CN103510714A - 一种十字型钢柱焊接及施工方法 - Google Patents

一种十字型钢柱焊接及施工方法 Download PDF

Info

Publication number
CN103510714A
CN103510714A CN201210225458.8A CN201210225458A CN103510714A CN 103510714 A CN103510714 A CN 103510714A CN 201210225458 A CN201210225458 A CN 201210225458A CN 103510714 A CN103510714 A CN 103510714A
Authority
CN
China
Prior art keywords
welding
steel
cross
shaped steel
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201210225458.8A
Other languages
English (en)
Inventor
段运军
倪廷玉
赵利杰
李永涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHINA SIXTH METALLURGICAL CONSTRUCTION Co Ltd
Original Assignee
CHINA SIXTH METALLURGICAL CONSTRUCTION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHINA SIXTH METALLURGICAL CONSTRUCTION Co Ltd filed Critical CHINA SIXTH METALLURGICAL CONSTRUCTION Co Ltd
Priority to CN201210225458.8A priority Critical patent/CN103510714A/zh
Publication of CN103510714A publication Critical patent/CN103510714A/zh
Withdrawn legal-status Critical Current

Links

Images

Landscapes

  • Butt Welding And Welding Of Specific Article (AREA)

Abstract

一种十字型钢柱的焊接及施工的方法,采用工艺流程为选择、放样、下料、制作H型钢、制作T型钢、矫正、边缘加工、组装十字柱、焊接十字柱、装焊顶板和地脚板、矫正调直、清理挂牌、验收出厂等工序。对于装配精度,采取自动组立与工装夹具来保证;对于焊接变形,采取适当的焊接工艺及加上必要的机械与火焰校正,现场安装采用整体吊装安装方式。不但满足了正常的施工要求,而且下料准确,减少废料,节约钢材,确保整体施工质量满足设计及施工规范要求;质量显著提高,优化设计降低了高空作业人员与设备的风险,安全性显著提高,减轻了工人的劳动强度。

Description

一种十字型钢柱焊接及施工方法
技术领域
本发明涉及施工领域,尤其是一种十字型钢柱的焊接及施工的方法。
背景技术
近年来,钢和混凝土的组合结构在我国获得了长足的发展,广泛应用于高层建筑、大跨桥梁、工业厂房和地铁站台柱等。十字型钢柱是一种常用的工程结构,而施工工程中主要的难点在于装配精度及焊接变形的控制。
发明内容
针对上述问题,本发明解决技术难题所采取的方案是:采用工艺流程为选择、放样、下料、制作H型钢、制作T型钢、矫正、边缘加工、组装十字柱、焊接十字柱、装焊顶板和地脚板、矫正调直、清理挂牌、验收出厂等工序。对于装配精度,采取自动组立与工装夹具来保证;对于焊接变形,采取适当的焊接工艺及加上必要的机械与火焰矫正。
本发明的有益效果是:下料准确,减少废料,节约钢材,确保整体施工质量满足设计及施工规范要求;质量显著提高,优化设计降低了高空作业人员与设备的风险,安全性显著提高,并减轻了工人的劳动强度。
附图说明
下面结合附图对本发明进行进一步的说明。
图1为十字型钢柱制作流程图;图2为H型钢制作流程图。
具体实施方式
1. 采用工艺流程为选择、放样、下料、制作H型钢、制作T型钢、矫正、边缘加工、组装十字柱、焊接十字柱、装焊顶板和地脚板、矫正调直、清理挂牌、验收出厂等工序,如图1。
1.1H型钢制作流程为下料、H型钢组对、自动焊接、自动矫正,如图2。
① 下料前先根据分段长度进行板料接长板料对接时,坡口为X型坡口。并在焊缝两头各增加与坡口型式相同的引弧板一块。焊后去掉,并修磨焊道边缘至平整;板料对接处焊后进行探伤。合格后,对接口处进行调平。
② 板料直条下料,包括切割,加工坡口。
③ 翼缘与腹板组立,组对前先按翼板宽度找出板料中心线,再按此中心线返出腹板边缘线,并按此线进行组对;对所有影响板料组对的缺陷,如毛刺等进行清理,以保证组对精度;组对时先按板料长度检查,要求总长度上侧弯≤2mm,宽度误差±1.5mm;采用小直径焊条或焊丝打底焊1道。坡口底层焊道采用焊条手工电弧焊时宜使用小于ø4mm的焊条或CO2气体保护焊施焊,底层根部焊道的最小尺寸以最大厚度不超过6mm。打底反面需继续施焊的,必须在反面清根后才能施焊。
④ 组立后的H型构件放在45°门式埋弧焊机的胎架上,进行全自动埋弧焊接。
⑤ 成型后的H型钢放在翼缘矫正机上矫正。
1.2 T型钢制作是由焊接H型钢切割而成,先做成H型钢,然后从腹板中间把H型钢切割成两个T型钢,H组立前,将腹板对中剖,但每米留20mm不要剖断,待H钢组立焊接完成,冷却,要用T型钢时,再把原没剖断处剖断。
2. 十字型钢柱是由一个焊接H钢和两个T型钢组立、焊接而成。
采用专用的组装卡具来保证其尺寸要求,当 T型钢发生弯曲,组十字时,可自制门式辅具配以千斤顶压以保证T型腹板与H钢腹板密合。然后组对加劲板进行组焊,对加劲板要求进行铣加工或使用数控下料以保证T型钢中心位置及十字型截面互成90度角。
焊接要求T型钢腹板开坡口熔透焊,焊接量较大。如果构件截面足够大可考虑埋弧焊。
控制焊接结构变形的措施:一是焊接前用临时撑将T型钢支撑牢固作刚性固定,避免焊接变形,然后再装隔板。二是将隔板先装好再焊接,这样用隔板来固定T型钢控制焊接变形,这样做必须在隔板上留出足够大的焊主焊缝的工艺孔。
3.焊接变形经常采用以下三种火焰矫正方法:①线状加热法;②点状加热法;③三角形加热法。
构件不同部位的火焰矫正加热温度(T)和冷却方式按下面的施工方法(材质为低碳钢):低温矫正:500℃≤T≤600℃ 冷却方式:水 ;
中温矫正:600℃≤T≤700℃ 冷却方式:空气和水;
高温矫正:700℃≤T≤800℃ 冷却方式:空气 。
3.1翼缘板的角变形矫正:在翼缘板上面(对准焊缝外)纵向线状加热(加热温度控制在650℃以下),加热范围不超过两焊脚所控制的范围,不宜用水冷却。
线状加热时不应在同一位置反复加热,同时加热过程中不要进行浇水。
3.2钢构件的上拱与下挠及弯曲矫正:①在翼缘板上,对着纵长焊缝,由中间向两端作线状加热,即可矫正弯曲变形。为避免产生弯曲和扭曲变形,两条加热带要同步进行。可采取低温矫正或中温矫正法。这种方法有利于减少焊接内应力,但这种方法在纵向收缩的同时有较大的横向收缩,较难掌握。②翼缘板上作线状加热,在腹板上作三角形加热。用这种方法矫正焊接型钢的弯曲变形,效果显著,翼缘板上横向线状加热宽度视板厚一般取20mm一90mm,板厚小时,加热宽度要窄一些,加热过程应由宽度中间向两边扩展。线状加热最好由两人同时操作进行,再在腹板上分别加热三角形,三角形的宽度不应超过板厚的2倍,三角形的底与对应的翼板上线状加热宽度相等。加热三角形从顶部开始,然后从中心向两侧扩展,一层层加热直到三角形的底为止。加热腹板时温度不能太高,否则造成凹陷变形,很难修复。
3.3钢构件的波浪变形:矫正波浪变形首先要找出凸起的高点,用圆点加热法配合手锤矫正。加热圆点的直径一般为50mm一90mm,当钢板厚度或波浪形面积较大时直径也应放大,可按d=(4t+10)mm(d为加热点直径,t为板厚)计算得出加热圆点直径。烤嘴从高点起作螺旋形移动,采用中温矫正。当温度达到600℃一700℃时,在加热区边缘处垫块钢板用手锤击打,使加热区金属受挤压,冷却收缩后被拉平。矫正时应避免产生过大的收缩应力。矫完一个圆点后再进行加热第二个高点,方法同上。为加快冷却速度,可对Q235钢材进行加水冷却。这种矫正方法属于点状加热法,加热点的分布可呈梅花形或链式密点形,温度不要超过750℃。
主要施工方法:工厂分段加工成品构件在施工现场进行十字型钢柱桥式起重机吊装安装,可节省作业时间并大大减少现场作业人员数量。

Claims (4)

1.一种十字型钢柱的焊接及施工的方法,其特征是:采用工艺流程为选择、放样、下料、制作H型钢、制作T型钢、矫正、边缘加工、组装十字柱、焊接十字柱、装焊顶板和地脚板、矫正调直、清理挂牌、验收出厂等工序;对于装配精度,采取自动组立与工装夹具来保证;对于焊接变形,采取适当的焊接工艺及加上必要的机械与火焰校正,现场安装采用整体吊装安装方式。
2.根据权利要求1所述的一种十字型钢柱的焊接及施工的方法,其特征是:采用工艺流程为选择、放样、下料、制作H型钢、制作T型钢、矫正、边缘加工、组装十字柱、焊接十字柱、装焊顶板和地脚板、矫正调直、清理挂牌、验收出厂等工序,如图1。
3.根据权利要求1所述的一种十字型钢柱的焊接及施工的方法,其特征是:H型钢制作流程为下料、H型钢组对、自动焊接、自动校正,如图2。
4.根据权利要求1所述的一种十字型钢柱的焊接及施工的方法,其特征是:T型钢制作是由焊接H型钢切割而成,先做成H型钢,然后从腹板中间把H型钢切割成两个T型钢,H组立前,将腹板对中剖,但每米留20mm不要剖断,待H钢组立焊接完成,冷却,要用T型钢时,再把原没剖断处剖断。
CN201210225458.8A 2012-07-03 2012-07-03 一种十字型钢柱焊接及施工方法 Withdrawn CN103510714A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210225458.8A CN103510714A (zh) 2012-07-03 2012-07-03 一种十字型钢柱焊接及施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210225458.8A CN103510714A (zh) 2012-07-03 2012-07-03 一种十字型钢柱焊接及施工方法

Publications (1)

Publication Number Publication Date
CN103510714A true CN103510714A (zh) 2014-01-15

Family

ID=49894088

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210225458.8A Withdrawn CN103510714A (zh) 2012-07-03 2012-07-03 一种十字型钢柱焊接及施工方法

Country Status (1)

Country Link
CN (1) CN103510714A (zh)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103912061A (zh) * 2014-03-31 2014-07-09 浙江精工钢结构集团有限公司 钢结构弯扭构件高精度免测量施工方法
CN104259622A (zh) * 2014-07-31 2015-01-07 中国十七冶集团有限公司 潮湿环境下厂房柱对接焊接方法
CN104452963A (zh) * 2014-11-02 2015-03-25 中国水利水电第四工程局有限公司 一种钢网架关键部件制作及施工方法
CN104475991A (zh) * 2014-10-25 2015-04-01 中国二十二冶集团有限公司 十字型钢骨柱装配工艺
CN105562898A (zh) * 2016-03-03 2016-05-11 湖北浩南钢结构工程有限公司 一种钢板拼焊十字柱制作防变形的方法
CN105888136A (zh) * 2014-11-28 2016-08-24 华北冶建工程建设有限公司 一种十字型钢柱制作组装方法
CN106736262A (zh) * 2016-11-24 2017-05-31 唐山开元特种焊接设备有限公司 H型钢生产工艺
CN109304384A (zh) * 2018-12-07 2019-02-05 中冶建工集团有限公司 一种焊接组合t型钢柱的矫正装置及矫正方法
CN110695618A (zh) * 2018-07-10 2020-01-17 北京京盛泰华金属结构有限公司 H型钢焊接工艺
CN112453661A (zh) * 2020-11-10 2021-03-09 新疆冶金建设(集团)有限责任公司 一种十字钢柱控制热变形的焊接制作方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002070161A (ja) * 2000-09-05 2002-03-08 Penta Ocean Constr Co Ltd 鋼管柱の建方方法および鉄骨構造物の構築方法
CN101695787A (zh) * 2009-10-16 2010-04-21 无锡洲翔重工科技有限公司 十字柱组立机
CN201546368U (zh) * 2009-09-16 2010-08-11 广东启光集团有限公司 钢结构柱体
CN101818575A (zh) * 2010-02-10 2010-09-01 中国建筑第七工程局有限公司 十字形型钢柱施工工艺

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002070161A (ja) * 2000-09-05 2002-03-08 Penta Ocean Constr Co Ltd 鋼管柱の建方方法および鉄骨構造物の構築方法
CN201546368U (zh) * 2009-09-16 2010-08-11 广东启光集团有限公司 钢结构柱体
CN101695787A (zh) * 2009-10-16 2010-04-21 无锡洲翔重工科技有限公司 十字柱组立机
CN101818575A (zh) * 2010-02-10 2010-09-01 中国建筑第七工程局有限公司 十字形型钢柱施工工艺

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
宋统战: "《"十"字型钢构件焊接制作工艺研究》", 《现代焊接》 *

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103912061A (zh) * 2014-03-31 2014-07-09 浙江精工钢结构集团有限公司 钢结构弯扭构件高精度免测量施工方法
CN103912061B (zh) * 2014-03-31 2016-03-16 浙江精工钢结构集团有限公司 钢结构弯扭构件高精度免测量施工方法
CN104259622A (zh) * 2014-07-31 2015-01-07 中国十七冶集团有限公司 潮湿环境下厂房柱对接焊接方法
CN104475991A (zh) * 2014-10-25 2015-04-01 中国二十二冶集团有限公司 十字型钢骨柱装配工艺
CN104452963A (zh) * 2014-11-02 2015-03-25 中国水利水电第四工程局有限公司 一种钢网架关键部件制作及施工方法
CN104452963B (zh) * 2014-11-02 2017-04-19 中国水利水电第四工程局有限公司 一种钢网架关键部件制作及施工方法
CN105888136A (zh) * 2014-11-28 2016-08-24 华北冶建工程建设有限公司 一种十字型钢柱制作组装方法
CN105562898A (zh) * 2016-03-03 2016-05-11 湖北浩南钢结构工程有限公司 一种钢板拼焊十字柱制作防变形的方法
CN106736262A (zh) * 2016-11-24 2017-05-31 唐山开元特种焊接设备有限公司 H型钢生产工艺
CN110695618A (zh) * 2018-07-10 2020-01-17 北京京盛泰华金属结构有限公司 H型钢焊接工艺
CN109304384A (zh) * 2018-12-07 2019-02-05 中冶建工集团有限公司 一种焊接组合t型钢柱的矫正装置及矫正方法
CN109304384B (zh) * 2018-12-07 2024-04-05 中冶建工集团有限公司 一种焊接组合t型钢柱的矫正装置及矫正方法
CN112453661A (zh) * 2020-11-10 2021-03-09 新疆冶金建设(集团)有限责任公司 一种十字钢柱控制热变形的焊接制作方法

Similar Documents

Publication Publication Date Title
CN103510714A (zh) 一种十字型钢柱焊接及施工方法
CN103659182B (zh) 弯扭箱型梁360°旋转楼梯的制作方法
CN102896480A (zh) 双曲面h型钢的制作方法
CN203636271U (zh) 桥梁顶板、底板及腹板焊接反变形胎架工装
CN104625622B (zh) 一种焊接飘带状厚板箱型结构的方法
CN103521556A (zh) 一种十字钢焊接变形后火焰矫正的方法
CN103711066B (zh) 新型钢箱梁顶板单元结构及制作方法
CN108031957B (zh) 一种耐候全焊钢结构加劲梁悬索桥的焊接制造方法
CN107035060A (zh) 一种大截面厚壁焊接箱型构件及其制作方法
CN103184766A (zh) 一种大型钢结构及其制作方法
CN103934693A (zh) 箱型结构柱/梁成型的加工工艺
CN207013923U (zh) 一种斜交h型钢的组装胎具
CN109128444B (zh) 防止蒸汽头板焊接变形的焊接方法及装置
CN103231157A (zh) 一种焊接h型钢的制作工艺
CN103669665A (zh) 钢筋桁架楼承板施工的标高差节点施工工艺
CN103481022A (zh) 一种墩柱模板制造方法
CN102909479A (zh) 方形长钢梁焊接方法
CN110860768B (zh) 一种轨道吊大梁承轨梁与方钢轨道焊接工艺
CN107060209A (zh) 一种多边形钢柱及其加工方法
CN110877191B (zh) 大吨位重型实腹式吊车梁预起拱制造工法
CN105414892A (zh) 用船位型焊接制作腹板有蜂窝状空洞的h型钢的方法
CN103551705A (zh) 重庆单轨车顶板组成焊接工艺方法
CN109434315B (zh) 一种连体式箱体剪力墙结构的加工制作工艺
CN111571072A (zh) 一种箱型细长梁的焊接精度控制方法
CN209277403U (zh) 一种梁钢筋骨架固定卡具

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C04 Withdrawal of patent application after publication (patent law 2001)
WW01 Invention patent application withdrawn after publication

Application publication date: 20140115