CN103728102B - 沥青船液货罐的气密和强度试验工艺方法 - Google Patents
沥青船液货罐的气密和强度试验工艺方法 Download PDFInfo
- Publication number
- CN103728102B CN103728102B CN201210391131.8A CN201210391131A CN103728102B CN 103728102 B CN103728102 B CN 103728102B CN 201210391131 A CN201210391131 A CN 201210391131A CN 103728102 B CN103728102 B CN 103728102B
- Authority
- CN
- China
- Prior art keywords
- liquid goods
- tank
- goods tank
- strength test
- test
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
- Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)
Abstract
本发明公开了一种沥青船液货罐的气密和强度试验工艺方法,包括以下步骤:A、液货罐气密试验:将液货罐在总组阶段敷设绝缘前进行充气,适当增加充气时间,以保证充气过程及结果可靠,并检测充气过程中有无渗漏出现;B、进行液货罐罐体外绝缘敷设;C、将液货罐进行吊装合拢;D、液货罐强度试验。本发明一种沥青船液货罐的气密和强度试验工艺方法,既保证了罐体结构的气密性和整个液货罐整体吊装前的完整性,又能确保强度试验的顺利进行,有效避免了合拢后敷设绝缘施工困难的问题,有效缩短了该种沥青船的建造周期,极大提高了建造效率。
Description
技术领域
本发明涉及一种沥青船液货罐的气密和强度试验工艺方法。
背景技术
在液货罐吊装之前船台强度不能承受整个液货罐做灌水试验,因而不能保证罐体结构的气密性和整个液货罐整体吊装前的完整性,不能确保强度试验的顺利进行,致使液货罐合拢后敷设绝缘施工困难,这样会使沥青船的建造周期增加,极大的影响建造效率。
发明内容
本发明的目的是提供一种沥青船液货罐的气密和强度试验工艺方法。
本发明为实现上述目的所采用的技术方案是:一种沥青船液货罐的气密和强度试验工艺方法,包括以下步骤:
A、液货罐气密试验:将液货罐在总组阶段形成完整的罐体后进行充气,适当增加充气时间,以保证充气过程及结果可靠,并检测充气过程中有无渗漏出现;如果在气密试验过程中发现局部漏气,需要将漏气部位用气刨刨开后重新焊透,直到密性完好为止;
B、进行液货罐罐体外绝缘敷设:绝缘敷设前要确保液罐密性完好,按技术要求敷设绝缘,罐体顶部限位块处绝缘暂不敷设,待合拢后顶部限位块与甲板配合完好后施工,绝缘敷设完后,检验绝缘敷设质量。
C、将液货罐进行吊装合拢:在船台阶段液货罐罐体吊装完成后,上下限位块、止滑块、垫块按技术要求研配安装,与主船体完整合拢。
D、液货罐强度试验:液货罐强度试验在水下进行,首先在试验前在液货罐的指定位置做型值记录,并设定一个固定参照物,然后在强度试验过程中,检测罐体外部结构是否有明显变形和且排水后未复位现象,将随罐体舱壁变形而产生位置变化的碰钉作为比较点,对比实验过程和参照物之间的位置变化,通过对罐体变形和复位情况来判断实际结构强度是否完好。
所述步骤D中试验过程中,所述步骤D中试验过程中,适当增加压水时间,检测在罐体内部罐体的纵壁是否有变形。
本发明一种沥青船液货罐的气密和强度试验工艺方法,在液货罐吊装之前进行气密试验并进行液罐外部绝缘敷设,待船舶下水后再进行强度试验,既保证了罐体结构的气密性和整个液货罐整体吊装前的完整性,又能确保强度试验的顺利进行,有效避免了合拢后敷设绝缘施工困难的问题,有效缩短了该种沥青船的建造周期,极大提高了建造效率。
具体实施方式
沥青船液货罐的气密和强度试验工艺方法,包括以下步骤:A、液货罐气密试验:为确保液货罐气密性完好,将液货罐在总组阶段(船台上)敷设绝缘前做充气试验,试验过程中严格控制试验细节,适当增加充气时间,以保证试验过程及结果可靠,气密试验过程中发现的渗漏处应立即刨开补焊,直到罐体密性完好,没有漏点为止;B、进行液货罐罐体外绝缘敷设;绝缘敷设前要确保液罐密性完好,按技术要求敷设绝缘,罐体顶部限位块处绝缘暂不敷设,待合拢后顶部限位块与甲板配合完好后施工,绝缘敷设完后,检验绝缘敷设质量;C、将液货罐进行吊装合拢;在船台阶段液货罐罐体吊装完成后,上下限位块、止滑块、垫块按技术要求研配安装,与主船体完整合拢;D、液货罐强度试验:液货罐强度试验在水下进行,首先在试验前在液货罐的指定位置做型值记录,便于试验后的数据对比,并设定一个固定参照物,然后在强度试验过程中,检测罐体外部结构是否有明显变形和且排水后未复位现象,将随罐体舱壁变形而产生位置变化的碰钉作为比较点,对比实验过程和参照物之间的位置变化,液货罐强度试验过程中,适当增加压水时间,检测在罐体外侧是否有漏水现象,在罐体内部罐体的纵壁是否有变形,本发明沥青船液货罐的气密和强度试验工艺方法,在液货罐吊装之前进行气密试验并进行液罐外部绝缘敷设,待船舶下水后再进行强度试验,既保证了罐体结构的气密性和整个液货罐整体吊装前的完整性,又能确保强度试验的顺利进行,有效避免了合拢后敷设绝缘施工困难的问题,有效缩短了该种沥青船的建造周期,极大提高了建造效率。
Claims (2)
1.一种沥青船液货罐的气密和强度试验工艺方法,其特征在于:包括以下步骤:
A、液货罐气密试验:将液货罐在总组阶段形成完整的罐体后进行充气,适当增加充气时间,以保证充气过程及结果可靠,并检测充气过程中有无渗漏出现;如果在气密试验过程中发现局部漏气,需要将漏气部位用气刨刨开后重新焊透,直到密性完好为止;
B、进行液货罐罐体外绝缘敷设:绝缘敷设前要确保液货罐密性完好,按技术要求敷设绝缘,罐体顶部限位块处绝缘暂不敷设,待合拢后顶部限位块与甲板配合完好后施工,绝缘敷设完后,检验绝缘敷设质量;
C、将液货罐进行吊装合拢:在船台阶段液货罐罐体吊装完成后,上下限位块、止滑块、垫块按技术要求研配安装,与主船体完整合拢;
D、液货罐强度试验:液货罐强度试验在水下进行,首先在试验前在液货罐的指定位置做型值记录,并设定一个固定参照物,然后在强度试验过程中,检测罐体外部结构是否有明显变形和排水后未复位现象,将随罐体舱壁变形而产生位置变化的碰钉作为比较点,对比实验过程和参照物之间的位置变化,通过对罐体变形和复位情况来判断实际结构强度是否完好。
2.根据权利要求1所述的一种沥青船液货罐的气密和强度试验工艺方法,其特征在于:所述步骤D中试验过程中,适当增加压水时间,检测在罐体内部罐体的纵壁是否有变形。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210391131.8A CN103728102B (zh) | 2012-10-16 | 2012-10-16 | 沥青船液货罐的气密和强度试验工艺方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210391131.8A CN103728102B (zh) | 2012-10-16 | 2012-10-16 | 沥青船液货罐的气密和强度试验工艺方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103728102A CN103728102A (zh) | 2014-04-16 |
CN103728102B true CN103728102B (zh) | 2016-12-21 |
Family
ID=50452272
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210391131.8A Expired - Fee Related CN103728102B (zh) | 2012-10-16 | 2012-10-16 | 沥青船液货罐的气密和强度试验工艺方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103728102B (zh) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115959260A (zh) * | 2022-12-15 | 2023-04-14 | 招商局金陵鼎衡船舶(扬州)有限公司 | 一种全压式lpg运输船货罐完整性吊装建造工艺 |
CN117367996B (zh) * | 2023-12-08 | 2024-02-20 | 康利源科技(天津)股份有限公司 | 一种用于船舶止移块的包覆金属强度检测方法 |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2465172Y (zh) * | 2001-01-18 | 2001-12-12 | 中华人民共和国天津出入境检验检疫局 | 危险品包装气密试验机 |
KR20080021421A (ko) * | 2006-09-04 | 2008-03-07 | 삼성테크윈 주식회사 | 정-부압 일체형 기밀 시험 장치 |
RU2451916C1 (ru) * | 2011-02-11 | 2012-05-27 | Открытое Акционерное Общество "Научно-Исследовательский Институт "Гермес" | Способ контроля |
CN202382910U (zh) * | 2011-12-23 | 2012-08-15 | 武汉一冶钢结构有限责任公司 | 用于船罐气密性试验的装置 |
-
2012
- 2012-10-16 CN CN201210391131.8A patent/CN103728102B/zh not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN103728102A (zh) | 2014-04-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109895945A (zh) | 一种矿砂船舷侧总段的纵横舱壁预组装方法 | |
CN104596704B (zh) | 一种lng罐体试验方法 | |
CN103728102B (zh) | 沥青船液货罐的气密和强度试验工艺方法 | |
CN103043181A (zh) | 一种干船坞内实现机舱设备运行、调试中散热的冷却方法 | |
CN104340336B (zh) | 一种船舶超重分段翻身方法 | |
CN107604933A (zh) | 一种贴靠式钢套箱围堰 | |
CN108120565A (zh) | 一种换能器电缆管的密性试验方法 | |
CN109108515A (zh) | 一种轮船油管的安装方法 | |
CN102582799B (zh) | 浮箱水上合拢工艺 | |
CN103913281A (zh) | 一种焊缝密性试验方法 | |
CN203965109U (zh) | 新型污水井及类似处所的密性试验盖 | |
CN203805438U (zh) | 高保温真空模板 | |
CN203285457U (zh) | 一种高防水、高气密性暗挖隧道结构 | |
CN207147895U (zh) | 一种简易式船舶舷侧通海短管 | |
CN103291329B (zh) | 暗挖隧道防水及气密性的施工方法及结构 | |
CN201819779U (zh) | 一种同时进行多处密封性检测的多功能钢提桶检测机 | |
JP2013049452A (ja) | Frpを用いたタンクの補修方法 | |
CN203241301U (zh) | 柔性防渗材料抗高压水开裂能力的仿真试验模型 | |
CN203132924U (zh) | 一种压力容器的局部试压结构 | |
CN104439819A (zh) | 一种低温双层液氨储罐施工工艺 | |
CN108930260A (zh) | 自升式平台桩腿的安装方法 | |
CN105711752B (zh) | A型独立液货舱底面外侧垂向支座绝缘的安装方法 | |
CN204422152U (zh) | 一种船舶建造中t型材水密补板整体水密性检测用的真空罩 | |
CN106976524A (zh) | 箱柱组件的安装方法 | |
CN207763888U (zh) | 一种外墙管根密封性能检测装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161221 Termination date: 20171016 |