CN103692032B - A kind of feed mechanism of making water meter copper sleeve - Google Patents

A kind of feed mechanism of making water meter copper sleeve Download PDF

Info

Publication number
CN103692032B
CN103692032B CN201310722402.8A CN201310722402A CN103692032B CN 103692032 B CN103692032 B CN 103692032B CN 201310722402 A CN201310722402 A CN 201310722402A CN 103692032 B CN103692032 B CN 103692032B
Authority
CN
China
Prior art keywords
water meter
copper sleeve
meter copper
passage
feed mechanism
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310722402.8A
Other languages
Chinese (zh)
Other versions
CN103692032A (en
Inventor
潘建浩
潘建能
潘建波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Tianci Brothers Water Meter & Sanitaryware Co Ltd
Original Assignee
Ningbo Tianci Brothers Water Meter & Sanitaryware Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Tianci Brothers Water Meter & Sanitaryware Co Ltd filed Critical Ningbo Tianci Brothers Water Meter & Sanitaryware Co Ltd
Priority to CN201310722402.8A priority Critical patent/CN103692032B/en
Publication of CN103692032A publication Critical patent/CN103692032A/en
Application granted granted Critical
Publication of CN103692032B publication Critical patent/CN103692032B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The present invention relates to a kind of feed mechanism of making water meter copper sleeve, it is characterized in that: comprise the climbing device for water meter copper sleeve semi-finished product are selected successively and transferred from material storing box; Material choosing apparatus, the end of climbing device is connected with the entrance of material choosing apparatus by connecting gear, for water meter copper sleeve semi-finished product highly against regulation are screened, and the water meter copper sleeve semi-finished product that highly conform with the regulations is transferred to collator; Collator, the entrance of collator is connected with the outlet of material choosing apparatus, and the outlet of collator is connected with external water meter copper sleeve machining tool. Above-mentioned each device completes respectively the Real-Time Monitoring to arrangement situation before the half-finished orderly transmission of water meter copper sleeve, automatic sorting and output and regulates the overall work process of feed mechanism, realize mechanization, the automation of feed mechanism entirety, improved operating efficiency.

Description

A kind of feed mechanism of making water meter copper sleeve
Technical field
The present invention relates to a kind of feeding structure, be specifically related to a kind of feeding structure of making water meter copper sleeve.
Background technology
Water meter copper sleeve is the connecting elements of indispensability when resident's water meter is installed, by water meter copper sleeve semi-finished product are sent into processingIn lathe, its one end is processed into shape of threads and can obtains the water meter copper sleeve for installing, respectively the company of installation at water meter two endsJointed water meter copper sleeve is arranged on water meter on water supply line to realize. Whether water meter is closely connected and installs with water supply lineThe use state of rear water meter is all closely related with the quality of water meter copper sleeve that water meter is installed, the water meter copper of manufacturing specification couplingJoint is one of critical process. All generally to adopt streamline to carry out production and processing for this class workpiece of water meter copper sleeve,Workpiece to be processed is generally successively through feed zone, transmission range, select materials district and material discharge region, finally enters processing district, workPart only has successively through above-mentioned each region and just can complete and finally be processed into qualified product. In water meter copper sleeve feeding in the pastIn process, mostly adopt the mode of artificial feeding, this feeding style has increased staff's labour intensity, and feedingFrequency is unstable. Adopt the mode feeding of conveyer belt to enhance productivity, by the automatization level of raising production lineReduce staff's labour intensity, Chinese invention patent " automatic feeding " (publication No. CN102807078A)Disclose a kind of automatic feeding that comprises conveying mechanism, this conveying mechanism comprises support, motor, sending of being tilted toExpect connecting gear (being equivalent to conveyer mechanism) and be arranged on the multiple work supporting blocks on feeding delivery mechanism, this device is adoptedMaterial is transmitted in an orderly manner with conveyer mechanism and the work supporting block that distributes on it, accurate positioning, effectively improves and producesEfficiency. But said apparatus is preferably applied in the transmission to powder, need so single for water meter copper sleeve semi-finished product, but there is the problem of workpiece adhesion in the workpiece transmitting, exist on a work supporting block and be accompanied with two in feeding processAbove water meter copper sleeve semi-finished product, cannot really realize the object that workpiece is transmitted in order.
In addition the water meter copper sleeve of producing in order to ensure each machining tool, can both meet product standard, possess phaseThe product specification of answering, need to carry out prescreen to water meter copper sleeve semi-finished product to be processed, pick out those underproof asWith water meter copper sleeve semi-finished product jagged, that size height is not inconsistent. And in actual mechanical process, this sorting operation oftenBe to rely on manual work to complete, not only spend a large amount of manpowers and time, and adopt manpower sorting also to have larger mistakePoor. Further, adopt aforementioned streamline to carry out feeding to water meter copper sleeve semi-finished product, the cooperation between each functional regionThe key that ensures the flow work efficiency, and in actual production process, once do mechanization operation is all realized in each region,To be difficult to ensure each other card coordinate flexibly, from main regulation job schedule, although can be by interlock belt, belt pulley etc.The feeding transmission speed of equipment control feed zone and transmission range, but for the more difficult realization of district and material discharge region of selecting materials, especiallyIn material discharge region, the speed that enters material discharge region when water meter copper sleeve semi-finished product to be processed exceedes it and exports to and add from material discharge regionWhen the speed of work lathe, water meter copper sleeve semi-finished product will be trapped in material discharge region until affect whole feed mechanism operation, makeBecome the confusion of flow process.
Summary of the invention
Technical problem to be solved by this invention is to provide a kind of feeding of making water meter copper sleeve for above-mentioned prior artStructure, completes to the half-finished orderly transmission of water meter copper sleeve, to the water meter copper sleeve semi-finished product automatic sorting not highly being inconsistentAnd arrange exporting front water meter copper sleeve semi-finished product.
The present invention addresses the above problem adopted technical scheme: a kind of feed mechanism of making water meter copper sleeve, its spyLevy and be: comprise
For the climbing device that water meter copper sleeve semi-finished product are selected successively and transferred from material storing box;
Material choosing apparatus, the end of climbing device is connected with the entrance of material choosing apparatus by connecting gear, for not highly being inconsistentThe water meter copper sleeve semi-finished product that close regulation screen, and the water meter copper sleeve semi-finished product that highly conform with the regulations are transferred to rowOrder device;
Collator, the entrance of collator is connected with the outlet of material choosing apparatus, the outlet of collator and external water meterCopper sleeve machining tool connects.
As improvement, described climbing device comprises for depositing the half-finished material storing box of water meter copper sleeve, vertically or tilt to establishThe conveyer belt of putting, accept with material storing box, and drive the first driving mechanism of conveyer belt transmission, on described conveyer belt, arrangeHave the parts of accepting from accepting water meter copper sleeve in material storing box, the side that parts are accepted in described conveyer belt setting is provided with by secondDriving mechanism drive brush roll, thereby the setting position of this brush roll with accept the corresponding guarantee of parts brush roll can be clearSweep the improper water meter copper sleeve of accepting on parts that is undertaken on. This structure, guarantees only to carry one on a work supporting blockWater meter copper sleeve semi-finished product and can really realize the object that water meter copper sleeve semi-finished product are transmitted in order.
As preferably, described in accept the bracket that parts are pair of opposing, between this pair of bracket, be formed with and accept water meterThe half-finished container cavity of copper sleeve. Climb in process, bracket is from accepting water meter copper sleeve semi-finished product to container cavity in material storing boxIn and with conveyer belt move realize transmit.
Further, the side that parts are accepted in described conveyer belt setting is also provided with gear and removes unnecessary water meter copper sleeve on described bracketHalf-finished backstopping assembly. Described backstopping assembly comprises the holder being connected with conveyer belt, the company of offering on described holderJoint chair hole, and be through in this Connection Block hole can easy on and off activity block axis, the bottom of described block axis can beUnder Gravitative Loads, prop up described container cavity edge. Meanwhile, the upper end of described block axis is provided with and prevents that block axis is from Connection BlockThe locating part dropping in hole. Concrete process is to accept the half-finished bracket of water meter copper sleeve along with conveyer belt moves upward,After contacting with the bottom of block axis, by block axis jack-up, in the process of contact jack-up, what on bracket, may exist is manyRemaining water meter copper sleeve semi-finished product are blocked axle bumper, have further guaranteed that a pair of bracket only carries a water meter copper sleeve half and becomesProduct, are fallen under the effect of self gravitation again by the block axis of jack-up afterwards.
Preferably, described backstopping assembly is arranged on the top of brush roll, completes after cleaning first accepting parts in brush rollFurther carry out backstop removing to accepting water meter copper sleeve semi-finished product unnecessary on parts, ensure that each parts of accepting only carryWater meter copper sleeve semi-finished product.
Described making water meter copper sleeve is provided with and accepts parts described in stretching into the connecting gear porch of feed mechanismBottom container cavity, for accepting the half-finished guide plate of water meter copper sleeve, realize water meter copper sleeve semi-finished product from climbing deviceEnter more swimmingly connecting gear.
Described material choosing apparatus comprises the passage of selecting materials that guiding water meter copper sleeve semi-finished product pass through, described in the select materials top of passageBe provided with limit for height lid; The both sides of the described passage of selecting materials are relatively set with the first correlation sensor, and the first correlation sensor comprises phaseMutually the first emission sensor and first receiving sensor of cooperating, correspondingly, described in select materials passage and/or limit for height coverHave and make the transmitting through the through hole of the passage of selecting materials of the first emission sensor; The bottom of the described passage of selecting materials is provided withThe door of being closed by driving mechanisms control, the first receiving sensor of described the first correlation sensor and described driving mechanism connectConnect, cause receiving sensor can not receive the first emission sensor when there being water meter copper sleeve semi-finished product to be stuck in the passage of selecting materialsWhen the signal sending, described in described driving mechanisms control, thereby door is opened and is made these water meter copper sleeve semi-finished product from selecting materials in passageDrop, realize the half-finished sorting of water meter copper sleeve with this, highly underproof workpiece is rejected in feed mechanism.
Preferably, described in being arranged on by fixture, limit for height lid described in above-mentioned material choosing apparatus selects materials on passage, and limit for height lidAnd the height of selecting materials between passage can regulate by described fixture, so just can adapt to the water meter copper sleeve of different size.
Described collator comprises the sequence passage that holds the orderly accumulation of water meter copper sleeve, and is arranged on described sequence passageThe second correlation sensor of both sides, the second correlation sensor comprises that second emission sensor and second of the work of cooperatively interacting connectsReceive sensor, described the second receiving sensor is connected with the first driving mechanism, when the water meter copper sleeve in sequence passage is arrangedAfter the second correlation sensor institute correspondence position, cause the second receiving sensor not receive the transmitting of the second emission sensorWhen signal, described the first driving mechanism quits work. By the second correlation sensor to sequence in-channel water table copper sleeve partlyThe Real-Time Monitoring of finished product, and the second receiving sensor is connected with the first driving mechanism, the entirety of feed mechanism just can be regulatedThe progress of work, makes climbing device, material choosing apparatus and the co-ordination of collator energy, realize feed mechanism entirety mechanization,Automation, has improved complete machine operating efficiency.
Compared with prior art, the invention has the advantages that: adopt feed mechanism provided by the invention, it is right better to completeThe half-finished orderly transmission of water meter copper sleeve, can also carry out automatic sorting to the water meter copper sleeve semi-finished product that are not highly inconsistent, withIn time, can also effectively arrange exporting front water meter copper sleeve semi-finished product, and total automaticity is higher, without manuallyParticipate in, improved feeding efficiency.
The climbing device particularly providing in the further technical scheme of the present invention is by vertically or the conveyer belt being obliquely installedUpper installation brush roll, makes brush roll clean accepting parts, sweeps off the improper water meter copper of accepting on parts that is undertaken onJoint semi-finished product, ensure that water meter copper sleeve semi-finished product are transmitted in an orderly manner, have avoided work piece delivery confusion. In addition arrange,Bracket on conveyer belt is to design according to the true form of water meter copper sleeve, is conducive to accept this water meter copper sleeve and subtractsFew overloading; And be arranged in addition on conveyer belt for gear and go to accept the half-finished stopper section of unnecessary water meter copper sleeve on partsPart, has further guaranteed that a pair of bracket of accepting only carries water meter copper sleeve semi-finished product, makes the dress that climbs of this feed mechanismPut real realization the half-finished orderly transmission of water meter copper sleeve.
In the further technical scheme of the present invention, material choosing apparatus is designed to guide water meter copper sleeve semi-finished product pass through select materials logicalRoad structure arranges limit for height lid above the passage of selecting materials, and described limit for height lid and the distance of selecting materials between passage are adjustable, andBe oppositely arranged correlation sensor in the both sides of the passage of selecting materials, realized the automatic sorting to water meter copper sleeve semi-finished product height,Replace operating personnel's heavy and monotonous labour, realize mechanization and the automation of the operation of selecting materials.
In the further technical scheme of the present invention, collator is designed to hold the row of water meter copper sleeve semi-finished product ordered arrangementOrder channel design, and at this sequence passage both sides relative position, correlation sensor is installed, realize treating in collator defeatedGo out water meter copper sleeve semi-finished product and arrange Real-Time Monitoring the operation of energy flexible modulation feed mechanism of situation, ensured whole feedingProgram normal operation.
Brief description of the drawings
Fig. 1 is the overall schematic of feed mechanism in the embodiment of the present invention;
Fig. 2 is the structural representation of climbing device bracket in the embodiment of the present invention;
Fig. 3 is the structural representation of climbing device backstopping assembly in the embodiment of the present invention;
Fig. 4 is the overall schematic at another visual angle of feed mechanism in the embodiment of the present invention;
Fig. 5 is the partial structurtes schematic diagram of the material choosing apparatus of B portion shown in Fig. 4.
Detailed description of the invention
Below in conjunction with accompanying drawing, embodiment is described in further detail the present invention.
Making water meter copper sleeve in the present embodiment mainly comprises climbing device, the conveyer with material storing box with feed mechanismStructure, material choosing apparatus and collator, described climbing device, connecting gear, material choosing apparatus and collator phase successivelyConnect. Water meter copper sleeve semi-finished product in material storing box are transmitted in order through climbing device, enter material choosing apparatus enter through connecting gearRow sorting, rejects highly underproof water meter copper sleeve semi-finished product, finally connects sort qualified water meter copper through material choosing apparatusSemi-finished product are introduced collator and are waited for that being delivered to external machining tool completes last processing.
As shown in Figure 1, the climbing device of this feed mechanism comprises for depositing the half-finished material storing box 1 of water meter copper sleeve,Vertically or be obliquely installed, with the conveyer belt 2 that material storing box 1 is accepted, on described conveyer belt 2, be provided with in material storing box 1Accept the half-finished parts 4 of accepting of water meter copper sleeve, the side that parts are accepted in described conveyer belt 2 settings is provided with brush roll 5,Thereby the setting position of this brush roll 5 with accept the corresponding guarantee of parts 4 brush roll 5 and can clean improper being undertaken onWater meter copper sleeve semi-finished product on relay part.
In the present embodiment, the rotating shaft of described brush roll 5 and conveyer belt 2 be arranged in parallel, are more conducive to brush roll 5 to loadClean at the unnecessary water meter copper sleeve semi-finished product of accepting on parts 4.
As shown in Figure 2, described in, accept the bracket 41 that parts 4 are pair of opposing, formation between this pair of bracket 41Accept the half-finished container cavity A of water meter copper sleeve. Climb in process, bracket 41 is accepted water meter copper in material storing box 1Joint semi-finished product move to realize and transmit in container cavity A and with conveyer belt 2.
On described bracket 41, be also provided with installing hole 42, fixture is arranged on described biography through this installing hole 42 by bracket 41Send and be with on 2.
As shown in Figure 1,3, the side that parts 4 are accepted in described conveyer belt 2 settings is also provided with gear and goes on described bracket 41 manyThe remaining half-finished backstopping assembly 6 of water meter copper sleeve. Described backstopping assembly 6 comprises the holder 61 being connected with conveyer belt 2,On described holder 61, offer Connection Block hole 610, and be through in this Connection Block hole 610 can easy on and off activityBlock axis 62, the bottom of described block axis 62 can prop up described container cavity A edge under Gravitative Loads. Meanwhile, instituteThe upper end of stating block axis 62 is provided with and prevents the locating part 620 of block axis 62 from dropping in Connection Block hole 610. ConcreteProcess is to accept the half-finished bracket of water meter copper sleeve along with conveyer belt moves upward, after contacting with the bottom of block axis,By block axis jack-up, in the process of contact jack-up, the unnecessary water meter copper sleeve semi-finished product that may exist on bracket are blockedAxle bumper goes, and is again fallen afterwards by the block axis of jack-up under the effect of self gravitation.
In the present embodiment, described backstopping assembly 6 is arranged on the top of brush roll 5, completes head in brush roll to accepting partsAfter inferior cleaning, further carry out backstop removing to accepting water meter copper sleeve semi-finished product unnecessary on parts, ensured to accept partsOnce only carry water meter copper sleeve semi-finished product.
The half-finished climbing device of this transmission water meter copper sleeve also comprises the first driving mechanism that drives conveyer belt transmission, drivesThe second driving mechanism that brush roll is rotated, the first driving mechanism and the second driving mechanism are same driving mechanism, driving machineStructure can adopt motor or hydraulic drive mechanism, and the present embodiment adopts motor, and motor is arranged on the inside of frame 3.
Described making water meter copper sleeve is provided with and accepts parts 4 described in stretching into the connecting gear porch of feed mechanismBottom container cavity A, for accepting the half-finished guide plate (not shown) of water meter copper sleeve, realize water meter copper sleeve halfFinished product enters connecting gear from climbing device, the first transport unit 14 and horizontally disposed under connecting gear protection is tilted toThe second transport unit 15.
As shown in Figure 4,5, the material choosing apparatus in the present embodiment comprises selecting materials that guiding water meter copper sleeve semi-finished product pass throughPassage 8, described in the select materials top of passage be provided with limit for height lid 9; Described both sides of selecting materials passage 8 are relatively set with first pairPenetrate sensor, the first correlation sensor comprises that the first emission sensor 11-1 and first of the work of cooperatively interacting receives sensingDevice 11-2, correspondingly, described in select materials and have and make transmitting of the first emission sensor on passage 8 and limit for height lid 9Through the through hole 90 of the passage 8 of selecting materials; Described bottom of selecting materials passage 8 is provided with by driving mechanism 7 and controls the door (figure closingIn not shown), the receiving sensor of described the first correlation sensor is connected with described driving mechanism 7, when there being water meter copper to connectSemi-finished product are stuck in the passage 8 of selecting materials and the through hole 90 that blocks signal transmission causes the first receiving sensor not receiveWhen the signal that emission sensor is sent, thereby described driving mechanism 7 controls described door and open and make this water meter copper sleeve semi-finished productIn the passage 8 of selecting materials, drop.
Described limit for height lid 9 is selected materials on passage 8 described in being arranged on by fixture 10, and limit for height lid 9 and the passage 8 of selecting materialsBetween height can regulate by described fixture 10.
In the present embodiment, described the first correlation sensor is infrared emission sensor, comprises infrared emission sensor and infraredReceiving sensor. Block the through hole 90 that signal transmits during when having water meter copper sleeve semi-finished product to be trapped in to select materials in passage 8,Infrared receiving sensor does not receive signal, and the driving mechanism 7 being attached thereto is opened the door of the channel bottom of selecting materials, and makes this waterTable copper sleeve semi-finished product drop automatically.
The described passage 8 of selecting materials is obliquely installed, so that guiding water meter copper sleeve workpiece passes through.
As shown in Figure 4, the collator in the present embodiment is arranged on the end of making water meter copper sleeve feed mechanism, andBe connected with the entrance of water meter copper sleeve machining tool, comprise and hold the sequence passage that water meter copper sleeve semi-finished product are piled up in order12, and be arranged on the second correlation sensor of described sequence passage both sides, the second correlation sensor comprises the work that cooperatively interactsThe the second emission sensor 13-1 and the second receiving sensor 13-2 that do, described receiving sensor is moving with control feed mechanismThe driving mechanism of doing is connected, when the water meter copper sleeve semi-finished product in sequence passage are aligned to the second corresponding position of correlation sensor instituteWhen postpone causes the second receiving sensor not receive transmitting of the second emission sensor, described driving mechanism stops workDo.
Described sequence passage 12 is obliquely installed, and water meter copper sleeve semi-finished product will be at sequence passage 1 under Action of Gravity Field like thisInside closely arrange in an orderly manner, make sequence and output more smooth and easy.
Described in the present embodiment, the second correlation sensor is infrared emission sensor, comprises infrared emission sensor and infrared connecingReceive sensor. When water meter copper sleeve semi-finished product to be exported in sequence passage are stacked into enough height and block infrared signalWhile transmitting and receiving, drive the driving mechanism of feed mechanism operation automatically to close down; Water meter copper sleeve in passage to be sortedWhen semi-finished product are reduced to infrared receiving sensor and again receive the infrared signal of infrared emission sensor emission, described drivingMechanism restarts, and so realizes the monitoring to sequence in-channel water table copper sleeve semi-finished product sequence situation, and controls flexiblyFeed mechanism operation.
Climbing device, material choosing apparatus and the collator of said structure completed respectively the water meter copper sleeve in material storing boxSemi-finished product transmit in order, to the water meter copper sleeve semi-finished product automatic sorting highly differing and water meter copper sleeve semi-finished product are existedThe sequence situation Real-Time Monitoring in sequence district also automatically regulates feed mechanism operation, make whole feed mechanism realized mechanization,Automation, has improved operating efficiency effectively.
The foregoing is only the preferred embodiment of the present invention, for a person skilled in the art, do not departing from thisUnder bright principle, can also make multiple improvement to each portion structure of feed mechanism, for example according to water meter copper sleeve certainlyThe two ends of body are formed with inside hole slot, for the ease of accept water meter copper sleeve semi-finished product in material storing box, described in acceptParts can be designed as the post of accepting being vertically set on described conveyer belt, accept post and stretch into water meter copper sleeve semi-finished product and appointInterior also this water meter copper sleeve half product of jack-up of hole slot of meaning one end, realizes the step of accepting feeding from material storing box, this type ofThe distortion of structure also all should be considered as in protection scope of the present invention.

Claims (8)

1. a feed mechanism of making water meter copper sleeve, is characterized in that: comprise
For the climbing device that water meter copper sleeve semi-finished product are selected successively and transferred from material storing box;
Material choosing apparatus, the end of climbing device is connected with the entrance of material choosing apparatus by connecting gear, for water meter copper sleeve semi-finished product highly against regulation are screened, and the water meter copper sleeve semi-finished product that highly conform with the regulations is transferred to collator;
Collator, the entrance of collator is connected with the outlet of material choosing apparatus, and the outlet of collator is connected with external water meter copper sleeve machining tool;
Described climbing device comprises for depositing the half-finished material storing box of water meter copper sleeve, vertically or the conveyer belt being obliquely installed, accept with material storing box, and the first driving mechanism of driving conveyer belt transmission, on described conveyer belt, be provided with the parts of accepting from accepting water meter copper sleeve in material storing box, the side that parts are accepted in described conveyer belt setting is provided with the brush roll being driven by the second driving mechanism, thus the setting position of this brush roll with accept the corresponding guarantee of parts brush roll and can clean the improper water meter copper sleeve of accepting on parts that is undertaken on;
Describedly accept the bracket that parts are pair of opposing, between this pair of bracket, be formed with the container cavity of accepting water meter copper sleeve; On described bracket, be also provided with installing hole, fixture is arranged on bracket on described conveyer belt through this installing hole.
2. feed mechanism according to claim 1, it is characterized in that: the side that parts are accepted in described conveyer belt setting is also provided with gear removes the backstopping assembly of unnecessary water meter copper sleeve on described bracket, described backstopping assembly comprises the holder being connected with conveyer belt, on described holder, offer Connection Block hole, and be through in this Connection Block hole can easy on and off activity block axis, the bottom of described block axis can prop up described container cavity edge under Gravitative Loads, and the upper end of described block axis is provided with and prevents the locating part of block axis from dropping in Connection Block hole.
3. feed mechanism according to claim 2, is characterized in that: described backstopping assembly is arranged on the top of brush roll.
4. feed mechanism according to claim 1, is characterized in that: described connecting gear porch be provided with can stretch into accept the container cavity bottom of parts, for accepting the half-finished guide plate of water meter copper sleeve.
5. feed mechanism according to claim 1, is characterized in that: rotating shaft and the conveyer belt of described brush roll be arranged in parallel.
6. feed mechanism according to claim 1, is characterized in that: described material choosing apparatus comprises the passage of selecting materials that a guiding water meter copper sleeve passes through, described in the select materials top of passage be provided with limit for height lid; The both sides of the described passage of selecting materials are relatively set with the first correlation sensor, the first correlation sensor comprises the first emission sensor and first receiving sensor of the work of cooperatively interacting, correspondingly, passage and/or the limit for height of selecting materials described in covers and has the through hole that makes the transmitting number of the first emission sensor pass the passage of selecting materials; The bottom of the described passage of selecting materials is provided with the door that driving mechanisms control is closed, the first receiving sensor of described the first correlation sensor is connected with described driving mechanism, thereby door is opened this water meter copper sleeve is dropped in the passage of selecting materials when having water meter copper sleeve to be stuck in to select materials while causing the first receiving sensor can not receive the signal that the first emission sensor sends in passage, described in described driving mechanisms control.
7. feed mechanism according to claim 6, is characterized in that: described in described limit for height lid is arranged on by fixture, select materials on passage, and limit for height lid and the height of selecting materials between passage can regulate by described fixture.
8. feed mechanism according to claim 1, it is characterized in that: described collator comprises the sequence passage that holds the orderly accumulation of water meter copper sleeve, and be arranged on the second correlation sensor of described sequence passage both sides, the second correlation sensor comprises the second emission sensor and second receiving sensor of the work of cooperatively interacting, described the second receiving sensor is connected with the first driving mechanism, while causing the second receiving sensor not receive transmitting of the second emission sensor after the water meter copper sleeve in sequence passage is aligned to the second correlation sensor institute correspondence position, described the first driving mechanism quits work.
CN201310722402.8A 2013-12-24 2013-12-24 A kind of feed mechanism of making water meter copper sleeve Expired - Fee Related CN103692032B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310722402.8A CN103692032B (en) 2013-12-24 2013-12-24 A kind of feed mechanism of making water meter copper sleeve

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310722402.8A CN103692032B (en) 2013-12-24 2013-12-24 A kind of feed mechanism of making water meter copper sleeve

Publications (2)

Publication Number Publication Date
CN103692032A CN103692032A (en) 2014-04-02
CN103692032B true CN103692032B (en) 2016-05-11

Family

ID=50353783

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310722402.8A Expired - Fee Related CN103692032B (en) 2013-12-24 2013-12-24 A kind of feed mechanism of making water meter copper sleeve

Country Status (1)

Country Link
CN (1) CN103692032B (en)

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4653185A (en) * 1984-11-26 1987-03-31 Tachikawa Spring Co. Ltd. Apparatus for mounting tension springs automatically
US5145047A (en) * 1989-09-27 1992-09-08 Merlin Gerin Flexible production system comprising individually motorized mechanical modules whose operation is selected and synchronized by electronic means
JPH11129128A (en) * 1997-10-28 1999-05-18 Ondo Kosakusho:Kk Bolt feeding device
CN201010067Y (en) * 2007-03-29 2008-01-23 北京石油化工学院 Full-automatic electromagnetic steel nail packaged suites of equipment
CN201304493Y (en) * 2008-10-16 2009-09-09 陈云法 Feeding device for lathe
CN201338207Y (en) * 2009-01-16 2009-11-04 江苏格尔顿传动有限公司 Novel ear-hole automatic processing equipment of automobile steering universal joint fork
CN102807078A (en) * 2012-08-08 2012-12-05 天津市汉沽德源机械制造有限公司 Automatic sending device
CN202607394U (en) * 2012-05-22 2012-12-19 林玉松 Special-shaped workpiece feeding device on machine tool
CN202701889U (en) * 2012-05-09 2013-01-30 翔科自动化机械(上海)有限公司 Automatic valve oil seal trimming and spring sleeving machine
CN202804791U (en) * 2012-09-11 2013-03-20 玉环县佳颂工业自动化设备厂 Feeding device for automatic processing machine tool for special-shaped workpiece
CN203621666U (en) * 2013-12-24 2014-06-04 宁波天赐兄弟水表水暖有限公司 Feed mechanism for manufacturing water meter copper connectors

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4653185A (en) * 1984-11-26 1987-03-31 Tachikawa Spring Co. Ltd. Apparatus for mounting tension springs automatically
US5145047A (en) * 1989-09-27 1992-09-08 Merlin Gerin Flexible production system comprising individually motorized mechanical modules whose operation is selected and synchronized by electronic means
JPH11129128A (en) * 1997-10-28 1999-05-18 Ondo Kosakusho:Kk Bolt feeding device
CN201010067Y (en) * 2007-03-29 2008-01-23 北京石油化工学院 Full-automatic electromagnetic steel nail packaged suites of equipment
CN201304493Y (en) * 2008-10-16 2009-09-09 陈云法 Feeding device for lathe
CN201338207Y (en) * 2009-01-16 2009-11-04 江苏格尔顿传动有限公司 Novel ear-hole automatic processing equipment of automobile steering universal joint fork
CN202701889U (en) * 2012-05-09 2013-01-30 翔科自动化机械(上海)有限公司 Automatic valve oil seal trimming and spring sleeving machine
CN202607394U (en) * 2012-05-22 2012-12-19 林玉松 Special-shaped workpiece feeding device on machine tool
CN102807078A (en) * 2012-08-08 2012-12-05 天津市汉沽德源机械制造有限公司 Automatic sending device
CN202804791U (en) * 2012-09-11 2013-03-20 玉环县佳颂工业自动化设备厂 Feeding device for automatic processing machine tool for special-shaped workpiece
CN203621666U (en) * 2013-12-24 2014-06-04 宁波天赐兄弟水表水暖有限公司 Feed mechanism for manufacturing water meter copper connectors

Also Published As

Publication number Publication date
CN103692032A (en) 2014-04-02

Similar Documents

Publication Publication Date Title
CN202336437U (en) Fruit grading and conveying production line
CN109482500A (en) Kiwi berry automatic sorting slitting device and application method
CN103692276B (en) A kind of collator making water meter copper connector feed mechanism
CN208196299U (en) Bar automatic loading and unloading system
CN203599964U (en) Material selecting device of feeding mechanism for manufacture water meter copper connectors
CN103692032B (en) A kind of feed mechanism of making water meter copper sleeve
CN203621666U (en) Feed mechanism for manufacturing water meter copper connectors
CN104964988A (en) Improved sorting apparatus for capsules
CN203599961U (en) Climbing device of feeding mechanism for manufacturing water meter copper connectors
CN203611052U (en) Arranging system of feeding mechanism for production of copper water meter connectors
CN204866588U (en) Sorter is used in production of improvement type capsule
CN206827582U (en) Pinaculum of badminton automatic feeding
CN103659428B (en) A kind of climbing device of making water meter copper sleeve feed mechanism
CN103692278B (en) A kind of material choosing apparatus making water meter copper connector feed mechanism
CN104000288B (en) Walnut production line
CN209251715U (en) Root cutting device is used in a kind of production of needle mushroom
CN206393437U (en) Vertical paralleled surface grinding machine automatic loading and unloading mechanism
CN205799136U (en) Full-automatic gem rapid stone sticking machine
CN205555430U (en) Container sorting device with automatic sorting function
CN216444626U (en) Automatic sieve rig of circulation material loading constructs
CN216064342U (en) Shaped chrysanthemum grafting is with waiting to graft seedling sorter
CN109604169A (en) It is a kind of for reinforcing bar cutting after small powder screen apparatus for placing
CN203047990U (en) Automatic ceramic mud base feeder
CN213468543U (en) Grit screening plant
CN209601378U (en) Numerical control board automatic lifting feeding improves mechanism

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee