CN103669222A - 预制箱梁的组合式遮阳防雨棚 - Google Patents
预制箱梁的组合式遮阳防雨棚 Download PDFInfo
- Publication number
- CN103669222A CN103669222A CN201310716942.5A CN201310716942A CN103669222A CN 103669222 A CN103669222 A CN 103669222A CN 201310716942 A CN201310716942 A CN 201310716942A CN 103669222 A CN103669222 A CN 103669222A
- Authority
- CN
- China
- Prior art keywords
- hack lever
- case beam
- support
- rainproof canopy
- sun
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Tents Or Canopies (AREA)
Abstract
本发明公开了一种预制箱梁的组合式遮阳防雨棚,解决了现有箱梁及T梁预制中遮阳雨棚反复拆装所存在的材料浪费,耽误工期的问题。包括在左、右人行道上均焊接有纵向通长固定角钢,在纵向通长固定角钢与箱梁翼缘挡板之间等间隔的活动设置有遮阳防雨棚支架立柱,在遮阳防雨棚支架立柱的顶端设置有支撑三角架,在支撑三角架顶部固定设置有插接管;左活动架杆(11)的右端与右活动架杆(17)左端通过铰轴(16)铰接,左活动架杆(11)的左端插接在左插接管(8)中,在右活动架杆(17)右端插接在右插接管(20)中,在左活动架杆(11)的右端和右活动架杆(17)上面活动设置有遮雨布(27)。本发明采用接插组合式的雨棚支架,组装方便,拆卸容易。
Description
技术领域
本发明涉及一种遮阳防雨棚,特别涉及一种在预制箱梁混凝土浇筑及钢筋绑扎施工中所使用的遮阳防雨棚
背景技术
在工厂预制梁中,箱梁的预制是在露天下完成作业的,单片梁的预制周期约3-4天。预制箱梁的前期钢筋绑扎工序和混凝土浇筑工序,工艺要求不能在雨中进行,确保混凝土浇筑时不受雨水侵害,现有技术是在预制箱梁的上方搭设临时防雨遮阳棚来满足工艺要求,当浇筑工序完成后,必需拆除临时搭设的防雨遮阳棚,以方便龙门吊来进行内外模安装、脱模、移梁等工序,临时防雨棚是采用纵横交叉的若干钢管组成的整体棚架,其结构较重,且拼装不便,使用时需使用两个龙门吊悬吊起雨棚悬在空中进行混凝土的浇灌,这种方法是很不安全,增加了施工成本,临时雨棚存在反复搭设和拆除造成材料浪费,耽误工期,增加工人的劳动强度的问题,严重制约了制梁的总体施工进度。
发明内容
本发明提供了一种预制箱梁的组合式遮阳防雨棚,解决了现有箱梁及T梁预制中遮阳雨棚反复拆装所存在的材料浪费,耽误工期的技术问题。
一种预制箱梁的组合式遮阳防雨棚,包括箱梁左外侧模支撑桁架和箱梁右外侧模支撑桁架,在左外侧模支撑桁架和箱梁右外侧模支撑桁架上设置有箱梁外侧模,在箱梁外侧模的左端设置有箱梁左翼缘挡板,箱梁左翼缘挡板的左侧设置有左人行道,在箱梁外侧模的右端设置有箱梁右翼缘挡板,箱梁右翼缘挡板的右侧设置有右人行道,在左人行道上焊接有纵向通长左固定角钢,在纵向通长左固定角钢与箱梁左翼缘挡板之间等间隔的活动设置有遮阳防雨棚支架左立柱,在遮阳防雨棚支架左立柱的顶端设置有左支撑三角架,在左支撑三角架顶部固定设置有左插接管,在人行道上焊接有纵向通长右固定角钢,在纵向通长右固定角钢与箱梁右翼缘挡板之间等间隔的活动设置有遮阳防雨棚支架右立柱,在遮阳防雨棚支架右立柱的顶端设置有右支撑三角架,在右支撑三角架的顶部固定设置有右插接管;左活动架杆的右端与右活动架杆左端通过铰轴铰接在一起,左活动架杆的左端插接在左插接管中,右活动架杆的右端插接在右插接管中,在左活动架杆的右端下方设置有伸缩顶杆左挡板支架,在右活动架杆的左端下方设置有伸缩顶杆右挡板支架,在伸缩顶杆左挡板支架与伸缩顶杆右挡板支架之间设置有伸缩顶杆,在遮阳防雨棚支架左立柱的顶端设置有防雨棚支叉,在左活动架杆和右活动架杆上面活动设置有遮雨布,在铰轴的两端连接有吊钩。
在伸缩顶杆的套筒与伸缩杆之间设置有固定销,在左插接管与左活动架杆的左端之间设置有左固定销,在右插接管与右活动架杆的右端之间设置有右固定销,在左活动架杆上设置有左纵向支撑杆插管,在前后相邻的两个左纵向支撑杆插管之间插接有左纵向支撑杆,在右活动架杆上设置有右纵向支撑杆插管,在前后相邻的两个右纵向支撑杆插管之间插接有右纵向支撑杆,左插接管与遮阳防雨棚支架左立柱之间的夹角为98度,遮阳防雨棚支架右立柱与右插接管之间的夹角也为98度。
本发明采用接插组合式的雨棚支架,组装方便,拆卸容易,支架顶架可方便拆卸折叠,移动方便,稳定性好,加快了桥梁制梁施工的总体进度。
附图说明
图1是本发明的结构示意图。
具体实施方式
一种预制箱梁的组合式遮阳防雨棚,包括箱梁左外侧模支撑桁架1和箱梁右外侧模支撑桁架26,在左外侧模支撑桁架1和箱梁右外侧模支撑桁架26上设置有箱梁外侧模2,在箱梁外侧模2的左端设置有箱梁左翼缘挡板4,箱梁左翼缘挡板4的左侧设置有左人行道3,在箱梁外侧模2的右端设置有箱梁右翼缘挡板24,箱梁右翼缘挡板24的右侧设置有右人行道25,在左人行道3上焊接有纵向通长左固定角钢5,在纵向通长左固定角钢5与箱梁左翼缘挡板4之间等间隔的活动设置有遮阳防雨棚支架左立柱6,在遮阳防雨棚支架左立柱6的顶端设置有左支撑三角架7,在左支撑三角架7顶部固定设置有左插接管8,在人行道25上焊接有纵向通长右固定角钢23,在纵向通长右固定角钢23与箱梁右翼缘挡板24之间等间隔的活动设置有遮阳防雨棚支架右立柱22,在遮阳防雨棚支架右立柱22的顶端设置有右支撑三角架21,在右支撑三角架21的顶部固定设置有右插接管20;左活动架杆11的右端与右活动架杆17左端通过铰轴16铰接在一起,左活动架杆11的左端插接在左插接管8中,右活动架杆17的右端插接在右插接管20中,在左活动架杆11的右端下方设置有伸缩顶杆左挡板支架13,在右活动架杆17的左端下方设置有伸缩顶杆右挡板支架15,在伸缩顶杆左挡板支架13与伸缩顶杆右挡板支架15之间设置有伸缩顶杆14,在遮阳防雨棚支架左立柱6的顶端设置有防雨棚支叉10,在左活动架杆11和右活动架杆17上面活动设置有遮雨布27,在铰轴16的两端连接有吊钩19。
在伸缩顶杆14的套筒与伸缩杆之间设置有固定销15,在左插接管8与左活动架杆11的左端之间设置有左固定销9,在右插接管20与右活动架杆17的右端之间设置有右固定销,在左活动架杆11上设置有左纵向支撑杆插管12,在前后相邻的两个左纵向支撑杆插管之间插接有左纵向支撑杆,在右活动架杆17上设置有右纵向支撑杆插管18,在前后相邻的两个右纵向支撑杆插管之间插接有右纵向支撑杆,左插接管8与遮阳防雨棚支架左立柱6之间的夹角为98度,遮阳防雨棚支架右立柱22与右插接管20之间的夹角α也为98度。
本发明技术特别适用在雨水较多,天气炎热周期长的地区使用。本发明装置构造简单轻便,拆装方便,只需2个工人配合龙门吊,即可在很短时间内完成拆装作业,提高工作效益,保证了箱梁预制质量。该装置可多用,待混凝土浇筑完成可以随时移至钢筋绑扎作业中,为工人在炎热天气下作业遮阳。在防晒雨棚立柱6上设置有防雨布支叉10用来收藏防雨布,节省了防雨布的存放空间。使用该遮阳防雨棚确保了恶劣天气下箱梁预制工序的顺利进行。
Claims (2)
1.一种预制箱梁的组合式遮阳防雨棚,包括箱梁左外侧模支撑桁架(1)和箱梁右外侧模支撑桁架(26),在箱梁左外侧模支撑桁架(1)和箱梁右外侧模支撑桁架(26)上设置有箱梁外侧模(2),在箱梁外侧模(2)的左端设置有箱梁左翼缘挡板(4),在箱梁左翼缘挡板(4)的左侧设置有左人行道(3),在箱梁外侧模(2)的右端设置有箱梁右翼缘挡板(24),在箱梁右翼缘挡板(24)的右侧设置有右人行道(25),其特征在于,在左人行道(3)上焊接有纵向通长左固定角钢(5),在纵向通长左固定角钢(5)与箱梁左翼缘挡板(4)之间等间隔地活动设置有遮阳防雨棚支架左立柱(6),在遮阳防雨棚支架左立柱(6)的顶端设置有左支撑三角架(7),在左支撑三角架(7)的顶部固定设置有左插接管(8),在人行道(25)上焊接有纵向通长右固定角钢(23),在纵向通长右固定角钢(23)与箱梁右翼缘挡板(24)之间等间隔地活动设置有遮阳防雨棚支架右立柱(22),在遮阳防雨棚支架右立柱(22)的顶端设置有右支撑三角架(21),在右支撑三角架(21)的顶部固定设置有右插接管(20);左活动架杆(11)的右端与右活动架杆(17)左端通过铰轴(16)铰接在一起,左活动架杆(11)的左端插接在左插接管(8)中,右活动架杆(17)的右端插接在右插接管(20)中,在左活动架杆(11)的右端下方设置有伸缩顶杆左挡板支架(13),在右活动架杆(17)的左端下方设置有伸缩顶杆右挡板支架(15),在伸缩顶杆左挡板支架(13)与伸缩顶杆右挡板支架(15)之间设置有伸缩顶杆(14),在遮阳防雨棚支架左立柱(6)的顶端设置有防雨棚支叉(10),在左活动架杆(11)和右活动架杆(17)的上面活动设置有遮雨布(27),在铰轴(16)的两端连接有吊钩(19)。
2.根据权利要求1所述的一种预制箱梁的组合式遮阳防雨棚,其特征在于,在伸缩顶杆(14)的套简与套筒中的伸缩杆之间设置有固定销(15),在左插接管(8)与左活动架杆(11)的左端之间设置有左固定销(9),在右插接管(20)与右活动架杆(17)的右端之间设置有右固定销,在左活动架杆(11)上设置有左纵向支撑杆插管(12),在前后相邻的两个左纵向支撑杆插管(12)之间插接有左纵向支撑杆,在右活动架杆(17)上设置有右纵向支撑杆插管(18),在前后相邻的两个右纵向支撑杆插管(18)之间插接有右纵向支撑杆,左插接管(8)与遮阳防雨棚支架左立柱(6)之间的夹角为98度,遮阳防雨棚支架右立柱(22)与右插接管(20)之间的夹角(α)为98度。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310716942.5A CN103669222B (zh) | 2013-12-24 | 2013-12-24 | 预制箱梁的组合式遮阳防雨棚 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310716942.5A CN103669222B (zh) | 2013-12-24 | 2013-12-24 | 预制箱梁的组合式遮阳防雨棚 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103669222A true CN103669222A (zh) | 2014-03-26 |
CN103669222B CN103669222B (zh) | 2016-08-17 |
Family
ID=50307937
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310716942.5A Active CN103669222B (zh) | 2013-12-24 | 2013-12-24 | 预制箱梁的组合式遮阳防雨棚 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103669222B (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105983759A (zh) * | 2015-01-30 | 2016-10-05 | 五冶集团上海有限公司 | 高湿环境下钢料仓组装焊接方法 |
CN106120795A (zh) * | 2016-06-23 | 2016-11-16 | 中国十九冶集团有限公司 | 砼浇筑标温作业方法 |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2703703A1 (fr) * | 1993-04-06 | 1994-10-14 | Sarl Leduc | Dispositif de protection pour la construction de ponts au-dessus de voies de circulation électrifiées par caténaires. |
KR20030046890A (ko) * | 2001-12-07 | 2003-06-18 | 충 현 이 | 천막 |
CN201245816Y (zh) * | 2008-07-08 | 2009-05-27 | 中铁十一局集团有限公司 | 用于桥梁施工的移动模架活动雨篷 |
CN102162301A (zh) * | 2011-03-04 | 2011-08-24 | 葛洲坝集团第五工程有限公司 | 冬季混凝土施工保温保湿防护方法及装置 |
CN202247688U (zh) * | 2011-09-23 | 2012-05-30 | 中铁十一局集团有限公司 | 一种上跨高速铁路防气动力防护棚架 |
CN202519589U (zh) * | 2012-04-17 | 2012-11-07 | 中铁十一局集团第三工程有限公司 | 一种移动模架的防雨棚 |
CN202644410U (zh) * | 2012-06-27 | 2013-01-02 | 中铁第四勘察设计院集团有限公司 | 一种三角形桁架结构的防护棚架 |
CN103061248A (zh) * | 2013-01-15 | 2013-04-24 | 广东省公路勘察规划设计院股份有限公司 | 一种防止污染水源的桥式隧道结构及其施工方法 |
CN203639836U (zh) * | 2013-12-24 | 2014-06-11 | 中铁十九局集团第三工程有限公司 | 预制箱梁的组合式遮阳防雨棚 |
-
2013
- 2013-12-24 CN CN201310716942.5A patent/CN103669222B/zh active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2703703A1 (fr) * | 1993-04-06 | 1994-10-14 | Sarl Leduc | Dispositif de protection pour la construction de ponts au-dessus de voies de circulation électrifiées par caténaires. |
KR20030046890A (ko) * | 2001-12-07 | 2003-06-18 | 충 현 이 | 천막 |
CN201245816Y (zh) * | 2008-07-08 | 2009-05-27 | 中铁十一局集团有限公司 | 用于桥梁施工的移动模架活动雨篷 |
CN102162301A (zh) * | 2011-03-04 | 2011-08-24 | 葛洲坝集团第五工程有限公司 | 冬季混凝土施工保温保湿防护方法及装置 |
CN202247688U (zh) * | 2011-09-23 | 2012-05-30 | 中铁十一局集团有限公司 | 一种上跨高速铁路防气动力防护棚架 |
CN202519589U (zh) * | 2012-04-17 | 2012-11-07 | 中铁十一局集团第三工程有限公司 | 一种移动模架的防雨棚 |
CN202644410U (zh) * | 2012-06-27 | 2013-01-02 | 中铁第四勘察设计院集团有限公司 | 一种三角形桁架结构的防护棚架 |
CN103061248A (zh) * | 2013-01-15 | 2013-04-24 | 广东省公路勘察规划设计院股份有限公司 | 一种防止污染水源的桥式隧道结构及其施工方法 |
CN203639836U (zh) * | 2013-12-24 | 2014-06-11 | 中铁十九局集团第三工程有限公司 | 预制箱梁的组合式遮阳防雨棚 |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105983759A (zh) * | 2015-01-30 | 2016-10-05 | 五冶集团上海有限公司 | 高湿环境下钢料仓组装焊接方法 |
CN105983759B (zh) * | 2015-01-30 | 2018-10-16 | 五冶集团上海有限公司 | 高湿环境下钢料仓组装焊接方法 |
CN106120795A (zh) * | 2016-06-23 | 2016-11-16 | 中国十九冶集团有限公司 | 砼浇筑标温作业方法 |
Also Published As
Publication number | Publication date |
---|---|
CN103669222B (zh) | 2016-08-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP5047680B2 (ja) | 連続高架橋の施工方法 | |
CN106013233B (zh) | 用于地下管廊现浇施工的滑移体系及其施工方法 | |
CN103306208A (zh) | 1.6次抛物线形新型四柱板式空心变截面高墩爬模方法 | |
CN107630709B (zh) | 一种暗挖隧道施工用移动式台车的施工方法 | |
CN104831756B (zh) | 一种利用模板顶托工具进行现浇板后浇带支模的施工方法 | |
CN105401679A (zh) | 大坡度现浇混凝土斜屋面施工方法 | |
CN202544854U (zh) | 地铁车站衬砌台车 | |
CN103485574B (zh) | 一种造粒塔塔顶钢筋混凝土结构施工方法 | |
CN202990391U (zh) | 一种多功能模板支撑架 | |
CN103669222A (zh) | 预制箱梁的组合式遮阳防雨棚 | |
CN204676881U (zh) | 大跨度交叉桁架钢结构支撑系统 | |
CN203639836U (zh) | 预制箱梁的组合式遮阳防雨棚 | |
CN111364516A (zh) | 一种管廊墙板流水施工撑拆走行体系及其施工方法 | |
CN113622660B (zh) | 一种竖向孔洞用整体吊装式模板结构及混凝土施工方法 | |
CN202430994U (zh) | 模板限位卡 | |
CN208088825U (zh) | 一种用于装配式建筑的叠合板的安装结构 | |
CN108868218B (zh) | 一种装配式小型厂房建筑 | |
CN203200719U (zh) | 悬空式倒坡模板装置 | |
CN203361641U (zh) | 现浇楼梯的组合式钢模板 | |
CN106013234B (zh) | 地下综合管廊的施工方法 | |
CN110318550B (zh) | 斜屋面安全带悬挂装置及其安装工艺 | |
CN104675184A (zh) | 双悬臂全折叠晴雨棚 | |
CN209741674U (zh) | 土建施工水泥浇灌装置 | |
CN209918784U (zh) | 一种钢筋绑扎胎具内支撑架 | |
CN207598256U (zh) | 一种管廊简易模车 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |