CN103758520A - Sharp inclined coal seam flexible shield support multi-step coal mining method - Google Patents

Sharp inclined coal seam flexible shield support multi-step coal mining method Download PDF

Info

Publication number
CN103758520A
CN103758520A CN201310743965.5A CN201310743965A CN103758520A CN 103758520 A CN103758520 A CN 103758520A CN 201310743965 A CN201310743965 A CN 201310743965A CN 103758520 A CN103758520 A CN 103758520A
Authority
CN
China
Prior art keywords
storehouse
adopt
ladder
storehouses
push
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310743965.5A
Other languages
Chinese (zh)
Other versions
CN103758520B (en
Inventor
耿养谋
常宝才
马植胜
王新华
牛凤祥
王忠武
常士东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Haohua Energy Resource Co Ltd
Original Assignee
Beijing Haohua Energy Resource Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Haohua Energy Resource Co Ltd filed Critical Beijing Haohua Energy Resource Co Ltd
Priority to CN201310743965.5A priority Critical patent/CN103758520B/en
Publication of CN103758520A publication Critical patent/CN103758520A/en
Application granted granted Critical
Publication of CN103758520B publication Critical patent/CN103758520B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Ladders (AREA)

Abstract

The invention discloses a sharp inclined coal seam flexible shield support multi-step coal mining method which comprises the steps of step formation, hole drilling, blasting, coal digging, support and hole support disassembly. The method disclosed by the invention has the advantages of simple roadway layout and strong adaptability to geological change, and can realize multi-point synchronous operation, thereby increasing the single face output.

Description

A kind of half-edge coal seam flexible type shield staged coal-mining method
Technical field
The present invention relates to a kind of coal-mining method.Be specifically related to a kind of half-edge coal seam flexible type shield staged coal-mining method.
Background technology
In steeply-inclined seam mining process, exploitation is in the past all that separate unit stepwise is produced, and production efficiency is low, and workman's safety is also influenced, so the mode of consideration design multi-stage stairs is mined, improves the safety production situation of half-edge coal seam.
Summary of the invention
The object of the invention is to realize the back production simultaneously of many steps, improve the single rate of half-edge coal seam work plane, and ensure the safety of operating worker.
In order to achieve the above object, the present invention has following technical scheme:
A kind of half-edge coal seam flexible type shield of the present invention staged coal-mining method, comprises the following steps:
(1) ladder forms technique
The first step: No. 1 eye mouthful support is torn in storehouse open; upwards push to adopt 6.0 meters of layout No. 1 storehouses, the 1st ladder →, No. 1 storehouse and tear again an eye mouthful support open; upwards push to adopt 1.0-2.0 rice and arrange that two, No. 1 storehouse, the 2nd ladder →, No. 1 storehouse ladder pushes to adopt forward No. 1 storehouse, 4.0-5.0 rice → simultaneously and tears eye mouthful support open again, upwards push to adopt 1.0-2.0 rice and arrange No. 1 the 3rd, storehouse ladder;
(2) normally push to adopt
Second step: in No. 1 storehouse, 3 ladders normally push to adopt simultaneously, treats that No. 1 the 1st, storehouse ladder pushes to adopt 5 meters of No. 1 storehouse upper ends of distance and stops;
(3) pushing to adopt No. 1 storehouse upper end or more than 2 storehouse changeover portion
The 3rd step: first carry out No. 2 storehouses and tear eye mouthful support open, upwards push to adopt 6.0 meters and arrange No. 2 the 1st, storehouse ladders;
The 4th step: then carry out the 1st ladder in No. 1 storehouse and push to adopt 5 meters to No. 2 Cang Yankou position;
The 5th step: continue the 2nd, 3 ladders in No. 1 storehouse to push to adopt simultaneously, treat that the 2nd ladder pushes to adopt 5 meters, No. 1 storehouse upper end of distance or No. 2 storehouses and stop in No. 1 the storehouse in;
The 6th step: tear eye mouthful support open from No. 2 storehouses more again, upwards push to adopt 1.0-2.0 rice and arrange No. 2 the 2nd, storehouse ladders, then No. 2 two, storehouse ladders push to adopt forward 4.0-5.0 rice simultaneously;
The 7th step: continue the 2nd ladder in No. 1 storehouse to push to adopt 5 meters to No. 2 Cang Yankou position;
The 8th step: tear again eye mouthful support open from No. 2 storehouses again, upwards push to adopt 1.0-2.0 rice and arrange No. 2 the 3rd, storehouse ladders;
The 9th step: and then the 3rd ladder in No. 1 storehouse pushed to adopt to No. 2 Cang Yankou positions, so far No. 1 storehouse has all pushed to adopt;
The tenth step: 3 ladders in No. 2 storehouses are pushed to adopt simultaneously, treat in No. 2 storehouses that the 1st ladder pushes to adopt apart from 5 meters of No. 3 storehouse upper ends to stop;
The 11 step: repeated the storehouse that the way in No. 2 storehouse is left excessively, that is: eye mouthful support is torn in No. 3 storehouses open, upwards push to adopt 6.0 meters and arrange No. 3 the 1st, storehouse ladders, in No. 2 storehouses, the 1st ladder pushes to adopt 5 meters to No. 3 storehouse eye mouth, in No. 2 storehouses the 2nd, 3 ladders push to adopt simultaneously, treating in No. 2 storehouses that the 2nd ladder pushes to adopt apart from 5 meters of No. 2 storehouse upper ends stops, No. 3 eye mouthful support is torn in storehouse again open, upwards push to adopt 1.0-2.0 rice and arrange No. 3 the 2nd, storehouse ladders, No. 3 two, storehouse ladder pushes to adopt forward 4.0-5.0 rice simultaneously, in No. 2 storehouses, the 2nd ladder pushes to adopt 5 meters to No. 3 storehouse eye mouth, No. 3 eye mouthful support is torn in storehouse again open, upwards push to adopt 1.0-2.0 rice and arrange No. 3 the 3rd, storehouse ladders, in No. 2 storehouses, the 3rd ladder pushes to adopt to No. 3 storehouse eye mouths, in No. 3 storehouses, 3 ladders push to adopt simultaneously, treating in No. 3 storehouses that the 1st ladder pushes to adopt apart from 5 meters of No. 3 storehouse upper ends stops, push to adopt in No. 3 storehouses the 1st ladder to upper end, in No. 3 storehouses the 2nd, 3 ladders push to adopt simultaneously, treating that the 2nd ladder adopted to 5 meters of No. 3 storehouse upper ends stops, push to adopt in No. 3 storehouses the 2nd ladder to upper end, push to adopt in No. 3 storehouses the 3rd ladder to upper end.
Wherein, 3 of ladder numbers in each storehouse.
Wherein, ladder height is less than or equal to 1.2 meters.
Wherein, the length 4.0-5.0 rice between ladder.
Wherein, the work plane gradient is less than or equal to 25 degree.
Owing to having taked above technical scheme, the invention has the advantages that: tunnel is arranged simple, qualitative change strong adaptability over the ground, can realize multiple spot operation simultaneously, has improved single face output.
Accompanying drawing explanation
Fig. 1 is first ladder arrangement diagram;
Fig. 2 is second ladder arrangement diagram;
Fig. 3 is the 3rd ladder arrangement diagram;
Fig. 4 is that the first ladder pushes to adopt figure.
The specific embodiment
Below implement to be used for illustrating the present invention, but be not used for limiting the scope of the invention.
Referring to Fig. 1-Fig. 4, technological process of the present invention comprises:
One, ladder forms
A: scheme one
(1) ladder forms technique
The first step: No. 1 eye mouthful support is torn in storehouse open, upwards push to adopt 6.0 meters of layout No. 1 storehouses, the 1st ladder →, No. 1 storehouse and tear again an eye mouthful support open, upwards push to adopt 1.0-2.0 rice and arrange that two, No. 1 storehouse, the 2nd ladder →, No. 1 storehouse ladder pushes to adopt forward No. 1 storehouse, 4.0-5.0 rice → simultaneously and tears eye mouthful support open again, upwards push to adopt 1.0-2.0 rice and arrange No. 1 the 3rd, storehouse ladder;
(2) normally push to adopt
Second step: in No. 1 storehouse, 3 ladders normally push to adopt simultaneously, treats that No. 1 the 1st, storehouse ladder pushes to adopt 5 meters of No. 1 storehouse upper ends of distance and stops;
(3) pushing to adopt No. 1 storehouse upper end or more than 2 storehouse changeover portion
The 3rd step: first carry out No. 2 storehouses and tear eye mouthful support open, upwards push to adopt 6.0 meters and arrange No. 2 the 1st, storehouse ladders;
The 4th step: then carry out the 1st ladder in No. 1 storehouse and push to adopt 5 meters to No. 2 Cang Yankou position;
The 5th step: continue the 2nd, 3 ladders in No. 1 storehouse to push to adopt simultaneously, treat that the 2nd ladder pushes to adopt distance No. 1 storehouse upper end (or No. 2 storehouses) 5 meters and stop in No. 1 the storehouse in;
The 6th step: tear again again an eye mouthful support from No. 2 storehouses open, upwards push to adopt 1.0-2.0 rice and arrange No. 2 the 2nd, storehouse ladders → then No. 2 two, storehouse ladders push to adopt forward 4.0-5.0 rice simultaneously;
The 7th step: continue the 2nd ladder in No. 1 storehouse to push to adopt 5 meters to No. 2 Cang Yankou position;
The 8th step: tear again eye mouthful support open from No. 2 storehouses again, upwards push to adopt 1.0-2.0 rice and arrange No. 2 the 3rd, storehouse ladders;
The 9th step: and then the 3rd ladder in No. 1 storehouse pushed to adopt to No. 2 Cang Yankou positions so far to No. 1 storehouse all to have pushed to adopt;
The tenth step: 3 ladders in No. 2 storehouses are pushed to adopt simultaneously, treat in No. 2 storehouses that the 1st ladder pushes to adopt apart from 5 meters of No. 3 storehouse upper ends to stop;
The 11 step: repeated the storehouse that the way in No. 2 storehouse is left excessively, that is: eye mouthful support is torn in No. 3 storehouses open, upwards push to adopt 6.0 meters and arrange in No. 2 storehouses, the 1st ladder →, No. 3 storehouses that the 1st ladder pushes to adopt in No. 2 storehouse, eye mouth →, 5 meters to No. 3 storehouses the 2nd, 3 ladders push to adopt simultaneously, treat in No. 2 storehouses the 2nd ladder push to adopt apart from 5 meters of No. 2 storehouse upper ends stop → No. 3 an eye mouthful support is torn in storehouse again open, upwards push to adopt 1.0-2.0 rice and arrange that two ladders in No. 3 storehouse, the 2nd ladder →, No. 3 storehouses push to adopt forward the 2nd ladder simultaneously in the No. 2 storehouse, 4.0-5.0 rice → in and push to adopt No. 3 storehouse, eye mouth →, 5 meters to No. 3 storehouses and tear an eye mouth support open again, upwards pushing to adopt 1.0-2.0 rice arranges in No. 2 storehouse, the 3rd ladder →, No. 3 storehouses that the 3rd ladder pushes to adopt to 3 ladders in No. 3 storehouse, eye mouth →, No. 3 storehouses and pushes to adopt simultaneously, treating in No. 3 storehouses that the 1st ladder pushes to adopt apart from 5 meters of No. 3 storehouse upper ends stops → pushes to adopt in No. 3 storehouses the 1st ladder in No. 3 storehouse, upper end → the 2nd, 3 ladders push to adopt simultaneously, treat the 2nd ladder adopt to 5 meters of No. 3 storehouse upper ends stop → push to adopt in No. 3 storehouses the 2nd ladder to upper end → push to adopt in No. 3 storehouses the 3rd ladder to upper end.
B: scheme two
(1) ladder forms technique
The first step: No. 1 eye mouthful support is torn in storehouse open, upwards push to adopt 6.0 meters of layout No. 1 storehouses, the 1st ladder →, No. 1 storehouse and tear again an eye mouthful support open, upwards push to adopt 1.0-2.0 rice and arrange that two, No. 1 storehouse, the 2nd ladder →, No. 1 storehouse ladder pushes to adopt forward No. 1 storehouse, 4.0-5.0 rice → simultaneously and tears eye mouthful support open again, upwards push to adopt 1.0-2.0 rice and arrange No. 1 the 3rd, storehouse ladder;
(2) normally push to adopt
Second step: in No. 1 storehouse, 3 ladders push to adopt simultaneously, treats in No. 1 storehouse that the 1st ladder pushes to adopt to No. 2 Cang Yankou positions to stop;
(3) pushing to adopt No. 1 storehouse upper end or more than 2 storehouse changeover portion
The 3rd step: tear eye mouthful support open in No. 2 storehouses, upwards push to adopt 6.0 meters and arrange No. 2 the 1st, storehouse ladders;
The 4th step: then continue the 2nd, 3 ladders in No. 1 storehouse to push to adopt simultaneously, treat in No. 1 storehouse that the 2nd ladder pushes to adopt to No. 2 Cang Yankou positions to stop;
The 5th step: tear again again an eye mouthful support from No. 2 storehouses open, upwards push to adopt 1.0-2.0 rice and arrange No. 2 the 2nd, storehouse ladders → then No. 2 two, storehouse ladders are pushed to adopt forward to 4.0-5.0 rice simultaneously;
The 6th step: again the 3rd ladder in No. 1 storehouse pushed to adopt to No. 2 storehouse eye mouths;
The 7th step: tear again again an eye mouthful support from No. 2 storehouses open, upwards push to adopt 1.0-2.0 rice and arrange that in No. 2 storehouses of No. 2 the 3rd, storehouse ladders → then, 3 ladders push to adopt simultaneously, treat in No. 2 storehouses that the 1st ladder pushes to adopt to No. 3 Cang Yankou positions to stop;
The 8th step: repeated the storehouse that the way in No. 2 storehouse is left excessively, that is: eye mouthful support is torn in No. 3 storehouses open, upwards push to adopt 6.0 meters and arrange in No. 2 storehouses, the 1st ladder →, No. 3 storehouses the 2nd, 3 ladders push to adopt simultaneously, treat in No. 2 storehouses that the 2nd ladder pushes to adopt and to No. 3 storehouse, eye mouth →, No. 3 storehouses, tear again an eye mouthful support open, upwards push to adopt 1.0-2.0 rice and arrange that two ladders in No. 3 storehouse, the 2nd ladder →, No. 3 storehouses push to adopt forward the 3rd ladder simultaneously in the No. 2 storehouse, 4.0-5.0 rice → in and push to adopt and to No. 3 storehouse, eye mouth →, No. 3 storehouses, tear an eye mouth support open again, upwards push to adopt 1.0-2.0 rice and arrange that in No. 3 storehouse, the 3rd ladder →, No. 3 storehouses, the 3rd ladder pushes to adopt simultaneously, treating in No. 3 storehouses that the 1st ladder pushes to adopt to 5 meters of No. 3 storehouse upper ends stops → pushes to adopt in No. 3 storehouses the 1st ladder in No. 3 storehouse, upper end → the 2nd, 3 ladders push to adopt simultaneously, treat the 2nd ladder adopt to 5 meters of No. 3 storehouse upper ends stop → push to adopt in No. 3 storehouses the 2nd ladder to upper end → push to adopt in No. 3 storehouses the 3rd ladder to upper end.
In implementation process, should be noted that item:
While 1, tearing eye mouth open, to tear in time tailstock open.
While 2, pushing to adopt, in each storehouse, each ladder must be pushed ahead simultaneously, mustn't push to adopt by single ladder.
3, in each storehouse, each ladder pushes to adopt progress and wants consistent, forbids two ladders to push to adopt together.
When 4, upper and lower storehouse pushes to adopt simultaneously, upper storehouse descends the mistake in storehouse apart from the height that can not exceed a ladder in advance.
In time continuous frame when 5, upper end pushes to adopt.According to the former soft coal-mining method of covering, push to adopt.
Two, perforating, blow out
1, borehole arrangement, quantity, angle, will be according to coal seam thickness, hardness clear and definite regulation in operating regulation.
2, borehole depth must not exceed 2 meters.
3,, during hole placing, keep as far as possible in each ladder, having an effective single-column of supporting after banger.
4,, according to seam hardness, in operating regulation blasting chart, clearly stipulate charging means, dose and firing order.
5, in each storehouse, must a powder charge of all ladders detonate simultaneously.
Three, take off coal and supporting
While 1, taking off coal after banger, must, from the most next ladder in each storehouse, upwards take off successively coal, forbid two or more ladders to take off coal simultaneously.
2, the regulation that strict implement " is taken off and made a call to ".Take off enough posts apart from making a call to a column, column spacing is not more than 1.5 meters, and will be according to top board exposed area and roof condition, complement band cap stull in time.
3, work plane side drawing coal technology and technical safety measures must clearly stipulate in operating regulation.Within the scope of 5 meters of each rise race eye mouth and upper ends, frame back pad layer thickness is less than near 3 meters, side coal discharge outlet the point post of 5 meters of scope inner supports and supports defective and support bottom, side coal discharge outlet place and do not accomplish fluently before a post, all forbids to be sidelong coal operation after frame.
4, after wanting clear and definite work plane to push to adopt in operating regulation, get the spacing of post and stull ready, specify roof cracking or support upper limbs and leave the technical safety measures that should take after top board.
Four, tear eye mouthful support open
1, eye mouthful place must transfer in time support and accomplish fluently a post (coupled columns) and stull effectively control well eye mouthful place a flexible shield support, reduce eye mouthful locate a top board exposed area.
2, often follow from eye mouth and push to adopt and start new circulation time, the only accurate mode of tearing rare back-propping plate (each at most only accurate backboard of tearing 1 rare open) open that adopts, forbid directly eye mouth support to be removed and pushed to adopt, guarantee that ladder height is not more than 1.2 meters, treat that ladder pushes to adopt 6 meters of rear dismountable eye mouthful place's supports.
3, when tunnel is widened the view mouthful (layout ladder), the mode that must clearly stipulate in operating regulation to widen the view mouthful, supporting requirement and the technical safety measures at eye mouthful place.
4, tear the front supporting that must overhaul eye mouthful Xia20 meter Li lane of frame open, scarce vertical brace, backboard, timely replacement, and top board stone alive is processed clean.
5, tearing frame open must from top to bottom be undertaken by frame, tears frame mode open and must clearly stipulate in operating regulation with the safety specifications of tearing frame open.
Obviously, the above embodiment of the present invention is only for example of the present invention is clearly described, and is not the restriction to embodiments of the present invention.For those of ordinary skill in the field, can also make other changes in different forms on the basis of the above description.Here cannot give exhaustive to all embodiments.Everyly belong to apparent variation or the still row in protection scope of the present invention of variation that technical scheme of the present invention extends out.

Claims (5)

1. a half-edge coal seam flexible type shield staged coal-mining method, is characterized in that, comprises the following steps:
(1) ladder forms technique
The first step: No. 1 eye mouthful support is torn in storehouse open; upwards push to adopt 6.0 meters of layout No. 1 storehouses, the 1st ladder →, No. 1 storehouse and tear again an eye mouthful support open; upwards push to adopt 1.0-2.0 rice and arrange that two, No. 1 storehouse, the 2nd ladder →, No. 1 storehouse ladder pushes to adopt forward No. 1 storehouse, 4.0-5.0 rice → simultaneously and tears eye mouthful support open again, upwards push to adopt 1.0-2.0 rice and arrange No. 1 the 3rd, storehouse ladder;
(2) normally push to adopt
Second step: in No. 1 storehouse, 3 ladders normally push to adopt simultaneously, treats that No. 1 the 1st, storehouse ladder pushes to adopt 5 meters of No. 1 storehouse upper ends of distance and stops;
(3) pushing to adopt No. 1 storehouse upper end or more than 2 storehouse changeover portion
The 3rd step: first carry out No. 2 storehouses and tear eye mouthful support open, upwards push to adopt 6.0 meters and arrange No. 2 the 1st, storehouse ladders;
The 4th step: then carry out the 1st ladder in No. 1 storehouse and push to adopt 5 meters to No. 2 Cang Yankou position;
The 5th step: continue the 2nd, 3 ladders in No. 1 storehouse to push to adopt simultaneously, treat that the 2nd ladder pushes to adopt 5 meters, No. 1 storehouse upper end of distance or No. 2 storehouses and stop in No. 1 the storehouse in;
The 6th step: tear eye mouthful support open from No. 2 storehouses more again, upwards push to adopt 1.0-2.0 rice and arrange No. 2 the 2nd, storehouse ladders, then No. 2 two, storehouse ladders push to adopt forward 4.0-5.0 rice simultaneously;
The 7th step: continue the 2nd ladder in No. 1 storehouse to push to adopt 5 meters to No. 2 Cang Yankou position;
The 8th step: tear again eye mouthful support open from No. 2 storehouses again, upwards push to adopt 1.0-2.0 rice and arrange No. 2 the 3rd, storehouse ladders;
The 9th step: and then the 3rd ladder in No. 1 storehouse pushed to adopt to No. 2 Cang Yankou positions so far to No. 1 storehouse all to have pushed to adopt;
The tenth step: 3 ladders in No. 2 storehouses are pushed to adopt simultaneously, treat in No. 2 storehouses that the 1st ladder pushes to adopt apart from 5 meters of No. 3 storehouse upper ends to stop;
The 11 step: repeated the storehouse that the way in No. 2 storehouse is left excessively, that is: eye mouthful support is torn in No. 3 storehouses open, upwards push to adopt 6.0 meters and arrange No. 3 the 1st, storehouse ladders, in No. 2 storehouses, the 1st ladder pushes to adopt 5 meters to No. 3 storehouse eye mouth, in No. 2 storehouses the 2nd, 3 ladders push to adopt simultaneously, treating in No. 2 storehouses that the 2nd ladder pushes to adopt apart from 5 meters of No. 2 storehouse upper ends stops, No. 3 eye mouthful support is torn in storehouse again open, upwards push to adopt 1.0-2.0 rice and arrange No. 3 the 2nd, storehouse ladders, No. 3 two, storehouse ladder pushes to adopt forward 4.0-5.0 rice simultaneously, in No. 2 storehouses, the 2nd ladder pushes to adopt 5 meters to No. 3 storehouse eye mouth, No. 3 eye mouthful support is torn in storehouse again open, upwards push to adopt 1.0-2.0 rice and arrange No. 3 the 3rd, storehouse ladders, in No. 2 storehouses, the 3rd ladder pushes to adopt to No. 3 storehouse eye mouths, in No. 3 storehouses, 3 ladders push to adopt simultaneously, treating in No. 3 storehouses that the 1st ladder pushes to adopt apart from 5 meters of No. 3 storehouse upper ends stops, push to adopt in No. 3 storehouses the 1st ladder to upper end, in No. 3 storehouses the 2nd, 3 ladders push to adopt simultaneously, treating that the 2nd ladder adopted to 5 meters of No. 3 storehouse upper ends stops, push to adopt in No. 3 storehouses the 2nd ladder to upper end, push to adopt in No. 3 storehouses the 3rd ladder to upper end.
2. a kind of half-edge coal seam flexible type shield staged coal-mining method as claimed in claim 1, is characterized in that 3 of ladder numbers in each storehouse.
3. a kind of half-edge coal seam flexible type shield staged coal-mining method as claimed in claim 1, is characterized in that, ladder height is less than or equal to 1.2 meters.
4. a kind of half-edge coal seam flexible type shield staged coal-mining method as claimed in claim 1, is characterized in that the length 4.0-5.0 rice between ladder.
5. a kind of half-edge coal seam flexible type shield staged coal-mining method as claimed in claim 1, is characterized in that, the work plane gradient is less than or equal to 25 degree.
CN201310743965.5A 2013-12-28 2013-12-28 A kind of half-edge coal seam flexible type shield staged coal-mining method Active CN103758520B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310743965.5A CN103758520B (en) 2013-12-28 2013-12-28 A kind of half-edge coal seam flexible type shield staged coal-mining method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310743965.5A CN103758520B (en) 2013-12-28 2013-12-28 A kind of half-edge coal seam flexible type shield staged coal-mining method

Publications (2)

Publication Number Publication Date
CN103758520A true CN103758520A (en) 2014-04-30
CN103758520B CN103758520B (en) 2016-10-05

Family

ID=50525819

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310743965.5A Active CN103758520B (en) 2013-12-28 2013-12-28 A kind of half-edge coal seam flexible type shield staged coal-mining method

Country Status (1)

Country Link
CN (1) CN103758520B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103993883A (en) * 2014-05-20 2014-08-20 四川省华蓥山煤业股份有限公司李子垭南煤矿 Sharp inclined coal seam flexible shield support mining method
CN109779630A (en) * 2019-02-20 2019-05-21 北京昊华能源股份有限公司 A kind of half-edge coal seam coal-mining method

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4512610A (en) * 1983-05-27 1985-04-23 Mobil Oil Corporation Mining system
CN1474032A (en) * 2003-08-08 2004-02-11 中南大学 Continuous mining method of stepped sectional extruding and ore caving followed by filling
CN1546839A (en) * 2003-12-11 2004-11-17 云南驰宏锌锗股份有限公司 Ladder type mining method using united pillars to support roof and partition stope
CN1657745A (en) * 2005-03-03 2005-08-24 开滦(集团)有限责任公司 Coal-minin method of high-dipping thick seam
CN101307692A (en) * 2008-07-14 2008-11-19 邹开科 Sharply inclined coal seam mining method
CN101429867A (en) * 2008-12-13 2009-05-13 山西焦煤集团有限责任公司 Major cycle slanting extraction method for coal mining work surface
CN101818643A (en) * 2010-05-18 2010-09-01 中南大学 Stepped non-pillar continuous filling mining method for deep well super high large breaking ore body panel
CN102418526A (en) * 2011-12-02 2012-04-18 瓮福(集团)有限责任公司 High-sublevel subdivision mining method of moderately thick heavy-pitch waste-rock-containing interlayer phosphate orebody along strike
CN102562066A (en) * 2012-01-16 2012-07-11 袁野 Method for mechanically mining coal by using steep seam pseudo inclination bracing type retractable flexible shield support
CN103061764A (en) * 2012-12-14 2013-04-24 北京昊华能源股份有限公司 Goaf waste rock filling coal mining method of flexible shield support in half-edge coal seam

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4512610A (en) * 1983-05-27 1985-04-23 Mobil Oil Corporation Mining system
CN1474032A (en) * 2003-08-08 2004-02-11 中南大学 Continuous mining method of stepped sectional extruding and ore caving followed by filling
CN1546839A (en) * 2003-12-11 2004-11-17 云南驰宏锌锗股份有限公司 Ladder type mining method using united pillars to support roof and partition stope
CN1657745A (en) * 2005-03-03 2005-08-24 开滦(集团)有限责任公司 Coal-minin method of high-dipping thick seam
CN101307692A (en) * 2008-07-14 2008-11-19 邹开科 Sharply inclined coal seam mining method
CN101429867A (en) * 2008-12-13 2009-05-13 山西焦煤集团有限责任公司 Major cycle slanting extraction method for coal mining work surface
CN101818643A (en) * 2010-05-18 2010-09-01 中南大学 Stepped non-pillar continuous filling mining method for deep well super high large breaking ore body panel
CN102418526A (en) * 2011-12-02 2012-04-18 瓮福(集团)有限责任公司 High-sublevel subdivision mining method of moderately thick heavy-pitch waste-rock-containing interlayer phosphate orebody along strike
CN102562066A (en) * 2012-01-16 2012-07-11 袁野 Method for mechanically mining coal by using steep seam pseudo inclination bracing type retractable flexible shield support
CN103061764A (en) * 2012-12-14 2013-04-24 北京昊华能源股份有限公司 Goaf waste rock filling coal mining method of flexible shield support in half-edge coal seam

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
霍丙杰: "复杂难采煤层评价方法与开采技术研究", 《中国博士学位论文全文数据库 工程科技Ⅰ辑》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103993883A (en) * 2014-05-20 2014-08-20 四川省华蓥山煤业股份有限公司李子垭南煤矿 Sharp inclined coal seam flexible shield support mining method
CN109779630A (en) * 2019-02-20 2019-05-21 北京昊华能源股份有限公司 A kind of half-edge coal seam coal-mining method

Also Published As

Publication number Publication date
CN103758520B (en) 2016-10-05

Similar Documents

Publication Publication Date Title
CN108612530B (en) Mining method for hanging wall surrounding rock crushing inclined medium-thickness ore body
CN104989404B (en) It is pseudo- in Steeply dipping narrow deposits arteries and veins to tilt ore deposit Medium-long hole mining method
CN105569659B (en) A kind of tunnel hydraulic slotted liner technique directional blasting cuts top pressure relief method
CN103696769B (en) Upward shrinkage spaced charging fractional blasting slot-drawing method
CN102182461A (en) Efficient mining method for thick metal ore body in slanting
CN104806244A (en) Filling mining method for slant middle-thick ore body
CN205825826U (en) A kind of mine slope presplit blasting big gun pore structure
CN105134286B (en) L-type well goaf gas pumping method
CN101368482B (en) Novel technique of slight-pitch ore body overall mining method
CN105735996A (en) Presplitting type wall cutting and filling stoping method for thin ore vein
CN105422102B (en) A kind of vertical medium-length hole ore blast subsection access back-filling method
CN106121652A (en) Closed pit open-pit mine ore recovery method
CN103557001B (en) A kind of low section high oper cylinler shrink afterwards filling mining method
CN204627657U (en) Coal mine gas ground extraction casing programme
CN103982186A (en) Bottom-pillar-free retreating vertical inclined strip sublevel caving mining method
CN104847350A (en) Method for treating suspended roof by medium-length hole blasting
CN103758520A (en) Sharp inclined coal seam flexible shield support multi-step coal mining method
US4458947A (en) Mining method
CN104343453A (en) Filling mining method of slowly-inclined medium-thick ore deposit
CN104153782B (en) Progressive caving mining method
CN103982185B (en) Upright opening and lateral aperture work in coordination with the mechanization sublevel cut and fill method of back production
CN105863727A (en) Method for treating pillar goaf
CN105298493A (en) Nondestructive explosion mining method for underground gently-inclined thin-layered jade mine
CN103982184B (en) Underground mine oper cylinler caved stopes falls the directed landing control method of ore
CN107131805B (en) Mining method for improving ore removal grade of underground caving stope

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant