CN103774902A - 一种污水厂曝气池的防渗堵漏方法 - Google Patents
一种污水厂曝气池的防渗堵漏方法 Download PDFInfo
- Publication number
- CN103774902A CN103774902A CN201210414631.9A CN201210414631A CN103774902A CN 103774902 A CN103774902 A CN 103774902A CN 201210414631 A CN201210414631 A CN 201210414631A CN 103774902 A CN103774902 A CN 103774902A
- Authority
- CN
- China
- Prior art keywords
- hole
- grouting
- water
- cement
- leakage stopping
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Sealing Material Composition (AREA)
- Working Measures On Existing Buildindgs (AREA)
Abstract
一种污水厂曝气池的防渗堵漏方法,包括池壁堵漏和底板堵漏:池壁堵漏方案为:先沿渗漏处凿开一个孔洞,然后在洞底部放入碎石,用快凝水泥胶浆将其与洞壁紧密粘合,同时把灌浆管迅速压入未凝固的水泥胶浆内,最后用水泥胶浆封闭洞口,在完成上述工序并停留1 h后,检查洞口周围没有渗水流出即可进行灌浆;底板堵漏方案为:沿伸缩缝两侧每间隔2 m均匀设置一个灌浆孔,孔与底板呈45°斜角,斜插至伸缩缝下部;然后用快硬水泥胶浆将灌浆嘴固定于灌浆孔洞内进行试灌;灌浆按由一端向另一端循序渐进的方法进行;本发明能够很好地堵漏防渗,施工过程简单,施工后效果良好,能够大幅提升修复后曝气池的使用寿命。
Description
技术领域
本发明涉及建材以及活动房领域,特别涉及一种污水厂曝气池的防渗堵漏方法。
背景技术
污水处理厂中的曝气池由于水质复杂,含有大量有机物,在使用时间长了之后会产生渗漏现象,防渗防漏处理是工程施工的必备的关键技术环节,现有的防渗堵漏处理多采用直接涂抹水泥的方法,使用寿命不长,容易反复出现渗漏。
发明内容
为了克服上述现有技术的不足,本发明的目的在于提供一种污水厂曝气池的防渗堵漏方法。
为了实现上述目的,本发明采用的技术方案是:
一种污水厂曝气池的防渗堵漏方法,包括池壁堵漏和底板堵漏:
池壁堵漏方案为:
先沿渗漏处凿开一个孔洞,然后在洞底部放入碎石,用快凝水泥胶浆将其与洞壁紧密粘合,同时把灌浆管迅速压入未凝固的水泥胶浆内,最后用水泥胶浆封闭洞口,在完成上述工序并停留1 h后,检查洞口周围没有渗水流出即可进行灌浆,浆液的水灰比一般可先按质量比水:水泥=1∶0.8试配,灌浆压力控制在0.1 MPa以内;
底板堵漏方案为:
沿伸缩缝两侧每间隔2 m均匀设置一个灌浆孔,孔与底板呈45°斜角,斜插至伸缩缝下部;然后用快硬水泥胶浆将灌浆嘴固定于灌浆孔洞内;再灌浆嘴埋设固定后约1 h即可进行试灌,灌浆液的水灰比为质量比水:水泥=1∶0.8试配,压力为0.1 MPa;灌浆按由一端向另一端循序渐进的方法进行;实施灌浆后,对砌砖槽重新进行了试水检查,确认没有渗漏问题后,清理灌浆残液,用水泥砂浆将孔口补平抹光。
池壁堵漏方案中灌浆管管口要紧靠洞底部石子,以防管口被封堵。
池壁堵漏方案中灌浆过程,要确保浆液充分灌实,如出现压力表指针突然下降的情况,则掺入3 %水玻璃。
池壁堵漏方案中当混凝土渗水量较大时,每次灌浆几分钟出现较大渗漏时停止施工,停隔30 min后再重新实施灌浆,如此反复多次,直至灌实为止。
与现有技术相比,利用本发明能够很好地堵漏防渗,施工过程简单,施工后效果良好,能够大幅提升修复后曝气池的使用寿命。
具体实施方式
下面结合实施例对本发明进行更详尽的说明。
本发明为一种污水厂曝气池的防渗堵漏方法,包括池壁堵漏和底板堵漏:
池壁堵漏方案为:
先沿渗漏处凿开一个孔洞,然后在洞底部放入碎石,用快凝水泥胶浆将其与洞壁紧密粘合,同时把灌浆管迅速压入未凝固的水泥胶浆内,最后用水泥胶浆封闭洞口,在完成上述工序并停留1 h后,检查洞口周围没有渗水流出即可进行灌浆,浆液的水灰比一般可先按质量比水:水泥=1∶0.8试配,灌浆压力控制在0.1 MPa以内;
底板堵漏方案为:
沿伸缩缝两侧每间隔2 m均匀设置一个灌浆孔,孔与底板呈45°斜角,斜插至伸缩缝下部;然后用快硬水泥胶浆将灌浆嘴固定于灌浆孔洞内;再灌浆嘴埋设固定后约1 h即可进行试灌,灌浆液的水灰比为质量比水:水泥=1∶0.8试配,压力为0.1 MPa;灌浆按由一端向另一端循序渐进的方法进行;实施灌浆后,对砌砖槽重新进行了试水检查,确认没有渗漏问题后,清理灌浆残液,用水泥砂浆将孔口补平抹光。
池壁堵漏方案中灌浆管管口要紧靠洞底部石子,以防管口被封堵。
池壁堵漏方案中灌浆过程,要确保浆液充分灌实,如出现压力表指针突然下降的情况,则掺入3 %水玻璃。
Claims (4)
1.一种污水厂曝气池的防渗堵漏方法,其特征在于,包括池壁堵漏和底板堵漏:
池壁堵漏方案为:
先沿渗漏处凿开一个孔洞,然后在洞底部放入碎石,用快凝水泥胶浆将其与洞壁紧密粘合,同时把灌浆管迅速压入未凝固的水泥胶浆内,最后用水泥胶浆封闭洞口,在完成上述工序并停留1 h后,检查洞口周围没有渗水流出即可进行灌浆,浆液的水灰比一般可先按质量比水:水泥=1∶0.8试配,灌浆压力控制在0.1 MPa以内;
底板堵漏方案为:
沿伸缩缝两侧每间隔2 m均匀设置一个灌浆孔,孔与底板呈45°斜角,斜插至伸缩缝下部;然后用快硬水泥胶浆将灌浆嘴固定于灌浆孔洞内;再灌浆嘴埋设固定后约1 h即可进行试灌,灌浆液的水灰比为质量比水:水泥=1∶0.8试配,压力为0.1 MPa;灌浆按由一端向另一端循序渐进的方法进行;实施灌浆后,对砌砖槽重新进行了试水检查,确认没有渗漏问题后,清理灌浆残液,用水泥砂浆将孔口补平抹光。
2.根据权利要求1所述的污水厂曝气池的防渗堵漏方法,其特征在于,池壁堵漏方案中灌浆管管口要紧靠洞底部石子,以防管口被封堵。
3.根据权利要求1所述的污水厂曝气池的防渗堵漏方法,其特征在于,池壁堵漏方案中灌浆过程,要确保浆液充分灌实,如出现压力表指针突然下降的情况,则掺入3 %水玻璃。
4.根据权利要求1所述的污水厂曝气池的防渗堵漏方法,其特征在于,池壁堵漏方案中当混凝土渗水量较大时,每次灌浆几分钟出现较大渗漏时停止施工,停隔30 min后再重新实施灌浆,如此反复多次,直至灌实为止。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210414631.9A CN103774902A (zh) | 2012-10-25 | 2012-10-25 | 一种污水厂曝气池的防渗堵漏方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210414631.9A CN103774902A (zh) | 2012-10-25 | 2012-10-25 | 一种污水厂曝气池的防渗堵漏方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103774902A true CN103774902A (zh) | 2014-05-07 |
Family
ID=50567608
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210414631.9A Pending CN103774902A (zh) | 2012-10-25 | 2012-10-25 | 一种污水厂曝气池的防渗堵漏方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103774902A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107268648A (zh) * | 2017-06-14 | 2017-10-20 | 中国葛洲坝集团第六工程有限公司 | 一种基岩渗水抽排方法 |
CN108411949A (zh) * | 2018-03-28 | 2018-08-17 | 中国建筑第八工程局有限公司 | 地下室底板沼气渗漏点加固封闭结构及处理方法 |
-
2012
- 2012-10-25 CN CN201210414631.9A patent/CN103774902A/zh active Pending
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107268648A (zh) * | 2017-06-14 | 2017-10-20 | 中国葛洲坝集团第六工程有限公司 | 一种基岩渗水抽排方法 |
CN108411949A (zh) * | 2018-03-28 | 2018-08-17 | 中国建筑第八工程局有限公司 | 地下室底板沼气渗漏点加固封闭结构及处理方法 |
CN108411949B (zh) * | 2018-03-28 | 2020-02-07 | 中国建筑第八工程局有限公司 | 地下室底板沼气渗漏点加固封闭结构及处理方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107387123B (zh) | 针对盾构管片拼缝渗漏现象进行压力灌浆堵漏的施工方法 | |
CN106013259B (zh) | 震动扰动环境下的地下工程混凝土结构变形缝堵漏方法 | |
CN101914917B (zh) | 软土地区地铁基坑开挖用防渗堵漏施工方法 | |
CN202730973U (zh) | 混凝土外墙螺栓孔防渗漏结构 | |
CN106321121A (zh) | 一种用于地下工程的抗震动扰动裂缝的堵漏加固方法 | |
CN107060116B (zh) | 一种用于建筑物沉降缝的高压注浆堵漏方法 | |
CN105350556A (zh) | 一种新材料地下结构堵漏施工工艺 | |
CN113107018B (zh) | 一种地下构筑物结构裂缝渗漏水处理工法 | |
CN103821114B (zh) | 一种在渗水压力作用下废弃的水库涵洞封堵方法 | |
CN102505663A (zh) | 一种浓缩池、水池渗漏修复方法 | |
CN109629845A (zh) | 混凝土结构接缝部位漏水处理装置及其施工方法 | |
CN105442861B (zh) | 卫生间排水管道渗漏水背水面修复方法 | |
CN107165434B (zh) | 一种用于卫生间楼面的高压注浆堵漏方法 | |
CN105239729B (zh) | 已施工屋面后开洞穿管修复的施工方法 | |
CN101672187A (zh) | 一种防渗水处理方法 | |
CN104652495A (zh) | 基坑内支撑立柱与底板节点防水施工工艺 | |
CN207959289U (zh) | 一种用于地下室后浇带部位的漏水修补结构 | |
CN103774902A (zh) | 一种污水厂曝气池的防渗堵漏方法 | |
CN103205986A (zh) | 混凝土筏基施工缝处注浆装置及方法 | |
CN110552378A (zh) | 地下空间顶板沉降后浇带提前封闭结构 | |
KR100920963B1 (ko) | 고성능 그라우트재를 이용한 이음부의 누수보강구조 및누수보강공법 | |
CN204533836U (zh) | 管道穿楼板防渗漏装置 | |
CN105781580A (zh) | 隧洞裂缝修补的方法 | |
KR102356751B1 (ko) | 타일이나 석재를 철거하지 않는 트랜치 방수 보수 시공시스템 | |
CN104963364A (zh) | 盖挖逆作法结构板下侧墙施工缝的处理方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20140507 |