CN103741939A - Climbing type building construction operating platform on outer portion of building and installing method - Google Patents

Climbing type building construction operating platform on outer portion of building and installing method Download PDF

Info

Publication number
CN103741939A
CN103741939A CN201310725001.8A CN201310725001A CN103741939A CN 103741939 A CN103741939 A CN 103741939A CN 201310725001 A CN201310725001 A CN 201310725001A CN 103741939 A CN103741939 A CN 103741939A
Authority
CN
China
Prior art keywords
platform
wall
stock
building
attached
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310725001.8A
Other languages
Chinese (zh)
Other versions
CN103741939B (en
Inventor
王乔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Construction Engineering Quality Inspection And Testing Center Co ltd
Shandong Provincial Academy of Building Research
Original Assignee
Shandong Provincial Academy of Building Research
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Provincial Academy of Building Research filed Critical Shandong Provincial Academy of Building Research
Priority to CN201310725001.8A priority Critical patent/CN103741939B/en
Publication of CN103741939A publication Critical patent/CN103741939A/en
Application granted granted Critical
Publication of CN103741939B publication Critical patent/CN103741939B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Ladders (AREA)

Abstract

The invention provides a climbing type building construction operating platform on the outer portion of a building and an installing method. The climbing type building construction operating platform on the outer portion of the building comprises a column and a platform. A platform sleeve frame, a movable wall attaching sleeve frame and a bottom wall attaching frame which can all move up and down along the column are arranged from top to bottom. The platform is installed on the platform sleeve frame; when the platform runs along the column, the platform sleeve frame is not connected with the building, the movable wall attaching sleeve frame is provided with a plurality of clamping mechanisms so that the movable wall attaching sleeve frame can clamp a column main limb, the movable wall attaching sleeve frame is connected with the building, and the bottom wall attaching frame is connected with the building through a detachable wall attaching frame. When the movable wall attaching sleeve frame moves along the column, the platform sleeve frame, the movable wall attaching sleeve frame and the bottom wall attaching frame are connected with the building through detachable wall attaching frames; when the column performs climbing along the platform sleeve frame and the movable wall attaching sleeve frame, the platform sleeve frame and the movable wall attaching sleeve frame are connected with the building through the detachable wall attaching frames, and the bottom wall attaching frame is not connected with the building.

Description

The outside climbing type CONSTRUCTION OPERATIONS platform of building and mounting method
Technical field
The present invention relates to a kind of building operations operating platform, be specifically related to the outside climbing type CONSTRUCTION OPERATIONS platform of a kind of building and mounting method.
Background technology
Building operations is divided into main body construction and internal and external ornament two stages of construction, the facility operating for constructor in domestic construction work progress is at present comparatively backward, still there is no a kind of safe and reliable operation facility or equipment that can be applicable to main body construction, can be applied to again building external decoration construction simultaneously.Work progress need to be installed and used two kinds of different operation facilities, has caused the increase of manpower, waste of time and use cost.
There is company to introduce electronic construction lifting platform from external, this kind equipment purposes only limits to building external decoration staged construction, as shown in Fig. 1 .2.3: in decoration construction, column starts to connect height from ground outside highrise building, and adopt wall-attached frame, be often connected and fixed with building across a certain distance.When depth of building is higher, need a large amount of column standard knot and wall-attached frame, use cost is higher, uses and cannot compete with aerial work basket economy separately in the building external decoration stage, seldom uses at present in engineering.
Summary of the invention
In order to overcome above-mentioned technical deficiency, the invention provides the outside climbing type CONSTRUCTION OPERATIONS platform of a kind of building and mounting method.
The present invention adopts following measures to realize:
The outside climbing type CONSTRUCTION OPERATIONS of a kind of building platform, is characterized in that: comprise column and platform; Column is provided with the platform stock that can move up and down along it, mobile attached wall stock and bottom wall-attached frame from top to bottom; Platform is arranged on platform stock, when platform moves along column, platform stock is not connected with building, and mobile attached wall stock arranges multiple clamp mechanism can clamp the main limb of column, and be connected with building, bottom wall-attached frame is connected by detachable wall-attached frame with building; When mobile attached wall stock moves along column, platform stock, mobile attached wall stock and bottom wall-attached frame are connected by detachable wall-attached frame with building; When column climbs along platform stock, mobile attached wall stock, platform stock, mobile attached wall stock are all connected by detachable wall-attached frame with building, and bottom wall-attached frame is not connected with building.
Further, platform stock, mobile attached wall stock include support body; Support body four sides shroud ring is on column, and support body is provided with opening near the one side of building, and the upper and lower two ends of support body all adopt multiple rollers to contact with 4 main limbs of column.
Further, wall-attached frame is the space truss structure connecting as one by bearing pin being arranged on support body opening surface.
Further, mobile attached wall stock clamp mechanism comprises installing rack and adjusts bolt and nut component, roller is arranged on installing rack, adjust bolt and nut component and comprise adjustment bolt and adjusting nut, adjusting nut is arranged in support body, adjust bolt one end and be arranged in support body, the other end is connected with installing rack.
Further, mobile attached wall stock and wall-attached frame bottom, bottom are equipped with an operating platform.
Further, platform stock, the upper and lower both ends of the surface corner location of mobile attached wall stock support body all adopt 2 rollers to contact with the main limb of column.
A mounting method for the outside climbing type CONSTRUCTION OPERATIONS of building platform, is characterized in that comprising the following steps:
1) under the duty of CONSTRUCTION OPERATIONS platform, platform stock and platform are run to building top, wall-attached frame is installed platform stock and building are connected and fixed;
2) remove the wall-attached frame of mobile attached wall stock, make mobile attached wall stock along column 2 floor heights that climb, to next attached wall position;
3), in next attached wall position, the wall-attached frame of mobile attached wall stock is installed;
4) wall-attached frame of dismounting bottom wall-attached frame;
5) platform stock and mobile attached wall stock are guiding device, column 2 floor heights that climb;
6) wall-attached frame of installation bottom wall-attached frame, then, removes the wall-attached frame of platform stock;
7) CONSTRUCTION OPERATIONS platform finishes climb mode, enters duty.
The present invention mainly contains following characteristics:
1) one side by building at platform stock, mobile attached wall stock and bottom wall-attached frame, designed wall-attached frame that can be connected with building, fast demountable, when platform stock, mobile attached wall stock and bottom wall-attached frame are when moving duty, remove wall-attached frame; When platform stock and mobile attached wall stock climb guiding device as column, wall-attached frame to be installed and to be connected with building, its operating mechanism can be used as the actuating unit that column climbs;
2) the present invention particularly uses in super highrise building at highrise building, can save a large amount of column standard knot and wall-attached frame, reduces significantly use cost, has strengthened the feasibility that CONSTRUCTION OPERATIONS platform is promoted the use of;
3) stock is together with column shroud ring, and is provided with opening, and makes operating platform more approach building, and constructability, needn't install expansion platform additional;
4) be equipped with can be for the operating platform of constructor's dismounting wall-attached frame for platform stock, mobile attached wall stock and bottom wall-attached frame, and handling safety is reliable.
Accompanying drawing explanation
Fig. 1 is electronic construction lifting platform schematic side view;
Fig. 2 is electronic construction lifting platform stock and wall-attached frame schematic diagram;
Fig. 3 is that electronic construction lifting platform master looks schematic diagram;
Fig. 4 is platform stock of the present invention and wall-attached frame schematic diagram;
Fig. 5 is schematic side view of the present invention;
Fig. 6 is the main schematic diagram of looking of the present invention;
Fig. 7 is the attached schematic diagram of looking of the present invention;
Fig. 8 is A enlarged drawing in Fig. 5;
Fig. 9 is mobile attached wall stock schematic diagram;
Figure 10 is B enlarged drawing in Fig. 9;
Figure 11 is each stock installation wall-attached frame structural representation;
Figure 12 is that 2 floor heights of mobile attached wall stock operation are to a upper attachment point position;
Figure 13 is that mobile attached wall stock is installed wall-attached frame in a upper attachment point position;
Figure 14 is that bottom attached wall stock is removed wall-attached frame;
Figure 15 is that bottom attached wall stock and column climb 2 floor heights to a upper attachment point position;
Figure 16 is that bottom wall-attaching equipment is installed wall-attached frame;
Figure 17 is that the present invention is at upper position work schematic diagram.
In figure, 1-column, 2-platform stock, 3-platform, 4-building, 5-move attached wall stock, 6-bottom attached wall stock, 7-wall-attached frame, 8-and adjust bolt, 9-adjusting nut, 10-installing rack, 11-operating platform, a-support body, b-roller, 7-1-connect bearing pin, 7-2-trussed construction.
The specific embodiment
Below in conjunction with the drawings and specific embodiments, the present invention is described further.
With reference to accompanying drawing 5, accompanying drawing 6, accompanying drawing 7, the outside climbing type CONSTRUCTION OPERATIONS of a kind of building platform, comprises column 1 and platform 3; Column 1 is provided with the platform stock 2 that can move up and down along it, mobile attached wall stock 5 and bottom wall-attached frame 6 from top to bottom; Platform 3 is arranged on platform stock 2, when platform 3 moves along column 1, platform stock 2 is not connected with building 4, mobile attached wall stock 5 arranges multiple clamp mechanism can clamp the main limb of column 1, and be connected with building 4, bottom wall-attached frame 6 is connected by detachable wall-attached frame 7 with building 4; When mobile attached wall stock 5 moves along column 1, mobile attached wall stock 5 is not connected with building 4, and platform stock 2, mobile attached wall stock 5 and bottom wall-attached frame 6 are connected with building 4 and are connected by detachable wall-attached frame 7 by detachable wall-attached frame with building; When column 1 climbs along platform stock 2, mobile attached wall stock 5, platform stock 2, mobile attached wall stock 5 all removably connect by wall-attached frame 7 with building 4, and bottom wall-attached frame 6 is not connected with building 4.
With reference to accompanying drawing 4, platform stock 2, mobile attached wall stock 5 and bottom attached wall stock 6 include support body a; Support body a four sides shroud ring is on column 1, and support body a is provided with opening near the one side of building 4, and the upper and lower two ends of support body a all adopt multiple roller b to contact with 4 main limbs of column 1.
With reference to accompanying drawing 4, wall-attached frame 7 connects for being arranged on passing through on support body a opening surface the trussed construction 7-2 that bearing pin 7-1 connects as one.In reality, the upper and lower both ends of the surface corner location of support body a all adopts 2 roller b to contact with the main limb of column 1.
With reference to accompanying drawing 8,9,10, clamp mechanism comprises installing rack 10 and adjusts bolt and nut component, roller b is arranged on installing rack 10, adjust bolt and nut component and comprise adjustment bolt 8 and adjusting nut 9, adjusting nut 9 is arranged in support body a, adjust bolt 8 one end and be arranged in support body a, the other end is connected with installing rack 10.
With reference to accompanying drawing 5, mobile attached wall stock 5 and bottom wall-attached frame 6 bottoms are equipped with an operating platform 11.
A mounting method for the outside climbing type CONSTRUCTION OPERATIONS of building platform, comprises the following steps:
1) with reference to accompanying drawing 11, under the duty of CONSTRUCTION OPERATIONS platform, platform stock 2 and platform are run to building 4 tops, wall-attached frame 7 is installed platform stock 2 and building 4 are connected and fixed;
2) with reference to accompanying drawing 12, remove the wall-attached frame 7 of mobile attached wall stock 5, make mobile attached wall stock 5 along column 12 floor heights that climb, to next attached wall position;
3), with reference to accompanying drawing 13, in next attached wall position, the wall-attached frame 7 of mobile attached wall stock 5 is installed;
4), with reference to accompanying drawing 14, remove the wall-attached frame 7 of bottom wall-attached frame 6;
5) with reference to accompanying drawing 15, platform stock 2 and mobile attached wall stock 5 are guiding device, column 12 floor heights that climb;
6) with reference to accompanying drawing 16, the wall-attached frame 7 of bottom wall-attached frame 6 is installed, then, remove the wall-attached frame 7 of platform stock 2;
7), with reference to accompanying drawing 17, CONSTRUCTION OPERATIONS platform finishes climb mode, enters duty.
Below only described basic principle of the present invention and preferred embodiment, those skilled in the art can make many changes and improvements according to foregoing description, and these changes and improvements should belong to protection scope of the present invention.

Claims (7)

1. the outside climbing type CONSTRUCTION OPERATIONS of a building platform, is characterized in that: comprise column and platform; Column is provided with the platform stock that can move up and down along it, mobile attached wall stock and bottom wall-attached frame from top to bottom; Platform is arranged on platform stock, when platform moves along column, platform stock is not connected with building, and mobile attached wall stock arranges multiple clamp mechanism can clamp the main limb of column, and be connected with building, bottom wall-attached frame is connected by detachable wall-attached frame with building; When mobile attached wall stock moves along column, platform stock and bottom wall-attached frame are connected by detachable wall-attached frame with building; When column climbs along platform stock, mobile attached wall stock, platform stock, mobile attached wall stock are all connected by detachable wall-attached frame with building, and bottom wall-attached frame is not connected with building.
2. the outside climbing type CONSTRUCTION OPERATIONS of building platform according to claim 1, is characterized in that: platform stock, mobile attached wall stock include support body; Support body four sides shroud ring is on column, and support body is provided with opening near the one side of building, and the upper and lower two ends of support body all adopt multiple rollers to contact with 4 main limbs of column.
3. the outside climbing type CONSTRUCTION OPERATIONS of building platform according to claim 2, is characterized in that: wall-attached frame is to be arranged on passing through on support body opening surface to connect the space truss structure that bearing pin connects as one.
4. the outside climbing type CONSTRUCTION OPERATIONS of building platform according to claim 2, it is characterized in that: clamp mechanism comprises installing rack and adjusts bolt and nut component, roller is arranged on installing rack, adjust bolt and nut component and comprise adjustment bolt and adjusting nut, adjusting nut is arranged in support body, adjust bolt one end and be arranged in support body, the other end is connected with installing rack.
5. according to the outside climbing type CONSTRUCTION OPERATIONS of building described in claim 1 or 2 or 3 or 4 platform, it is characterized in that: mobile attached wall stock and wall-attached frame bottom, bottom are equipped with an operating platform.
6. according to the outside climbing type CONSTRUCTION OPERATIONS of building described in claim 2 or 3 or 4 platform, it is characterized in that: the upper and lower both ends of the surface corner location of support body all adopts 2 rollers to contact with the main limb of column.
7. a mounting method for the outside climbing type CONSTRUCTION OPERATIONS of claim 1 or 2 or 3 or 4 any one buildings platform, is characterized in that comprising the following steps:
1) under the duty of CONSTRUCTION OPERATIONS platform, platform stock and platform are run to building top, wall-attached frame is installed platform stock and building are connected and fixed;
2) remove the wall-attached frame of mobile attached wall stock, make mobile attached wall stock along column 2 floor heights that climb, to next attached wall position;
3), in next attached wall position, the wall-attached frame of mobile attached wall stock is installed;
4) wall-attached frame of dismounting bottom wall-attached frame;
5) platform stock and mobile attached wall stock are guiding device, column 2 floor heights that climb;
6) wall-attached frame of installation bottom wall-attached frame, then, removes the wall-attached frame of platform stock;
7) CONSTRUCTION OPERATIONS platform finishes climb mode, enters duty.
CN201310725001.8A 2013-12-25 2013-12-25 The outside climbing type CONSTRUCTION OPERATIONS platform of building and mounting method Expired - Fee Related CN103741939B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310725001.8A CN103741939B (en) 2013-12-25 2013-12-25 The outside climbing type CONSTRUCTION OPERATIONS platform of building and mounting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310725001.8A CN103741939B (en) 2013-12-25 2013-12-25 The outside climbing type CONSTRUCTION OPERATIONS platform of building and mounting method

Publications (2)

Publication Number Publication Date
CN103741939A true CN103741939A (en) 2014-04-23
CN103741939B CN103741939B (en) 2015-10-21

Family

ID=50498996

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310725001.8A Expired - Fee Related CN103741939B (en) 2013-12-25 2013-12-25 The outside climbing type CONSTRUCTION OPERATIONS platform of building and mounting method

Country Status (1)

Country Link
CN (1) CN103741939B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105275207A (en) * 2015-02-11 2016-01-27 中建四局第三建筑工程有限公司 Up-down cyclic alternating construction method for external vertical face of high-rise building
CN109736558A (en) * 2019-03-01 2019-05-10 曹峰 Climbing type CONSTRUCTION OPERATIONS platform and installation method outside building

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2128653Y (en) * 1992-07-24 1993-03-24 同济大学 Multi-function mutual rise and fall framing scaffold
CN2434378Y (en) * 2000-06-30 2001-06-13 唐玉霞 Creeping formwork construction appts for column shape building
WO2003074818A1 (en) * 2002-03-05 2003-09-12 Shenzhen Techen Up-Down Scaffold Engineering Co., Ltd. An automatic orbital up-down scaffold
GB2421940A (en) * 2003-09-16 2006-07-12 Andrey Grigoryevich Tirskiy High-rise fire fighting, rescue and construction equipement
CN101586392A (en) * 2009-04-13 2009-11-25 许树根 Mast climbing type aerial working platform
CN201506699U (en) * 2009-09-25 2010-06-16 北京星河模板脚手架工程有限公司 Electric lifting bridge rack for construction
CN201679220U (en) * 2010-05-25 2010-12-22 中国建筑科学研究院建筑机械化研究分院 Single mast climbing working platform
CN203097281U (en) * 2012-12-24 2013-07-31 中国核工业华兴建设有限公司 Nuclear power station double-layer containment vessel hydraulic creeping formwork
CN203640251U (en) * 2013-12-25 2014-06-11 山东省建筑科学研究院 Climbing type building construction operating platform outside building

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2128653Y (en) * 1992-07-24 1993-03-24 同济大学 Multi-function mutual rise and fall framing scaffold
CN2434378Y (en) * 2000-06-30 2001-06-13 唐玉霞 Creeping formwork construction appts for column shape building
WO2003074818A1 (en) * 2002-03-05 2003-09-12 Shenzhen Techen Up-Down Scaffold Engineering Co., Ltd. An automatic orbital up-down scaffold
GB2421940A (en) * 2003-09-16 2006-07-12 Andrey Grigoryevich Tirskiy High-rise fire fighting, rescue and construction equipement
CN101586392A (en) * 2009-04-13 2009-11-25 许树根 Mast climbing type aerial working platform
CN201506699U (en) * 2009-09-25 2010-06-16 北京星河模板脚手架工程有限公司 Electric lifting bridge rack for construction
CN201679220U (en) * 2010-05-25 2010-12-22 中国建筑科学研究院建筑机械化研究分院 Single mast climbing working platform
CN203097281U (en) * 2012-12-24 2013-07-31 中国核工业华兴建设有限公司 Nuclear power station double-layer containment vessel hydraulic creeping formwork
CN203640251U (en) * 2013-12-25 2014-06-11 山东省建筑科学研究院 Climbing type building construction operating platform outside building

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105275207A (en) * 2015-02-11 2016-01-27 中建四局第三建筑工程有限公司 Up-down cyclic alternating construction method for external vertical face of high-rise building
CN109736558A (en) * 2019-03-01 2019-05-10 曹峰 Climbing type CONSTRUCTION OPERATIONS platform and installation method outside building
CN109736558B (en) * 2019-03-01 2020-11-27 安徽省宏远建设项目管理有限公司 Climbing type building construction operation platform outside building

Also Published As

Publication number Publication date
CN103741939B (en) 2015-10-21

Similar Documents

Publication Publication Date Title
CA2713161A1 (en) Load transportation system
MX342375B (en) Assembly process of a telescopic tower.
CN201635379U (en) Safety platform for installation and construction of roof contour plate hang ceiling
CN201417657Y (en) Installation device of indoor transformer
CN202248941U (en) Integral lifting, positioning and mounting device for large-scale steel members
CN204081426U (en) Subway tunnel movable Scaffold car
CN103741939B (en) The outside climbing type CONSTRUCTION OPERATIONS platform of building and mounting method
CN203640251U (en) Climbing type building construction operating platform outside building
CN203359889U (en) Wall plate lifting and installation integrated operation platform
CN203640291U (en) Height-difference adjustable double-layer operating platform for construction of building body and external ornaments
CN106181367A (en) A kind of step and step chains assembled tool
CN104870358A (en) Maintenance method for a lift
CN103556837B (en) A kind of method realizing steel column at annex place and install
KR20150002736U (en) Wheels are mounted on construction site temporary electrical power distribution box
CN103669867B (en) Building body and outer decoration construction discrepancy in elevation adjustable double-layer operating platform and installation method
CN105133918A (en) Roof travel tent
CN103803425A (en) Electric hoist gantry crane
CN204737704U (en) Be used for special hanging flower basket of wiping line installation
CN103303811A (en) Automatic jacking system of internal climbing tower crane
CN205421883U (en) Suspension type operation platform
CN203373983U (en) Discharging platform capable of rising and falling along with climbing frame
CN205894537U (en) Rotatory stair glass handrail mounting structure of small diameter
CN205802909U (en) A kind of liftable electrician's operating platform
CN204138153U (en) A kind of foundation for tower crane lifting self-locking mechanism
CN205170139U (en) Automatic mounting structure of additional scram device on staircase or moving walk

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20140423

Assignee: SHANDONG TENGFEI CONSTRUCTION MECHANICAL ENGINEERING CO.,LTD.

Assignor: SHANDONG PROVINCIAL ACADEMY OF BUILDING RESEARCH

Contract record no.: 2017370000072

Denomination of invention: Climbing type building construction operating platform on outer portion of building and installing method

Granted publication date: 20151021

License type: Common License

Record date: 20171106

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200813

Address after: 250031 Shandong Province Flyover District of Ji'nan City Road 29.

Co-patentee after: Shandong construction engineering quality inspection and Testing Center Co.,Ltd.

Patentee after: Shandong Academy of Building Science Co.,Ltd.

Address before: 250000 Shandong Province Flyover District of Ji'nan City Road 29.

Patentee before: SHANDONG PROVINCIAL ACADEMY OF BUILDING RESEARCH

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151021

Termination date: 20211225