CN103711066B - 新型钢箱梁顶板单元结构及制作方法 - Google Patents

新型钢箱梁顶板单元结构及制作方法 Download PDF

Info

Publication number
CN103711066B
CN103711066B CN201310639866.2A CN201310639866A CN103711066B CN 103711066 B CN103711066 B CN 103711066B CN 201310639866 A CN201310639866 A CN 201310639866A CN 103711066 B CN103711066 B CN 103711066B
Authority
CN
China
Prior art keywords
fishplate bar
shaped rib
welding
plate unit
weld
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310639866.2A
Other languages
English (en)
Other versions
CN103711066A (zh
Inventor
薛宏强
王岁利
朱新华
丁秀丽
薛长利
田刚毅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Baoji Bridge Group Co Ltd
Original Assignee
China Railway Baoji Bridge Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Baoji Bridge Group Co Ltd filed Critical China Railway Baoji Bridge Group Co Ltd
Priority to CN201310639866.2A priority Critical patent/CN103711066B/zh
Publication of CN103711066A publication Critical patent/CN103711066A/zh
Application granted granted Critical
Publication of CN103711066B publication Critical patent/CN103711066B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

本发明涉及一种在大型钢构桥梁制作中,能够有效保证顶板单元制作质量及精度的新型钢箱梁顶板单元结构及制作方法,由顶板、多块接板及多条U形肋组成,接板将U形肋断开,接板与顶板、U形肋之间均采用熔透焊接。焊接变形对板单元制作精度及质量影响较大。优点:一是通过对顶板单元预变形设置,减少熔透角焊缝的焊接变形;二是本发明所采用的预变形措施简单易行,不需要制作专用工装,实施效果明显。在保证制作质量的前提下,既缩短了制造周期,又取得了很好的经济效果;三是本发明取得了大量的试验数据,积累了熔透焊缝焊接变形的控制方法。

Description

新型钢箱梁顶板单元结构及制作方法
技术领域
本发明涉及一种在大型钢构桥梁制作中,能够有效保证顶板单元制作质量及精度的新型钢箱梁顶板单元结构及制作方法,属于钢桥梁部件制造领域。
背景技术
近年来钢桥制造技术日趋成熟,大跨度钢箱梁板单元制作大多采用面板组装U形肋后在反变形胎架上焊接,然后加工周边坡口的制作工艺。板单元的制作质量及制造精度很容易得到控制。但是,根据结构设计需要,近年来出现一种特殊结构的板单元,此类板单元多用于索塔、锚墩及辅助墩处。梁段顶底板纵向加劲在横隔板处断开。横隔板与顶板、U形肋均采用熔透焊接。由于焊接收缩比较大,板单元制作时,隔板与面板连接部位易产生变形。面板应力不能及时释放导致平面度超差,使得焊后矫正工作量大,局部死弯矫正效果甚微。板单元制作质量相对较差,对节段制作带来很大影响。
发明内容
设计目的:避免背景技术中的不足之处,设计一种能够有效保证顶板单元制作质量及精度的新型钢箱梁顶板单元结构及制作方法,从而实现板单元制作,使其结构尺寸、平面度等工艺项点满足标准要求。
设计方案:由于顶板单元焊接变形主要体现在两个方面:1、接板焊接采用双面坡口,焊接完毕后易产生局部角变形,致使单元平面度超差。2、U形肋与接板熔透焊缝焊接完毕后内部应力不易释放,致使板单元产生局部变形,平面度超差。根据制作过程中的变形量检测及数据分析发现:板单元的变形主要是由于熔透焊缝的焊接引起的,而U形肋与顶板单元坡口角焊缝的变形相对要小的多。因此本发明需要解决的技术问题有以下几项:1)顶板单元焊接完毕后面板局部变形大,接板及U形肋焊接前需分别设置预变形,变形量的确定是此类顶板单元制作的关键。2)顶板单元接板组焊完毕后,板单元焊接主要包括U形肋与顶板坡口角焊缝、U形肋与接板熔透焊缝,制作的关键在于采用合理的焊接顺序及焊接工艺以保证板单元制作质量。为此,为保证隔板与顶板熔透缝焊接作业,本发明在结构设计上,顶板单元主要由顶板、接板及U形肋等部分组成。顶板单元结构示意见图1。
根据结构特点,U形肋必须采用整体后装或增设嵌补段。由于横隔板间距较小,两侧设立嵌补段后中间段小于500mm,而且设置嵌补段还将增加横向对接缝。为此采用U形肋整体后装的制作工艺,板单元的变形主要通过一系列的反变形措施实现。顶板单元制作方案:钢板滚平预处理后,在平台上划出基准线、接板组装位置线及U形肋组装位置线,然后对顶板单元接板部位进行预弯,接板与顶板熔透焊缝焊接完毕后,组装U形肋钢衬垫并配装U形肋,再后在反变形胎架上船位焊接,焊接完毕后对面板进行修整,最后划线焰切周边坡口。顶板单元制作工艺流程:见图2。
技术方案1:一种新型钢箱梁顶板单元,由顶板、多块接板及U形肋组成,U形肋采用接板断开为多条U形肋,两条U形肋相对处与接板焊接、与顶板之间采用熔透焊接。
技术方案2:一种新型钢箱梁顶板单元结构制作方法,钢板滚平预处理后,在平台上划出纵、横基准线,并以其为基准划接板组装位置线及纵肋组装位置线,相邻两接板位置线之间增加2-2.5mm工艺量,将面板平铺于板单元组装平台上,采用火焰矫正的方式将接板部位预弯25-30mm,然后按线组焊接板,并对变形进行矫正,保证U形肋组装前接板部位预弯8-10mm,然后组装钢衬垫,并配装U形肋,U形肋组装后先在平台上焊接接板与U形肋的熔透角焊缝,然后在反变形胎架上船位施焊U形肋与顶板坡口角焊缝,焊缝施焊时由两侧向中间对称施焊(板单元焊接顺序见图3),焊接完毕后对板单元变形进行矫正,修正基线后,划线切割周边坡口。
本发明与背景技术相比,一是通过对顶板单元预变形设置,减少熔透角焊缝的焊接变形;二是本发明所采用的预变形措施简单易行,不需要制作专用工装,实施效果明显。在保证制作质量的前提下,既缩短了制造周期,又取得了很好的经济效果;三是本发明取得了大量的试验数据,积累了熔透焊缝焊接变形的控制方法。
附图说明
图1是钢箱梁顶板单元结构示意图。
图2是顶板单元制作工艺流程示意图。
图3是顶板单元焊接顺序示意图。
具体实施方式
实施例1:参照附图1。一种新型钢箱梁顶板单元,由顶板1、多块接板2及U形肋3组成,U形肋3采用接板2断开为多条U形肋,两条U形肋3相对处与接板2熔透焊接、与顶板之间采用熔透焊接。U形肋3在接板2处断开,且与接板采用熔透焊接。熔透焊缝、坡口焊缝多,焊接变形大,矫正困难。
实施例2:一种新型钢箱梁顶板单元结构制作方法,钢板滚平预处理后,在平台上划出纵、横基准线,并以其为基准划接板组装位置线及纵肋组装位置线,相邻两接板位置线之间增加2-2.5mm工艺量,将面板平铺于板单元组装平台上,采用火焰矫正的方式将接板部位预弯25-30mm,然后按线组焊接板,并对变形进行矫正,保证U形肋组装前接板部位预弯8-10mm,然后组装钢衬垫,并配装U形肋,U形肋组装后先在平台上焊接接板与U形肋的熔透角焊缝,然后在反变形胎架上船位施焊U形肋与顶板坡口角焊缝,焊缝施焊时由两侧向中间对称施焊,焊接完毕后对板单元变形进行矫正,修正基线后,划线切割周边坡口。为减少变形,U形肋焊缝施焊前分别在顶板外表面及U形肋与隔板之间设置马板和型钢加劲,减少焊接过程中的变形。
下面以大榭第二大桥索塔区钢箱梁顶板单元制作为例,介绍本技术发明的具体实施方式:
板单元划线完毕后,先在组装胎架上进行预弯,重点控制接板间距及垂直度。然后安装反变形板条加劲,采用CO2气体保护焊对称施焊接板熔透焊缝。焊缝无损检测完毕后,对变形进行矫正,并对板单元进行二次预弯。配装钢衬垫及U形肋。在反变形胎架上进行施焊,无损检测合格后,划线切割周边及坡口,完成板单元制作。
需要理解到的是:上述实施例虽然对本发明的设计思路作了比较详细的文字描述,但是这些文字描述,只是对本发明设计思路的简单文字描述,而不是对本发明设计思路的限制,任何不超出本发明设计思路的组合、增加或修改,均落入本发明的保护范围内。

Claims (2)

1.一种新型钢箱梁顶板单元,其特征是由顶板(1)、多块接板(2)及U形肋(3)组成,U形肋(3)采用接板(2)断开为多条U形肋,两条U形肋(3)相对处与接板(2)焊接、与顶板之间采用熔透焊接;其制作方法:钢板滚平预处理后,在平台上划出纵、横基准线,并以其为基准划接板组装位置线及纵肋组装位置线,相邻两接板位置线之间增加2-2.5mm工艺量,将面板平铺于板单元组装平台上,采用火焰矫正的方式将接板部位预弯25-30mm,然后按线组焊接板,并对变形进行矫正,保证U形肋组装前接板部位预弯8-10mm,然后组装钢衬垫,并配装U形肋,U形肋组装后先在平台上焊接接板与U形肋的熔透角焊缝,然后在反变形胎架上船位施焊U形肋与顶板坡口角焊缝,焊缝施焊时由两侧向中间对称施焊,焊接完毕后对板单元变形进行矫正,修正基线后,划线切割周边坡口。
2.根据权利要求1所述的新型钢箱梁顶板单元,其特征是:为减少变形,U形肋焊缝施焊前分别在顶板外表面及U形肋与隔板之间设置马板和型钢加劲,减少焊接过程中的变形。
CN201310639866.2A 2013-12-04 2013-12-04 新型钢箱梁顶板单元结构及制作方法 Active CN103711066B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310639866.2A CN103711066B (zh) 2013-12-04 2013-12-04 新型钢箱梁顶板单元结构及制作方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310639866.2A CN103711066B (zh) 2013-12-04 2013-12-04 新型钢箱梁顶板单元结构及制作方法

Publications (2)

Publication Number Publication Date
CN103711066A CN103711066A (zh) 2014-04-09
CN103711066B true CN103711066B (zh) 2016-04-27

Family

ID=50404386

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310639866.2A Active CN103711066B (zh) 2013-12-04 2013-12-04 新型钢箱梁顶板单元结构及制作方法

Country Status (1)

Country Link
CN (1) CN103711066B (zh)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105507158B (zh) * 2016-01-26 2017-04-19 盈都桥梁钢构工程有限公司 一种钢箱梁嵌补封板辅助安装装置及方法
CN107513936B (zh) * 2017-09-06 2024-04-05 中铁宝桥集团有限公司 上字形边主梁结构及制作方法
CN108555470A (zh) * 2018-07-04 2018-09-21 上海市政工程设计研究总院(集团)有限公司 一种u肋的嵌补段焊接结构
CN109986308B (zh) * 2019-04-26 2020-07-28 江苏京沪重工有限公司 一种钢箱梁板单元u肋与t肋组合建造工艺
CN110722252B (zh) * 2019-09-11 2021-09-17 沪东中华造船(集团)有限公司 一种复合接头与铝合金轻围壁的装配定位方法
CN114083108B (zh) * 2021-11-18 2023-06-02 南京雷尔伟新技术股份有限公司 Apm车底架、车顶生产方法
CN114669955B (zh) * 2022-04-29 2024-01-23 徐州徐工挖掘机械有限公司 一种预防管板结构焊接变形的方法

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2832898Y (zh) * 2005-11-17 2006-11-01 湖北省交通规划设计院 大跨度公路桥钢箱梁桥面板的横向支撑
JP2010106606A (ja) * 2008-10-31 2010-05-13 Taiheiyo Cement Corp 鋼床版構造及び鋼床版補強工法
JP2012017563A (ja) * 2010-07-06 2012-01-26 Hanshin Expressway Co Ltd 鋼床版および鋼床版の溶接方法
CN103084806A (zh) * 2013-01-18 2013-05-08 中铁宝桥(扬州)有限公司 一种大型曲线钢箱梁制作方法
CN203049452U (zh) * 2012-12-27 2013-07-10 南京工业大学 一种工厂预制正交异性钢板-复合材料组合桥面结构
CN203144900U (zh) * 2013-03-19 2013-08-21 南京工业大学 一种正交异性钢板-复合材料空心板组合桥面结构
CN103410089A (zh) * 2013-08-08 2013-11-27 南京工业大学 一种正交异性钢板-纤维格栅增强混凝土组合桥面结构
CN203700931U (zh) * 2013-12-04 2014-07-09 中铁宝桥集团有限公司 新型钢箱梁顶板单元结构

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2832898Y (zh) * 2005-11-17 2006-11-01 湖北省交通规划设计院 大跨度公路桥钢箱梁桥面板的横向支撑
JP2010106606A (ja) * 2008-10-31 2010-05-13 Taiheiyo Cement Corp 鋼床版構造及び鋼床版補強工法
JP2012017563A (ja) * 2010-07-06 2012-01-26 Hanshin Expressway Co Ltd 鋼床版および鋼床版の溶接方法
CN203049452U (zh) * 2012-12-27 2013-07-10 南京工业大学 一种工厂预制正交异性钢板-复合材料组合桥面结构
CN103084806A (zh) * 2013-01-18 2013-05-08 中铁宝桥(扬州)有限公司 一种大型曲线钢箱梁制作方法
CN203144900U (zh) * 2013-03-19 2013-08-21 南京工业大学 一种正交异性钢板-复合材料空心板组合桥面结构
CN103410089A (zh) * 2013-08-08 2013-11-27 南京工业大学 一种正交异性钢板-纤维格栅增强混凝土组合桥面结构
CN203700931U (zh) * 2013-12-04 2014-07-09 中铁宝桥集团有限公司 新型钢箱梁顶板单元结构

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
悬索桥钢箱加劲梁设计与制造技术的分析研究;代希华 等;《公路》;20120425(第04期);第102-103页"3.1 纵肋不贯通横肋"部分以及图10(a) *

Also Published As

Publication number Publication date
CN103711066A (zh) 2014-04-09

Similar Documents

Publication Publication Date Title
CN103711066B (zh) 新型钢箱梁顶板单元结构及制作方法
CN102277825B (zh) 一种钢桁架桥及其制作方法
CN101011781B (zh) 桥梁钢塔柱制造过程中焊接变形控制方法
CN202117225U (zh) 一种十字钢柱
CN103806660B (zh) 劲性混凝土结构梁-柱节点施工方法
CN103015537B (zh) 一种装配式钢结构体系的梁柱节点连接装置
CN103434611A (zh) 大型船舶的高精度控制建造方法
CN105332510A (zh) 一种复杂梁柱节点核心区施工方法
CN202099719U (zh) 一种钢桁架桥
CN103510714A (zh) 一种十字型钢柱焊接及施工方法
CN103184766A (zh) 一种大型钢结构及其制作方法
CN203700931U (zh) 新型钢箱梁顶板单元结构
CN107199437A (zh) 一种钢锚梁节段制备方法
CN106193620A (zh) 一种钢板剪力墙柱的加工方法
CN205444492U (zh) 一种h型悬臂钢梁柱几何截面拼接结构
JP6861431B2 (ja) 鋼床版インスタント橋
CN104878732A (zh) 一种钻井平台桩腿固桩架及其制作工艺
CN103212928B (zh) 防止悬臂梁底板焊接变形的方法
CN105290724A (zh) 一种桥梁下弦杆制作工艺
CN103481022A (zh) 一种墩柱模板制造方法
CN109434315B (zh) 一种连体式箱体剪力墙结构的加工制作工艺
CN103706827A (zh) 多片主梁上承式栓焊钢板梁桥的主梁上盖板钻孔方法
CN110789678A (zh) 一种用于化学品船底部分段对接装配的方法
CN108381128B (zh) 一种吊点穿出工形耐候钢边主梁制作方法
CN207904734U (zh) 上字形边主梁结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant