CN104153451A - 预制托块混凝土管道安装施工方法 - Google Patents

预制托块混凝土管道安装施工方法 Download PDF

Info

Publication number
CN104153451A
CN104153451A CN201410393856.XA CN201410393856A CN104153451A CN 104153451 A CN104153451 A CN 104153451A CN 201410393856 A CN201410393856 A CN 201410393856A CN 104153451 A CN104153451 A CN 104153451A
Authority
CN
China
Prior art keywords
pipeline
construction method
prefabricated
prefabricated tray
supporting block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410393856.XA
Other languages
English (en)
Inventor
夏家庭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201410393856.XA priority Critical patent/CN104153451A/zh
Publication of CN104153451A publication Critical patent/CN104153451A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Sewage (AREA)

Abstract

本发明公开了一种预制托块混凝土管道安装施工方法,包括如下步骤:1)按照管道设计要求,准备预制托块,所述预制托块采用C20砼预制;2)管道垫层达到设计要求的强度后,根据管道长度将预制托块放置在管道接头位置;3)安装管道并调整预制托块的位置使管道保持在一直线上;4)封闭管道接口,将地板钢筋穿过预制托块底部的钢筋预留孔,底板和护肩同时浇筑;5)待混凝土强度达到设计和规范要求后,拆模及验收。本发明的优点是:结构简单,易于制造,成本低;实用性强,减少工序,缩短工期,预防管道出现流水不畅、地板与管道护肩断裂等问题。

Description

预制托块混凝土管道安装施工方法
技术领域
本发明涉及一种市政管道施工技术,更具体的说,是涉及一种预制托块混凝土管道安装施工方法。
背景技术
在市政管道施工过程中,混凝土管道施工方法过程为垫层、管基(地板)、管道安装、封闭接口、混凝土管道护肩,该方法在施工过程中有如下缺点:施工工序多且周期长,控制要点有多个,在抢抓工期时无法缩短其工序完成时间;抢抓工期时上道工序混凝土强度不够、流向标高不流畅、使用后因受压地板局部断裂等。
发明内容
本发明针对现有技术的不足,而提供一种减少管道施工工序、防止管道流水不畅、防止地板与管道护肩断裂的预制托块混凝土管道安装施工方法。
本发明的预制托块混凝土管道安装施工方法,包括如下步骤:
(1)     按照管道设计要求,制作预制托块;
(2)     管道垫层达到设计要求的强度后,根据管道长度将预制托块放置在管道接头位置;
(3)     安装管道并调整预制托块的位置,使管道保持在一水平面上;
(4)     封闭管道接口,将地板钢筋穿过预制托块底部的钢筋预留孔,底板和护肩同时浇筑;
(5)     待混凝土强度达到设计和规范要求后,拆模并回填沟槽。
所述预制托块的上表面为圆弧形,所述圆弧的角度为35°。所述预制托块底部和侧面成45°角。所述钢筋预留孔圆心到预制托块下表面的距离为5cm。所述预制托块采用C20砼制作。
本发明的有益效果是:(1)本发明的预制托块结构简单,易于制造,成本低;(2)本发明施工方法实用性强,减少工序,缩短工期,节约施工成本,提高质量与功效,减少安全隐患;(3)能防止管道出现流水不畅、地板与管道护肩断裂等问题。
附图说明
图1为本发明的结构示意图;
图中:预制托块1、钢筋预留孔2。
具体实施方式
下面结合附图对本发明作进一步的描述。
在图中,本发明的预制托块混凝土管道安装施工方法,包括如下步骤:
(1)     按照管道设计要求,制作预制托块1;
(2)     管道垫层达到设计要求的强度后,根据管道长度将预制托块1放置在管道接头位置;
(3)     安装管道并调整预制托块1的位置,使管道保持在一水平面上;
(4)     封闭管道接口,将地板钢筋穿过预制托块1底部的钢筋预留孔2,底板和护肩同时浇筑;
(5)     待混凝土强度达到设计和规范要求后,拆模并回填沟槽。
所述预制托块1的上表面为圆弧形,所述圆弧的角度为35°。所述预制托块1底部和侧面成45°角。所述钢筋预留孔2圆心到预制托块1下表面的距离为5cm。所述预制托块1采用C20砼制作。
使用本发明方法施工时,首先利用预制托块1为支撑点,底部设置钢筋预留孔2,预制托块1的高度根据设计图纸不同管径以及钢筋混凝土管基厚度设定;施工时将地板模板与管道护肩模板整体安装同时浇筑,有力保障管道与基础的整体性和板块性。
实施例1
南京燕山路南延道路工程I标段采用本发明的施工方法,该项目雨水管道ko+040~140左右幅,直径1米钢筋混凝土管道,两幅各100m。
未采用本发明施工方法,采用传统工艺施工该段,前进方向右侧,主要人工、机械、材料投入情况为:
1、施工总工期15天;
2、安装人工工日150工日;
3、机械6个台班,主要施工费用投入为48000元,安全费用投入2000元。
采用本发明施工方法施工该段,前进方向左侧,主要人工、机械、材料投入情况为:
1、施工总工期9天;
2、安装人工工日90工日;
3、机械4个台班,主要施工费用投入为30000元,安全费用投入2000元。
使用本发明施工方法与传统工艺施工方法安装费用比对,采用本发明施工方法每100米可节省工期6天,节省人工投入60工日,节省机械投入2个台班,使用本发明施工方法共计节省费用18000元/米。本项目共计6000米管道工程,采用本发明施工方法累计可节省工期360天,节省施工投入费用1080000元。

Claims (5)

1.一种预制托块混凝土管道安装施工方法,其特征在于,包括如下步骤:
(1)按照管道设计要求,制作预制托块(1);
(2)管道垫层达到设计要求的强度后,根据管道长度将预制托块(1)放置在管道接头位置;
(3)安装管道并调整预制托块(1)的位置,使管道保持在一水平面上;
(4)封闭管道接口,将地板钢筋穿过预制托块(1)底部的钢筋预留孔(2),底板和护肩同时浇筑;
(5)待混凝土强度达到设计和规范要求后,拆模并回填沟槽。
2.根据权利要求1所述的预制托块混凝土管道安装施工方法,其特征是,所述预制托块(1)的上表面为圆弧形,所述圆弧的角度为35°。
3.根据权利要求1所述的预制托块混凝土管道安装施工方法,其特征是,所述预制托块(1)底部和侧面成45°角。
4.根据权利要求1所述的预制托块混凝土管道安装施工方法,其特征是,所述钢筋预留孔(2)圆心到预制托块(1)下表面的距离为5cm。
5.根据权利要求1所述的预制托块混凝土管道安装施工方法,其特征是,所述预制托块(1)采用C20砼制作。
CN201410393856.XA 2014-08-12 2014-08-12 预制托块混凝土管道安装施工方法 Pending CN104153451A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410393856.XA CN104153451A (zh) 2014-08-12 2014-08-12 预制托块混凝土管道安装施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410393856.XA CN104153451A (zh) 2014-08-12 2014-08-12 预制托块混凝土管道安装施工方法

Publications (1)

Publication Number Publication Date
CN104153451A true CN104153451A (zh) 2014-11-19

Family

ID=51879065

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410393856.XA Pending CN104153451A (zh) 2014-08-12 2014-08-12 预制托块混凝土管道安装施工方法

Country Status (1)

Country Link
CN (1) CN104153451A (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105113607A (zh) * 2015-08-28 2015-12-02 济南城建集团有限公司 一种雨水管道结构及其施工方法
CN106759786A (zh) * 2017-01-17 2017-05-31 温州市宏泰市政园林建设有限公司 一种雨水管道结构及其施工方法
CN107882152A (zh) * 2017-12-04 2018-04-06 瑞安市东南市政工程建设有限公司 一种市政排污管铺设及施工方法
CN112982622A (zh) * 2021-03-01 2021-06-18 中国十七冶集团有限公司 一种球墨铸铁管t型接口区域施工方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0493431A (ja) * 1990-08-08 1992-03-26 Kensetsu Kiso Eng Co Ltd 下水道及びその施工法
CN1712643A (zh) * 2004-06-14 2005-12-28 胡彦彬 一种用于预制管道混凝土基础的施工方法
KR20060005497A (ko) * 2004-07-13 2006-01-18 김종한 지하 매설용 파이프 받침대
KR100889694B1 (ko) * 2008-06-30 2009-03-19 주식회사 도화종합기술공사 원형관로의 유동방지장치
CN101881032A (zh) * 2010-06-04 2010-11-10 朝阳市天龙大型水泥管道(集团)有限公司 混凝土管材枕座
CN203729322U (zh) * 2014-01-28 2014-07-23 山东中宏路桥建设有限公司 一种预制混凝土管道基础

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0493431A (ja) * 1990-08-08 1992-03-26 Kensetsu Kiso Eng Co Ltd 下水道及びその施工法
CN1712643A (zh) * 2004-06-14 2005-12-28 胡彦彬 一种用于预制管道混凝土基础的施工方法
KR20060005497A (ko) * 2004-07-13 2006-01-18 김종한 지하 매설용 파이프 받침대
KR100889694B1 (ko) * 2008-06-30 2009-03-19 주식회사 도화종합기술공사 원형관로의 유동방지장치
CN101881032A (zh) * 2010-06-04 2010-11-10 朝阳市天龙大型水泥管道(集团)有限公司 混凝土管材枕座
CN203729322U (zh) * 2014-01-28 2014-07-23 山东中宏路桥建设有限公司 一种预制混凝土管道基础

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105113607A (zh) * 2015-08-28 2015-12-02 济南城建集团有限公司 一种雨水管道结构及其施工方法
CN106759786A (zh) * 2017-01-17 2017-05-31 温州市宏泰市政园林建设有限公司 一种雨水管道结构及其施工方法
CN107882152A (zh) * 2017-12-04 2018-04-06 瑞安市东南市政工程建设有限公司 一种市政排污管铺设及施工方法
CN112982622A (zh) * 2021-03-01 2021-06-18 中国十七冶集团有限公司 一种球墨铸铁管t型接口区域施工方法
CN112982622B (zh) * 2021-03-01 2022-05-03 中国十七冶集团有限公司 一种球墨铸铁管t型接口区域施工方法

Similar Documents

Publication Publication Date Title
CN104631512B (zh) 吊模法后浇带梁板施工方法
CN203022024U (zh) 一种管廊现浇施工整体移动式模架
CN103061504B (zh) 混凝土板管道安装预留洞施工模具及施工方法
CN104790676A (zh) 一种预制墙板安装的快速调平、找正装置及其方法
CN102966121A (zh) 一种管廊现浇施工整体移动式模架
CN204385634U (zh) 铁路不停运跨线箱涵整体顶进装置
CN203639932U (zh) 一种用于铁路高柱信号机机柱安装的预埋基础结构
CN104153451A (zh) 预制托块混凝土管道安装施工方法
CN203625942U (zh) 地下室外墙后浇带超前止水结构
CN103770218B (zh) 大型标准构件的节段匹配预制方法
CN204984424U (zh) 防止开口盾尾管片下沉的垫块装置
CN107023032A (zh) 一种综合管廊的现浇方法
CN103485370B (zh) 一种防止墙板有害裂缝的混凝土施工控制方法
CN203096762U (zh) 一种防冻胀地梁
CN104727339A (zh) 电力设备基础两步式施工方法
CN204590782U (zh) 一种工业化预制装配式围墙
CN210190135U (zh) 一种预制板吊装预埋件定位装置
CN102877859A (zh) 隧道二衬端头模结构及其安装方法
CN203346950U (zh) 高层建筑临时供水管道暗敷构造
CN202990112U (zh) 水电站厂房板梁预留插筋结构
CN204531405U (zh) 一种便于楼梯施工缝位置清理的活动模板装置
CN104264992B (zh) 高层建筑管道间的施工方法
CN203729323U (zh) 一种预制混凝土管道基础
CN203454182U (zh) 锅炉集中供气系统
CN203145034U (zh) 一种装配式预应力混凝土圆筒型柱体基础

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20141119