CN109736558A - Climbing type CONSTRUCTION OPERATIONS platform and installation method outside building - Google Patents
Climbing type CONSTRUCTION OPERATIONS platform and installation method outside building Download PDFInfo
- Publication number
- CN109736558A CN109736558A CN201910154365.2A CN201910154365A CN109736558A CN 109736558 A CN109736558 A CN 109736558A CN 201910154365 A CN201910154365 A CN 201910154365A CN 109736558 A CN109736558 A CN 109736558A
- Authority
- CN
- China
- Prior art keywords
- climbing
- guide rail
- fixedly connected
- column guide
- shaft
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 230000009194 climbing Effects 0.000 title claims abstract description 88
- 238000010276 construction Methods 0.000 title claims abstract description 30
- 238000009434 installation Methods 0.000 title claims abstract description 18
- 238000000034 method Methods 0.000 title claims abstract description 17
- 230000007246 mechanism Effects 0.000 claims abstract description 15
- 230000006641 stabilisation Effects 0.000 abstract description 2
- 238000011105 stabilization Methods 0.000 abstract description 2
- 238000010586 diagram Methods 0.000 description 4
- 238000009435 building construction Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000000354 decomposition reaction Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000007935 neutral effect Effects 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention discloses climbing type CONSTRUCTION OPERATIONS platform outside building and installation methods, including column guide rail, it is equidistant on the side vertical direction of the column guide rail to be fixedly connected with multiple cross bars, climbing device is slidably connected on the column guide rail, the climbing device, organic frame is installed in the outside of the climbing device, is fixedly connected with platform on the side wall of the rack;The climbing device provides power by driving mechanism.Present invention employs turntable drive-types to replace design of climbing, it is climbed stabilization using this design method, when shaft starts to move upwards by middle part, due to the setting of the second fluting, thus shaft can be against armband pushrod movement thereon when moving to the highest point of the second fluting, pin shaft movement is driven by U-shaped frame after pushrod movement, simultaneously because pin slide is connected on climbing support, thus pin shaft can drive climbing support along column guide rail axial direction upward sliding.
Description
Technical field
The present invention relates to climbing type construction behaviour outside CONSTRUCTION OPERATIONS platform technology field more particularly to building
Make platform and installation method.
Background technique
Building is the general name of building and structures, is people to meet social life needs, utilizes grasped object
Matter technological means, and the artificial environment created with certain scientific law, geomantic omen theory and aesthetic principle, architectural engineering is logical
The installation activity for crossing the construction to all kinds of building constructions and its affiliated facility and route matched with its, pipeline and equipment is formed
Engineering entity meet people wherein " building construction ", which refers to, to be had top cover, beam column, wall, basis and be capable of forming inner space
Production is lived, the engineering of study and public activity needs.
Construction is divided into main body construction and internal and external ornament is constructed two stages, at present for applying in domestic construction work progress
The facility of worker person's operation more falls behind, and still can be suitble to main body construction without one kind but also be applied to construction exterior simultaneously
Adorn the safe and reliable operation facility or equipment of construction.When skyscraper main structure construction, need to set up outer foundation hand in advance
Frame is used for work surface demand and security protection.There are two types of forms for conventional type exterior wall scaffold: one kind is the outer foundation hand of console mode
Frame, one kind are overhanging type exterior wall scaffold.Work progress needs to install and use this two different operation facility, causes people
The increase of power, waste of time and use cost.
Summary of the invention
The purpose of the present invention is to solve above-mentioned problems, and climbing type CONSTRUCTION OPERATIONS outside the building proposed
Platform and installation method.
To achieve the goals above, present invention employs following technical solutions:
Climbing type CONSTRUCTION OPERATIONS platform and installation method outside building, including column guide rail, the column
It is equidistant on the side vertical direction of guide rail to be fixedly connected with multiple cross bars, the machine of climbing is slidably connected on the column guide rail
Structure, the climbing device, the outside of the climbing device install organic frame, are fixedly connected with platform on the side wall of the rack;
The climbing device provides power by driving mechanism;
The climbing device is by push rod, turntable, climbing support, U-shaped frame, pin shaft, the first fluting, shaft and the second fluting structure
At the output end of the turntable and driving mechanism connects and be driven by it circular motion, and the two sides eccentric part of the turntable is solid
Surely it is connected with the shaft of setting normal thereto, the shaft is connected with the push rod being vertically arranged, and up and down the two of the push rod
End is fixedly connected to horizontally disposed U-shaped frame, and the inner side of the U-shaped frame is fixedly connected with pin shaft parallel with it, institute
It states pin shaft to pass through out of climbing support, the climbing support is slidably connected on column guide rail, and the pin shaft is close to column guide rail
Side be fixedly connected with and climb block.
Outside the above-mentioned building in climbing type CONSTRUCTION OPERATIONS platform, the driving mechanism includes decelerating motor,
The decelerating motor uses planet-gear speed reducing motor, and the output shaft of the decelerating motor is fixedly connected with the axle center of turntable.
Outside the above-mentioned building in climbing type CONSTRUCTION OPERATIONS platform, the climbing support include sliding sleeve, baffle and
Connecting plate;Sliding slot is axially offered on the sliding sleeve, the sliding sleeve is slidably connected by sliding slot and column guide rail, the sliding sleeve
It is slidably connected on column guide rail, the both ends of the sliding sleeve are fixedly connected with connecting plate respectively, and two connecting plates are common
It is fixedly connected with baffle.
Outside the above-mentioned building in climbing type CONSTRUCTION OPERATIONS platform, the pin shaft is fixed far from the side for climbing block
It is connected at least one gag lever post, the gag lever post passes through baffle far from the one end for climbing block and is fixedly connected with limited block, described
Part of the gag lever post between baffle and pin shaft is arranged with reset spring.
Outside the above-mentioned building in climbing type CONSTRUCTION OPERATIONS platform, the equal level in the two sides of the climbing support is opened up
There is the first fluting, the both ends of the pin shaft both pass through the first fluting and horizontal sliding in it, vertically offer on the push rod
Second fluting, the both ends of the shaft both pass through the second fluting.
The invention also discloses a kind of installation methods of climbing type CONSTRUCTION OPERATIONS platform outside building:
Step 1: selected place of climbing in advance, and spacing between the two is calculated, processed according to two spacing between the two,
Select the column guide rail for being slightly above this length;
Column guide rail is run to the top at pre- place of climbing by step 2, and installation wall-attached frame is by column guide rail and builds
Object is connected and fixed;
Step 3: platform is mounted on the rack by bolt, and leveling bolt is arranged in the screw hole of platform, adjusts leveling
Bolt it is elastic, and polish the upper surface of platform, so that platform surface is horizontal.
Compared with prior art, the present invention has following advantages:
1, it alternately climbs design, is climbed stabilization using this design method, when shaft starts in using turntable drive-type
When portion starts to move upwards, due to the setting of the second fluting, thus shaft can when moving to the highest point of the second fluting
Against armband pushrod movement thereon, pin shaft movement is driven by U-shaped frame after pushrod movement, is climbed simultaneously because pin slide is connected to
It rises on frame, thus pin shaft can drive climbing support along column guide rail axial direction upward sliding;With pivot to top and by
When the other side moves downward, pin shaft movement is driven by U-shaped frame after pushrod movement, pin shaft is slotted along first to close to column
One Slideslip of guide rail is caught on cross bar so that block will be climbed.Due to the shaft alternating movement of turntable two sides, thus the shaft of two sides
Continuous intermittent move upwards to realize of climbing support can be driven to climb by push rod, U-shaped frame and pin shaft, gradually band moving platform
Rise.
2, the present invention further uses gag lever post, reset spring, baffle, pin shaft so that climbing block can be inserted under normal conditions
On column guide rail, to increase locking property, safety is increased.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of climbing type CONSTRUCTION OPERATIONS platform outside building proposed by the present invention;
Fig. 2 is the schematic diagram of internal structure of rack in the present invention;
Fig. 3 is driving mechanism schematic diagram in the present invention;
Fig. 4 is the cross-sectional view of Fig. 2 taken along line A-A of the present invention;
Fig. 5 is the neutral pillar rail-sides view of the present invention;
Fig. 6 is climbing type CONSTRUCTION OPERATIONS platform exterior structural schematic diagram outside building proposed by the present invention.
In figure: 1 column guide rail, 2 climbing devices, 21 push rods, 22 turntables, 23 climbing supports, 231 sliding sleeves, 232 baffles, 233
Connecting plate, 24 U-shaped framves, 25 pin shafts, 26 first flutings, 27 shafts, 28 second flutings, 3 fixed frames, 4 driving mechanisms, 41 drivings
Block, 7 limited blocks, 8 flutings, 9 reset springs, 10 gag lever posts, 11 racks, 12 platforms, 13 cross are climbed in axis, 42 decelerating motors, 5 sliding slots, 6
Bar.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
Embodiment one
Referring to figs. 1 to Fig. 6, building outside climbing type CONSTRUCTION OPERATIONS platform and installation method, including column are led
Rail 1, it is equidistant on the side vertical direction of column guide rail 1 to be fixedly connected with multiple cross bars 13, the company of sliding on column guide rail 1
It is connected to climbing device 2, climbing device 2, the outside of climbing device 2 is installed organic frame 11, is fixedly connected on the side wall of rack 11
Platform 12.
Climbing device 2 provides power by driving mechanism 4.
Specifically, driving mechanism includes decelerating motor 42, and decelerating motor 42 uses planet-gear speed reducing motor, decelerating motor
42 output shaft is fixedly connected with the axle center of turntable 22.
Climbing device 2 is by push rod 21, turntable 22, climbing support 23, U-shaped frame 24, the fluting of pin shaft 25, first 26,27 and of shaft
Second fluting 28 is constituted, and turntable 22 connect with the output end of driving mechanism 4 and be driven by it circular motion, two lateral deviations of turntable 22
The shaft 27 of setting normal thereto is fixedly connected at the heart, shaft 27 is connected with the push rod 21 being vertically arranged, push rod 21
Upper and lower ends be fixedly connected to horizontally disposed U-shaped frame 24, the inner side of U-shaped frame 24 is fixedly connected with parallel with it
Pin shaft 25, pin shaft 25 are passed through out of climbing support 23, and climbing support 23 is slidably connected on column guide rail 1, and pin shaft 25 is close to column
The side of formula guide rail 1, which is fixedly connected with, climbs block 6.
Specifically, climbing support 23 includes sliding sleeve 231, baffle 232 and connecting plate 233;Sliding slot is axially offered on sliding sleeve 231
5, sliding sleeve 231 is slidably connected by sliding slot 5 with column guide rail 1, and sliding sleeve 231 is slidably connected on column guide rail 1, sliding sleeve
231 both ends are fixedly connected with connecting plate 233 respectively, and two connecting plates 233 are fixedly connected with baffle 232 jointly.
Further, the equal level in the two sides of climbing support 23 offers the first fluting 26, and the both ends of pin shaft 25 both pass through first
Fluting 26 and level are slided vertically offers the second fluting 28 in it, on push rod 21, and the both ends of shaft 27 both pass through second and open
Slot 28.
Embodiment two
The present embodiment is further provided with elastic arrived piece on the basis of example 1, and overall plan is as follows:
Referring to figs. 1 to Fig. 6, building outside climbing type CONSTRUCTION OPERATIONS platform and installation method, including column are led
Rail 1, it is equidistant on the side vertical direction of column guide rail 1 to be fixedly connected with multiple cross bars 13, the company of sliding on column guide rail 1
It is connected to climbing device 2, climbing device 2, the outside of climbing device 2 is installed organic frame 11, is fixedly connected on the side wall of rack 11
Platform 12.
Climbing device 2 provides power by driving mechanism 4.
Specifically, driving mechanism includes decelerating motor 42, and decelerating motor 42 uses planet-gear speed reducing motor, decelerating motor
42 output shaft is fixedly connected with the axle center of turntable 22.
Climbing device 2 is by push rod 21, turntable 22, climbing support 23, U-shaped frame 24, the fluting of pin shaft 25, first 26,27 and of shaft
Second fluting 28 is constituted, and turntable 22 connect with the output end of driving mechanism 4 and be driven by it circular motion, two lateral deviations of turntable 22
The shaft 27 of setting normal thereto is fixedly connected at the heart, shaft 27 is connected with the push rod 21 being vertically arranged, push rod 21
Upper and lower ends be fixedly connected to horizontally disposed U-shaped frame 24, the inner side of U-shaped frame 24 is fixedly connected with parallel with it
Pin shaft 25, pin shaft 25 are passed through out of climbing support 23, and climbing support 23 is slidably connected on column guide rail 1, and pin shaft 25 is close to column
The side of formula guide rail 1, which is fixedly connected with, climbs block 6.
Specifically, climbing support 23 includes sliding sleeve 231, baffle 232 and connecting plate 233;Sliding slot is axially offered on sliding sleeve 231
5, sliding sleeve 231 is slidably connected by sliding slot 5 with column guide rail 1, and sliding sleeve 231 is slidably connected on column guide rail 1, sliding sleeve
231 both ends are fixedly connected with connecting plate 233 respectively, and two connecting plates 233 are fixedly connected with baffle 232 jointly.
Further, pin shaft 25 is fixedly connected at least one gag lever post 10 far from the side for climbing block 6, and gag lever post 10 is separate
The one end for climbing block 6 passes through baffle 232 and is fixedly connected with limited block 7, portion of the gag lever post 10 between baffle 232 and pin shaft 25
Divide and is arranged with reset spring 9.The setting of reset spring 9 is so that climbing block 6 can be inserted on column guide rail 1 under normal conditions.
Further, the equal level in the two sides of climbing support 23 offers the first fluting 26, and the both ends of pin shaft 25 both pass through first
Fluting 26 and level are slided vertically offers the second fluting 28 in it, on push rod 21, and the both ends of shaft 27 both pass through second and open
Slot 28.
Column guide rail 1 is installed, and climbing device 2 is mounted on column guide rail 1, when needing to climb, is opened
Decelerating motor 42 is opened, decelerating motor 42 drives the turntable 22 of connection fixed thereto to rotate by drive shaft in turn, and turntable 22 rotates
Afterwards and then drive two shafts 27 of two sides with its circular motion.
The Kinematic Decomposition of shaft 27 is at multistep:
When the beginning of shaft 27 is moved upwards by middle part, due to the setting of the second fluting 28, thus shaft 27 is being transported
Move to second fluting 28 highest point when can move against armband push rod 21 thereon, push rod 21 movement after pass through U-shaped frame 24
Pin shaft 25 is driven to move, simultaneously because pin shaft 25 is slidably connected on climbing support 23, thus pin shaft 25 can drive 23 edge of climbing support
Column guide rail 1 slide axially upwards;
When moving to top with shaft 27 and moved downward by the other side, push rod 21 is driven after moving by U-shaped frame 24
Pin shaft 25 moves, and pin shaft 25 slots 26 to the Slideslip close to column guide rail 1, so that will climb block 6 is caught in cross along first
On bar.
Due to 27 alternating movement of shaft of 22 two sides of turntable, thus the shaft 27 of two sides can pass through push rod, U-shaped frame 24 and pin
Axis 25 drives continuous intermittent move upwards of climbing support 23 to climb to realize, gradually band moving platform 12 rises.
In upper embodiment one and embodiment two, it is all made of following installation method:
The installation method includes the following steps:
Step 1: selected place of climbing in advance, and spacing between the two is calculated, processed according to two spacing between the two,
Select the column guide rail 1 for being slightly above this length;
Column guide rail 1, is run to the top at pre- place of climbing by step 2, installation wall-attached frame by column guide rail 1 with build
Object is built to be connected and fixed;
Step 3: platform 12 being mounted in rack 11 by bolt, leveling bolt is arranged in the screw hole of platform 12, is adjusted
The elastic of leveling bolt is saved, and is polished the upper surface of platform 12, so that 12 surface of platform is horizontal.
Description before offer be can practice to make any person skilled in the art it is described herein various
Aspect.Various modifications in terms of these will be easy to be understood by those skilled, and general as defined in this article
Suitable principle can be applied to other aspects.Therefore, claim be not intended to be limited to herein shown in aspect, but answer
The full scope consistent with linguistic claim is awarded, wherein removing non-specifically sound to the citation of the singular of element
It is bright, it is otherwise not intended to indicate " one and only one ", but " one or more ".Meant herein using term " exemplary "
" being used as example, example or explanation ".It need not be construed as here depicted as any aspect of " exemplary " preferred or advantageous over it
In terms of him.Unless specifically stated otherwise, otherwise term "some" refer to one or more.Each side described throughout this disclosure
The element in face is that those of ordinary skill in the art currently or hereafter pass through in known all structures with equivalent scheme functionally
Citation is clearly included in this, and is intended to be covered by the claims.In addition, any content disclosed herein is not all purport
The public is being contributed to, no matter whether such disclosure is explicitly recited in detail in the claims.There is no any claim member
Element should be interpreted that device adds function, unless the element is clearly described using phrase " device being used for ... ".
Claims (6)
1. climbing type CONSTRUCTION OPERATIONS platform outside building, including column guide rail (1), which is characterized in that the column
It is equidistant on the side vertical direction of formula guide rail (1) to be fixedly connected with multiple cross bars (13), it is slided on the column guide rail (1)
It is connected with climbing device (2), the climbing device (2), organic frame (11) are installed in the outside of the climbing device (2), the machine
Platform (12) are fixedly connected on the side wall of frame (11);
The climbing device (2) provides power by driving mechanism (4);
The climbing device (2) is opened by push rod (21), turntable (22), climbing support (23), U-shaped frame (24), pin shaft (25), first
Slot (26), shaft (27) and the second fluting (28) are constituted, and the turntable (22) connect and with the output end of driving mechanism (4) by it
Circular motion is driven, the two sides eccentric part of the turntable (22) is fixedly connected to the shaft (27) of setting normal thereto, described
Shaft (27) is connected with the push rod (21) being vertically arranged, and the upper and lower ends of the push rod (21) are fixedly connected to level and set
The U-shaped frame (24) set, the inner side of the U-shaped frame (24) are fixedly connected with pin shaft parallel with it (25), the pin shaft
(25) it is passed through out of climbing support (23), the climbing support (23) is slidably connected on column guide rail (1), and the pin shaft (25) is leaned on
The side of nearly column guide rail (1), which is fixedly connected with, climbs block (6).
2. climbing type CONSTRUCTION OPERATIONS platform outside building according to claim 1, which is characterized in that the driving
Mechanism includes decelerating motor (42), and the decelerating motor (42) uses planet-gear speed reducing motor, the decelerating motor (42)
Output shaft is fixedly connected with the axle center of turntable (22).
3. climbing type CONSTRUCTION OPERATIONS platform outside building according to claim 2, which is characterized in that described to climb
Frame (23) includes sliding sleeve (231), baffle (232) and connecting plate (233);Sliding slot (5) are axially offered on the sliding sleeve (231),
The sliding sleeve (231) is slidably connected by sliding slot (5) with column guide rail (1), and the sliding sleeve (231) is slidably connected at column
On guide rail (1), the both ends of the sliding sleeve (231) are fixedly connected with connecting plate (233) respectively, and two connecting plates (233) are altogether
It is same to be fixedly connected with baffle (232).
4. climbing type CONSTRUCTION OPERATIONS platform outside building according to claim 3, which is characterized in that the pin shaft
(25) it is fixedly connected at least one gag lever post (10) far from the side for climbing block (6), the gag lever post (10) is separate to climb block (6)
One end passes through baffle (232) and is fixedly connected with limited block (7), and the gag lever post (10) is located at baffle (232) and pin shaft (25)
Between part be arranged with reset spring (9).
5. climbing type CONSTRUCTION OPERATIONS platform and installation method, feature exist outside building according to claim 3
In the equal level in two sides of the climbing support (23) offers the first fluting (26), and the both ends of the pin shaft (25) both pass through first
It slots (26) and horizontal sliding is in it, vertically offered the second fluting (28) on the push rod (21), the shaft (27)
Both ends both pass through the second fluting (28).
6. the installation method of climbing type CONSTRUCTION OPERATIONS platform outside building, which is characterized in that the installation method includes such as
Lower step:
Step 1: selected place of climbing in advance, and spacing between the two is calculated, according to two spacing processing between the two, select
The slightly above column guide rail (1) of this length;
Column guide rail (1), is run to the top at pre- place of climbing by step 2, installation wall-attached frame by column guide rail (1) with build
Object is built to be connected and fixed;
Step 3: platform (12) being mounted on rack (11) by bolt, leveling bolt is arranged in the screw hole of platform (12),
The elastic of leveling bolt is adjusted, and is polished the upper surface of platform (12), so that platform (12) surface is horizontal.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910154365.2A CN109736558B (en) | 2019-03-01 | 2019-03-01 | Climbing type building construction operation platform outside building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910154365.2A CN109736558B (en) | 2019-03-01 | 2019-03-01 | Climbing type building construction operation platform outside building |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109736558A true CN109736558A (en) | 2019-05-10 |
CN109736558B CN109736558B (en) | 2020-11-27 |
Family
ID=66368971
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910154365.2A Active CN109736558B (en) | 2019-03-01 | 2019-03-01 | Climbing type building construction operation platform outside building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109736558B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111101847A (en) * | 2019-12-19 | 2020-05-05 | 常德市鼎城永欣机械制造有限公司 | Tower crane climbing frame |
CN115749235A (en) * | 2022-12-28 | 2023-03-07 | 重庆迈高电梯有限公司 | Elevator shaft lifting scaffold and assembling method |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4478385A (en) * | 1981-05-02 | 1984-10-23 | Josef Maier | Climbing forms |
CN200975099Y (en) * | 2007-03-02 | 2007-11-14 | 顾粉兵 | automatic up-down workstation for buildings exterior wall decoration |
CN101210456A (en) * | 2006-12-29 | 2008-07-02 | 西北工业大学 | Wedge safety device used for high altitude lifting platform |
CN103741939A (en) * | 2013-12-25 | 2014-04-23 | 山东省建筑科学研究院 | Climbing type building construction operating platform on outer portion of building and installing method |
CN105040965A (en) * | 2015-07-07 | 2015-11-11 | 北京星河模板脚手架工程有限公司 | Attached type raising and falling overhead working device and construction method |
CN105587114A (en) * | 2015-12-28 | 2016-05-18 | 广州市京龙工程机械有限公司 | Improved construction ascending and descending platform |
-
2019
- 2019-03-01 CN CN201910154365.2A patent/CN109736558B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4478385A (en) * | 1981-05-02 | 1984-10-23 | Josef Maier | Climbing forms |
CN101210456A (en) * | 2006-12-29 | 2008-07-02 | 西北工业大学 | Wedge safety device used for high altitude lifting platform |
CN200975099Y (en) * | 2007-03-02 | 2007-11-14 | 顾粉兵 | automatic up-down workstation for buildings exterior wall decoration |
CN103741939A (en) * | 2013-12-25 | 2014-04-23 | 山东省建筑科学研究院 | Climbing type building construction operating platform on outer portion of building and installing method |
CN105040965A (en) * | 2015-07-07 | 2015-11-11 | 北京星河模板脚手架工程有限公司 | Attached type raising and falling overhead working device and construction method |
CN105587114A (en) * | 2015-12-28 | 2016-05-18 | 广州市京龙工程机械有限公司 | Improved construction ascending and descending platform |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111101847A (en) * | 2019-12-19 | 2020-05-05 | 常德市鼎城永欣机械制造有限公司 | Tower crane climbing frame |
CN115749235A (en) * | 2022-12-28 | 2023-03-07 | 重庆迈高电梯有限公司 | Elevator shaft lifting scaffold and assembling method |
Also Published As
Publication number | Publication date |
---|---|
CN109736558B (en) | 2020-11-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109736558A (en) | Climbing type CONSTRUCTION OPERATIONS platform and installation method outside building | |
EP3105393A1 (en) | Hoist device for a scaffold | |
CN107355083B (en) | A kind of hoistway module assembling system and assembling method | |
CN203244340U (en) | Telescopic hanging basket | |
CN209099747U (en) | It prevents from reversing elevating scaffold | |
CN106088561A (en) | A kind of construction scaffold | |
CN107244615B (en) | A kind of gate-type lifting equipment and method | |
CN213174733U (en) | Rack for construction hanging basket | |
CN212269370U (en) | A alternately from climbing formula platform for installation of elevator guide rail | |
CN115637645A (en) | Intelligent tower building device for steel tower construction | |
CN115506565A (en) | Building platform for outdoor building and indoor decoration | |
CN113638624A (en) | Constructional engineering steel construction support frame | |
CN113830647A (en) | Lift for building engineering | |
CN218933787U (en) | Self-climbing platform used in hoistway | |
CN207392766U (en) | A kind of hoistway module assembling system | |
CN215711618U (en) | Dedicated jacking equipment of electromechanical installation | |
CN215407647U (en) | Building site passageway protection shed structure | |
CN220223474U (en) | Assembled building construction lift platform | |
CN212210290U (en) | Cable erecting device for electromechanical installation | |
CN218292721U (en) | Steel structure net rack jacking device | |
CN214785783U (en) | Adjustable scaffold is used in building engineering construction | |
CN221917088U (en) | Butt joint equipment for assembled bridge building | |
CN110644761A (en) | Building construction protection platform | |
CN213294604U (en) | Construction platform for housing construction engineering | |
CN216238159U (en) | Anti-falling device for bridge construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20201109 Address after: Room 1608 and 1609, unit 2, sunshine Times Plaza, 288 qicang Road, Mingguang City, Chuzhou City, Anhui Province Applicant after: Anhui Hongyuan Construction Project Management Co., Ltd Address before: 250000 No. 4657 Tourist Road, Licheng District, Jinan City, Shandong Province Applicant before: Cao Feng |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant |