CN103669878A - 一种核心筒钢筋接驳方法 - Google Patents

一种核心筒钢筋接驳方法 Download PDF

Info

Publication number
CN103669878A
CN103669878A CN201310571371.0A CN201310571371A CN103669878A CN 103669878 A CN103669878 A CN 103669878A CN 201310571371 A CN201310571371 A CN 201310571371A CN 103669878 A CN103669878 A CN 103669878A
Authority
CN
China
Prior art keywords
steel bars
reinforcing bar
slab
steel
core tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310571371.0A
Other languages
English (en)
Inventor
包纯南
蒋宇航
李明贵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongtian Construction Group Co Ltd
Original Assignee
Zhongtian Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongtian Construction Group Co Ltd filed Critical Zhongtian Construction Group Co Ltd
Priority to CN201310571371.0A priority Critical patent/CN103669878A/zh
Publication of CN103669878A publication Critical patent/CN103669878A/zh
Pending legal-status Critical Current

Links

Images

Abstract

本发明公开了一种核心筒钢筋接驳方法,包括如下步骤:步骤一:核心筒施工时,将预埋钢板按预定位置预埋好,连接钢筋焊接在预埋钢板上;步骤二:待楼板施工时,在楼板上下皮钢筋对应的位置焊接加固钢板,将钢筋焊接在加固钢板上完成钢筋的连接;步骤三:绑扎另一个方向的钢筋,绑扎完成验收合格后浇筑混凝土。本发明采用预埋条带(格)式核心筒钢筋接驳方法,可使钢筋有效连接,且可校正钢筋略偏现象。

Description

一种核心筒钢筋接驳方法
技术领域
本发明涉及建筑施工领域,具体涉及核心筒钢筋接驳方法。
背景技术
随着城市建设的发展,超高层建筑越来越多,框架-核心筒结构成为国际上超高层建筑广泛采用的主流结构形式。施工时由于先施工核心筒结构,所以给楼板施工的钢筋绑扎造成不便,现场通常采用植筋的形式,但植筋的效果往往不太理想。
发明内容
本发明所要解决的技术问题就是提供一种核心筒钢筋接驳方法,可使钢筋有效连接,且可校正钢筋略偏现象。
为解决上述技术问题,本发明采用如下技术方案:一种核心筒钢筋接驳方法,其特征在于包括如下步骤:
步骤一:核心筒施工时,将预埋钢板按预定位置预埋好,连接钢筋焊接在预埋钢板上;
步骤二:待楼板施工时,在楼板上下皮钢筋对应的位置焊接加固钢板,将钢筋焊接在加固钢板上完成钢筋的连接;
步骤三:绑扎另一个方向的钢筋,绑扎完成验收合格后浇筑混凝土。
优选的,当楼板厚度较厚时,采用条格式预埋钢板,当楼板厚度较薄时,采用条带式预埋钢板。
本发明采用预埋条带(格)式核心筒钢筋接驳方法,可使钢筋有效连接,且可校正钢筋略偏现象。
附图说明
下面结合附图和具体实施方式对本发明作进一步描述:
图1是预埋条带式核心筒钢筋接驳结构示意图;
图2是预埋条格式核心筒钢筋接驳结构示意图。
具体实施方式
一种核心筒钢筋接驳方法,包括如下步骤:
步骤一:核心筒1施工时,将预埋钢板按预定位置预埋好,连接钢筋3焊接在预埋钢板上;
步骤二:待楼板施工时,在楼板上下皮钢筋对应的位置焊接加固钢板,将钢筋焊接在加固钢板上完成钢筋的连接;
步骤三:绑扎另一个方向的钢筋,绑扎完成验收合格后浇筑混凝土。
如图1所示,当楼板厚度较厚时,采用条带式预埋钢板2进行预埋施工。
如图2所示,当楼板厚度较薄时,采用条格式预埋钢板4进行预埋施工。

Claims (2)

1.一种核心筒钢筋接驳方法,其特征在于包括如下步骤:
步骤一:核心筒施工时,将预埋钢板按预定位置预埋好,连接钢筋焊接在预埋钢板上;
步骤二:待楼板施工时,在楼板上下皮钢筋对应的位置焊接加固钢板,将钢筋焊接在加固钢板上完成钢筋的连接;
步骤三:绑扎另一个方向的钢筋,绑扎完成验收合格后浇筑混凝土。
2.根据权利要求1所述的核心筒钢筋接驳方法,其特征在于:当楼板厚度较厚时,采用条格式预埋钢板,当楼板厚度较薄时,采用条带式预埋钢板。
CN201310571371.0A 2013-11-13 2013-11-13 一种核心筒钢筋接驳方法 Pending CN103669878A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310571371.0A CN103669878A (zh) 2013-11-13 2013-11-13 一种核心筒钢筋接驳方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310571371.0A CN103669878A (zh) 2013-11-13 2013-11-13 一种核心筒钢筋接驳方法

Publications (1)

Publication Number Publication Date
CN103669878A true CN103669878A (zh) 2014-03-26

Family

ID=50308587

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310571371.0A Pending CN103669878A (zh) 2013-11-13 2013-11-13 一种核心筒钢筋接驳方法

Country Status (1)

Country Link
CN (1) CN103669878A (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105239779A (zh) * 2015-11-02 2016-01-13 安徽杭萧钢结构有限公司 核心筒的施工方法及核心筒
CN107893479A (zh) * 2017-11-27 2018-04-10 广州大学 一种预制装配式混凝土框架
CN115162536A (zh) * 2022-06-20 2022-10-11 中国建筑第八工程局有限公司 核心筒与楼板的连接结构及其施工方法
CN115288304A (zh) * 2022-08-12 2022-11-04 中国建筑第八工程局有限公司 一种筒墙体与楼板连接的钢腰带结构、焊接设备及方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0570090A (ja) * 1991-09-05 1993-03-23 Haseko Corp 鉄筋の運搬方法
JPH09279846A (ja) * 1996-04-10 1997-10-28 Masumi Yamada 錆び止め塗り鉄筋と鉄骨
CN101845887A (zh) * 2009-03-25 2010-09-29 杨正德 钢骨预应力钢筋混凝土的建筑构造方法
CN103291000A (zh) * 2013-05-24 2013-09-11 中国华冶科工集团有限公司 工具式钢筋支架及其悬挂楼板负弯矩钢筋的施工方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0570090A (ja) * 1991-09-05 1993-03-23 Haseko Corp 鉄筋の運搬方法
JPH09279846A (ja) * 1996-04-10 1997-10-28 Masumi Yamada 錆び止め塗り鉄筋と鉄骨
CN101845887A (zh) * 2009-03-25 2010-09-29 杨正德 钢骨预应力钢筋混凝土的建筑构造方法
CN103291000A (zh) * 2013-05-24 2013-09-11 中国华冶科工集团有限公司 工具式钢筋支架及其悬挂楼板负弯矩钢筋的施工方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
张晓勇等: "预制全装配式混凝土框架结构施工技术", 《施工技术》 *
黄宇星等: "预制混凝土结构连接方式研究综述", 《混凝土》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105239779A (zh) * 2015-11-02 2016-01-13 安徽杭萧钢结构有限公司 核心筒的施工方法及核心筒
CN107893479A (zh) * 2017-11-27 2018-04-10 广州大学 一种预制装配式混凝土框架
CN115162536A (zh) * 2022-06-20 2022-10-11 中国建筑第八工程局有限公司 核心筒与楼板的连接结构及其施工方法
CN115288304A (zh) * 2022-08-12 2022-11-04 中国建筑第八工程局有限公司 一种筒墙体与楼板连接的钢腰带结构、焊接设备及方法

Similar Documents

Publication Publication Date Title
CN201217847Y (zh) 插入式预留孔灌浆钢筋搭接连接构件
CN104032869B (zh) 一种预制叠合楼板及其预制施工方法
CN103669878A (zh) 一种核心筒钢筋接驳方法
CN102235034A (zh) 预制构件及其与主体结构连接的施工方法
CN202055263U (zh) 钢筋混凝土廊道
CN106639052B (zh) 钢板混凝土剪力墙的装配式结构体系及其施工方法
CN204199330U (zh) 一种后浇带整体止水钢板
CN103590493A (zh) 叠合板式混凝土剪力墙及纵向连接方法
CN103726589A (zh) 工形钢与钢管架构界面鼓凸设斜钢筋装配剪力墙及作法
CN202787330U (zh) 一种后浇带模板
CN204212023U (zh) 一种拼接式钢筋混凝土临时路面
CN204626453U (zh) 城市地下综合管廊中管道的支承机构
CN103866866B (zh) 超高层核心筒与外框架梁后浇节点
CN204551172U (zh) 一种装配式钢筋混凝土空心预制路面
CN204059665U (zh) 一种预制排孔式剪力墙
CN202280152U (zh) 一种在钢筋混凝土板底设置预埋件的结构
CN205024719U (zh) 桩基础与地下连续墙一体化的逆作法施工竖向支撑体系
CN204934980U (zh) 钢筋搭接焊接头辅助器
CN103643741A (zh) 预制混凝土构件连接方法
CN206693470U (zh) 一种现浇次梁t形楼板
CN203361643U (zh) 免拆除、免凿毛预留孔洞的模板
CN102587420A (zh) 一种以钻孔灌注桩作分隔围护的分期施工地下室换撑方法
CN202466913U (zh) 跨度内应用钢筋180°弯锚连接的混凝土叠合板
CN204510649U (zh) 一种预制件组合楼梯
CN205314553U (zh) 加强型梁柱或剪力墙用保温免拆模板

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140326