CN109736558A - Climbing type CONSTRUCTION OPERATIONS platform and installation method outside building - Google Patents

Climbing type CONSTRUCTION OPERATIONS platform and installation method outside building Download PDF

Info

Publication number
CN109736558A
CN109736558A CN201910154365.2A CN201910154365A CN109736558A CN 109736558 A CN109736558 A CN 109736558A CN 201910154365 A CN201910154365 A CN 201910154365A CN 109736558 A CN109736558 A CN 109736558A
Authority
CN
China
Prior art keywords
climbing
guide rail
fixedly connected
column guide
shaft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910154365.2A
Other languages
Chinese (zh)
Other versions
CN109736558B (en
Inventor
曹峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Hongyuan Construction Project Management Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201910154365.2A priority Critical patent/CN109736558B/en
Publication of CN109736558A publication Critical patent/CN109736558A/en
Application granted granted Critical
Publication of CN109736558B publication Critical patent/CN109736558B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses climbing type CONSTRUCTION OPERATIONS platform outside building and installation methods, including column guide rail, it is equidistant on the side vertical direction of the column guide rail to be fixedly connected with multiple cross bars, climbing device is slidably connected on the column guide rail, the climbing device, organic frame is installed in the outside of the climbing device, is fixedly connected with platform on the side wall of the rack;The climbing device provides power by driving mechanism.Present invention employs turntable drive-types to replace design of climbing, it is climbed stabilization using this design method, when shaft starts to move upwards by middle part, due to the setting of the second fluting, thus shaft can be against armband pushrod movement thereon when moving to the highest point of the second fluting, pin shaft movement is driven by U-shaped frame after pushrod movement, simultaneously because pin slide is connected on climbing support, thus pin shaft can drive climbing support along column guide rail axial direction upward sliding.

Description

Climbing type CONSTRUCTION OPERATIONS platform and installation method outside building
Technical field
The present invention relates to climbing type construction behaviour outside CONSTRUCTION OPERATIONS platform technology field more particularly to building Make platform and installation method.
Background technique
Building is the general name of building and structures, is people to meet social life needs, utilizes grasped object Matter technological means, and the artificial environment created with certain scientific law, geomantic omen theory and aesthetic principle, architectural engineering is logical The installation activity for crossing the construction to all kinds of building constructions and its affiliated facility and route matched with its, pipeline and equipment is formed Engineering entity meet people wherein " building construction ", which refers to, to be had top cover, beam column, wall, basis and be capable of forming inner space Production is lived, the engineering of study and public activity needs.
Construction is divided into main body construction and internal and external ornament is constructed two stages, at present for applying in domestic construction work progress The facility of worker person's operation more falls behind, and still can be suitble to main body construction without one kind but also be applied to construction exterior simultaneously Adorn the safe and reliable operation facility or equipment of construction.When skyscraper main structure construction, need to set up outer foundation hand in advance Frame is used for work surface demand and security protection.There are two types of forms for conventional type exterior wall scaffold: one kind is the outer foundation hand of console mode Frame, one kind are overhanging type exterior wall scaffold.Work progress needs to install and use this two different operation facility, causes people The increase of power, waste of time and use cost.
Summary of the invention
The purpose of the present invention is to solve above-mentioned problems, and climbing type CONSTRUCTION OPERATIONS outside the building proposed Platform and installation method.
To achieve the goals above, present invention employs following technical solutions:
Climbing type CONSTRUCTION OPERATIONS platform and installation method outside building, including column guide rail, the column It is equidistant on the side vertical direction of guide rail to be fixedly connected with multiple cross bars, the machine of climbing is slidably connected on the column guide rail Structure, the climbing device, the outside of the climbing device install organic frame, are fixedly connected with platform on the side wall of the rack;
The climbing device provides power by driving mechanism;
The climbing device is by push rod, turntable, climbing support, U-shaped frame, pin shaft, the first fluting, shaft and the second fluting structure At the output end of the turntable and driving mechanism connects and be driven by it circular motion, and the two sides eccentric part of the turntable is solid Surely it is connected with the shaft of setting normal thereto, the shaft is connected with the push rod being vertically arranged, and up and down the two of the push rod End is fixedly connected to horizontally disposed U-shaped frame, and the inner side of the U-shaped frame is fixedly connected with pin shaft parallel with it, institute It states pin shaft to pass through out of climbing support, the climbing support is slidably connected on column guide rail, and the pin shaft is close to column guide rail Side be fixedly connected with and climb block.
Outside the above-mentioned building in climbing type CONSTRUCTION OPERATIONS platform, the driving mechanism includes decelerating motor, The decelerating motor uses planet-gear speed reducing motor, and the output shaft of the decelerating motor is fixedly connected with the axle center of turntable.
Outside the above-mentioned building in climbing type CONSTRUCTION OPERATIONS platform, the climbing support include sliding sleeve, baffle and Connecting plate;Sliding slot is axially offered on the sliding sleeve, the sliding sleeve is slidably connected by sliding slot and column guide rail, the sliding sleeve It is slidably connected on column guide rail, the both ends of the sliding sleeve are fixedly connected with connecting plate respectively, and two connecting plates are common It is fixedly connected with baffle.
Outside the above-mentioned building in climbing type CONSTRUCTION OPERATIONS platform, the pin shaft is fixed far from the side for climbing block It is connected at least one gag lever post, the gag lever post passes through baffle far from the one end for climbing block and is fixedly connected with limited block, described Part of the gag lever post between baffle and pin shaft is arranged with reset spring.
Outside the above-mentioned building in climbing type CONSTRUCTION OPERATIONS platform, the equal level in the two sides of the climbing support is opened up There is the first fluting, the both ends of the pin shaft both pass through the first fluting and horizontal sliding in it, vertically offer on the push rod Second fluting, the both ends of the shaft both pass through the second fluting.
The invention also discloses a kind of installation methods of climbing type CONSTRUCTION OPERATIONS platform outside building:
Step 1: selected place of climbing in advance, and spacing between the two is calculated, processed according to two spacing between the two, Select the column guide rail for being slightly above this length;
Column guide rail is run to the top at pre- place of climbing by step 2, and installation wall-attached frame is by column guide rail and builds Object is connected and fixed;
Step 3: platform is mounted on the rack by bolt, and leveling bolt is arranged in the screw hole of platform, adjusts leveling Bolt it is elastic, and polish the upper surface of platform, so that platform surface is horizontal.
Compared with prior art, the present invention has following advantages:
1, it alternately climbs design, is climbed stabilization using this design method, when shaft starts in using turntable drive-type When portion starts to move upwards, due to the setting of the second fluting, thus shaft can when moving to the highest point of the second fluting Against armband pushrod movement thereon, pin shaft movement is driven by U-shaped frame after pushrod movement, is climbed simultaneously because pin slide is connected to It rises on frame, thus pin shaft can drive climbing support along column guide rail axial direction upward sliding;With pivot to top and by When the other side moves downward, pin shaft movement is driven by U-shaped frame after pushrod movement, pin shaft is slotted along first to close to column One Slideslip of guide rail is caught on cross bar so that block will be climbed.Due to the shaft alternating movement of turntable two sides, thus the shaft of two sides Continuous intermittent move upwards to realize of climbing support can be driven to climb by push rod, U-shaped frame and pin shaft, gradually band moving platform Rise.
2, the present invention further uses gag lever post, reset spring, baffle, pin shaft so that climbing block can be inserted under normal conditions On column guide rail, to increase locking property, safety is increased.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of climbing type CONSTRUCTION OPERATIONS platform outside building proposed by the present invention;
Fig. 2 is the schematic diagram of internal structure of rack in the present invention;
Fig. 3 is driving mechanism schematic diagram in the present invention;
Fig. 4 is the cross-sectional view of Fig. 2 taken along line A-A of the present invention;
Fig. 5 is the neutral pillar rail-sides view of the present invention;
Fig. 6 is climbing type CONSTRUCTION OPERATIONS platform exterior structural schematic diagram outside building proposed by the present invention.
In figure: 1 column guide rail, 2 climbing devices, 21 push rods, 22 turntables, 23 climbing supports, 231 sliding sleeves, 232 baffles, 233 Connecting plate, 24 U-shaped framves, 25 pin shafts, 26 first flutings, 27 shafts, 28 second flutings, 3 fixed frames, 4 driving mechanisms, 41 drivings Block, 7 limited blocks, 8 flutings, 9 reset springs, 10 gag lever posts, 11 racks, 12 platforms, 13 cross are climbed in axis, 42 decelerating motors, 5 sliding slots, 6 Bar.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Embodiment one
Referring to figs. 1 to Fig. 6, building outside climbing type CONSTRUCTION OPERATIONS platform and installation method, including column are led Rail 1, it is equidistant on the side vertical direction of column guide rail 1 to be fixedly connected with multiple cross bars 13, the company of sliding on column guide rail 1 It is connected to climbing device 2, climbing device 2, the outside of climbing device 2 is installed organic frame 11, is fixedly connected on the side wall of rack 11 Platform 12.
Climbing device 2 provides power by driving mechanism 4.
Specifically, driving mechanism includes decelerating motor 42, and decelerating motor 42 uses planet-gear speed reducing motor, decelerating motor 42 output shaft is fixedly connected with the axle center of turntable 22.
Climbing device 2 is by push rod 21, turntable 22, climbing support 23, U-shaped frame 24, the fluting of pin shaft 25, first 26,27 and of shaft Second fluting 28 is constituted, and turntable 22 connect with the output end of driving mechanism 4 and be driven by it circular motion, two lateral deviations of turntable 22 The shaft 27 of setting normal thereto is fixedly connected at the heart, shaft 27 is connected with the push rod 21 being vertically arranged, push rod 21 Upper and lower ends be fixedly connected to horizontally disposed U-shaped frame 24, the inner side of U-shaped frame 24 is fixedly connected with parallel with it Pin shaft 25, pin shaft 25 are passed through out of climbing support 23, and climbing support 23 is slidably connected on column guide rail 1, and pin shaft 25 is close to column The side of formula guide rail 1, which is fixedly connected with, climbs block 6.
Specifically, climbing support 23 includes sliding sleeve 231, baffle 232 and connecting plate 233;Sliding slot is axially offered on sliding sleeve 231 5, sliding sleeve 231 is slidably connected by sliding slot 5 with column guide rail 1, and sliding sleeve 231 is slidably connected on column guide rail 1, sliding sleeve 231 both ends are fixedly connected with connecting plate 233 respectively, and two connecting plates 233 are fixedly connected with baffle 232 jointly.
Further, the equal level in the two sides of climbing support 23 offers the first fluting 26, and the both ends of pin shaft 25 both pass through first Fluting 26 and level are slided vertically offers the second fluting 28 in it, on push rod 21, and the both ends of shaft 27 both pass through second and open Slot 28.
Embodiment two
The present embodiment is further provided with elastic arrived piece on the basis of example 1, and overall plan is as follows:
Referring to figs. 1 to Fig. 6, building outside climbing type CONSTRUCTION OPERATIONS platform and installation method, including column are led Rail 1, it is equidistant on the side vertical direction of column guide rail 1 to be fixedly connected with multiple cross bars 13, the company of sliding on column guide rail 1 It is connected to climbing device 2, climbing device 2, the outside of climbing device 2 is installed organic frame 11, is fixedly connected on the side wall of rack 11 Platform 12.
Climbing device 2 provides power by driving mechanism 4.
Specifically, driving mechanism includes decelerating motor 42, and decelerating motor 42 uses planet-gear speed reducing motor, decelerating motor 42 output shaft is fixedly connected with the axle center of turntable 22.
Climbing device 2 is by push rod 21, turntable 22, climbing support 23, U-shaped frame 24, the fluting of pin shaft 25, first 26,27 and of shaft Second fluting 28 is constituted, and turntable 22 connect with the output end of driving mechanism 4 and be driven by it circular motion, two lateral deviations of turntable 22 The shaft 27 of setting normal thereto is fixedly connected at the heart, shaft 27 is connected with the push rod 21 being vertically arranged, push rod 21 Upper and lower ends be fixedly connected to horizontally disposed U-shaped frame 24, the inner side of U-shaped frame 24 is fixedly connected with parallel with it Pin shaft 25, pin shaft 25 are passed through out of climbing support 23, and climbing support 23 is slidably connected on column guide rail 1, and pin shaft 25 is close to column The side of formula guide rail 1, which is fixedly connected with, climbs block 6.
Specifically, climbing support 23 includes sliding sleeve 231, baffle 232 and connecting plate 233;Sliding slot is axially offered on sliding sleeve 231 5, sliding sleeve 231 is slidably connected by sliding slot 5 with column guide rail 1, and sliding sleeve 231 is slidably connected on column guide rail 1, sliding sleeve 231 both ends are fixedly connected with connecting plate 233 respectively, and two connecting plates 233 are fixedly connected with baffle 232 jointly.
Further, pin shaft 25 is fixedly connected at least one gag lever post 10 far from the side for climbing block 6, and gag lever post 10 is separate The one end for climbing block 6 passes through baffle 232 and is fixedly connected with limited block 7, portion of the gag lever post 10 between baffle 232 and pin shaft 25 Divide and is arranged with reset spring 9.The setting of reset spring 9 is so that climbing block 6 can be inserted on column guide rail 1 under normal conditions.
Further, the equal level in the two sides of climbing support 23 offers the first fluting 26, and the both ends of pin shaft 25 both pass through first Fluting 26 and level are slided vertically offers the second fluting 28 in it, on push rod 21, and the both ends of shaft 27 both pass through second and open Slot 28.
Column guide rail 1 is installed, and climbing device 2 is mounted on column guide rail 1, when needing to climb, is opened Decelerating motor 42 is opened, decelerating motor 42 drives the turntable 22 of connection fixed thereto to rotate by drive shaft in turn, and turntable 22 rotates Afterwards and then drive two shafts 27 of two sides with its circular motion.
The Kinematic Decomposition of shaft 27 is at multistep:
When the beginning of shaft 27 is moved upwards by middle part, due to the setting of the second fluting 28, thus shaft 27 is being transported Move to second fluting 28 highest point when can move against armband push rod 21 thereon, push rod 21 movement after pass through U-shaped frame 24 Pin shaft 25 is driven to move, simultaneously because pin shaft 25 is slidably connected on climbing support 23, thus pin shaft 25 can drive 23 edge of climbing support Column guide rail 1 slide axially upwards;
When moving to top with shaft 27 and moved downward by the other side, push rod 21 is driven after moving by U-shaped frame 24 Pin shaft 25 moves, and pin shaft 25 slots 26 to the Slideslip close to column guide rail 1, so that will climb block 6 is caught in cross along first On bar.
Due to 27 alternating movement of shaft of 22 two sides of turntable, thus the shaft 27 of two sides can pass through push rod, U-shaped frame 24 and pin Axis 25 drives continuous intermittent move upwards of climbing support 23 to climb to realize, gradually band moving platform 12 rises.
In upper embodiment one and embodiment two, it is all made of following installation method:
The installation method includes the following steps:
Step 1: selected place of climbing in advance, and spacing between the two is calculated, processed according to two spacing between the two, Select the column guide rail 1 for being slightly above this length;
Column guide rail 1, is run to the top at pre- place of climbing by step 2, installation wall-attached frame by column guide rail 1 with build Object is built to be connected and fixed;
Step 3: platform 12 being mounted in rack 11 by bolt, leveling bolt is arranged in the screw hole of platform 12, is adjusted The elastic of leveling bolt is saved, and is polished the upper surface of platform 12, so that 12 surface of platform is horizontal.
Description before offer be can practice to make any person skilled in the art it is described herein various Aspect.Various modifications in terms of these will be easy to be understood by those skilled, and general as defined in this article Suitable principle can be applied to other aspects.Therefore, claim be not intended to be limited to herein shown in aspect, but answer The full scope consistent with linguistic claim is awarded, wherein removing non-specifically sound to the citation of the singular of element It is bright, it is otherwise not intended to indicate " one and only one ", but " one or more ".Meant herein using term " exemplary " " being used as example, example or explanation ".It need not be construed as here depicted as any aspect of " exemplary " preferred or advantageous over it In terms of him.Unless specifically stated otherwise, otherwise term "some" refer to one or more.Each side described throughout this disclosure The element in face is that those of ordinary skill in the art currently or hereafter pass through in known all structures with equivalent scheme functionally Citation is clearly included in this, and is intended to be covered by the claims.In addition, any content disclosed herein is not all purport The public is being contributed to, no matter whether such disclosure is explicitly recited in detail in the claims.There is no any claim member Element should be interpreted that device adds function, unless the element is clearly described using phrase " device being used for ... ".

Claims (6)

1. climbing type CONSTRUCTION OPERATIONS platform outside building, including column guide rail (1), which is characterized in that the column It is equidistant on the side vertical direction of formula guide rail (1) to be fixedly connected with multiple cross bars (13), it is slided on the column guide rail (1) It is connected with climbing device (2), the climbing device (2), organic frame (11) are installed in the outside of the climbing device (2), the machine Platform (12) are fixedly connected on the side wall of frame (11);
The climbing device (2) provides power by driving mechanism (4);
The climbing device (2) is opened by push rod (21), turntable (22), climbing support (23), U-shaped frame (24), pin shaft (25), first Slot (26), shaft (27) and the second fluting (28) are constituted, and the turntable (22) connect and with the output end of driving mechanism (4) by it Circular motion is driven, the two sides eccentric part of the turntable (22) is fixedly connected to the shaft (27) of setting normal thereto, described Shaft (27) is connected with the push rod (21) being vertically arranged, and the upper and lower ends of the push rod (21) are fixedly connected to level and set The U-shaped frame (24) set, the inner side of the U-shaped frame (24) are fixedly connected with pin shaft parallel with it (25), the pin shaft (25) it is passed through out of climbing support (23), the climbing support (23) is slidably connected on column guide rail (1), and the pin shaft (25) is leaned on The side of nearly column guide rail (1), which is fixedly connected with, climbs block (6).
2. climbing type CONSTRUCTION OPERATIONS platform outside building according to claim 1, which is characterized in that the driving Mechanism includes decelerating motor (42), and the decelerating motor (42) uses planet-gear speed reducing motor, the decelerating motor (42) Output shaft is fixedly connected with the axle center of turntable (22).
3. climbing type CONSTRUCTION OPERATIONS platform outside building according to claim 2, which is characterized in that described to climb Frame (23) includes sliding sleeve (231), baffle (232) and connecting plate (233);Sliding slot (5) are axially offered on the sliding sleeve (231), The sliding sleeve (231) is slidably connected by sliding slot (5) with column guide rail (1), and the sliding sleeve (231) is slidably connected at column On guide rail (1), the both ends of the sliding sleeve (231) are fixedly connected with connecting plate (233) respectively, and two connecting plates (233) are altogether It is same to be fixedly connected with baffle (232).
4. climbing type CONSTRUCTION OPERATIONS platform outside building according to claim 3, which is characterized in that the pin shaft (25) it is fixedly connected at least one gag lever post (10) far from the side for climbing block (6), the gag lever post (10) is separate to climb block (6) One end passes through baffle (232) and is fixedly connected with limited block (7), and the gag lever post (10) is located at baffle (232) and pin shaft (25) Between part be arranged with reset spring (9).
5. climbing type CONSTRUCTION OPERATIONS platform and installation method, feature exist outside building according to claim 3 In the equal level in two sides of the climbing support (23) offers the first fluting (26), and the both ends of the pin shaft (25) both pass through first It slots (26) and horizontal sliding is in it, vertically offered the second fluting (28) on the push rod (21), the shaft (27) Both ends both pass through the second fluting (28).
6. the installation method of climbing type CONSTRUCTION OPERATIONS platform outside building, which is characterized in that the installation method includes such as Lower step:
Step 1: selected place of climbing in advance, and spacing between the two is calculated, according to two spacing processing between the two, select The slightly above column guide rail (1) of this length;
Column guide rail (1), is run to the top at pre- place of climbing by step 2, installation wall-attached frame by column guide rail (1) with build Object is built to be connected and fixed;
Step 3: platform (12) being mounted on rack (11) by bolt, leveling bolt is arranged in the screw hole of platform (12), The elastic of leveling bolt is adjusted, and is polished the upper surface of platform (12), so that platform (12) surface is horizontal.
CN201910154365.2A 2019-03-01 2019-03-01 Climbing type building construction operation platform outside building Active CN109736558B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910154365.2A CN109736558B (en) 2019-03-01 2019-03-01 Climbing type building construction operation platform outside building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910154365.2A CN109736558B (en) 2019-03-01 2019-03-01 Climbing type building construction operation platform outside building

Publications (2)

Publication Number Publication Date
CN109736558A true CN109736558A (en) 2019-05-10
CN109736558B CN109736558B (en) 2020-11-27

Family

ID=66368971

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910154365.2A Active CN109736558B (en) 2019-03-01 2019-03-01 Climbing type building construction operation platform outside building

Country Status (1)

Country Link
CN (1) CN109736558B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111101847A (en) * 2019-12-19 2020-05-05 常德市鼎城永欣机械制造有限公司 Tower crane climbing frame
CN115749235A (en) * 2022-12-28 2023-03-07 重庆迈高电梯有限公司 Elevator shaft lifting scaffold and assembling method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4478385A (en) * 1981-05-02 1984-10-23 Josef Maier Climbing forms
CN200975099Y (en) * 2007-03-02 2007-11-14 顾粉兵 automatic up-down workstation for buildings exterior wall decoration
CN101210456A (en) * 2006-12-29 2008-07-02 西北工业大学 Wedge safety device used for high altitude lifting platform
CN103741939A (en) * 2013-12-25 2014-04-23 山东省建筑科学研究院 Climbing type building construction operating platform on outer portion of building and installing method
CN105040965A (en) * 2015-07-07 2015-11-11 北京星河模板脚手架工程有限公司 Attached type raising and falling overhead working device and construction method
CN105587114A (en) * 2015-12-28 2016-05-18 广州市京龙工程机械有限公司 Improved construction ascending and descending platform

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4478385A (en) * 1981-05-02 1984-10-23 Josef Maier Climbing forms
CN101210456A (en) * 2006-12-29 2008-07-02 西北工业大学 Wedge safety device used for high altitude lifting platform
CN200975099Y (en) * 2007-03-02 2007-11-14 顾粉兵 automatic up-down workstation for buildings exterior wall decoration
CN103741939A (en) * 2013-12-25 2014-04-23 山东省建筑科学研究院 Climbing type building construction operating platform on outer portion of building and installing method
CN105040965A (en) * 2015-07-07 2015-11-11 北京星河模板脚手架工程有限公司 Attached type raising and falling overhead working device and construction method
CN105587114A (en) * 2015-12-28 2016-05-18 广州市京龙工程机械有限公司 Improved construction ascending and descending platform

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111101847A (en) * 2019-12-19 2020-05-05 常德市鼎城永欣机械制造有限公司 Tower crane climbing frame
CN115749235A (en) * 2022-12-28 2023-03-07 重庆迈高电梯有限公司 Elevator shaft lifting scaffold and assembling method

Also Published As

Publication number Publication date
CN109736558B (en) 2020-11-27

Similar Documents

Publication Publication Date Title
CN109736558A (en) Climbing type CONSTRUCTION OPERATIONS platform and installation method outside building
EP3105393A1 (en) Hoist device for a scaffold
CN107355083B (en) A kind of hoistway module assembling system and assembling method
CN203244340U (en) Telescopic hanging basket
CN209099747U (en) It prevents from reversing elevating scaffold
CN106088561A (en) A kind of construction scaffold
CN107244615B (en) A kind of gate-type lifting equipment and method
CN213174733U (en) Rack for construction hanging basket
CN212269370U (en) A alternately from climbing formula platform for installation of elevator guide rail
CN115637645A (en) Intelligent tower building device for steel tower construction
CN115506565A (en) Building platform for outdoor building and indoor decoration
CN113638624A (en) Constructional engineering steel construction support frame
CN113830647A (en) Lift for building engineering
CN218933787U (en) Self-climbing platform used in hoistway
CN207392766U (en) A kind of hoistway module assembling system
CN215711618U (en) Dedicated jacking equipment of electromechanical installation
CN215407647U (en) Building site passageway protection shed structure
CN220223474U (en) Assembled building construction lift platform
CN212210290U (en) Cable erecting device for electromechanical installation
CN218292721U (en) Steel structure net rack jacking device
CN214785783U (en) Adjustable scaffold is used in building engineering construction
CN221917088U (en) Butt joint equipment for assembled bridge building
CN110644761A (en) Building construction protection platform
CN213294604U (en) Construction platform for housing construction engineering
CN216238159U (en) Anti-falling device for bridge construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20201109

Address after: Room 1608 and 1609, unit 2, sunshine Times Plaza, 288 qicang Road, Mingguang City, Chuzhou City, Anhui Province

Applicant after: Anhui Hongyuan Construction Project Management Co., Ltd

Address before: 250000 No. 4657 Tourist Road, Licheng District, Jinan City, Shandong Province

Applicant before: Cao Feng

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant