CN103692278B CN201310723074.3A CN201310723074A CN103692278B CN 103692278 B CN103692278 B CN 103692278B CN 201310723074 A CN201310723074 A CN 201310723074A CN 103692278 B CN103692278 B CN 103692278B
Authority
CN
China
Prior art keywords
water meter
passage
copper connector
meter copper
sensor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310723074.3A
Other languages
Chinese (zh)
Other versions
CN103692278A (en
Inventor
潘建浩
潘建能
潘建波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Tianci Brothers Water Meter & Sanitaryware Co Ltd
Original Assignee
Ningbo Tianci Brothers Water Meter & Sanitaryware Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Tianci Brothers Water Meter & Sanitaryware Co Ltd filed Critical Ningbo Tianci Brothers Water Meter & Sanitaryware Co Ltd
Priority to CN201310723074.3A priority Critical patent/CN103692278B/en
Publication of CN103692278A publication Critical patent/CN103692278A/en
Application granted granted Critical
Publication of CN103692278B publication Critical patent/CN103692278B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23QDETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g. ARRANGEMENTS FOR COPYING OR CONTROLLING; MACHINE TOOLS IN GENERAL CHARACTERISED BY THE CONSTRUCTION OF PARTICULAR DETAILS OR COMPONENTS; COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOT DIRECTED TO A PARTICULAR RESULT
    • B23Q7/00Arrangements for handling work specially combined with or arranged in, or specially adapted for use in connection with, machine tools, e.g. for conveying, loading, positioning, discharging, sorting
    • B23Q7/12Sorting arrangements

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Sorting Of Articles (AREA)

Abstract

The present invention relates to a kind of material choosing apparatus making water meter copper connector feed mechanism, including the passage of selecting materials that a guiding water meter copper connector is passed through, described in select materials passage be arranged over limit for height lid;The both sides of described passage of selecting materials are relatively set with the first opposite type sensor, first opposite type sensor include cooperating first emission sensor and first of work receives sensor, correspondingly, selecting materials described in have on passage and/or limit for height lid makes the transmitting traverse of the first emission sensor select materials the through hole of passage;The bottom of described passage of selecting materials is provided with the door that driving mechanisms control is closed, the first of described first opposite type sensor receives sensor and is connected with described driving mechanism, during the signal that the first emission sensor sends when having water meter copper connector semi-finished product to be stuck in select materials in passage to cause the first reception sensor not receive, door described in described driving mechanisms control open so that these water meter copper connector semi-finished product drop in passage of selecting materials, realize the automatic sorting function of the program of selecting materials with this.

Description

A kind of material choosing apparatus making water meter copper connector feed mechanism
Technical field
The present invention relates to a kind of material choosing apparatus, be specifically related to a kind of material choosing apparatus making water meter copper connector feed mechanism.
Background technology
The connecting elements that water meter copper connector is indispensable when being install resident's water meter, by being sent into by water meter copper connector semi-finished product, its one end is processed into by machining tool the water meter copper connector that namely screw-like is available for installing, installs at water meter two ends respectively and connect water meter copper connector to realize water pump composite on water supply line.Water meter and water supply line whether compact siro spinning technology and after installing the uses state of water meter all closely related with the quality of the water meter copper connector installing water meter, the water meter copper connector that manufacturing specification mates is one of critical process.In concrete production process, the water meter copper connector produced in order to ensure each machining tool can both meet product standard, possess corresponding product specification, need water meter copper connector semi-finished product to be processed are screened in advance, pick out those underproof water meter copper connector semi-finished product as not being inconsistent with jagged, dimensional height.And in actual mechanical process, this sorting operation relies on manual work to complete often, not only spend substantial amounts of manpower and time, and adopt manpower sorting to there is also bigger error, so that losing time energy, drag down production efficiency, the raising of actual yield rate is very not notable yet, there is the shortcoming got half the result with twice the effort.According to the half-finished true form of water meter copper connector and size, designing and can being automatically performed the material choosing apparatus that water meter copper connector semi-finished product carry out highly sorting is the problem that person skilled needs to solve.
Additionally, conventional water meter copper connector mostly adopts the mode of artificial feeding before delivering to machine tooling, this feeding style adds the labor intensity of staff, and feeding frequency is unstable.Adopt conveyer mechanism and be distributed work supporting block thereon and can be effectively improved production efficiency, but water meter copper connector semi-finished product are so needed to the workpiece of single transmission, but the problem that there is workpiece adhesion in feeding process, namely exist on a work supporting block and be accompanied with plural water meter copper connector semi-finished product, and make troubles to following process, it is impossible to realize really carrying out workpiece in order the purpose of single transmission.Further, employing streamline is typically all for this class workpiece of water meter copper connector and carries out production and processing, workpiece to be processed is usually and sequentially passes through feed zone, transmission range, select materials district and material discharge region, finally enter processing district, workpiece just can complete after only sequentially passing through above-mentioned each region to be processed into qualified product, and the cooperation between production line each function region is to ensure that the key of production line work efficiency.But in actual production process, owing to Deng Ge region, feed zone is all do mechanization operation, the more difficult realization in region of each function cooperates, from main regulation job schedule, although can by interlocking belt, the equipment such as belt pulley control the feeding transmission speed of feed zone and transmission range, but for district and the material discharge region then more difficult realization of selecting materials, particularly in material discharge region, when the speed that water meter copper connector semi-finished product to be processed enter material discharge region exceedes it from material discharge region output to the speed of machining tool, water meter copper connector semi-finished product will be trapped in material discharge region until affecting whole feed mechanism operation, cause the confusion of production line.
Summary of the invention
The technical problem to be solved is to provide a kind of mechanization and automatization that to the material choosing apparatus of highly underproof water meter copper connector semi-finished product automatic sorting, can really realize program of selecting materials for above-mentioned prior art.
It is a further object to provide the climbing device of a kind of feed mechanism and ensure that water meter copper connector semi-finished product are transmitted in order, and a kind of collator is provided, it is possible to monitor water meter copper connector semi-finished product sequence situation in material discharge region and flexible feed mechanism action.
This invention address that the technical scheme that the problems referred to above adopt is: a kind of material choosing apparatus making water meter copper connector feed mechanism, it is characterised in that: include the passage of selecting materials that a guiding water meter copper connector is passed through, described in select materials passage be arranged over limit for height lid;
The both sides of described passage of selecting materials are relatively set with the first opposite type sensor, first opposite type sensor include cooperating first emission sensor and first of work receives sensor, correspondingly, select materials described in passage and/or limit for height lid have make the first emission sensor launch the signal through hole through passage of selecting materials;
The bottom of described passage of selecting materials is provided with the door closed by driving mechanisms control, the first of described first opposite type sensor receives sensor and is connected with described driving mechanism, and during the signal that the first emission sensor sends when having water meter copper connector semi-finished product to be stuck in select materials in passage to cause the first reception sensor not receive, door described in described driving mechanisms control opens so that these water meter copper connector semi-finished product drop in passage of selecting materials.
Described limit for height lid by fixture be arranged on described in select materials on passage, and limit for height lid and the height selected materials between passage can be regulated by described fixture.
Described first opposite type sensor is infrared emission sensor, including infrared emission sensor and infrared receiver sensor.When having water meter copper connector semi-finished product to be trapped in select materials in passage, infrared signal transmission passage is blocked, and infrared receiver sensor does not receive signal, and the driving mechanism being attached thereto opens the door of channel bottom of selecting materials, and makes these water meter copper connector semi-finished product automatically drop.
Preferably, channel slopes of selecting materials described in is arranged, in order to guide water meter copper connector semi-finished product to pass through.
Specifically, make water meter copper connector feed mechanism and also include climbing device and collator, the outlet of climbing device is connected with the entrance of material choosing apparatus by connecting gear, and collator is arranged on the end of material choosing apparatus, and is connected with the entrance of water meter copper connector machining tool.
Described climbing device includes material storing box, vertically or be obliquely installed and conveyer belt that material storing box is accepted, described conveyer belt is provided with in material storing box and accepts the half-finished undertaking parts of water meter copper connector, described conveyer belt arranges the side accepting parts and is provided with brush roll, this brush roll to arrange position corresponding with accepting parts thus ensureing that brush roll can clean the improper water meter copper connector semi-finished product accepted on parts that are undertaken on, described undertaking parts are the bracket of pair of opposing, are formed with the undertaking half-finished accommodation chamber of water meter copper connector between this pair bracket.
Usually, described bracket being additionally provided with installing hole, bracket is arranged on described conveyer belt by fixture through this installing hole.
The conveyer belt of above-mentioned climbing device arranges the side accepting parts and is additionally provided with gear and removes the half-finished backstopping assembly of unnecessary water meter copper connector on described bracket, described backstopping assembly includes the fixing seat being connected with conveyer belt, described fixing seat offers connection bore, and be through in this connection bore can be freely up and down movable block axis, the bottom of described block axis can prop up described accommodation cavity edge under Gravitative Loads, and the upper end of described block axis is provided with and prevents block axis from connecting the locating part dropped in bore.Concrete process is to accept the half-finished bracket of water meter copper connector to move up along with conveyer belt, after contacting with the bottom of block axis, by block axis jack-up, in the process of contact jack-up, on bracket, unnecessary water meter copper connector semi-finished product that may be present are blocked axle bumper, further ensure that a pair bracket only carries water meter copper connector semi-finished product, again fallen under the effect of self gravitation by the block axis of jack-up afterwards.
The connecting gear porch of described making water meter copper connector feed mechanism is provided with bottom the accommodation chamber accepting parts that can stretch on described climbing device conveyer belt, for accepting the half-finished guide plate of water meter copper connector, it is achieved water meter copper connector semi-finished product enter connecting gear from climbing device.
Described collator includes holding the sequence passage that water meter copper connector semi-finished product are piled up in order, and it is arranged on the second opposite type sensor of described sequence passage both sides, second opposite type sensor include cooperating second emission sensor and second of work receives sensor, described second receives sensor is connected with the driving mechanism controlling feed mechanism action, when the water meter copper connector semi-finished product in the passage that sorts cause, after being aligned to position corresponding to the second opposite type sensor, the transmitting signal that the second reception sensor does not receive the second emission sensor, described driving mechanism quits work.
Compared with prior art, it is an advantage of the current invention that:
Material choosing apparatus is designed to the passage of selecting materials guiding water meter copper connector semi-finished product to pass through, it is provided above limit for height lid at passage of selecting materials, described limit for height lid and the distance scalable selected materials between passage, and it is oppositely arranged opposite type sensor in the both sides of passage of selecting materials, achieve the automatic sorting to water meter copper connector semi-finished product height, replace the heavy and monotonous labour of operator, it is achieved the mechanization of operation of selecting materials and automatization, improve production efficiency.
In addition, in feed mechanism, the conveyer belt side of climbing device arranges brush roll, this brush roll arrange position with accept parts corresponding, brush roll is enable to clean the improper water meter copper connector semi-finished product being undertaken on these undertaking parts, additionally mounted go to accept the half-finished backstopping assembly of unnecessary water meter copper connector on parts for gear on a moving belt, further ensure that a pair undertaking bracket only carries water meter copper connector semi-finished product, ensure that water meter copper connector semi-finished product can be transmitted in an orderly manner, it is to avoid transmission process causes confusion.
Collator is designed to accommodate that the sequence channel design of water meter copper connector semi-finished product ordered arrangement, and at this sequence passage both sides relative position, opposite type sensor is installed, achieve water meter copper connector semi-finished product to be output in collator are arranged situation monitoring flexible feed mechanism operation, the ingenious confusion avoiding feed program, and save manpower.
Accompanying drawing explanation
Fig. 1 is the overall schematic of feed mechanism in the embodiment of the present invention;
Fig. 2 is the structural representation of climbing device bracket in the embodiment of the present invention;
Fig. 3 is the structural representation of climbing device backstopping assembly in the embodiment of the present invention;
Fig. 4 is the overall schematic at another visual angle of feed mechanism in the embodiment of the present invention;
Fig. 5 is the partial structurtes schematic diagram in B portion material choosing apparatus shown in Fig. 4.
Detailed description of the invention
Below in conjunction with accompanying drawing embodiment, the present invention is described in further detail.
Making water meter copper connector feed mechanism in the present embodiment mainly includes with the climbing device of material storing box, connecting gear, material choosing apparatus and collator, and described climbing device, connecting gear, material choosing apparatus and collator connect successively.Water meter copper connector semi-finished product in material storing box are transmitted in order through climbing device, communicated mechanism enters material choosing apparatus and sorts, reject highly underproof water meter copper connector semi-finished product, finally the water meter copper connector semi-finished product qualified through material choosing apparatus sorting are introduced collator etc. and complete last processing to be delivered to external machining tool.
As shown in Figure 1, the climbing device of this feed mechanism includes for depositing the half-finished material storing box 1 of water meter copper connector, vertically or be obliquely installed and conveyer belt 2 that material storing box 1 is accepted, described conveyer belt 2 is provided with in material storing box 1, accepts the half-finished undertaking parts 4 of water meter copper connector, described conveyer belt 2 arrange accept parts side be provided with brush roll 5, this brush roll 5 arrange position with accept parts 4 corresponding thus ensure brush roll 5 can clean improper be undertaken on undertaking parts on water meter copper connector semi-finished product.
In the present embodiment, the rotating shaft of described brush roll 5 and conveyer belt 2 be arranged in parallel, be more beneficial for brush roll 5 and load is cleaned at the unnecessary water meter copper connector semi-finished product accepted on parts 4.
As in figure 2 it is shown, the bracket 41 that described undertaking parts 4 are pair of opposing, between this pair bracket 41, it is formed with undertaking water meter copper connector half-finished accommodation chamber A.Climbing in process, bracket 41 is from accepting water meter copper connector semi-finished product in material storing box 1 to holding in the A of chamber and moving realization transmission with conveyer belt 2.
Being additionally provided with installing hole 42 on described bracket 41, bracket 41 is arranged on described conveyer belt 2 by fixture through this installing hole 42.
As shown in Figure 1,3, described conveyer belt 2 arranges the side accepting parts 4 and is additionally provided with gear and removes the half-finished backstopping assembly 6 of unnecessary water meter copper connector on described bracket 41.Described backstopping assembly 6 includes the fixing seat 61 being connected with conveyer belt 2, described fixing seat 61 offers connection bore 610, and be through in this connection bore 610 can be freely up and down movable block axis 62, the bottom of described block axis 62 can prop up A edge, described accommodation chamber under Gravitative Loads.Meanwhile, the upper end of described block axis 62 is provided with and prevents block axis 62 from connecting the locating part 620 dropped in bore 610.Concrete process is to accept the half-finished bracket of water meter copper connector to move upward along with conveyer belt, after contacting with the bottom of block axis, by block axis jack-up, in the process of contact jack-up, on bracket, unnecessary water meter copper connector semi-finished product that may be present are blocked axle bumper, are again fallen under the effect of self gravitation by the block axis of jack-up afterwards.
In the present embodiment, described backstopping assembly 6 is arranged on the top of brush roll 5, further undertaking parts on unnecessary water meter copper connector semi-finished product are carried out backstop removing to accepting after parts complete cleaning first in brush roll, it is ensured that accept parts and once only carry water meter copper connector semi-finished product.
This half-finished climbing device of transmission water meter copper connector also includes the first driving mechanism driving conveyer belt transmission, drive the second driving mechanism that brush roll rotates, first driving mechanism and the second driving mechanism are same driving mechanism, driving mechanism can adopt motor or hydraulic drive mechanism, the present embodiment adopts motor, and motor is arranged on the inside of frame 3.
The connecting gear porch of described making water meter copper connector feed mechanism is provided with can be stretched into bottom the accommodation chamber A of described undertaking parts 4, for accepting the half-finished guide plate (not shown) of water meter copper connector; realizing water meter copper connector semi-finished product and enter connecting gear from climbing device, connecting gear protects the first transport unit 14 diagonally downward and horizontally disposed second transport unit 15.
As shown in Figure 4,5, the material choosing apparatus in the present embodiment includes the passage 8 of selecting materials that guiding water meter copper connector semi-finished product pass through, described in select materials passage be arranged over limit for height lid 9;The described both sides selecting materials passage 8 are relatively set with the first opposite type sensor, first opposite type sensor include cooperating the first emission sensor 11-1 and the first of work receives sensor 11-2, correspondingly, select materials described in passage 8 and limit for height lid 9 have make the first emission sensor launch the signal through hole 90 through passage 8 of selecting materials;The described bottom selecting materials passage 8 is provided with the door (not shown) being controlled closedown by driving mechanism 7, the reception sensor of described first opposite type sensor is connected with described driving mechanism 7, and when the through hole 90 having water meter copper connector semi-finished product to be stuck in select materials in passage 8 to block signal transmission cause the first reception sensor not receive signal that emission sensor sends, described driving mechanism 7 controls described door and open so that these water meter copper connector semi-finished product drop in passage 8 of selecting materials.
Described limit for height lid 9 by fixture 10 be arranged on described in select materials on passage 8, and limit for height lid 9 and the height selected materials between passage 8 can be regulated by described fixture 10.
In the present embodiment, described first opposite type sensor is infrared emission sensor, including infrared emission sensor and infrared receiver sensor.When having water meter copper connector semi-finished product to be trapped in select materials in passage 8 to block the through hole 90 of signal transmission, infrared receiver sensor does not receive signal, and the driving mechanism 7 being attached thereto opens the door of channel bottom of selecting materials, and makes these water meter copper connector semi-finished product automatically drop.
Described passage 8 of selecting materials is obliquely installed, in order to guide water meter copper connector workpiece to pass through.
As shown in Figure 4, collator in the present embodiment is arranged on the end making water meter copper connector feed mechanism, and be connected with the entrance of water meter copper connector machining tool, including holding the sequence passage 12 that water meter copper connector semi-finished product are piled up in order, and it is arranged on the second opposite type sensor of described sequence passage both sides, second opposite type sensor include cooperating the second emission sensor 13-1 and the second of work receives sensor 13-2, described reception sensor is connected with the driving mechanism controlling feed mechanism action, when the water meter copper connector semi-finished product in the passage that sorts cause, after being aligned to position corresponding to the second opposite type sensor, the transmitting signal that the second reception sensor does not receive the second emission sensor, described driving mechanism quits work.
Described sequence passage 12 is obliquely installed, and such water meter copper connector semi-finished product closely will arrange in an orderly manner under gravity in sequence passage 1, makes sequence and output more smooth and easy.
Second opposite type sensor described in the present embodiment is infrared emission sensor, including infrared emission sensor and infrared receiver sensor.When water meter copper connector semi-finished product to be output are stacked into enough highly and block the transmitting of infrared signal and receive in the passage that sorts, the driving mechanism of feed mechanism operation is driven to be automatically turned off;When water meter copper connector semi-finished product in the passage that sorts reduce the infrared signal again receiving infrared emission sensor emission to infrared receiver sensor, described driving mechanism restarts, so realize the monitoring to sequence in-channel water table copper sleeve semi-finished product sequence situation, and control feed mechanism operation flexibly.
The climbing device of said structure, material choosing apparatus and collator be respectively completed the water meter copper connector semi-finished product in material storing box are transmitted in order, to the water meter copper connector semi-finished product automatic sorting highly differed and to water meter copper connector semi-finished product sequence district sequence situation monitor in real time and be automatically adjusted feed mechanism operation, make whole feed mechanism achieve mechanization, automatization, be effectively improved work efficiency.
The foregoing is only the preferred embodiment of the present invention, for a person skilled in the art, without departing under principles of the invention, each portion structure of feed mechanism can also be made multiple improvement, such as it is formed with inside hole slot according to the two ends of water meter copper connector self, for the ease of accepting water meter copper connector semi-finished product in material storing box, described undertaking parts can be designed as the undertaking post being vertically set on described conveyer belt, accept post and stretch into interior also this water meter copper connector half product of jack-up of hole slot of any one end of water meter copper connector semi-finished product, namely realize accepting the step of feeding from material storing box, the deformation of this class formation also all should be considered as in protection scope of the present invention.

Claims (6)

1. the material choosing apparatus making water meter copper connector feed mechanism, it is characterised in that: include the passage of selecting materials that a guiding water meter copper connector is passed through, described in select materials passage be arranged over limit for height lid;
The both sides of described passage of selecting materials are relatively set with the first opposite type sensor, first opposite type sensor include cooperating first emission sensor and first of work receives sensor, correspondingly, select materials described in passage and/or limit for height lid have make the first emission sensor launch the signal through hole through passage of selecting materials;
The bottom of described passage of selecting materials is provided with the door that driving mechanisms control is closed, the first of described first opposite type sensor receives sensor and is connected with described driving mechanism, and during the signal that the first emission sensor sends when having water meter copper connector semi-finished product to be stuck in select materials in passage to cause the first reception sensor not receive, door described in described driving mechanisms control opens so that these water meter copper connector semi-finished product drop in passage of selecting materials;
Making water meter copper connector feed mechanism and also include climbing device and collator, the outlet of climbing device is connected with the entrance of material choosing apparatus by connecting gear, and collator is arranged on the end of material choosing apparatus, and is connected with the entrance of water meter copper connector machining tool;
Described climbing device includes material storing box, vertically or be obliquely installed and conveyer belt that material storing box is accepted, described conveyer belt is provided with in material storing box and accepts the half-finished undertaking parts of water meter copper connector, described conveyer belt arranges the side accepting parts and is provided with brush roll, this brush roll to arrange position corresponding with accepting parts thus ensureing that brush roll can clean the improper water meter copper connector semi-finished product accepted on parts that are undertaken on, described undertaking parts are the bracket of pair of opposing, are formed with the undertaking half-finished accommodation chamber of water meter copper connector between this pair bracket;
Described limit for height lid by fixture be arranged on described in select materials on passage, and limit for height lid and the height selected materials between passage can be regulated by described fixture.
2. material choosing apparatus according to claim 1, it is characterised in that: described first opposite type sensor is infrared emission sensor, and it includes infrared emission sensor and infrared receiver sensor.
3. material choosing apparatus according to claim 1, it is characterised in that: described in select materials channel slopes arrange.
4. the material choosing apparatus stated according to claim 1, it is characterized in that: described conveyer belt arranges the side accepting parts and is additionally provided with gear and removes the half-finished backstopping assembly of unnecessary water meter copper connector on described bracket, described backstopping assembly includes the fixing seat being connected with conveyer belt, described fixing seat offers connection bore, and be through in this connection bore can be freely up and down movable block axis, the bottom of described block axis can prop up described accommodation cavity edge under Gravitative Loads, and the upper end of described block axis is provided with and prevents block axis from connecting the locating part dropped in bore.
5. the material choosing apparatus stated according to claim 1, it is characterised in that: described connecting gear porch is provided with bottom the accommodation chamber that can stretch into described undertaking parts, for accepting the half-finished guide plate of water meter copper connector.
6. the material choosing apparatus stated according to claim 1, it is characterized in that: described collator includes holding the sequence passage that water meter copper connector semi-finished product are piled up in order, and it is arranged on the second opposite type sensor of described sequence passage both sides, second opposite type sensor include cooperating second emission sensor and second of work receives sensor, described second receives sensor is connected with the driving mechanism controlling feed mechanism action, when the water meter copper connector semi-finished product in the passage that sorts cause, after being aligned to position corresponding to the second opposite type sensor, the transmitting signal that the second reception sensor does not receive the second emission sensor, described driving mechanism quits work.
CN201310723074.3A 2013-12-24 2013-12-24 A kind of material choosing apparatus making water meter copper connector feed mechanism Expired - Fee Related CN103692278B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310723074.3A CN103692278B (en) 2013-12-24 2013-12-24 A kind of material choosing apparatus making water meter copper connector feed mechanism

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310723074.3A CN103692278B (en) 2013-12-24 2013-12-24 A kind of material choosing apparatus making water meter copper connector feed mechanism

Publications (2)

Publication Number Publication Date
CN103692278A CN103692278A (en) 2014-04-02
CN103692278B true CN103692278B (en) 2016-07-06

Family

ID=50354028

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310723074.3A Expired - Fee Related CN103692278B (en) 2013-12-24 2013-12-24 A kind of material choosing apparatus making water meter copper connector feed mechanism

Country Status (1)

Country Link
CN (1) CN103692278B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1760441A (en) * 1928-05-28 1930-05-27 U S Bottlers Machinery Co Cork-feeding device
US4732296A (en) * 1985-06-14 1988-03-22 Michael Heck Track feed arrangement for an automatic screw feeding machine
CN201304493Y (en) * 2008-10-16 2009-09-09 陈云法 Feeding device for lathe
CN202240416U (en) * 2011-06-27 2012-05-30 徐圣宇 Automatic assembly machine for wiring terminal screws
CN202517322U (en) * 2012-03-30 2012-11-07 采埃孚富奥底盘技术(长春)有限公司 Online height detecting device
CN202527996U (en) * 2012-05-05 2012-11-14 宁波同人轴承有限公司 Automatic feeding overturning device for processing bearing ring
CN103273360A (en) * 2013-05-20 2013-09-04 江西理工大学 Method and device for storing and supplying materials in multi-station mode
CN203599964U (en) * 2013-12-24 2014-05-21 宁波天赐兄弟水表水暖有限公司 Material selecting device of feeding mechanism for manufacture water meter copper connectors

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1760441A (en) * 1928-05-28 1930-05-27 U S Bottlers Machinery Co Cork-feeding device
US4732296A (en) * 1985-06-14 1988-03-22 Michael Heck Track feed arrangement for an automatic screw feeding machine
CN201304493Y (en) * 2008-10-16 2009-09-09 陈云法 Feeding device for lathe
CN202240416U (en) * 2011-06-27 2012-05-30 徐圣宇 Automatic assembly machine for wiring terminal screws
CN202517322U (en) * 2012-03-30 2012-11-07 采埃孚富奥底盘技术(长春)有限公司 Online height detecting device
CN202527996U (en) * 2012-05-05 2012-11-14 宁波同人轴承有限公司 Automatic feeding overturning device for processing bearing ring
CN103273360A (en) * 2013-05-20 2013-09-04 江西理工大学 Method and device for storing and supplying materials in multi-station mode
CN203599964U (en) * 2013-12-24 2014-05-21 宁波天赐兄弟水表水暖有限公司 Material selecting device of feeding mechanism for manufacture water meter copper connectors

Also Published As

Publication number Publication date
CN103692278A (en) 2014-04-02

Similar Documents

Publication Publication Date Title
CN101947005B (en) Full automatic bead threader
CN107840120A (en) Fully automatic paper tube tube drawbench
CN100534638C (en) Screw vibration feeding machine for small fruit automatic sorting apparatus
CN113182188A (en) Tubular product length sorting device for tubular product processing
CN103692276B (en) A kind of collator making water meter copper connector feed mechanism
CN108262632A (en) Bar automatic loading and unloading system
CN112960379B (en) Automatic loading and unloading device in coconut water taking production line
CN203599964U (en) Material selecting device of feeding mechanism for manufacture water meter copper connectors
CN103692278B (en) A kind of material choosing apparatus making water meter copper connector feed mechanism
KR101438321B1 (en) Part supply device
CN203611052U (en) Arranging system of feeding mechanism for production of copper water meter connectors
CN203621666U (en) Feed mechanism for manufacturing water meter copper connectors
CN205501482U (en) Carding system is opened in cashmere edulcoration
CN108100347A (en) A kind of mobile full-automatic steel pipe picking, cleaning classifying packing device
CN203599961U (en) Climbing device of feeding mechanism for manufacturing water meter copper connectors
CN103692032B (en) A kind of feed mechanism of making water meter copper sleeve
CN206720215U (en) Stay bolt automatic charging device
CN103659428B (en) A kind of climbing device of making water meter copper sleeve feed mechanism
KR100301027B1 (en) Continuous automatic tapping device for automobile oil filter reinforcement plate
CN108746172A (en) Metal ingredient removes prosthetic appliance and soil remediation technique automatically in a kind of soil
CN109604169A (en) It is a kind of for reinforcing bar cutting after small powder screen apparatus for placing
CN210558383U (en) Spandex fabric is with pine cloth machine
CN106679961A (en) Closestool lid damper testing equipment
CN115155760B (en) Screening device for laying hen feed processing
CN216192882U (en) Natural cotton color classification equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160706

Termination date: 20171224

CF01 Termination of patent right due to non-payment of annual fee