CN103659428A - Climbing device of feeding mechanism for manufacturing water meter copper connectors - Google Patents

Climbing device of feeding mechanism for manufacturing water meter copper connectors Download PDF

Info

Publication number
CN103659428A
CN103659428A CN201310722650.2A CN201310722650A CN103659428A CN 103659428 A CN103659428 A CN 103659428A CN 201310722650 A CN201310722650 A CN 201310722650A CN 103659428 A CN103659428 A CN 103659428A
Authority
CN
China
Prior art keywords
water meter
meter copper
copper sleeve
climbing device
conveyer belt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310722650.2A
Other languages
Chinese (zh)
Other versions
CN103659428B (en
Inventor
潘建浩
潘建能
潘建波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Tianci Brothers Water Meter & Sanitaryware Co Ltd
Original Assignee
Ningbo Tianci Brothers Water Meter & Sanitaryware Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Tianci Brothers Water Meter & Sanitaryware Co Ltd filed Critical Ningbo Tianci Brothers Water Meter & Sanitaryware Co Ltd
Priority to CN201310722650.2A priority Critical patent/CN103659428B/en
Publication of CN103659428A publication Critical patent/CN103659428A/en
Application granted granted Critical
Publication of CN103659428B publication Critical patent/CN103659428B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23QDETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g. ARRANGEMENTS FOR COPYING OR CONTROLLING; MACHINE TOOLS IN GENERAL CHARACTERISED BY THE CONSTRUCTION OF PARTICULAR DETAILS OR COMPONENTS; COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOT DIRECTED TO A PARTICULAR RESULT
    • B23Q7/00Arrangements for handling work specially combined with or arranged in, or specially adapted for use in connection with, machine tools, e.g. for conveying, loading, positioning, discharging, sorting
    • B23Q7/005Lifting devices
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B1/00Cleaning by methods involving the use of tools
    • B08B1/20Cleaning of moving articles, e.g. of moving webs or of objects on a conveyor

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Sorting Of Articles (AREA)

Abstract

The invention relates to a climbing device of a feeding mechanism for manufacturing water meter copper connectors. The climbing device is characterized in that the climbing device comprises a storage box for storing half-finished water meter copper connectors and a conveying belt vertically or obliquely arranged and connected with the storage tank in a carrying mode, and a carrying part for carrying the half-finished water meter copper connectors from the storage box is arranged on the conveying belt. A hairbrush roller is arranged on the side, where the carrying part is arranged, of the conveying belt, the hairbrush roller corresponds to the carrying part in arrangement position, and therefore it is guaranteed that the hairbrush roller can be used for sweeping the half-finished water meter copper connectors which are carried on the carrying part abnormally. The hairbrush roller is arranged on the side, where the half-finished water meter copper connectors are carried, of the conveying belt so that the hairbrush roller can be used for sweeping the carrying part, surplus half-finished water meter copper connectors attached onto the carrying part are swept away, therefore, it is guaranteed that the half-finished water meter copper connectors are conveyed orderly, chaos is prevented from occurring in conveying, and improvement of the production efficiency is facilitated.

Description

A kind of climbing device of making water meter copper sleeve use feed mechanism
Technical field
The present invention relates to a kind of climbing device, be specifically related to a kind of climbing device of feeding structure for water meter copper sleeve of making.
Background technology
Water meter copper sleeve is the connecting elements of indispensability when resident's water meter is installed, by water meter copper sleeve semi-finished product are sent into, in machining tool, its one end is processed into shape of threads and can obtains the water meter copper sleeve for installing, at water meter two ends, install respectively and connect water meter copper sleeve and to realize, water meter is arranged on water supply line.Water meter whether be closely connected with water supply line and install after the use state of water meter all closely related with the quality of water meter copper sleeve that water meter is installed, the water meter copper sleeve of manufacturing specification coupling is one of critical process.In conventional water meter copper sleeve production process, mostly adopt the mode of artificial feeding, water meter copper sleeve semi-finished product are delivered in lathe and processed successively, this feeding style has increased staff's labour intensity, and feeding frequency is unstable, has dragged down production efficiency.Adopt the mode feeding of conveyer belt to enhance productivity, by improving the automatization level of production line, reduce staff's labour intensity, Chinese invention patent < < automatic feeding > > (publication No. CN102807078A) discloses a kind of automatic feeding that comprises conveying mechanism, this conveying mechanism comprises support, motor, the feeding delivery mechanism being tilted to (being equivalent to conveyer mechanism) and be arranged on a plurality of work supporting blocks on feeding delivery mechanism, this device employing conveyer mechanism and the work supporting block distributing on it transmit material in an orderly manner, accurate positioning, effectively enhance productivity.Yet, said apparatus is preferably applied in the transmission to powder, for water meter copper sleeve semi-finished product, need like this workpiece of single transmission, in feeding process, but there is the problem of workpiece adhesion, exist and on a work supporting block, be accompanied with plural water meter copper sleeve semi-finished product, and make troubles to following process, cannot realize workpiece is really carried out to the object of single transmission in order, be unfavorable for enhancing productivity.
Summary of the invention
Technical problem to be solved by this invention is for above-mentioned prior art, to provide a kind of to make the climbing device of feed mechanism for water meter copper sleeve, thereby this climbing device can guarantee that on a work supporting block, only carrying water meter copper sleeve semi-finished product can really realize the object that water meter copper sleeve semi-finished product are transmitted in order.
The present invention addresses the above problem adopted technical scheme: a kind of climbing device of making water meter copper sleeve use feed mechanism, it is characterized in that: comprise for depositing the half-finished material storing box of water meter copper sleeve, vertically or be obliquely installed, the conveyer belt of accepting with material storing box, on described conveyer belt, be provided with in material storing box and accept the half-finished parts of accepting of water meter copper sleeve, the side that parts are accepted in described conveyer belt setting is provided with brush roll, thereby the setting position of this brush roll with accept the corresponding assurance of parts brush roll and can clean the improper water meter copper sleeve semi-finished product of accepting on parts that are undertaken on.
Particularly, described in accept the bracket that parts are pair of opposing, between this pair of bracket, be formed with and accept the half-finished container cavity of water meter copper sleeve.Climb in process, bracket moves and realizes transmission in container cavity and with conveyer belt from accepting water meter copper sleeve semi-finished product in material storing box.
Further, the side that parts are accepted in described conveyer belt setting is also provided with gear and removes the half-finished backstopping assembly of unnecessary water meter copper sleeve on described bracket.Described backstopping assembly comprises the holder being connected with conveyer belt, on described holder, offer Connection Block hole, and be through in this Connection Block hole can easy on and off activity block axis, the bottom of described block axis can prop up described container cavity edge under Gravitative Loads.Meanwhile, the upper end of described block axis is provided with and prevents the locating part of block axis from dropping in Connection Block hole.Concrete process is to accept the half-finished bracket of water meter copper sleeve along with conveyer belt moves upward, after contacting with the bottom of block axis, by block axis jack-up, in the process of contact jack-up, the unnecessary water meter copper sleeve semi-finished product that may exist on bracket are blocked axle bumper, further guaranteed that a pair of bracket only carries water meter copper sleeve semi-finished product, is fallen under the effect of self gravitation again by the block axis of jack-up afterwards.
Preferably, described backstopping assembly is arranged on the top of brush roll, in brush roll, to accepting after parts complete first cleaning, further to accepting water meter copper sleeve semi-finished product unnecessary on parts, carry out backstop removing, guarantee that each accepts parts and only carry water meter copper sleeve semi-finished product.
Usually, be also provided with installing hole on described bracket, fixture is arranged on bracket on described conveyer belt through this installing hole.
Because the two ends of water meter copper sleeve are formed with inside hole slot, for the ease of accept water meter copper sleeve semi-finished product in material storing box, the described parts of accepting can be designed as the post of accepting being vertically set on described conveyer belt, accept interior this water meter copper sleeve half product of jack-up of hole slot that post stretches into any one end of water meter copper sleeve semi-finished product, realize the step of accepting feeding from material storing box.
Preferably, rotating shaft and the conveyer belt of described brush roll be arranged in parallel, are more conducive to brush roll and clean loading on the unnecessary water meter copper sleeve semi-finished product of accepting on parts.
More reasonably that the half-finished climbing device of this transmission water meter copper sleeve also comprises the first driving mechanism that drives conveyer belt transmission, the second driving mechanism that drives brush roll to rotate, the first driving mechanism and the second driving mechanism are independently driving mechanism of same driving mechanism or two.
Compared with prior art, the invention has the advantages that: by the conveyer belt at climbing device, transmit the half-finished side of water meter copper sleeve brush roll is set, the setting position of this brush roll is with to accept parts corresponding, brush roll can be cleaned to be improperly undertaken on this and to accept the water meter copper sleeve semi-finished product on parts, guaranteed that water meter copper sleeve semi-finished product are transmitted in an orderly manner, avoid water meter copper sleeve semi-finished product transport process to cause confusion, improved the operating efficiency of production line.In addition, further in technical scheme, being arranged on conveyer belt is according to the true form design of water meter copper sleeve for accepting the bracket of workpiece, is conducive to it and accepts water meter copper sleeve semi-finished product and reduce overloading in material storing box; And be arranged in addition on conveyer belt for gear and remove to accept the half-finished backstopping assembly of unnecessary water meter copper sleeve on parts, further guaranteed that a pair of bracket of accepting only carries water meter copper sleeve semi-finished product, has really realized to the half-finished orderly transmission of water meter copper sleeve the climbing device of this feed mechanism.
Accompanying drawing explanation
Fig. 1 is the overall schematic of feed mechanism in the embodiment of the present invention;
Fig. 2 is the structural representation of climbing device bracket in the embodiment of the present invention;
Fig. 3 is the structural representation of climbing device backstopping assembly in the embodiment of the present invention;
Fig. 4 is the overall schematic at another visual angle of feed mechanism in the embodiment of the present invention;
Fig. 5 is the partial structurtes schematic diagram of the material choosing apparatus of B portion shown in Fig. 4.
The specific embodiment
Below in conjunction with accompanying drawing, embodiment is described in further detail the present invention.
Making water meter copper sleeve in the present embodiment mainly comprises climbing device, connecting gear, material choosing apparatus and the collator with material storing box with feed mechanism, and described climbing device, connecting gear, material choosing apparatus and collator join successively.Water meter copper sleeve semi-finished product in material storing box are transmitted in order through climbing device, through connecting gear, entering material choosing apparatus sorts, reject highly underproof water meter copper sleeve semi-finished product, finally by sort qualified water meter copper sleeve semi-finished product introducing collator through material choosing apparatus, wait for that being delivered to external machining tool completes last processing.
As shown in Figure 1, the climbing device of this feed mechanism comprises for depositing the half-finished material storing box 1 of water meter copper sleeve, vertically or the conveyer belt 2 being obliquely installed, accept with material storing box 1, on described conveyer belt 2, be provided with in material storing box 1 and accept the half-finished parts 4 of accepting of water meter copper sleeve, described conveyer belt 2 arranges a side of accepting parts and is provided with brush roll 5, thus the setting position of this brush roll 5 with accept the corresponding assurance of parts 4 brush roll 5 and can clean the improper water meter copper sleeve semi-finished product of accepting on parts that are undertaken on.
In the present embodiment, the rotating shaft of described brush roll 5 and conveyer belt 2 be arranged in parallel, are more conducive to 5 pairs of brush roll and load on the unnecessary water meter copper sleeve semi-finished product of accepting on parts 4 and clean.
As shown in Figure 2, described in accept parts 4 for the bracket 41 of pair of opposing, between this pair of bracket 41, be formed with and accept the half-finished container cavity A of water meter copper sleeve.Climb in process, bracket 41 moves and realizes transmission in container cavity A and with conveyer belt 2 from accepting water meter copper sleeve semi-finished product in material storing box 1.
On described bracket 41, be also provided with installing hole 42, fixture is arranged on bracket 41 on described conveyer belt 2 through this installing hole 42.
As shown in Figure 1,3, the side that parts 4 are accepted in described conveyer belt 2 settings is also provided with gear and removes the half-finished backstopping assembly 6 of unnecessary water meter copper sleeve on described bracket 41.Described backstopping assembly 6 comprises the holder 61 being connected with conveyer belt 2, on described holder 61, offer Connection Block hole 610, and be through in this Connection Block hole 610 can easy on and off activity block axis 62, the bottom of described block axis 62 can prop up described container cavity A edge under Gravitative Loads.Meanwhile, the upper end of described block axis 62 is provided with and prevents the locating part 620 of block axis 62 from dropping in Connection Block hole 610.Concrete process is to accept the half-finished bracket of water meter copper sleeve along with conveyer belt moves upward, after contacting with the bottom of block axis, by block axis jack-up, in the process of contact jack-up, the unnecessary water meter copper sleeve semi-finished product that may exist on bracket are blocked axle bumper, are again fallen afterwards by the block axis of jack-up under the effect of self gravitation.
In the present embodiment, described backstopping assembly 6 is arranged on the top of brush roll 5, in brush roll, to accepting after parts complete first cleaning, further to accepting water meter copper sleeve semi-finished product unnecessary on parts, carry out backstop removing, guaranteed to accept parts and once only carried water meter copper sleeve semi-finished product.
The half-finished climbing device of this transmission water meter copper sleeve also comprises the first driving mechanism that drives conveyer belt transmission, the second driving mechanism that drives brush roll to rotate, the first driving mechanism and the second driving mechanism are same driving mechanism, driving mechanism can adopt motor or hydraulic drive mechanism, the present embodiment adopts motor, and motor is arranged on the inside of frame 3.
Described making water meter copper sleeve is provided with described in stretching into the connecting gear porch of feed mechanism and accepts the container cavity A bottom of parts 4, for accepting the half-finished guide plate (not shown) of water meter copper sleeve; realize water meter copper sleeve semi-finished product and enter connecting gear from climbing device, the first transport unit 14 and horizontally disposed the second transport unit 15 under connecting gear protection is tilted to.
As shown in Figure 4,5, the material choosing apparatus in the present embodiment comprises the passage 8 of selecting materials that guiding water meter copper sleeve semi-finished product pass through, described in the select materials top of passage be provided with limit for height lid 9; Described both sides of selecting materials passage 8 are relatively set with the first correlation sensor, the first correlation sensor comprises the first emission sensor 11-1 and the first receiving sensor 11-2 of the work of cooperatively interacting, correspondingly, on passage 8 and the limit for height of selecting materials described in lid 9, have and make the transmitting through the through hole 90 of the passage 8 of selecting materials of the first emission sensor; Described bottom of selecting materials passage 8 is provided with by driving mechanism 7 and controls the door (not shown) of closing, the receiving sensor of described the first correlation sensor is connected with described driving mechanism 7, thereby in having water meter copper sleeve semi-finished product to be stuck in to select materials passage 8 and the through hole 90 that blocks signal transmission while causing the first receiving sensor can not receive the signal that emission sensor sends, described driving mechanism 7 are controlled described door and opened these water meter copper sleeve semi-finished product are dropped in the passage 8 of selecting materials.
Described in described limit for height lid 9 is arranged on by fixture 10, select materials on passage 8, and limit for height lid 9 can pass through described fixture 10 adjustings with the height of selecting materials between passage 8.
In the present embodiment, described the first correlation sensor is infrared emission sensor, comprises infrared emission sensor and infrared receiving sensor.In having water meter copper sleeve semi-finished product to be trapped in to select materials passage 8 and while blocking the through hole 90 that signal transmits, infrared receiving sensor does not receive signal, and the driving mechanism 7 being attached thereto is opened the door of the channel bottom of selecting materials, and these water meter copper sleeve semi-finished product are dropped automatically.
The described passage 8 of selecting materials is obliquely installed, so that guiding water meter copper sleeve workpiece passes through.
As shown in Figure 4, collator in the present embodiment is arranged on makes the end of feed mechanism for water meter copper sleeve, and be connected with the entrance of water meter copper sleeve machining tool, comprise and hold the sequence passage 12 that water meter copper sleeve semi-finished product are piled up in order, and the second correlation sensor that is arranged on described sequence passage both sides, the second correlation sensor comprises the second emission sensor 13-1 and the second receiving sensor 13-2 of the work of cooperatively interacting, described receiving sensor is connected with the driving mechanism of controlling feed mechanism action, while causing the second receiving sensor not receive transmitting of the second emission sensor after the water meter copper sleeve semi-finished product in sequence passage are aligned to the second correlation sensor institute correspondence position, described driving mechanism quits work.
Described sequence passage 12 is obliquely installed, and water meter copper sleeve semi-finished product will, in the interior closely arrangement in an orderly manner of sequence passage 1, make sequence and output more smooth and easy under Action of Gravity Field like this.
Described in the present embodiment, the second correlation sensor is infrared emission sensor, comprises infrared emission sensor and infrared receiving sensor.In sequence passage, when the water meter copper sleeve semi-finished product of exporting are stacked into enough height and block the transmitting and receiving of infrared signal, drive the driving mechanism of feed mechanism operation automatically to close down; When the water meter copper sleeve semi-finished product in the passage that sorts are reduced to infrared receiving sensor and again receive the infrared signal of infrared emission sensor emission, described driving mechanism restarts, so realize the monitoring to sequence in-channel water table copper sleeve semi-finished product sequence situation, and control flexibly feed mechanism operation.
The climbing device of said structure, material choosing apparatus and collator completed respectively to the water meter copper sleeve semi-finished product in material storing box transmit in order, to the water meter copper sleeve semi-finished product automatic sorting highly differing and to water meter copper sleeve semi-finished product at the sequence situation Real-Time Monitoring in sequence district and automatically regulate feed mechanism operation, make whole feed mechanism realize mechanization, automation, effectively improved operating efficiency.
The foregoing is only the preferred embodiment of the present invention, for a person skilled in the art, do not departing under principle of the present invention, can also make multiple improvement to each structure of feed mechanism, for example according to the two ends of water meter copper sleeve self, be formed with inside hole slot, for the ease of accept water meter copper sleeve semi-finished product in material storing box, the described parts of accepting can be designed as the post of accepting being vertically set on described conveyer belt, accept interior also this water meter copper sleeve half product of jack-up of hole slot that post stretches into any one end of water meter copper sleeve semi-finished product, realize the step of accepting feeding from material storing box, the distortion of this class formation also all should be considered as in protection scope of the present invention.

Claims (10)

1. make the climbing device of feed mechanism for water meter copper sleeve for one kind, it is characterized in that: comprise for depositing the half-finished material storing box of water meter copper sleeve, vertically or the conveyer belt being obliquely installed, accept with material storing box, on described conveyer belt, be provided with in material storing box and accept the half-finished parts of accepting of water meter copper sleeve, the side that parts are accepted in described conveyer belt setting is provided with brush roll, thus the setting position of this brush roll with accept the corresponding assurance of parts brush roll and can clean the improper water meter copper sleeve semi-finished product of accepting on parts that are undertaken on.
2. climbing device according to claim 1, is characterized in that: described in accept the bracket that parts are pair of opposing, between this pair of bracket, be formed with and accept the half-finished container cavity of water meter copper sleeve.
3. climbing device according to claim 2, is characterized in that: the side that parts are accepted in described conveyer belt setting is also provided with gear and removes the half-finished backstopping assembly of unnecessary water meter copper sleeve on described bracket.
4. climbing device according to claim 3, it is characterized in that: described backstopping assembly comprises the holder being connected with conveyer belt, on described holder, offer Connection Block hole, and be through in this Connection Block hole can easy on and off activity block axis, the bottom of described block axis can prop up described container cavity edge under Gravitative Loads.
5. climbing device according to claim 4, is characterized in that: the upper end of described block axis is provided with and prevents the locating part of block axis from dropping in Connection Block hole.
6. according to the climbing device described in any one claim in claim 3~5, it is characterized in that: described backstopping assembly is arranged on the top of brush roll.
7. climbing device according to claim 2, is characterized in that: on described bracket, be also provided with installing hole, fixture is arranged on bracket on described conveyer belt through this installing hole.
8. climbing device according to claim 1, is characterized in that: described in to accept parts be the post of accepting being vertically set on described conveyer belt.
9. climbing device according to claim 1, is characterized in that: rotating shaft and the conveyer belt of described brush roll be arranged in parallel.
10. climbing device according to claim 1, it is characterized in that: also comprise the first driving mechanism that drives conveyer belt transmission, the second driving mechanism that drives brush roll to rotate, the first driving mechanism and the second driving mechanism are independently driving mechanism of same driving mechanism or two.
CN201310722650.2A 2013-12-24 2013-12-24 A kind of climbing device of making water meter copper sleeve feed mechanism Expired - Fee Related CN103659428B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310722650.2A CN103659428B (en) 2013-12-24 2013-12-24 A kind of climbing device of making water meter copper sleeve feed mechanism

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310722650.2A CN103659428B (en) 2013-12-24 2013-12-24 A kind of climbing device of making water meter copper sleeve feed mechanism

Publications (2)

Publication Number Publication Date
CN103659428A true CN103659428A (en) 2014-03-26
CN103659428B CN103659428B (en) 2016-05-11

Family

ID=50298860

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310722650.2A Expired - Fee Related CN103659428B (en) 2013-12-24 2013-12-24 A kind of climbing device of making water meter copper sleeve feed mechanism

Country Status (1)

Country Link
CN (1) CN103659428B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5343997A (en) * 1991-11-12 1994-09-06 Henning Maerkedahl Method and device for successively feeding of components to a mounting apparatus
US20050077216A1 (en) * 2003-10-10 2005-04-14 Zemlin Karl E. Object orienting and sorting apparatus
CN201304493Y (en) * 2008-10-16 2009-09-09 陈云法 Feeding device for lathe
CN202780664U (en) * 2012-07-10 2013-03-13 浙江陀曼精密机械有限公司 Automatic conveying mechanism for short shafts
CN203076796U (en) * 2012-12-06 2013-07-24 武汉法利莱切割系统工程有限责任公司 Automatic feeding and discharging device for laser cutting machine
CN203599961U (en) * 2013-12-24 2014-05-21 宁波天赐兄弟水表水暖有限公司 Climbing device of feeding mechanism for manufacturing water meter copper connectors

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5343997A (en) * 1991-11-12 1994-09-06 Henning Maerkedahl Method and device for successively feeding of components to a mounting apparatus
US20050077216A1 (en) * 2003-10-10 2005-04-14 Zemlin Karl E. Object orienting and sorting apparatus
CN201304493Y (en) * 2008-10-16 2009-09-09 陈云法 Feeding device for lathe
CN202780664U (en) * 2012-07-10 2013-03-13 浙江陀曼精密机械有限公司 Automatic conveying mechanism for short shafts
CN203076796U (en) * 2012-12-06 2013-07-24 武汉法利莱切割系统工程有限责任公司 Automatic feeding and discharging device for laser cutting machine
CN203599961U (en) * 2013-12-24 2014-05-21 宁波天赐兄弟水表水暖有限公司 Climbing device of feeding mechanism for manufacturing water meter copper connectors

Also Published As

Publication number Publication date
CN103659428B (en) 2016-05-11

Similar Documents

Publication Publication Date Title
CN202336437U (en) Fruit grading and conveying production line
CN207138347U (en) A kind of auto parts machinery cleaning device
CN109733839A (en) Ceramic cigarette holder automatic infiltration glaze method
CN210655135U (en) Rice racking machine
CN103692276B (en) A kind of collator making water meter copper connector feed mechanism
CN203599961U (en) Climbing device of feeding mechanism for manufacturing water meter copper connectors
CN108262632A (en) Bar automatic loading and unloading system
CN203599964U (en) Material selecting device of feeding mechanism for manufacture water meter copper connectors
CN203621666U (en) Feed mechanism for manufacturing water meter copper connectors
CN103659428A (en) Climbing device of feeding mechanism for manufacturing water meter copper connectors
CN105562346B (en) A kind of sheet material sorting unit
CN103692032B (en) A kind of feed mechanism of making water meter copper sleeve
CN203611052U (en) Arranging system of feeding mechanism for production of copper water meter connectors
CN103692278B (en) A kind of material choosing apparatus making water meter copper connector feed mechanism
CN210936930U (en) Automatic feeding device of bolt thread rolling machine
CN114988142A (en) Axle type feed bin with fixed point send to structure
CN211712008U (en) Filter intelligence production and processing is with multidirectional fortune material controlgear
CN212859785U (en) Feeding and discharging device of full-automatic double-end round bar drilling machine
CN212607849U (en) Double-feeding type automatic external thread feeding machine
CN203437771U (en) Two-shaft reciprocation automatic-feeding nut tapping machine
CN204297710U (en) Material feeding system in a kind of flour processing process
CN207645389U (en) A kind of mechanical processing automatic charging device
CN206393437U (en) Vertical paralleled surface grinding machine automatic loading and unloading mechanism
CN208377854U (en) A kind of empty bottle rotary unloading device
CN206662914U (en) A kind of silver nail sanding apparatus

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160511

Termination date: 20171224