CN203611052U - Arranging system of feeding mechanism for production of copper water meter connectors - Google Patents

Arranging system of feeding mechanism for production of copper water meter connectors Download PDF

Info

Publication number
CN203611052U
CN203611052U CN201320856914.9U CN201320856914U CN203611052U CN 203611052 U CN203611052 U CN 203611052U CN 201320856914 U CN201320856914 U CN 201320856914U CN 203611052 U CN203611052 U CN 203611052U
Authority
CN
China
Prior art keywords
water meter
copper sleeve
passage
meter copper
sensor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320856914.9U
Other languages
Chinese (zh)
Inventor
潘建浩
潘建能
潘建波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Tianci Brothers Water Meter & Sanitaryware Co Ltd
Original Assignee
Ningbo Tianci Brothers Water Meter & Sanitaryware Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Tianci Brothers Water Meter & Sanitaryware Co Ltd filed Critical Ningbo Tianci Brothers Water Meter & Sanitaryware Co Ltd
Priority to CN201320856914.9U priority Critical patent/CN203611052U/en
Application granted granted Critical
Publication of CN203611052U publication Critical patent/CN203611052U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Sorting Of Articles (AREA)

Abstract

The utility model relates to an arranging system of a feeding mechanism for the production of copper water meter connectors, which is arranged at the end of the feeding mechanism for the production of copper water meter connectors and connected with the inlet of a machine tool for machining copper water meter connectors. The arranging system comprises an arranging passage and first through-beam sensors, the arranging passage is used for containing semifinished copper water meter connectors which are piled in order, the first through-beam sensors are mounted by both sides of the arranging passage and are a first transmitting sensor and a first receiving sensor which cooperate with each other to operate, the first receiving sensor is connected with a driving mechanism for controlling the feeding mechanism to act, and when the semifinished copper water meter connectors in the arranging passage are arranged to a position corresponding to the first through-beam sensors, so that the first receiving sensor cannot receive the signal transmitted by the first transmitting sensor, the operation of the driving mechanism is stopped. The arranging system with the structure can monitor the arrangement condition of semifinished copper water meter connectors and flexibly adjust the action of the feeding mechanism, thus increasing working efficiency.

Description

A kind of collator of making water meter copper sleeve feed mechanism
Technical field
The present invention relates to a kind of collator, be specifically related to a kind of collator of making water meter copper sleeve feed mechanism.
Background technology
Water meter copper sleeve is the connecting elements of indispensability when resident's water meter is installed, in machining tool, its one end is processed into screw-like and can obtains the water meter copper sleeve for installing by water meter copper sleeve semi-finished product are sent into, install at water meter two ends respectively and connect water meter copper sleeve and to realize, water meter is arranged on water supply line.Water meter whether be closely connected with water supply line and install after the use state of water meter all closely related with the quality of water meter copper sleeve that water meter is installed, the water meter copper sleeve of manufacturing specification coupling is one of critical process.All generally to adopt streamline to carry out production and processing for this class workpiece of water meter copper sleeve, workpiece to be processed is generally successively through feed zone, transmission range, select materials district and material discharge region, finally enter processing district, workpiece only has successively and just can complete and be processed into qualified product behind above-mentioned each region, and the cooperation between the each functional region of production line is the key that guarantees production line operating efficiency.But in actual production process, because Deng Ge region, feed zone is all do mechanization operation, the more difficult realization in each functional region cooperatively interacts, from main regulation job schedule, although can be by interlock belt, the feeding transmission speed of the equipment control feed zones such as belt pulley and transmission range, but for the more difficult realization of district and material discharge region of selecting materials, especially in material discharge region, when the speed that enters material discharge region when water meter copper sleeve semi-finished product to be processed exceedes it and exports the speed of machining tool to from material discharge region, water meter copper sleeve semi-finished product will be trapped in material discharge region and build up until affect whole feed mechanism operation, cause the confusion of production line, be unfavorable for enhancing productivity.
In addition, water meter copper sleeve is in the past delivering to before machine tooling the mode that mostly adopts artificial feeding, and this feeding style has increased staff's labour intensity, and feeding frequency is unstable.The work supporting block that adopts conveyer mechanism and distribute on it can be enhanced productivity effectively, but need like this workpiece of single transmission for water meter copper sleeve semi-finished product, in feeding process, but there is the problem of workpiece adhesion, exist and on a work supporting block, be accompanied with plural water meter copper sleeve semi-finished product, and make troubles to following process, cannot realize the object of workpiece really being carried out in order to single transmission.Further, the water meter copper sleeve of producing in order to ensure each machining tool can both meet product standard, possess corresponding product specification, need to carry out prescreen to water meter copper sleeve semi-finished product to be processed, pick out that those are underproof as with water meter copper sleeve semi-finished product jagged, that size height is not inconsistent.And in actual mechanical process, this sorting operation relies on manual work to complete often, not only spend a large amount of manpowers and time, and adopt manpower sorting also to have larger error, so that the energy of losing time, drag down production efficiency.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of collator of making water meter copper sleeve feed mechanism for above-mentioned prior art, can monitor the sequence situation of water meter copper sleeve semi-finished product in material discharge region, regulates feed mechanism normally to move.
The technical scheme in the invention for solving the above technical problem is: a kind of collator of making water meter copper sleeve feed mechanism, be arranged on the end of making water meter copper sleeve feed mechanism, and be connected with the entrance of water meter copper sleeve machining tool, it is characterized in that: comprise and hold the sequence passage that water meter copper sleeve semi-finished product are piled up in order, and be arranged on the first correlation sensor of described sequence passage both sides, the first correlation sensor comprises the first emission sensor and first receiving sensor of the work of cooperatively interacting, described the first receiving sensor is connected with the driving mechanism of controlling feed mechanism action, while causing the first receiving sensor not receive transmitting of the first emission sensor after the water meter copper sleeve semi-finished product in sequence passage are aligned to the first correlation sensor institute correspondence position, described driving mechanism quits work.
Preferably, described sequence passage tilts or vertically arranges, and water meter copper sleeve semi-finished product will closely be arranged in an orderly manner under Action of Gravity Field in sequence passage like this, makes sequence and output more smooth and easy.
Described the first correlation sensor is infrared emission sensor, comprises infrared emission sensor and infrared receiving sensor.When in sequence passage in the time that the water meter copper sleeve semi-finished product of exporting are stacked into enough height and block the transmitting and receiving of infrared signal, drive the driving mechanism of feed mechanism operation automatically to close down; When water meter copper sleeve semi-finished product in the passage that sorts are reduced to infrared receiving sensor and again receive the infrared signal of infrared emission sensor emission, described driving mechanism restarts, so realize the monitoring to sequence in-channel water table copper sleeve semi-finished product sequence situation, and control flexibly feed mechanism operation.
Make water meter copper sleeve and also comprise climbing device and material choosing apparatus with feed mechanism, the outlet of climbing device is connected with the entrance of material choosing apparatus by connecting gear.
Described climbing device comprises material storing box, vertically or the conveyer belt being obliquely installed, accept with material storing box, on described conveyer belt, be provided with in material storing box and accept the half-finished parts of accepting of water meter copper sleeve, the side that parts are accepted in described conveyer belt setting is provided with brush roll, thereby the setting position of this brush roll with accept the corresponding assurance of parts brush roll and can clean the improper water meter copper sleeve semi-finished product of accepting on parts that are undertaken on, describedly accept the bracket that parts are pair of opposing, between this pair of bracket, be formed with and accept the half-finished container cavity of water meter copper sleeve.
Usually, be also provided with installing hole on described bracket, fixture is arranged on bracket on described conveyer belt through this installing hole.
The side that parts are accepted in the conveyer belt setting of above-mentioned climbing device is also provided with gear and removes the half-finished backstopping assembly of unnecessary water meter copper sleeve on described bracket, described backstopping assembly comprises the holder being connected with conveyer belt, on described holder, offer Connection Block hole, and be through in this Connection Block hole can easy on and off activity block axis, the bottom of described block axis can prop up described container cavity edge under Gravitative Loads, and the upper end of described block axis is provided with and prevents the locating part of block axis from dropping in Connection Block hole.Concrete process is to accept the half-finished bracket of water meter copper sleeve along with conveyer belt moves upward, after contacting with the bottom of block axis, by block axis jack-up, in the process of contact jack-up, the unnecessary water meter copper sleeve semi-finished product that may exist on bracket are blocked axle bumper, further guarantee that a pair of bracket only carries water meter copper sleeve semi-finished product, is fallen under the effect of self gravitation again by the block axis of jack-up afterwards.
Preferably, described backstopping assembly is arranged on the top of brush roll, further carry out backstop removing to accepting water meter copper sleeve semi-finished product unnecessary on parts in brush roll to accepting after parts complete first cleaning, guarantee that each parts of accepting only carry water meter copper sleeve semi-finished product.
Described making water meter copper sleeve with the connecting gear porch of feed mechanism be provided with the container cavity bottom of accepting parts that can stretch on described climbing device conveyer belt, for accepting the half-finished guide plate of water meter copper sleeve, realize water meter copper sleeve semi-finished product and enter connecting gear from climbing device.
Described material choosing apparatus comprises the passage of selecting materials that guiding water meter copper sleeve semi-finished product pass through, described in the select materials top of passage be provided with limit for height lid; The both sides of the described passage of selecting materials are relatively set with the second correlation sensor, the second correlation sensor comprises the second emission sensor and second receiving sensor of the work of cooperatively interacting, correspondingly, passage and/or the limit for height of selecting materials described in covers to have and makes the transmitting through the through hole of the passage of selecting materials of the second emission sensor; The bottom of the described passage of selecting materials is provided with the door of being closed by driving mechanisms control, the second receiving sensor of described the second correlation sensor is connected with described driving mechanism, thereby door is opened these water meter copper sleeve semi-finished product is dropped in the passage of selecting materials in the time having water meter copper sleeve semi-finished product to be stuck in to cause in the passage of selecting materials the second receiving sensor can not receive the signal that the second emission sensor sends, described in described driving mechanisms control, realize the half-finished sorting of water meter copper sleeve with this, highly underproof workpiece is rejected in feed mechanism.
Preferably, described in limit for height lid described in above-mentioned material choosing apparatus is arranged on by fixture, select materials on passage, and limit for height lid and the height of selecting materials between passage can regulate by described fixture.
Compared with prior art, the utility model has the advantage of:
Collator is designed to hold to the sequence channel design of water meter copper sleeve semi-finished product ordered arrangement, and at this sequence passage both sides relative position, correlation sensor is installed, realize to water meter copper sleeve semi-finished product to be exported in collator are arranged the monitoring of situation and controlled flexibly feed mechanism operation, the ingenious confusion of avoiding feeding program, and saved manpower.
In addition, in feed mechanism, conveyer belt one side of climbing device is provided with brush roll, the setting position of this brush roll is with to accept parts corresponding, brush roll can be cleaned to be improperly undertaken on this and to accept the water meter copper sleeve semi-finished product on parts, be arranged in addition on conveyer belt and remove to accept the half-finished backstopping assembly of unnecessary water meter copper sleeve on parts for gear, further guarantee that a pair of bracket of accepting only carries water meter copper sleeve semi-finished product, guarantee that water meter copper sleeve semi-finished product are transmitted in order, avoid transport process to cause confusion, improved the operating efficiency of production line.
Material choosing apparatus is designed to introduce the half-finished passage of selecting materials of water meter copper sleeve, the described passage top of selecting materials arranges limit for height lid, described limit for height lid and the distance of selecting materials between passage are adjustable, and be oppositely arranged correlation sensor in the both sides of the passage of selecting materials, realize the half-finished automatic sorting of water meter copper sleeve to highly differing, replace operating personnel's heavy and monotonous labour, realize mechanization and the automation of the operation of selecting materials, improved production efficiency.
Accompanying drawing explanation
Fig. 1 is the overall schematic of feed mechanism in the utility model embodiment;
Fig. 2 is the structural representation of climbing device bracket in the utility model embodiment;
Fig. 3 is the structural representation of climbing device backstopping assembly in the utility model embodiment;
Fig. 4 is the overall schematic at another visual angle of feed mechanism in the utility model embodiment;
Fig. 5 is the partial structurtes schematic diagram of the material choosing apparatus of B portion shown in Fig. 4.
The specific embodiment
Below in conjunction with accompanying drawing, embodiment is described in further detail the utility model.
Making water meter copper sleeve in the present embodiment mainly comprises climbing device, connecting gear, material choosing apparatus and the collator with material storing box with feed mechanism, and described climbing device, connecting gear, material choosing apparatus and collator join successively.Water meter copper sleeve semi-finished product in material storing box are transmitted in order through climbing device, entering material choosing apparatus through connecting gear sorts, reject highly underproof water meter copper sleeve semi-finished product, finally wait for that by sort qualified water meter copper sleeve semi-finished product introducing collator through material choosing apparatus being delivered to external machining tool completes last processing.
As shown in Figure 1, the climbing device of this feed mechanism comprises for depositing the half-finished material storing box 1 of water meter copper sleeve, vertically or the conveyer belt 2 being obliquely installed, accept with material storing box 1, on described conveyer belt 2, be provided with in material storing box 1 and accept the half-finished parts 4 of accepting of water meter copper sleeve, described conveyer belt 2 arranges a side of accepting parts and is provided with brush roll 5, thus the setting position of this brush roll 5 with accept the corresponding assurance of parts 4 brush roll 5 and can clean the improper water meter copper sleeve semi-finished product of accepting on parts that are undertaken on.
In the present embodiment, the rotating shaft of described brush roll 5 and conveyer belt 2 be arranged in parallel, are more conducive to brush roll 5 and clean loading on the unnecessary water meter copper sleeve semi-finished product of accepting on parts 4.
As shown in Figure 2, described in accept the bracket 41 that parts 4 are pair of opposing, between this pair of bracket 41, be formed with and accept the half-finished container cavity A of water meter copper sleeve.Climb in process, bracket 41 moves and realizes transmission in container cavity A and with conveyer belt 2 from accepting water meter copper sleeve semi-finished product in material storing box 1.
On described bracket 41, be also provided with installing hole 42, fixture is arranged on bracket 41 on described conveyer belt 2 through this installing hole 42.
As shown in Figure 1,3, the side that parts 4 are accepted in described conveyer belt 2 settings is also provided with gear and removes the half-finished backstopping assembly 6 of unnecessary water meter copper sleeve on described bracket 41.Described backstopping assembly 6 comprises the holder 61 being connected with conveyer belt 2, on described holder 61, offer Connection Block hole 610, and be through in this Connection Block hole 610 can easy on and off activity block axis 62, the bottom of described block axis 62 can prop up described container cavity A edge under Gravitative Loads.Meanwhile, the upper end of described block axis 62 is provided with and prevents the locating part 620 of block axis 62 from dropping in Connection Block hole 610.Concrete process is to accept the half-finished bracket of water meter copper sleeve along with conveyer belt moves upward, after contacting with the bottom of block axis, by block axis jack-up, in the process of contact jack-up, the unnecessary water meter copper sleeve semi-finished product that may exist on bracket are blocked axle bumper, are again fallen afterwards by the block axis of jack-up under the effect of self gravitation.
In the present embodiment, described backstopping assembly 6 is arranged on the top of brush roll 5, further carry out backstop removing to accepting water meter copper sleeve semi-finished product unnecessary on parts in brush roll to accepting after parts complete first cleaning, guaranteed to accept parts and once only carried water meter copper sleeve semi-finished product.
The half-finished climbing device of this transmission water meter copper sleeve also comprises the first driving mechanism that drives conveyer belt transmission, the second driving mechanism that drives brush roll to rotate, the first driving mechanism and the second driving mechanism are same driving mechanism, driving mechanism can adopt motor or hydraulic drive mechanism, the present embodiment adopts motor, and motor is arranged on the inside of frame 3.
Described making water meter copper sleeve is provided with the connecting gear porch of feed mechanism and accepts the container cavity A bottom of parts 4 described in stretching into, for accepting the half-finished guide plate (not shown) of water meter copper sleeve; realize water meter copper sleeve semi-finished product and enter connecting gear from climbing device, the first transport unit 14 and horizontally disposed the second transport unit 15 under connecting gear protection is tilted to.
As shown in Figure 4,5, the material choosing apparatus in the present embodiment comprises the passage 8 of selecting materials that guiding water meter copper sleeve semi-finished product pass through, described in the select materials top of passage be provided with limit for height lid 9; Described both sides of selecting materials passage 8 are relatively set with the second correlation sensor, the second correlation sensor comprises the second emission sensor 11-1 and the second receiving sensor 11-2 of the work of cooperatively interacting, correspondingly, described in, select materials to have on passage 8 and limit for height lid 9 and make the transmitting through the through hole 90 of the passage 8 of selecting materials of the second emission sensor; Described bottom of selecting materials passage 8 is provided with by driving mechanism 7 and controls the door (not shown) of closing, the receiving sensor of described the second correlation sensor is connected with described driving mechanism 7, thereby when the through hole 90 that blocks signal transmission when having water meter copper sleeve semi-finished product to be stuck in to select materials in passage 8 causes the second receiving sensor can not receive the signal that emission sensor sends, described driving mechanism 7 controls described door and open these water meter copper sleeve semi-finished product are dropped in the passage 8 of selecting materials.
Described limit for height lid 9 is selected materials on passage 8 described in being arranged on by fixture 10, and limit for height lid 9 and the height of selecting materials between passage 8 can regulate by described fixture 10.
In the present embodiment, described the second correlation sensor is infrared emission sensor, comprises infrared emission sensor and infrared receiving sensor.Block the through hole 90 that signal transmits during when having water meter copper sleeve semi-finished product to be trapped in to select materials in passage 8, infrared receiving sensor does not receive signal, and the driving mechanism 7 being attached thereto is opened the door of the channel bottom of selecting materials, and these water meter copper sleeve semi-finished product are dropped automatically.
The described passage 8 of selecting materials is obliquely installed, so that guiding water meter copper sleeve workpiece passes through.
As shown in Figure 4, collator in the present embodiment is arranged on the end of making water meter copper sleeve feed mechanism, and be connected with the entrance of water meter copper sleeve machining tool, comprise and hold the sequence passage 12 that water meter copper sleeve semi-finished product are piled up in order, and be arranged on the first correlation sensor of described sequence passage both sides, the first correlation sensor comprises the first emission sensor 13-1 and the first receiving sensor 13-2 of the work of cooperatively interacting, described receiving sensor is connected with the driving mechanism of controlling feed mechanism action, while causing the first receiving sensor not receive transmitting of the first emission sensor after the water meter copper sleeve semi-finished product in sequence passage are aligned to the first correlation sensor institute correspondence position, described driving mechanism quits work.
Described sequence passage 12 is obliquely installed, and water meter copper sleeve semi-finished product will, in the interior closely arrangement in an orderly manner of sequence passage 1, make sequence and output more smooth and easy under Action of Gravity Field like this.
Described in the present embodiment, the first correlation sensor is infrared emission sensor, comprises infrared emission sensor and infrared receiving sensor.When in sequence passage in the time that the water meter copper sleeve semi-finished product of exporting are stacked into enough height and block the transmitting and receiving of infrared signal, drive the driving mechanism of feed mechanism operation automatically to close down; When water meter copper sleeve semi-finished product in the passage that sorts are reduced to infrared receiving sensor and again receive the infrared signal of infrared emission sensor emission, described driving mechanism restarts, so realize the monitoring to sequence in-channel water table copper sleeve semi-finished product sequence situation, and control flexibly feed mechanism operation.
Climbing device, material choosing apparatus and the collator of said structure completed respectively the water meter copper sleeve semi-finished product in material storing box transmitted in order, also automatically regulates feed mechanism operation to the water meter copper sleeve semi-finished product automatic sorting highly differing and to water meter copper sleeve semi-finished product at the sequence situation Real-Time Monitoring in sequence district, make whole feed mechanism realize mechanization, automation, effectively improved operating efficiency.
The foregoing is only the preferred embodiment of the present invention, for a person skilled in the art, do not departing under principle of the present invention, can also make multiple improvement to each portion structure of feed mechanism, for example be formed with inside hole slot according to the two ends of water meter copper sleeve self, for the ease of accept water meter copper sleeve semi-finished product in material storing box, the described parts of accepting can be designed as the post of accepting being vertically set on described conveyer belt, accept interior also this water meter copper sleeve half product of jack-up of hole slot that post stretches into any one end of water meter copper sleeve semi-finished product, realize the step of accepting feeding from material storing box, the distortion of this class formation also all should be considered as in protection scope of the present invention.

Claims (9)

1. make the collator of water meter copper sleeve feed mechanism for one kind, be arranged on the end of making water meter copper sleeve feed mechanism, and be connected with the entrance of water meter copper sleeve machining tool, it is characterized in that: comprise and hold the sequence passage that water meter copper sleeve semi-finished product are piled up in order, and be arranged on the first correlation sensor of described sequence passage both sides, the first correlation sensor comprises the first emission sensor and first receiving sensor of the work of cooperatively interacting, described the first receiving sensor is connected with the driving mechanism of controlling feed mechanism action, while causing the first receiving sensor not receive transmitting of the first emission sensor after the water meter copper sleeve semi-finished product in sequence passage are aligned to the first correlation sensor institute correspondence position, described driving mechanism quits work.
2. collator according to claim 1, is characterized in that: described sequence passage tilts or vertically arranges.
3. collator according to claim 1, is characterized in that: described the first correlation sensor is infrared emission sensor, comprises infrared emission sensor and infrared receiving sensor.
4. collator according to claim 1, is characterized in that: make water meter copper sleeve feed mechanism and also comprise climbing device and material choosing apparatus, the outlet of climbing device is connected with the entrance of material choosing apparatus by connecting gear.
5. the collator of stating according to claim 4, it is characterized in that: described climbing device comprises material storing box, vertically or be obliquely installed, the conveyer belt of accepting with material storing box, on described conveyer belt, be provided with in material storing box and accept the half-finished parts of accepting of water meter copper sleeve, the side that parts are accepted in described conveyer belt setting is provided with brush roll, thereby the setting position of this brush roll with accept the corresponding assurance of parts brush roll and can clean the improper water meter copper sleeve semi-finished product of accepting on parts that are undertaken on, describedly accept the bracket that parts are pair of opposing, between this pair of bracket, be formed with and accept the half-finished container cavity of water meter copper sleeve.
6. the collator of stating according to claim 5, it is characterized in that: the side that parts are accepted in described conveyer belt setting is also provided with gear and removes the half-finished backstopping assembly of unnecessary water meter copper sleeve on described bracket, described backstopping assembly comprises the holder being connected with conveyer belt, on described holder, offer Connection Block hole, and be through in this Connection Block hole can easy on and off activity block axis, the bottom of described block axis can prop up described container cavity edge under Gravitative Loads, and the upper end of described block axis is provided with and prevents the locating part of block axis from dropping in Connection Block hole.
7. the collator of stating according to claim 5, is characterized in that: described connecting gear porch is provided with and accepts the container cavity bottom of parts described in stretching into, for accepting the half-finished guide plate of water meter copper sleeve.
8. the collator of stating according to claim 4, is characterized in that: described material choosing apparatus comprises the passage of selecting materials that guiding water meter copper sleeve semi-finished product pass through, described in the select materials top of passage be provided with limit for height lid;
The both sides of the described passage of selecting materials are relatively set with the second correlation sensor, the second correlation sensor comprises the second emission sensor and second receiving sensor of the work of cooperatively interacting, correspondingly, passage and/or the limit for height of selecting materials described in covers and has the through hole that makes the transmitting number of the second emission sensor pass the passage of selecting materials;
The bottom of the described passage of selecting materials is provided with the door of being closed by driving mechanisms control, the second receiving sensor of described the second correlation sensor is connected with described driving mechanism, thereby door is opened these water meter copper sleeve semi-finished product are dropped in the passage of selecting materials in the time having water meter copper sleeve semi-finished product to be stuck in to cause in the passage of selecting materials the second receiving sensor can not receive the signal that the second emission sensor sends, described in described driving mechanisms control.
9. the collator of stating according to claim 4, is characterized in that: described in described limit for height lid is arranged on by fixture, select materials on passage, and limit for height lid and the height of selecting materials between passage can regulate by described fixture.
CN201320856914.9U 2013-12-24 2013-12-24 Arranging system of feeding mechanism for production of copper water meter connectors Expired - Fee Related CN203611052U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320856914.9U CN203611052U (en) 2013-12-24 2013-12-24 Arranging system of feeding mechanism for production of copper water meter connectors

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320856914.9U CN203611052U (en) 2013-12-24 2013-12-24 Arranging system of feeding mechanism for production of copper water meter connectors

Publications (1)

Publication Number Publication Date
CN203611052U true CN203611052U (en) 2014-05-28

Family

ID=50763733

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320856914.9U Expired - Fee Related CN203611052U (en) 2013-12-24 2013-12-24 Arranging system of feeding mechanism for production of copper water meter connectors

Country Status (1)

Country Link
CN (1) CN203611052U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103692276A (en) * 2013-12-24 2014-04-02 宁波天赐兄弟水表水暖有限公司 Sequencing device of feeding mechanism for manufacturing water meter copper connector

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103692276A (en) * 2013-12-24 2014-04-02 宁波天赐兄弟水表水暖有限公司 Sequencing device of feeding mechanism for manufacturing water meter copper connector
CN103692276B (en) * 2013-12-24 2016-09-07 宁波天赐兄弟水表水暖有限公司 A kind of collator making water meter copper connector feed mechanism

Similar Documents

Publication Publication Date Title
CN202336437U (en) Fruit grading and conveying production line
CN110711704A (en) Full-automatic garbage sorting device
CN103692276A (en) Sequencing device of feeding mechanism for manufacturing water meter copper connector
CN203599964U (en) Material selecting device of feeding mechanism for manufacture water meter copper connectors
CN203611052U (en) Arranging system of feeding mechanism for production of copper water meter connectors
CN108262632A (en) Bar automatic loading and unloading system
CN203621666U (en) Feed mechanism for manufacturing water meter copper connectors
CN205501482U (en) Carding system is opened in cashmere edulcoration
CN210711841U (en) Down feather sorting and filtering device
CN205324520U (en) Spinning -lathe is with treating processing material workbin structure
CN103692032B (en) A kind of feed mechanism of making water meter copper sleeve
CN203599961U (en) Climbing device of feeding mechanism for manufacturing water meter copper connectors
CN207723844U (en) A kind of automatic screw-driving equipment
CN103692278A (en) Sorting device of feeding mechanism for manufacturing water meter copper connector
CN202711367U (en) Automatic paper money conveying mechanism
CN109365280A (en) A kind of self-feeding selection by winnowing robot
CN206142426U (en) Work piece reposition of redundant personnel feedway
CN103659428B (en) A kind of climbing device of making water meter copper sleeve feed mechanism
CN208361506U (en) Carton production line automatic counting feeding-distribution device
KR100301027B1 (en) Continuous automatic tapping device for automobile oil filter reinforcement plate
CN207645389U (en) A kind of mechanical processing automatic charging device
CN208771818U (en) A kind of sorting unit in ceramic tile production
CN202174068U (en) Sorting system for pole pieces of lithium batteries
CN112027989A (en) Automatic cap conveying device for cap screwing operation
CN209222665U (en) A kind of intelligent mine selects machine

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140528

Termination date: 20141224

EXPY Termination of patent right or utility model