CN103643641B - 一种预应力连续梁桥主梁浇筑施工方法 - Google Patents

一种预应力连续梁桥主梁浇筑施工方法 Download PDF

Info

Publication number
CN103643641B
CN103643641B CN201310696593.5A CN201310696593A CN103643641B CN 103643641 B CN103643641 B CN 103643641B CN 201310696593 A CN201310696593 A CN 201310696593A CN 103643641 B CN103643641 B CN 103643641B
Authority
CN
China
Prior art keywords
cloth
flexible pipe
feed
turning arm
material distributing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310696593.5A
Other languages
English (en)
Other versions
CN103643641A (zh
Inventor
万华
林立军
刘朝强
刘武
赵煜成
陈新华
汪阳
龙泉
禹少峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Road and Bridge Construction Group Co Ltd
Original Assignee
Hunan Road and Bridge Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Road and Bridge Construction Group Co Ltd filed Critical Hunan Road and Bridge Construction Group Co Ltd
Priority to CN201310696593.5A priority Critical patent/CN103643641B/zh
Publication of CN103643641A publication Critical patent/CN103643641A/zh
Application granted granted Critical
Publication of CN103643641B publication Critical patent/CN103643641B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本发明公开了一种预应力连续梁桥主梁浇筑施工方法,它是在挂篮主桁架上安装设有旋转臂的布料机,通过布料机上部的旋转臂,依次完成底模上不同位置的所有布料点的供料,接着暂停混凝土输送管道供料,拆除一部分布料软管,缩短布料软管的长度,再旋转布料机的旋转臂,将布料软管底口依次正对待浇筑梁段上模上各布料点并供料,完成上模上所有布料点的供料。本发明方法可以实现不间断浇筑,避免反复拆、装输送管道,提高施工质量,缩短作业时间,降低工程风险。

Description

一种预应力连续梁桥主梁浇筑施工方法
技术领域
本发明属于桥梁施工方法,具体涉及一种预应力连续梁桥主梁浇筑施工方法。
背景技术
目前,在预应力连续梁桥主梁施工中,利用挂篮系统作为梁段浇筑荷载的支撑系统,直接铺设混凝土输送管道至各浇筑点进行混凝土浇筑。
由于预应力混凝土箱梁节段浇筑面广且浇筑部位多,而一根输送管道只有一个出料点,为防止混凝土因赶料距离过远而产生离析,通常采用拆、装混凝土输送管道变换出料点位置的方法,完成整段梁的浇筑。使用该方法进行混凝土浇筑,有以下缺点:
1、完成一段箱梁浇筑通常需变换出料点约10余次,浪费大量的人力及作业时间;
2、每次变换出料点时,均需暂停混凝土浇筑,造成混凝土浇筑不连续,易于造成输送管道堵管;
3、每次拆除的输送管道均需专门清洗,易于造成桥面污染及作业面混乱。
发明内容
本发明的目的是提供一种预应力连续梁桥主梁浇筑施工方法,以实现不间断浇筑,避免反复拆、装输送管道,提高施工质量,缩短作业时间,降低工程风险。
实现本发明目的采用的技术方案如下:
预应力连续梁桥主梁浇筑施工方法,包括以下步骤:
1、在挂篮主桁架上安装设有旋转臂的布料机;
2、挂篮主桁架携带布料机行走至待浇筑位后通过锚杆装置固定在桥梁已浇筑箱梁段上;
3、完成待浇筑梁段的浇筑准备,铺设好混凝土输送管道;
4、将布料机上的布料管道的进、出口分别与混凝土输送管道和布料软管连接;
5、水平旋转旋转臂,调整布料软管,直至布料软管底口对准待浇筑梁段底模上的布料点;
6、启动混凝土输送管道供料,由布料软管输出混凝土至布料点;
7、重复步骤5、6,通过布料机上部的旋转臂,依次完成底模上不同位置的所有布料点的供料;
8、暂停混凝土输送管道供料,拆除一部分布料软管,缩短布料软管的长度;
9、旋转布料机的旋转臂,将布料软管底口依次正对待浇筑梁段上模上各布料点并供料,完成上模上所有布料点的供料。
本发明的有益效果:
本发明通过本身自带的布料机即能完成预应力混凝土箱梁节段全部混凝土的浇筑,即利用设置在挂篮主桁架上的布料机进行梁段的混凝土浇筑:布料机与混凝土输送管道连接以实现混凝土的连续供应;通过布料机旋转臂上的布料管道的旋转实现布料点水平方向出料点的全面覆盖;通过布料软管实现混凝土出料点垂直方向的覆盖;混凝土通过布料机布料管道输送到各布料点。具有混凝土浇筑时能灵活变换混凝土出料点,基本实现不间断浇筑,避免反复拆、装输送管道,提高施工质量,缩短作业时间,降低工程风险的优点。
下面结合附图进一步说明本发明的技术方案。
附图说明
图1是本发明的结构示意图。
图2是图1的纵向剖面图。
图3是图1的横向剖面图。
具体实施方式
参见图1—图3,本发明方法采用带自浇筑功能的挂篮系统,该挂篮系统包括挂篮主桁架7和挂篮,挂篮主桁架7通过锚杆装置8固定在桥梁已浇筑箱梁段a上,挂篮包括通过吊杆9连接在挂篮主桁架7上的内、外纵梁13、10、底蓝11、固定在内、外纵梁13、10、底蓝11上的内模16、外模12、上模14和底模15,在所述挂篮主桁架7上设有布料机;所述布料机包括塔架1、设在塔架1顶部的旋转臂2、分别设在塔架1和旋转臂2上的布料管道4、4′,所述旋转臂2通过回转机构3与所述塔架1连接,所述塔架1和旋转臂2上的布料管道4、4′通过旋转接头连接,所述旋转臂2上布料管道4′的出口401与布料软管5连接,塔架1上布料管道4的进口402与混凝土输送管道6连接。
本发明方法按照以下步骤进行:
1、在挂篮主桁架5上安装设有旋转臂2的布料机1。
2、挂篮主桁架5携带布料机1行走至待浇筑位后通过锚杆装置8固定在桥梁已浇筑箱梁段a上。
3、完成待浇筑梁段c的浇筑准备,铺设好混凝土输送管道6。
4、将布料机1上的布料管道4、4′的进、出口402、401分别与混凝土输送管道6和布料软管5连接。
5、水平旋转旋转臂2,调整布料软管5,直至布料软管5底口对准待浇筑梁段c底模15上的布料点。
6、启动混凝土输送管道6供料,由布料软管5输出混凝土b至布料点。
7、重复步骤5、6,通过布料机上部的旋转臂2,依次完成底模15上不同位置的所有布料点的供料。
8、暂停混凝土输送管道6供料,拆除一部分布料软管5,缩短布料软管5的长度。
9、旋转布料机的旋转臂2,将布料软管5底口依次正对待浇筑梁段c上模14上各布料点并供料,完成上模14上所有布料点的供料。

Claims (1)

1.一种预应力连续梁桥主梁浇筑施工方法,其特征是包括以下步骤:
步骤1、在挂篮主桁架上安装设有旋转臂的布料机;
步骤2、挂篮主桁架携带布料机行走至待浇筑位后通过锚杆装置固定在桥梁已浇筑箱梁段上;
步骤3、完成待浇筑梁段的浇筑准备,铺设好混凝土输送管道;
步骤4、将布料机上的布料管道的进、出口分别与混凝土输送管道和布料软管连接;
步骤5、水平旋转旋转臂,调整布料软管,直至布料软管底口对准待浇筑梁段底模上的布料点;
步骤6、启动混凝土输送管道供料,由布料软管输出混凝土至布料点;
步骤7、重复步骤5、6,通过布料机上部的旋转臂,依次完成底模上不同位置的所有布料点的供料;
步骤8、暂停混凝土输送管道供料,拆除一部分布料软管,缩短布料软管的长度;
步骤9、旋转布料机的旋转臂,将布料软管底口依次正对待浇筑梁段上模上各布料点并供料,完成上模上所有布料点的供料。
CN201310696593.5A 2013-12-18 2013-12-18 一种预应力连续梁桥主梁浇筑施工方法 Active CN103643641B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310696593.5A CN103643641B (zh) 2013-12-18 2013-12-18 一种预应力连续梁桥主梁浇筑施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310696593.5A CN103643641B (zh) 2013-12-18 2013-12-18 一种预应力连续梁桥主梁浇筑施工方法

Publications (2)

Publication Number Publication Date
CN103643641A CN103643641A (zh) 2014-03-19
CN103643641B true CN103643641B (zh) 2015-12-30

Family

ID=50248919

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310696593.5A Active CN103643641B (zh) 2013-12-18 2013-12-18 一种预应力连续梁桥主梁浇筑施工方法

Country Status (1)

Country Link
CN (1) CN103643641B (zh)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105603885B (zh) * 2015-12-18 2017-06-13 广东省基础工程集团有限公司 一种具有起重和布料功能的液压移动式挂篮及其施工方法

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201520942U (zh) * 2009-06-11 2010-07-07 北京建研机械科技有限公司 解决现浇梁混凝土施工的移动模架布料机
KR20120093613A (ko) * 2011-02-15 2012-08-23 재원 양 강상판데크 일체식 복합구조의 프리스트레스트 콘크리트 박스거더 및 이를 이용한 교량의 시공방법

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103015731B (zh) * 2012-12-19 2015-05-13 中联重科股份有限公司 臂架系统及包含该臂架系统的布料机、泵送设备

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201520942U (zh) * 2009-06-11 2010-07-07 北京建研机械科技有限公司 解决现浇梁混凝土施工的移动模架布料机
KR20120093613A (ko) * 2011-02-15 2012-08-23 재원 양 강상판데크 일체식 복합구조의 프리스트레스트 콘크리트 박스거더 및 이를 이용한 교량의 시공방법

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
连续梁桥挂篮施工工艺及过程控制;代伟;《科技风》;20110803(第4期);第175页第1栏第4段第4-5行,第7段 *

Also Published As

Publication number Publication date
CN103643641A (zh) 2014-03-19

Similar Documents

Publication Publication Date Title
CN102966121B (zh) 一种管廊现浇施工整体移动式模架
CN107905111B (zh) 一种刚构连续梁边跨施工工艺
CN205134939U (zh) 一种适用于核心筒内侧空间狭小区域的液压爬模系统
CN104343086B (zh) 斜拉桥上塔柱钢锚梁锚固区段小空间施工方法
CN107905124B (zh) 一种对称式刚构连续梁施工工艺
CN108086170B (zh) 移动模架及移动模架的过孔施工方法
CN205575408U (zh) 水泥预制件脱模装置
CN108004927A (zh) 双肢三角挂篮及大跨度连续刚构桥悬臂梁段施工方法
CN201400996Y (zh) 一种后浇翼缘板的施工支架
CN203961238U (zh) 螺栓锚板可调工具式悬挑脚手架
CN103498421A (zh) 一种用于u型水利渡槽施工的移动模架
CN103419279A (zh) T梁模板整体拆除及纵向滑移施工方法
CN202194071U (zh) 可调内模
CN103643641B (zh) 一种预应力连续梁桥主梁浇筑施工方法
CN103291116B (zh) 用于倒锥形水塔塔顶水箱施工的网架式模板支撑操作平台
CN103669872A (zh) 一种筑墙方法和筑墙设备
CN203129025U (zh) 一种挂篮的悬吊固定装置
CN104153451A (zh) 预制托块混凝土管道安装施工方法
CN204530499U (zh) 用于公路桥梁预制梁板混凝土布料的自动行走装置
CN205243051U (zh) 快速移动全自动喷淋养护车
CN105421458B (zh) 一种混凝土布料机浇筑系统
CN203603068U (zh) 一种带自浇筑功能的挂篮系统
CN102733393B (zh) 自升式混凝土皮带输送机
CN103938900B (zh) 一种冷却塔的施工方法及塔机
CN203200719U (zh) 悬空式倒坡模板装置

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 410004 Hunan province Changsha Yuhua District of Shaoshan City Road No. 239

Applicant after: Hunan Road & Bridge Construction Group Co., Ltd.

Address before: 410004 Hunan province Changsha Yuhua District of Shaoshan City Road No. 239

Applicant before: Hunan Road & Bridge Construction Group Corp.

COR Change of bibliographic data
C14 Grant of patent or utility model
GR01 Patent grant