manual to take it, avoids the emergence of potential safety hazard.
Drawings
FIG. 1 is a schematic front view of the present invention;
FIG. 2 is a schematic side view of the present invention;
FIG. 3 is a schematic diagram of the side view cross-sectional structure of the cavity of the present invention;
fig. 4 is a schematic view of the elevation structure of the elevating platform of the present invention.
In the figure: 1. the worktable supports the steel frame; 2. a work table; 3. a cavity; 4. a longitudinal steel frame; 5. a groove; 6. a drive shaft; 7. a sling; 8. a lifting platform; 9. a material transport vehicle; 10. a material protection limiting frame; 11. a transverse steel frame; 12. a reinforcing rod; 13. climbing a ladder; 14. a movable panel; 15. a handle; 16. protecting the fence; 17. a gripper; 18. a pulley; 19. a limiting groove; 20. a steel frame connecting clamp.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Referring to fig. 1-4, a scaffold for construction engineering, comprising a workbench supporting steel frame 1, a workbench 2 lapped on the top of the workbench supporting steel frame 1, the workbench 2 can support constructors for facilitating the constructors to carry out high-altitude operation, steel frame connecting clamps 20 fixedly connected to both sides of the workbench 2, through the arrangement of the steel frame connecting clamps 20, the supporting members of the scaffold can be connected, the connecting strength of the supporting members is improved, a longitudinal steel frame 4 is fixedly installed inside the steel frame connecting clamps 20, a cavity 3 is formed inside the workbench 2, grooves 5 are formed on both sides inside the cavity 3, a driving shaft 6 is arranged inside the grooves 5, a hanging strip 7 is sleeved on the outer surface of the driving shaft 6, the driving shaft 6 can drive the hanging strip 7 to extend and retract after operation, and the other end of the hanging strip 7 is tied and hung on one side of a lifting platform 8, a material transport vehicle 9 is arranged in the lifting platform 8, a material protection limiting frame 10 is fixedly connected in the cavity 3, a lifting belt 7 can drive the lifting platform 8 to lift in the material protection limiting frame 10 in the telescopic process, the lifting platform 8 is arranged in the material protection limiting frame 10, the material protection limiting frame 10 can limit the lifting platform to prevent the material or tool in the lifting platform 8 from falling off due to the inclination, the longitudinal steel frame 4 is fixedly connected with the transverse steel frame 11 through a steel frame connecting clamp 20, the transverse steel frame 11 is fixedly connected with a reinforcing rod 12 through a steel frame connecting clamp 20, the two sides of the longitudinal steel frame 4 are both fixedly provided with a ladder 13, constructors climb through the ladder 13, one side of the top of the material protection limiting frame 10 is hinged with a movable panel 14, and the movable panel 14 plays a protection role for constructors, avoid constructor to drop into ground from cavity 3, the equal fixedly connected with handle 15 in front of activity panel 14 and material transport cart 9, after elevating platform 8 rose to the top, constructor will move about panel 14 and open, accessible handle 15 can pull out material transport cart 9 from elevating platform 8, thereby take the material or the instrument on the transport cart, the both sides at workstation 2 top all are provided with rail guard 16, the equal fixedly connected with tongs 17 in both sides of rail guard 16, the inside one side of recess 5 is provided with the motor, driving shaft 6 fixed connection is at the output of motor, the bottom of material transport cart 9 is provided with pulley 18, pulley 18 sets up the inside at spacing groove 19.
The utility model discloses in, use through suspender 7, driving shaft 6, elevating platform 8 and material transport vechicle 9's cooperation, the constructor accessible is placed instrument or material on material transport vechicle 9, then make driving shaft 6 operate, thereby can drive elevating platform 8 and go up and down, be convenient for the constructor to placing instrument or material on the transport vechicle and take, and the operation process is simple convenient, time saving and labor saving, it takes to it to need not the constructor to climb down from the scaffold frame, avoid the emergence of potential safety hazard, through the setting of material protection spacing frame 10 and elevating platform 8, in-process that elevating platform 8 goes up and down in material protection spacing frame 10, material protection spacing frame 10 can play spacing effect to it, thereby avoid elevating platform 8 to take place to incline and lead to inside material or instrument to drop out, support steelframe 1 through the workstation, workstation 2, The cooperation of horizontal steelframe 11, vertical steelframe 4, anchor strut 12 and steelframe connecting clamp 20 is used, not only can make constructor build this scaffold fast, and joint strength is high, has improved the holistic steadiness of this scaffold.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The utility model provides a scaffold frame for building engineering, includes that the workstation supports steelframe (1), its characterized in that, the top overlap joint that the workstation supported steelframe (1) has workstation (2), the equal fixedly connected with steelframe link (20) in both sides of workstation (2), the inside fixed mounting of steelframe link (20) has vertical steelframe (4), cavity (3) have been seted up to the inside of workstation (2), recess (5) have all been seted up to the inside both sides of cavity (3), the inside of recess (5) is provided with driving shaft (6), suspender (7) have been cup jointed to the surface of driving shaft (6), the other end of suspender (7) is tied and is hung one side at elevating platform (8), the inside of elevating platform (8) is provided with material transport vechicle (9).
2. The scaffold for building engineering according to claim 1, characterized in that a material protection limiting frame (10) is fixedly connected to the inside of the cavity (3), and the lifting platform (8) is arranged inside the material protection limiting frame (10).
3. A scaffold for building engineering according to claim 1, characterized in that the longitudinal steel frame (4) is fixedly connected with the transverse steel frame (11) by steel frame connecting clips (20), and the transverse steel frame (11) is fixedly connected with the reinforcing rods (12) by steel frame connecting clips (20).
4. The scaffold for building engineering as claimed in claim 2, wherein the ladder (13) is fixedly installed on both sides of the longitudinal steel frame (4), a movable panel (14) is hinged to one side of the top of the material protection limiting frame (10), and the handles (15) are fixedly connected to the movable panel (14) and the front of the material transport vehicle (9).
5. A scaffold for building engineering according to claim 1, characterized in that both sides of the top of the working platform (2) are provided with guard rails (16), and both sides of the guard rails (16) are fixedly connected with grippers (17).
6. A scaffold for building engineering according to claim 1, characterized in that a motor is arranged at one side inside the groove (5), the driving shaft (6) is fixedly connected at the output end of the motor, a pulley (18) is arranged at the bottom of the material transport cart (9), and the pulley (18) is arranged inside the limiting groove (19).
CN201921800406.2U 2019-10-14 2019-10-14 Scaffold for building engineering Expired - Fee Related CN211369454U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921800406.2U CN211369454U (en) 2019-10-14 2019-10-14 Scaffold for building engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921800406.2U CN211369454U (en) 2019-10-14 2019-10-14 Scaffold for building engineering

Publications (1)

Publication Number Publication Date
CN211369454U true CN211369454U (en) 2020-08-28

Family

ID=72172187

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921800406.2U Expired - Fee Related CN211369454U (en) 2019-10-14 2019-10-14 Scaffold for building engineering

Country Status (1)

Country Link
CN (1) CN211369454U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114592673A (en) * 2022-01-12 2022-06-07 许火胜 Wall whitewashes multifunctional support for building decoration

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114592673A (en) * 2022-01-12 2022-06-07 许火胜 Wall whitewashes multifunctional support for building decoration
CN114592673B (en) * 2022-01-12 2023-11-24 广州原点建设工程有限公司 Multifunctional bracket for wall surface painting for building decoration

Similar Documents

Publication Publication Date Title
CN211369454U (en) Scaffold for building engineering
CN206233546U (en) A kind of elevator hoistways workbench
CN209986318U (en) Scaffold accessory processingequipment
CN205604084U (en) Hanging flower basket device of prefabricated little case roof beam construction usefulness
CN211499700U (en) Construction protection handling frame
CN212453549U (en) Liftable scaffold for building decoration
CN215254409U (en) Scaffold for elevator well
JP3950800B2 (en) Suspension scaffold
CN211341660U (en) Scaffold for building engineering
CN202528152U (en) Vertical operation rack
CN206530030U (en) Steel construction operation frame
CN212802474U (en) Scaffold for building installation
CN218862053U (en) Civil engineering construction is with safe scaffold
CN220666854U (en) Adjustable construction frame
CN219095536U (en) Novel high altitude punching device
CN218522164U (en) Scaffold for building engineering
CN218375063U (en) Scaffold frame of high security
CN211647213U (en) Indoor decoration scaffold
CN219138287U (en) Building decoration uses multi-functional tripod
CN220954537U (en) Steel construction overhead working anti-furred ceiling tool equipment
CN219451444U (en) Building climbing frame
CN218406380U (en) Construction scaffold
CN217205203U (en) Multifunctional construction scaffold
CN217028753U (en) Anti-falling maintenance ladder
CN217000732U (en) Engineering construction support

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200828

Termination date: 20211014

CF01 Termination of patent right due to non-payment of annual fee